ASTM D4537-12(2018)
(Guide)Standard Guide for Establishing Procedures to Qualify and Certify Personnel Performing Coating and Lining Work Inspection in Nuclear Facilities
Standard Guide for Establishing Procedures to Qualify and Certify Personnel Performing Coating and Lining Work Inspection in Nuclear Facilities
SIGNIFICANCE AND USE
4.1 The requirements of this guide apply to personnel who perform coating and lining work inspection during (1) fabrication, (2) receipt of items at the construction site, (3) construction, (4) pre-operational and startup testing, and (5) operational phases of nuclear facilities.
4.2 It is the responsibility of each organization participating in the project to ensure that only those personnel within their respective organizations who meet the requirements of this guide are permitted to perform coating and lining work inspection activities covered by this guide.
4.3 The organization(s) responsible for establishing the applicable requirements for activities covered by this guide shall be identified, and the scope of their responsibility shall be documented. Delegation of this responsibility to other qualified organizations is permitted and shall be documented.
4.4 It is the responsibility of the organization performing these activities to specify the detailed methods and procedures for meeting the requirements of this guide, unless those methods and procedures are otherwise specified in the contract documents.
4.5 In the event of conflict, users of this guide must recognize that the licensee’s plant-specific quality assurance program and licensing commitments shall prevail with respect to the process of qualifying personnel performing inspection of coating and lining work.
SCOPE
1.1 This guide delineates the requirements for development of procedures for the qualification and certification of personnel who perform inspection of coating and lining work. Establishment of qualification requirements to verify conformance to specified requirements for nuclear facility coating and lining work is necessary to assure satisfactory performance of the inspections and to avoid compromising safety-related coating systems.
1.2 The intent of this guide is to provide a uniform interpretation of the requirements in ANSI/ASME N45.2.6 or ANSI/ASME NQA-1 as applicable, for the inspection of coating and lining work in nuclear facilities.
1.3 It is the intent of this guide to provide a recommended basis for qualification and certification, not to mandate a singular basis for all qualifications. Variations or simplifications of the qualifications described in this guide may be appropriate for special coating and lining work other than safety-related coating and lining systems. Similarly, the qualification and certification process might be abbreviated for work of minor scope such as touch-up.
1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.
1.5 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
General Information
Relations
Standards Content (Sample)
This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the
Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
Designation: D4537 − 12 (Reapproved 2018)
Standard Guide for
Establishing Procedures to Qualify and Certify Personnel
Performing Coating and Lining Work Inspection in Nuclear
Facilities
This standard is issued under the fixed designation D4537; the number immediately following the designation indicates the year of
original adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. A
superscript epsilon (´) indicates an editorial change since the last revision or reapproval.
1. Scope 2. Referenced Documents
2.1 ASTM Standards:
1.1 This guide delineates the requirements for development
D4538 Terminology Relating to Protective Coating and
of procedures for the qualification and certification of person-
Lining Work for Power Generation Facilities
nel who perform inspection of coating and lining work.
D5144 Guide for Use of Protective Coating Standards in
Establishment of qualification requirements to verify confor-
Nuclear Power Plants
mance to specified requirements for nuclear facility coating
D5498 Guide for Developing a Training Program for Per-
and lining work is necessary to assure satisfactory performance
sonnel Performing Coating and Lining Work Inspection
of the inspections and to avoid compromising safety-related
for Nuclear Facilities
coating systems.
2.2 ANSI/ASME Standards:
1.2 The intent of this guide is to provide a uniform inter-
ANSI/ASME N45.2.6 Qualifications of Inspection,
pretation of the requirements in ANSI/ASME N45.2.6 or
Examination, and Testing Personnel for Nuclear Power
ANSI/ASME NQA-1 as applicable, for the inspection of
Plants
coating and lining work in nuclear facilities.
ANSI/ASME NQA-1 Quality Assurance Program Require-
ments for Nuclear Facilities
1.3 It is the intent of this guide to provide a recommended
basis for qualification and certification, not to mandate a
3. Terminology
singular basis for all qualifications. Variations or simplifica-
tions of the qualifications described in this guide may be
3.1 Definitions—Definitions for use with this standard are
appropriate for special coating and lining work other than
shown in Terminology D4538 or other applicable standards.
safety-related coating and lining systems. Similarly, the quali-
3.2 Definitions of Terms Specific to This Standard:
ficationandcertificationprocessmightbeabbreviatedforwork
3.2.1 certification, n—written documentation of qualifica-
of minor scope such as touch-up.
tion.
