SIGNIFICANCE AND USE
4.1 Establishment of an in-service coatings monitoring program permits planning and prioritization of coatings maintenance work as needed to maintain coating integrity and performance in nuclear CSL I coating systems. For additional information on nuclear maintenance coating work, refer to ASTM MNL8.4  
4.2 A coatings monitoring program enables early identification and detection of potential problems in coating systems. Some CSL I coating systems may be known in advance to be suspect, deficient, or unqualified. Monitoring coating performance will assist in developing follow-up procedures to resolve any significant deficiency relative to coating work.  
4.3 Degraded coatings may generate debris under design basis accident conditions that could adversely affect the performance of the post-accident safety systems. A coatings monitoring program may be required to fulfill safety analysis report and generic letter commitments for CSL I coating work in a nuclear power plant facility.
SCOPE
1.1 This standard covers procedures for establishing a monitoring program for condition assessment of Coating Service Level (CSL) I coating systems in operating nuclear power plants. Monitoring is an ongoing process of evaluating the condition and performance of the in-service coating systems.  
1.2 It is the intent of this standard to provide a recommended basis for establishing a coatings condition assessment program, not to mandate a singular basis for all programs. Variations or simplifications of the program described in this standard may be appropriate for each operating nuclear power plant depending on their licensing commitments.  
1.3 This requirements of ASME Section XI, In-Service Inspection Subsections IWE and IWL are beyond the scope of this standard.  
1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.  
1.5 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.

General Information

Status
Published
Publication Date
31-Jan-2021
Current Stage
Ref Project

Relations

Buy Standard

Guide
ASTM D5163-16(2021) - Standard Guide for Establishing a Program for Condition Assessment of Coating Service Level I Coating Systems in Nuclear Power Plants
English language
5 pages
sale 15% off
Preview
sale 15% off
Preview

Standards Content (Sample)


