Intelligent Transport Systems (ITS); Testing; Conformance test specifications for Decentralized Environmental Notification Messages (DENM); Part 2: Test Suite Structure and Test Purposes (TSS & TP)

RTS/ITS-00150

General Information

Status
Published
Publication Date
18-May-2014
Current Stage
12 - Completion
Due Date
13-Jun-2014
Completion Date
19-May-2014
Mandate
Ref Project

Buy Standard

Standard
ETSI TS 102 869-2 V1.3.1 (2014-05) - Intelligent Transport Systems (ITS); Testing; Conformance test specifications for Decentralized Environmental Notification Messages (DENM); Part 2: Test Suite Structure and Test Purposes (TSS & TP)
English language
35 pages
sale 15% off
Preview
sale 15% off
Preview

Standards Content (Sample)

ETSI TS 102 869-2 V1.3.1 (2014-05)






Technical Specification
Intelligent Transport Systems (ITS);
Testing;
Conformance test specifications for
Decentralized Environmental Notification Messages (DENM);
Part 2: Test Suite Structure and Test Purposes (TSS & TP)

---------------------- Page: 1 ----------------------
2 ETSI TS 102 869-2 V1.3.1 (2014-05)



Reference
RTS/ITS-00150
Keywords
ITS, testing, TSS&TP
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE

Tel.: +33 4 92 94 42 00  Fax: +33 4 93 65 47 16

Siret N° 348 623 562 00017 - NAF 742 C
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° 7803/88

Important notice
The present document can be downloaded from:
http://www.etsi.org
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the only prevailing document is the
print of the Portable Document Format (PDF) version kept on a specific network drive within ETSI Secretariat.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at
http://portal.etsi.org/tb/status/status.asp
If you find errors in the present document, please send your comment to one of the following services:
http://portal.etsi.org/chaircor/ETSI_support.asp
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying
and microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.

© European Telecommunications Standards Institute 2014.
All rights reserved.

TM TM TM
DECT , PLUGTESTS , UMTS and the ETSI logo are Trade Marks of ETSI registered for the benefit of its Members.
TM
3GPP and LTE™ are Trade Marks of ETSI registered for the benefit of its Members and
of the 3GPP Organizational Partners.
GSM® and the GSM logo are Trade Marks registered and owned by the GSM Association.
ETSI

---------------------- Page: 2 ----------------------
3 ETSI TS 102 869-2 V1.3.1 (2014-05)
Contents
Intellectual Property Rights . 4
Foreword . 4
1 Scope . 5
2 References . 5
2.1 Normative references . 5
2.2 Informative references . 5
3 Definitions and abbreviations . 6
3.1 Definitions . 6
3.2 Abbreviations . 6
4 Test Suite Structure (TSS) . 6
4.1 Structure for DEN tests . 6
4.2 Test groups . 6
4.2.1 Root . 7
4.2.2 Groups . 7
4.2.3 Categories . 7
5 Test Purposes (TP) . 7
5.1 Introduction . 7
5.1.1 TP definition conventions . 7
5.1.2 TP Identifier naming conventions . 7
5.1.3 Rules for the behaviour description . 7
5.1.4 Sources of TP definitions . 8
5.1.5 Mnemonics for PICS reference . 8
5.2 Test purposes for DEN . 8
5.2.1 Message Transmission . 8
5.2.1.1 Message Format . 8
5.2.1.2 Event Generation . 9
5.2.1.3 Event Update . 13
5.2.1.4 Event Termination . 15
5.2.1.5 Message repetition . 20
5.2.2 Message Reception . 23
5.2.3 Keep-Alive Forwarding . 28
History . 35

ETSI

---------------------- Page: 3 ----------------------
4 ETSI TS 102 869-2 V1.3.1 (2014-05)
Intellectual Property Rights
IPRs essential or potentially essential to the present document may have been declared to ETSI. The information
pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found
in ETSI SR 000 314: "Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in
respect of ETSI standards", which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web
server (http://ipr.etsi.org).
Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee
can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web
server) which are, or may be, or may become, essential to the present document.
Foreword
This Technical Specification (TS) has been produced by ETSI Technical Committee Intelligent Transport Systems
(ITS).
The present document is part 2 of a multi-part deliverable covering Conformance test specification for Decentralized
Environmental Notification Messages (DENM) as identified below:
Part 1: "Test requirements and Protocol Implementation Conformance Statement (PICS) proforma";
Part 2: "Test Suite Structure and Test Purposes (TSS & TP)";
Part 3: "Abstract Test Suite (ATS) and Protocol Implementation eXtra Information for Testing (PIXIT)".
ETSI

