FprEN IEC 61326-2-2:2020
(Main)Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-2: Particular requirements - Test configurations, operational conditions and performance criteria for portable testing, measuring and monitoring equipment used in low-voltage distribution systems
Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 2-2: Particular requirements - Test configurations, operational conditions and performance criteria for portable testing, measuring and monitoring equipment used in low-voltage distribution systems
IEC 61326-2-2:2020 is available as IEC 61326-2-2:2020 RLV which contains the International Standard and its Redline version, showing all changes of the technical content compared to the previous edition.IEC 61326-2-2:2020 specifies more detailed test configurations, operational conditions and performance criteria for equipment covered by Annex A of IEC 61326-1:2020 which is: - used for testing, measuring or monitoring of protective measures in low-voltage distribution systems, and; - powered by battery and/or from the circuit measured, and - portable. Examples of such EUTs include, but are not limited to, voltage detectors, insulation testers, earth continuity testers, earth resistance testers, leakage current clamps, loop impedance testers, “residual-current-device-testers” (RCD-testers) and phase sequence testers as defined in IEC 61557 (all parts).
Elektrische Mess-, Steuer-, Regel- und Laborgeräte – EMV-Anforderungen – Teil 2-2: Besondere Anforderungen – Prüfanordnung, Betriebsbedingungen und Leistungsmerkmale für ortsveränderliche Prüf-, Mess- und Überwachungsgeräte für den Gebrauch in Niederspannungs-Stromversorgungsnetzen
Matériel électrique de mesure, de commande et de laboratoire - Exigences relatives à la CEM - Partie 2-2: Exigences particulières - Configurations d'essai, conditions de fonctionnement et critères de performance des matériels portables d'essai, de mesure et de surveillance utilisés dans des réseaux de distribution basse tension
IEC 61326-2-2:2020 est disponible sous forme de IEC 61326-2-2:2020 RLV qui contient la Norme internationale et sa version Redline, illustrant les modifications du contenu technique depuis l'édition précédente.L’IEC 61326:2020 donne des spécifications plus détaillées des configurations d’essai, des conditions fonctionnelles et des critères de performance pour les matériels couverts par l'Annexe A de l’IEC 61326-1:2020, qui sont: - utilisés pour le contrôle, la mesure ou la surveillance de mesures de protection dans les réseaux de distribution à basse tension, et; - alimentés par batterie et/ou par le circuit mesuré, et - portables. Exemples de tels EST (entre autres): détecteurs de tension, appareils d’essai d’isolement, appareils d’essai de continuité de terre, appareils d’essai de résistance à la terre, pinces de courant de fuite, appareils d’essai d’impédance de boucle, “appareils d’essai de dispositifs à courant résiduel” (appareils d’essai DCR) et appareils d’essai d'ordre de phases, tels que définis dans l’IEC 61557 (toutes les parties).
Električna oprema za merjenje, nadzor in laboratorijsko uporabo - Zahteve za elektromagnetno združljivost (EMC) - 2-2. del: Posebne zahteve - Preskusne konfiguracije, obratovalni pogoji in merila učinkovitosti za prenosno preskuševalno merilno opremo in opremo za nadzorovanje, ki se uporablja v nizkonapetostnih distribucijskih sistemih (IEC 61326-2-2:2012)
General Information
RELATIONS
Standards Content (sample)
SLOVENSKI STANDARD
oSIST prEN IEC 61326-2-2:2019
01-november-2019
Električna oprema za merjenje, nadzor in laboratorijsko uporabo - Zahteve za
elektromagnetno združljivost (EMC) - 2-2. del: Posebne zahteve - Preskusne
konfiguracije, obratovalni pogoji in merila za učinkovitosti za prenosno
preskuševalno, merilno opremo in opremo za nadzorovanje, ki se uporablja v
nizkonapetostnih distribucijski sistemih
Electrical equipment for measurement, control and laboratory use - EMC requirements -
Part 2-2: Particular requirements - Test configurations, operational conditions and
performance criteria for portable test, measuring and monitoring equipment used in low-
voltage distribution systems (IEC 61326-2-2:2012)Elektrische Mess-, Steuer-, Regel- und Laborgeräte – EMV-Anforderungen – Teil 2-2:
Besondere Anforderungen – Prüfanordnung, Betriebsbedingungen undLeistungsmerkmale für ortsveränderliche Prüf-, Mess- und Überwachungsgeräte für den
Gebrauch in Niederspannungs-StromversorgungsnetzenMatériel électrique de mesure, de commande et de laboratoire - Exigences relatives à la
CEM - Partie 2-2: Exigences particulières - Configurations d'essai, conditions de
fonctionnement et critères de performance des matériels portatifs d'essai, de mesure et
de surveillance utilisés dans des systèmes de distribution basse tensionTa slovenski standard je istoveten z: prEN IEC 61326-2-2:2019
ICS:
19.080 Električno in elektronsko Electrical and electronic
preskušanje testing
33.100.01 Elektromagnetna združljivost Electromagnetic compatibility
na splošno in general
oSIST prEN IEC 61326-2-2:2019 en,fr,de
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
---------------------- Page: 1 ----------------------oSIST prEN IEC 61326-2-2:2019
---------------------- Page: 2 ----------------------
oSIST prEN IEC 61326-2-2:2019
65A/924/CDV
COMMITTEE DRAFT FOR VOTE (CDV)
PROJECT NUMBER:
IEC 61326-2-2 ED3
DATE OF CIRCULATION: CLOSING DATE FOR VOTING:
2019-08-23 2019-11-15
SUPERSEDES DOCUMENTS:
65A/905/CD, 65A/915A/CC
IEC SC 65A : SYSTEM ASPECTS
SECRETARIAT: SECRETARY:
United Kingdom Mr Petar Luzajic
OF INTEREST TO THE FOLLOWING COMMITTEES: PROPOSED HORIZONTAL STANDARD:
TC 77, SC 77A
Other TC/SCs are requested to indicate their interest, if any, in
this CDV to the secretary.