This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the
Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
Designation: D5163 − 16 (Reapproved 2021)
Standard Guide for
Establishing a Program for Condition Assessment of
Coating Service Level I Coating Systems in Nuclear Power
Plants
This standard is issued under the fixed designation D5163; the number immediately following the designation indicates the year of
original adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. A
superscript epsilon (´) indicates an editorial change since the last revision or reapproval.
1. Scope D610 Practice for Evaluating Degree of Rusting on Painted
Steel Surfaces
1.1 This standard covers procedures for establishing a
D714 Test Method for Evaluating Degree of Blistering of
monitoring program for condition assessment of Coating
Paints
Service Level (CSL) I coating systems in operating nuclear
D3359 Test Methods for Rating Adhesion by Tape Test
power plants. Monitoring is an ongoing process of evaluating
D4538 Terminology Relating to Protective Coating and
the condition and performance of the in-service coating sys-
Lining Work for Power Generation Facilities
tems.
D4541 Test Method for Pull-Off Strength of Coatings Using
1.2 It is the intent of this standard to provide a recom-
Portable Adhesion Testers
mended basis for establishing a coatings condition assessment
D5498 Guide for Developing a Training Program for Per-
program, not to mandate a singular basis for all programs.
sonnel Performing Coating and Lining Work Inspection
Variations or simplifications of the program described in this
for Nuclear Facilities
standard may be appropriate for each operating nuclear power
D6677 Test Method for Evaluating Adhesion by Knife
plant depending on their licensing commitments.
D7091 Practice for Nondestructive Measurement of Dry
1.3 This requirements of ASME Section XI, In-Service Film Thickness of Nonmagnetic Coatings Applied to
Ferrous Metals and Nonmagnetic, Nonconductive Coat-
Inspection Subsections IWE and IWL are beyond the scope of
this standard. ings Applied to Non-Ferrous Metals
D7108 Guide for Establishing Qualifications for a Nuclear
1.4 This standard does not purport to address all of the
Coatings Specialist
safety concerns, if any, associated with its use. It is the
D7234 Test Method for Pull-OffAdhesion Strength of Coat-
responsibility of the user of this standard to establish appro-
ings on Concrete Using Portable Pull-Off Adhesion Tes-
priate safety, health, and environmental practices and deter-
ters
mine the applicability of regulatory limitations prior to use.
2.2 SSPC Standards:
1.5 This international standard was developed in accor-
SSPC-PA2 Procedure for Determining Conformance to Dry
dance with internationally recognized principles on standard-
Coating Thickness Requirements
ization established in the Decision on Principles for the
SSPC-PA 9 Measurement of Dry Coating Thickness on
Development of International Standards, Guides and Recom-
Cementitious Substrates Using Ultrasonic Gages
mendations issued by the World Trade Organization Technical
SSPC-VIS 2 Standard Method of Evaluating Degree of
Barriers to Trade (TBT) Committee.
Rusting on Painted Steel Surfaces
2. Referenced Documents
3. Terminology
2.1 ASTM Standards:
3.1 Definitions—Definitions for use with this standard are
shown in Terminology D4538 or other applicable standards.
This guide is under the jurisdiction of ASTM Committee D33 on Protective
3.2 Definitions of Terms Specific to This Standard:
Coating and Lining Work for Power Generation Facilities and is the direct
3.2.1 coating condition assessment, n—overallevaluationof
responsibility of Subcommittee D33.04 on Quality Systems and Inspection.
Current edition approved Feb. 1, 2021. Published February 2021. Originally the coating condition based upon performance monitoring and
approved in 1991. Last previous edition approved in 2016 as D5163 – 16. DOI:
visual inspection.
10.1520/D5163-16R21.
For referenced ASTM standards, visit the ASTM website, www.astm.org, or
contact ASTM Customer Service at service@astm.org. For Annual Book of ASTM
Standards volume information, refer to the standard’s Document Summary page on Available from Society for Protective Coatings (SSPC), 40 24th St., 6th Floor,
theASTM website. Pittsburgh, PA 15222-4656, http://www.sspc.org.
Copyright © ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States
D5163 − 16 (2021)
3.2.2 coating maintenance work, n—all-inclusive term as- program and licensing commitments shall prevail with respect
sociated with coating work that expressly relates to repair, to the coating performance monitoring process.
refurbishment, or replacement of an existing coating. (See also
6. Frequency
coating work.)
6.1 Frequency of in-service coating inspection monitoring
3.2.3 in-service coatings monitoring program,
shall be determined by the licensee or his designee. In
n—systematic program established to assess and document the
operating nuclear power plants, certain monitoring activities
condition of an existing coating system with respect to pre-
may be restricted to major maintenance outages or refueling
scribed performance attributes.
outages. It is a good practice to perform inspections during
4. Significance and Use
each refueling outage or during other major maintenance
outages.
4.1 Establishment of an in-service coatings monitoring pro-
gram permits planning and prioritization of coatings mainte-
7. Records and Past History
nance work as needed to maintain coating integrity and
7.1 Coating performance will depend on the operating
performance in nuclear CSL I coating systems. For additional
conditions experienced by the coating systems. Records of
information on nuclear maintenance coating work, refer to
these conditions shall be obtained for each operating unit.
ASTM MNL8.
These may include, but not be limited to, ambient conditions,
4.2 Acoatings monitoring program enables early identifica-
temperatures,humidity,immersion,splashandspillage,chemi-
tion and detection of potential problems in coating systems.
cal exposures, radiation exposures, previous decontamination
Some CSL I coating systems may be known in advance to be
procedures, abrasion and physical abuse, and start-up/
suspect, deficient, or unqualified. Monitoring coating perfor-
shutdown frequency. Any change in service criteria or modi-
mance will assist in developing follow-up procedures to
fications of the physical design shall be identified and dated.
resolve any significant deficiency relative to coating work.
7.2 The last two performance monitoring reports pertaining
4.3 Degraded coatings may generate debris under design
to the coating systems should be reviewed prior to the
basis accident conditions that could adversely affect the per-
monitoring process. Other past coatings history data to be
formance of the post-accident safety systems. A coatings
reviewed may include:
monitoring program may be required to fulfill safety analysis
7.2.1 Copies of coating specifications, manufacturer’s prod-
report and generic letter commitments for CSL I coating work
uct data sheets, and application procedures for in-place coat-
in a nuclear power plant facility.
ings.
7.2.2 Quality control documentation for the existing in-
5. Responsibility
place coating systems and their application.
5.1 The licensee or his designee should identify the depart-
7.2.3 Copies of previous inspection or monitoring reports.
ment or group within the organization to be responsible for
7.2.4 Documentation pertaining to any maintenance work
establishing the applicable requirements for activities or pro-
performed on existing coating systems.
cedures covered by this standard and should document the
scope of their responsibility. Delegation of this responsibility
8. Monitoring Procedure
to other outside qualified organizations is permitted and should
8.1 Priortoconductinganinspectionofthecoatingsystems,
be documented.
the responsible organization shall ensure that the necessary
5.2 The assigned department or group shall specify the
services and equipment required for inspection are provided.
detailed methods and procedures for meeting the applicable
Factors that must be considered while planning the inspection
requirements of this standard.
activities include, but are not limited to, lighting, access to
coated surfaces, cleaning surfaces of any deposit or build up,
5.3 The licensee’s Nuclear Coating Specialist, or other
ventilationand,wherenecessary,specialunderwaterinspection
individual assigned by the department or group should be
requirements.
responsible for:
5.3.1 C
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.