Smart Cards; Test specification for the Host Controller Interface (HCI); Part 2: UICC features (Release 11)

RTS/SCP-00HCIUvb00

General Information

Status
Published
Publication Date
26-Aug-2019
Technical Committee
Current Stage
12 - Completion
Due Date
29-Aug-2019
Completion Date
27-Aug-2019
Ref Project

Buy Standard

Standard
ETSI TS 102 695-2 V11.0.0 (2019-08) - Smart Cards; Test specification for the Host Controller Interface (HCI); Part 2: UICC features (Release 11)
English language
98 pages
sale 15% off
Preview
sale 15% off
Preview

Standards Content (Sample)

ETSI TS 102 695-2 V11.0.0 (2019-08)






TECHNICAL SPECIFICATION
Smart Cards;
Test specification for the Host Controller Interface (HCI);
Part 2: UICC features
(Release 11)

---------------------- Page: 1 ----------------------
Release 11 2 ETSI TS 102 695-2 V11.0.0 (2019-08)



Reference
RTS/SCP-00HCIUvb00
Keywords
smart card, terminal
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE

Tel.: +33 4 92 94 42 00  Fax: +33 4 93 65 47 16

Siret N° 348 623 562 00017 - NAF 742 C
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° 7803/88

Important notice
The present document can be downloaded from:
http://www.etsi.org/standards-search
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the prevailing version of an ETSI
deliverable is the one made publicly available in PDF format at www.etsi.org/deliver.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at
https://portal.etsi.org/TB/ETSIDeliverableStatus.aspx
If you find errors in the present document, please send your comment to one of the following services:
https://portal.etsi.org/People/CommiteeSupportStaff.aspx
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying
and microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.

© ETSI 2019.
All rights reserved.

DECT™, PLUGTESTS™, UMTS™ and the ETSI logo are trademarks of ETSI registered for the benefit of its Members.

3GPP™ and LTE™ are trademarks of ETSI registered for the benefit of its Members and
of the 3GPP Organizational Partners.
oneM2M™ logo is a trademark of ETSI registered for the benefit of its Members and
of the oneM2M Partners.
®
GSM and the GSM logo are trademarks registered and owned by the GSM Association.
ETSI

---------------------- Page: 2 ----------------------
Release 11 3 ETSI TS 102 695-2 V11.0.0 (2019-08)
Contents
Intellectual Property Rights . 10
Foreword . 10
Modal verbs terminology . 11
Introduction . 11
1 Scope . 12
2 References . 12
2.1 Normative references . 12
2.2 Informative references . 13
3 Definition of terms, symbols and abbreviations . 13
3.1 Terms . 13
3.2 Symbols . 13
3.3 Abbreviations . 13
3.4 Void . 14
3A Formats . 14
3A.1 Format of the table of optional features. 14
3A.2 Format of the applicability table . 15
3A.3 Status and Notations . 15
3A.4 Format of the conformance requirements tables . 16
4 Test environment . 16
4.1 Table of optional features . 16
4.2 Applicability table . 17
4.3 Information to be provided by the device supplier . 21
4.4 Test equipment . 21
4.4.0 Base Requirements . 21
4.4.1 Measurement/setting uncertainties . 21
4.4.2 Default conditions for DUT operation . 22
4.4.2.1 General . 22
4.4.2.2 Status of UICC interfaces . 22
4.4.3 Minimum/maximum conditions for DUT operation . 22
4.4.4 Conventions . 22
4.5 Test execution . 22
4.5.1 Parameter variations . 22
4.5.2 Execution requirements . 22
4.6 Pass criterion . 23
4.6.0 Principle . 23
4.6.1 Unanticipated behaviour from the DUT . 23
5 Test cases . 23
5.1 HCI architecture . 23
5.1.1 Overview . 23
5.1.2 Hosts . 24
5.1.2.1 Conformance requirements . 24
5.1.2.2 Test case 1: processing of RFU host identifier . 24
5.1.2.2.1 Test execution . 24
5.1.2.2.2 Initial conditions . 24
5.1.2.2.3 Test procedure . 24
5.1.3 Gates . 24
5.1.3.1 Conformance requirements . 24
5.1.3.2 Test case 1: existence of gates. 24
5.1.3.2.1 Test execution . 24
5.1.3.2.2 Initial conditions . 24
5.1.3.2.3 Test procedure . 25
5.1.3.3 Void. 25
ETSI