FUNCTIONS CONCERNED:
EMC ENVIRONMENT QUALITY ASSURANCE SAFETY
SUBMITTED FOR CENELEC PARALLEL VOTING NOT SUBMITTED FOR CENELEC PARALLEL VOTING
Attention IEC-CENELEC parallel votingThe attention of IEC National Committees, members of
CENELEC, is drawn to the fact that this Committee Draft for Vote
(CDV) is submitted for parallel voting.
The CENELEC members are invited to vote through the
CENELEC online voting system.
This document is still under study and subject to change. It should not be used for reference purposes.
Recipients of this document are invited to submit, with their comments, notification of any relevant patent rights of which they are
aware and to provide supporting documentation.TITLE:
Electrical equipment for measurement, control and laboratory use – EMC requirements – Part 2-2: Particular
requirements – Test configurations, operational conditions and performance criteria for portable test,
measuring and monitoring equipment used in low-voltage distribution systemsPROPOSED STABILITY DATE: 2023
NOTE FROM TC/SC OFFICERS:
Copyright © 2019 International Electrotechnical Commission, IEC. All rights reserved. It is permitted to download this
electronic file, to make a copy and to print out the content for the sole purpose of preparing National Committee positions.
You may not copy or "mirror" the file or printed version of the document, or any part of it, for any other purpose without
permission in writing from IEC.---------------------- Page: 3 ----------------------
oSIST prEN IEC 61326-2-2:2019
65A/924/CDV – 2 – IEC CDV 61326-2-2 © IEC 2019
1 CONTENTS
2 FOREWORD ........................................................................................................................... 3
3 1 Scope ............................................................................................................................... 5
4 2 Normative references ....................................................................................................... 5
5 3 Terms and definitions ....................................................................................................... 5
6 4 General ............................................................................................................................ 6
7 5 EMC test plan ................................................................................................................... 6
8 5.1 General ................................................................................................................... 6
9 5.2 Configuration of EUT during testing ......................................................................... 6
10 5.3 Operation conditions of EUT during testing .............................................................. 8
11 5.4 Specification of functional performance ................................................................... 8
12 5.5 Test description ....................................................................................................... 8
13 6 Immunity requirements ..................................................................................................... 8
14 6.1 Conditions during the tests ...................................................................................... 8
15 6.2 Immunity test requirements ..................................................................................... 8
16 6.3 Random aspects...................................................................................................... 9
17 6.4 Performance criteria ................................................................................................ 9
18 7 Emission requirements ..................................................................................................... 9
19 8 Test results and test report ............................................................................................... 9
20 9 Instructions for use ........................................................................................................... 9
22 Figure 101 – Test set-up for portable test, measuring and monitoring equipment based
23 on IEC 61000-4-3 ................................................................................................................... 7
24 Figure 102 – Example of connection details for voltage measurements ................................... 7
25 Figure 103 – Example of connection details for current measurements ................................... 8
---------------------- Page: 4 ----------------------oSIST prEN IEC 61326-2-2:2019
IEC CDV 61326-2-2 © IEC 2019 – 3 – 65A/924/CDV
27 INTERNATIONAL ELECTROTECHNICAL COMMISSION
28 ____________
30 ELECTRICAL EQUIPMENT FOR MEASUREMENT,
31 CONTROL AND LABORATORY USE –
32 EMC REQUIREMENTS –
34 Part 2-2: Particular requirements –
35 Test configurations, operational conditions and
36 performance criteria for portable test, measuring and
37 monitoring equipment used in low-voltage distribution systems
40 FOREWORD
41 1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising
42 all national electrotechnical committees (IEC National Committees). The object of IEC is to promote
43 international co-operation on all questions concerning standardization in the electrical and electronic fields. To
44 this end and in addition to other activities, IEC publishes International Standards, Technical Specifications,
45 Technical Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC
46 Publication(s)”). Their preparation is entrusted to technical committees; any IEC National Committee interested
47 in the subject dealt with may participate in this preparatory work. International, governmental and non-
48 governmental organizations liaising with the IEC also participate in this preparation. IEC collaborates closely
49 with the International Organization for Standardization (ISO) in accordance with conditions determined by
50 agreement between the two organizations.51 2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international
52 consensus of opinion on the relevant subjects since each technical committee has representation from all
53 interested IEC National Committees.54 3) IEC Publications have the form of recommendations for international use and are accepted by IEC National
55 Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC
56 Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any
57 misinterpretation by any end user.58 4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications
59 transparently to the maximum extent possible in their national and regional publications. Any divergence
60 between any IEC Publication and the corresponding national or regional publication shall be clearly indicated in
61 the latter.62 5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity
63 assessment services and, in some areas, access to IEC marks of conformity. IEC is not responsible for any
64 services carried out by independent certification bodies.65 6) All users should ensure that they have the latest edition of this publication.
66 7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and
67 members of its technical committees and IEC National Committees for any personal injury, property damage or
68 other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and
69 expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC
70 Publications.71 8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is
72 indispensable for the correct applicat...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.