1.4 This standard does not purport to address all of the
3.2.2 coating and lining work inspection, n—a phase of
safety concerns, if any, associated with its use. It is the
quality control that, by means of examination, observation, or
responsibility of the user of this standard to establish appro-
measurement, determines the conformance of safety-related
priate safety, health, and environmental practices and deter-
coating or lining system applications to predetermined quality
mine the applicability of regulatory limitations prior to use.
requirements.Theterminspectionasusedinthisstandardshall
1.5 This international standard was developed in accor-
be understood to mean coating and lining work inspection.
dance with internationally recognized principles on standard-
3.2.3 Level I, II, and III inspection, n—indicativeofthetime
ization established in the Decision on Principles for the
in grade classification for personnel who perform coating and
Development of International Standards, Guides and Recom-
lining work inspection. Each level reflects progressive experi-
mendations issued by the World Trade Organization Technical
ence and responsibility. This term is separate from and differs
Barriers to Trade (TBT) Committee.
distinctly from Coating Service Levels. The latter term reflects
1 2
This guide is under the jurisdiction of ASTM Committee D33 on Protective For referenced ASTM standards, visit the ASTM website, www.astm.org, or
Coating and Lining Work for Power Generation Facilities and is the direct contact ASTM Customer Service at service@astm.org. For Annual Book of ASTM
responsibility of Subcommittee D33.04 on Quality Systems and Inspection. Standards volume information, refer to the standard’s Document Summary page on
Current edition approved Aug. 1, 2018. Published August 2018. Originally the ASTM website.
approved in 1986. Last previous edition approved in 2012 as D4537 – 12. DOI: Available from American National Standards Institute (ANSI), 25 W. 43rd St.,
10.1520/D4537-12R18. 4th Floor, New York, NY 10036, http://www.ansi.org.
Copyright © ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States
D4537 − 12 (2018)
differing locations throughout a nuclear plant where safety- participation (“time in grade”) also shall be addressed in the
related and other coatings are found. (See Terminology section program, with emphasis on first-hand experience gained
of Guide D5144 for definitions of Coating Service Levels I, II, through actual performance of inspections.
and III.)
5.3 A candidate’s qualifications for certification shall be
3.2.4 personnel performing coating work inspection,
initially determined by a suitable evaluation of the candidate’s
n—individuals whose job functions include but are not neces-
education, experience, training, examination results and by a
sarily limited to coating and lining work inspection.
capability demonstration. The qualifying organization’s deter-
minations must reflect definitive criteria with respect to the
3.2.5 qualifications, n—skills, training, and experience re-
extent and currency of a candidate’s experience and training.
quiredforpersonneltoperformproperlythedutiesandexecute
the responsibilities of the appropriate certification level.
5.4 The job performance of personnel who perform coating
3.2.6 safety-relatedcoatingorliningsystem,n—acoatingor
and lining work inspection shall be reevaluated at periodic
lining system used inside or outside of the reactor containment,
intervals not to exceed three years. The reevaluation process
the detachment of which could adversely affect the safety
shall weigh evidence of continued satisfactory performance of
function of safety-related structures, systems, or components
inspection for the required extent or determine capability in
(SSC).
accordance with 5.3. If, during this evaluation or at any other
time, it is determined by the responsible organization that the
3.2.7 training, n—the program developed to ensure that
capabilities of an individual are not in accordance with the
personnel receive the knowledge and skills necessary for
qualifications specified for the job, that person shall be re-
qualification.
moved from that activity until the required capability has been
4. Significance and Use
demonstrated.
4.1 The requirements of this guide apply to personnel who
5.5 Qualification is considered revoked for any person who
perform coating and lining work inspection during (1)
has not been actively engaged in the performance or supervi-
fabrication, (2) receipt of items at the construction site, (3)
sion of coating and lining work inspection for a period of one
construction, (4) pre-operational and startup testing, and (5)
year during the certification period. Reevaluation in accor-
operational phases of nuclear facilities.
dance with 5.3 is required to restore qualification.
4.2 It is the responsibility of each organization participating
in the project to ensure that only those personnel within their 6. Functional Qualifications
respective organizations who meet the requirements of this
6.1 All physical coating work inspection activities can be
guide are permitted to perform coating and lining work
performed by personnel certified as qualified to perform
inspection activities covered by this guide.
coating and lining work inspection as Level I, Level II, or
4.3 The organization(s) responsible for establishing the
Level III status as described in the following.
applicable requirements for activities covered by this guide
6.2 PersonnelcertifiedashavingattainedLevelIstatusshall
shall be identified, and the scope of their responsibility shall be
be capable of the following:
documented.Delegationofthisresponsibilitytootherqualified
6.2.1 Implementing and recording all inspections required
organizations is permitted and shall be documented.
by the applicable procedures.