---------------------- Page: 3 ----------------------
Release 11 4 ETSI TS 102 695-2 V11.0.0 (2019-08)
5.1.4 Pipes. 25
5.1.4.1 Conformance requirements . 25
5.1.4.2 Test case 1: static pipe deletion - administration gate . 25
5.1.4.2.1 Test execution . 25
5.1.4.2.2 Initial conditions . 25
5.1.4.2.3 Test procedure . 26
5.1.4.3 Test case 2: static pipe deletion - link management gate . 26
5.1.4.3.1 Test execution . 26
5.1.4.3.2 Initial conditions . 26
5.1.4.3.3 Test procedure . 26
5.1.4.4 Test case 3: persistence of pipe state . 26
5.1.4.4.1 Test execution . 26
5.1.4.4.2 Initial conditions . 26
5.1.4.4.3 Test procedure . 26
5.1.4.5 Test case 4: initial pipe state . 27
5.1.4.5.1 Test execution . 27
5.1.4.5.2 Initial conditions . 27
5.1.4.5.3 Test procedure . 27
5.1.5 Registries . 27
5.1.5.1 Conformance requirements . 27
5.1.5.2 Void. 27
5.1.5.3 Void. 27
5.2 HCP . 28
5.2.1 HCP packets. 28
5.2.1.1 Conformance requirements . 28
5.2.2 HCP message structure . 28
5.2.2.1 Conformance requirements . 28
5.2.2.2 Test case 1: commands/events on pipe which is not open . 28
5.2.2.2.1 Test execution . 28
5.2.2.2.2 Initial conditions . 28
5.2.2.2.3 Test procedure . 29
5.2.3 Message fragmentation . 29
5.2.3.1 Conformance requirements . 29
5.3 Instructions . 30
5.3.1 Commands . 30
5.3.1.1 Overview . 30
5.3.1.1.1 Conformance requirements . 30
5.3.1.2 Generic commands . 30
5.3.1.2.1 ANY_SET_PARAMETER . 30
5.3.1.2.2 ANY_GET_PARAMETER. 31
5.3.1.2.3 ANY_OPEN_PIPE . 32
5.3.1.2.4 ANY_ CLOSE_P IP E . 33
5.3.1.3 Administration commands . 34
5.3.1.3.1 ADM_CREATE_PIPE . 34
5.3.1.3.2 ADM_NOTIFY_PIPE_CREATED . 34
5.3.1.3.3 ADM_DELETE_PIPE . 34
5.3.1.3.4 ADM_NOTIFY_PIPE_DELETED . 34
5.3.1.3.5 ADM_CLEAR_ALL_PIPE . 35
5.3.1.3.6 ADM_NOTIFY_ALL_PIPE_CLEARED . 35
5.3.2 Responses . 35
5.3.2.1 Conformance requirements . 35
5.3.2.2 Test case 1: response to unknown command . 35
5.3.2.2.1 Test execution . 35
5.3.2.2.2 Initial conditions . 35
5.3.2.2.3 Test procedure . 35
5.3.2.3 Test case 2: responses received out of order, previous command sent by host controller . 36
5.3.2.3.1 Test execution . 36
5.3.2.3.2 Initial conditions . 36
5.3.2.3.3 Test procedure . 36
5.3.2.4 Void. 36
5.3.3 Events . 36
5.3.3.1 Conformance requirements . 36
ETSI

---------------------- Page: 4 ----------------------
Release 11 5 ETSI TS 102 695-2 V11.0.0 (2019-08)
5.3.3.2 Test case 1: reception of unknown events . 36
5.3.3.2.1 Test execution . 36
5.3.3.2.2 Initial conditions . 37
5.3.3.2.3 Test procedure . 37
5.4 GATES and subclauses . 37
5.4.1 GATES . 37
5.4.1.1 Conformance requirements . 37
5.4.1.2 Test case 1: command and event support for link management gate . 37
5.4.1.2.1 Test execution . 37
5.4.1.2.2 Initial conditions . 37
5.4.1.2.3 Test procedure . 37
5.4.1.3 Test case 2: command and event support for management gates except link management gate . 38
5.4.1.3.1 Test execution . 38
5.4.1.3.2 Initial conditions . 38
5.4.1.3.3 Test procedure . 38
5.4.2 Management gates . 38
5.4.2.1 Administration gates . 38
5.4.2.1.1 Host controller administration gate . 38
5.4.2.1.2 Host administration gate . 39
5.4.2.2 Link management gate . 39
5.4.2.2.1 Host controller link management gate . 39
5.4.2.2.2 Host link management gate . 40
5.4.2.3 Identity management gate . 40
5.4.2.3.1 Local registry . 40
5.4.2.3.2 Remote registry . 42
5.4.2.4 Loop back gate . 42
5.4.2.4.1 Conformance requirements . 42
5.4.3 Generic gates . 42
5.5 HCI procedures . 43
5.5.1 Pipe management . 43
5.5.1.1 Pipe creation . 43
5.5.1.1.1 Conformance requirements . 43
5.5.1.1.2 Void . 43
5.5.1.1.3 Test case 2: ADM_NOTIFY_PIPE_CREATED from host controller . 43
5.5.1.1.4 Test case 3: ADM_NOTIFY_PIPE_CREATED from other host . 43
5.5.1.1.5 Test case 4: ADM_NOTIFY_PIPE_CREATED with incorrect destination H . 44
ID
5.5.1.1.6 Test case 5: unsuccessful ADM_NOTIFY_PIPE_CREATED . 44
5.5.1.2 Pipe deletion . 45
5.5.1.2.1 Conformance requirements . 45
5.5.1.2.2 Void . 45
5.5.1.2.3 Test case 2: receiving ADM_NOTIFY_PIPE_DELETED . 45
5.5.1.3 Clear all Pipes . 45
5.5.1.3.1 Conformance requirements . 45
5.5.1.3.2 Test case 1: ADM_CLEAR_ALL_PIPE for data link layer specified in ETSI TS 102 613 . 46
5.5.1.3.3 Test case 2: ADM_CLEAR_ALL_PIPE - static pipes, dynamic pipes to host controller . 47
5.5.1.3.4 Test case 3: ADM_CLEAR_ALL_PIPE - dynamic pipes to other host . 47
5.5.1.3.5 Void . 48
5.5.2 Registry access . 48
5.5.3 Host and Gate discovery . 48
5.5.4 Session initialization . 48
5.5.4.1 Conformance requirements . 48
5.5.4.2 Test case 1: SESSION_IDENTITY not changed . 49
5.5.4.2.1 Test execution . 49
5.5.4.2.2 Initial conditions . 49
5.5.4.2.3 Test procedure . 49
5.5.4.3 Test case 2: SESSION_IDENTITY changed . 49
5.5.4.3.1 Test execution . 49
5.5.4.3.2 Initial conditions . 49
5.5.4.3.3 Test procedure . 49
5.5.4.4 Test case 3: activation in low power mode, no session initialization . 50
5.5.4.4.1 Test execution .
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.