4.4 It is the responsibility of the organization performing
6.2.2 Verifying instrument calibration.
these activities to specify the detailed methods and procedures
6.2.3 Performing hold point inspections in accordance with
for meeting the requirements of this guide, unless those
the applicable procedures.
methods and procedures are otherwise specified in the contract
documents. 6.3 Personnel certified as having attained Level II status
shall be capable of the following:
4.5 In the event of conflict, users of this guide must
6.3.1 Performing all of the duties and responsibilities of
recognize that the licensee’s plant-specific quality assurance
Level I status personnel.
program and licensing commitments shall prevail with respect
6.3.2 Planning and supervising inspections, initiating and
to the process of qualifying personnel performing inspection of
reviewing inspection procedures, and evaluating the adequacy
coating and lining work.
of inspection activities performed.
5. General Requirements
6.3.3 Reviewing, organizing, and approving results of in-
spections.
5.1 Provisions shall be made for the indoctrination of
personnel performing coating and lining work inspection as to 6.3.4 Monitoring the performance of and supervising the
the technical objectives of the project, the codes and standards work of Level I status personnel.
that are to be used, and the quality assurance elements that are
6.3.5 Training and verifying, for certification, the qualifica-
to be employed.
tions of candidates for Level I inspection.
6.3.6 Initiating changes to quality procedures.
5.2 The need for and content of formal training programs
shall be determined, and such training activities shall be 6.3.7 Implementing the Quality Assurance Program if as-
conducted as required to qualify personnel who perform signed that authority by company policy or the Quality
coating and lining work inspection. The extent of on-the-job Assurance Program.
D4537 − 12 (2018)
6.3.8 Reviewing and, to the extent permitted under project/ examination, and testing activities for which they are being
plant procedures, documenting approval of quality related considered for certification.
aspects of safety-related coating and lining specifications.
8.2 Candidates for certification to perform Level I inspec-
6.4 Personnel certified as having attained Level III status,
tion shall, as a minimum, meet one or more of the following
shall have verifiable experience in the U.S. commercial nuclear
requirements:
power industry.As indicated in 5.3, criteria with respect to the
8.2.1 High school graduation or equivalent plus six months
extent and currency of that experience must be established.
of related experience in equivalent inspection activities.
Further, the following capabilities are required:
8.2.2 Completion of college level work leading to an
6.4.1 Carrying out all of the duties and responsibilities of
Associate Degree or higher, plus three months of related
Level II status personnel.
experience in equivalent inspection activities.
6.4.2 Training and verifying, for certification, the qualifica-
tions of candidates for Level I, Level II, and Level III
8.3 Candidates for certification to perform Level II inspec-
inspection.
tion shall, as a minimum, meet one or more of the following
6.4.3 Evaluating the adequacy of programs used to train and
requirements:
certify personnel who will perform coating and lining work
8.3.1 High school graduation or equivalent plus one year of
inspection.
satisfactory performance of Level I inspection in a correspond-
6.4.4 Authorizing personnel certified to perform Level II
ing inspection activity.
inspection to carry out training and examination duties.
8.3.2 High school graduation or equivalent plus three years
6.4.5 Approving safety-related coating and lining work
of related experience in equivalent inspection activities.
inspection procedures.
8.3.3 Completion of college level work leading to an
7. Physical Qualifications
Associate Degree plus one year of related experience in
equivalent inspection activities.
7.1 Individuals who perform coating and lining work in-
8.3.4 Four-year college graduation plus six months of re-
spection shall be examined annually to ensure natural or
lated experience in equivalent inspection activities.
corrected near-distance visual acuity in at least one eye. The
individual shall read the J-1 letters on a Standard Jaeger Test
8.4 Candidates for certification to perform Level III inspec-
Chart, or equivalent, at a distance of not less than 12 in. with
tion shall meet one or more of the following requirements:
one or both eyes, uncorrected or corrected.
8.4.1 High school graduation or equivalent plus six years of
7.2 Each candidate shall be examined for color perception
satisfactory performance of Level II inspection in a corre-
usingtheIshiharaTestortheFarnsworthD-15Testwhenbeing
sponding inspection activity.
certified or recertified. If a candidate does not pass the
8.4.2 High school graduation or equivalent plus ten years of
Red/Green Sensitive Ishihara Test, the candidate may take the
related experience in equivalent inspection activities; or high
Farnsworth D-15 Test.
school graduation plus eight years experience in equivalent
7.3 If a candidate does not pass the Farnsworth D-15 Test,
inspection activities, with at least two years satisfactory per-
the candidate may be evaluated by a licensed medical practi-
formance of Level II inspection. The candidate shall have at
tioner to provide the necessary data to determine the candi-
least two years associated with nuclear facilities or sufficient
date’s color perception. An individual certified after an evalu-
training to be knowledgeable of the quality assurance require-
ation by a licensed medical practitioner may only be certified
ments for nuclear coating work.
toperforminspectionworkthatiswithinthecandidates’scolor
8.4.3 Completion of college level work leading to an
perception capability.
Associate Degree and seven years of related experience in
7.4 The examinations required by 7.1 and 7.2 shall be
equivalent inspection activities. The candidate shall have at
administered by a licensed medical practitioner or a person
least two years of this experience
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.