---------------------- Page: 4 ----------------------
5 ETSI TS 102 869-2 V1.3.1 (2014-05)
1 Scope
The present document provides the Test Suite Structure and Test Purposes (TSS & TP) for Decentralized
Environmental Notification Messages (DENM) as defined in EN 302 637-3 [1] in compliance with the relevant
requirements and in accordance with the relevant guidance given in ISO/IEC 9646-7 [6].
The ISO standard for the methodology of conformance testing (ISO/IEC 9646-1 [3] and ISO/IEC 9646-2 [4]) as well as
the ETSI rules for conformance testing (ETS 300 406 [7]) are used as a basis for the test methodology.
2 References
References are either specific (identified by date of publication and/or edition number or version number) or
non-specific. For specific references, only the cited version applies. For non-specific references, the latest version of the
reference document (including any amendments) applies.
Referenced documents which are not found to be publicly available in the expected location might be found at
http://docbox.etsi.org/Reference.
NOTE: While any hyperlinks included in this clause were valid at the time of publication ETSI cannot guarantee
their long term validity.
2.1 Normative references
The following referenced documents are necessary for the application of the present document.
[1] ETSI EN 302 637-3 (V1.2.0): "Intelligent Transport Systems (ITS); Vehicular Communications;
Basic Set of Applications; Part 3: Specifications of Decentralized Environmental Notification
Basic Service".
[2] ETSI TS 102 869-1 (V1.3.1): "Intelligent Transport Systems (ITS); Testing; Conformance test
specifications for Decentralized Environmental Notification Messages (DENM); Part 1: Test
requirements and Protocol Implementation Conformance Statement (PICS) proforma".
[3] ISO/IEC 9646-1 (1994): "Information technology -- Open Systems Interconnection --
Conformance testing methodology and framework -- Part 1: General concepts".
[4] ISO/IEC 9646-2 (1994): "Information technology -- Open Systems Interconnection --
Conformance testing methodology and framework -- Part 2: Abstract Test Suite specification".
[5] ISO/IEC 9646-6 (1994): "Information technology -- Open Systems Interconnection --
Conformance testing methodology and framework -- Part 6: Protocol profile test specification".
[6] ISO/IEC 9646-7 (1995): "Information technology -- Open Systems Interconnection --
Conformance testing methodology and framework -- Part 7: Implementation Conformance
Statements".
[7] ETSI ETS 300 406 (1995): "Methods for testing and Specification (MTS); Protocol and profile
conformance testing specifications; Standardization methodology".
2.2 Informative references
The following referenced documents are not necessary for the application of the present document but they assist the
user with regard to a particular subject area.
[i.1] ETSI EG 202 798 (V1.1.1): "Intelligent Transport Systems (ITS); Testing; Framework for
conformance and interoperability testing".
ETSI

---------------------- Page: 5 ----------------------
6 ETSI TS 102 869-2 V1.3.1 (2014-05)
3 Definitions and abbreviations
3.1 Definitions
For the purposes of the present document, the terms and definitions given in EN 302 637-3 [1], ISO/IEC 9646-6 [5] and
ISO/IEC 9646-7 [6] apply.
3.2 Abbreviations
For the purposes of the present document, the following abbreviations apply:
BV Valid Behaviour
CAN Controller Area Network
CLT Current Local Time
DE Data Element
DEN Decentralized Environmental Notification
DENM Decentralized Environmental Notification Message
EVGN Event Generation
ITS Intelligent Transportation Systems
ITS-S Intelligent Transport System - Station
IUT Implementation Under Test
MSGF Message Format
PDU Protocol Data Unit
TP Test Purposes
TSS Test Suite Structure
4 Test Suite Structure (TSS)
4.1 Structure for DEN tests
Table 1 shows the DEN Test Suite Structure (TSS) including its subgroups defined for conformance testing.
Table 1: TSS for DEN
Root Group category
DEN Message transmission Valid behaviour
--- Message format Valid behaviour
--- Event Generation Valid behaviour
--- Event Update Valid behaviour
--- Event Termination Valid behaviour
--- Message Repetition Valid behaviour
Message reception Valid behaviour
Keep-alive Forwarding Valid behaviour

The test suite is structured as a tree with the root defined as DEN. The tree is of rank 2 with the first rank a Group, the
second a category. The second rank is the standard ISO conformance test categories.
4.2 Test groups
The test suite has a total of three levels. The first level is the root. The second level separates the root into various
functional areas. The third level is the standard ISO conformance test categories.
ETSI

---------------------- Page: 6 ----------------------
7 ETSI TS 102 869-2 V1.3.1 (2014-05)
4.2.1 Root
The root identify the Decentralized environmental Notification Messages (DENM) given in EN 302 637-3 [1].
4.2.2 Groups
This level contains three functional areas identified as:
• Message transmission
• Message format
• Event Generation
• Event Update
• Event Termination
• Message Repetition
• Message reception
• Keep-alive Forwarding
4.2.3 Categories
This level contains the standard ISO conformance test categories limited to the valid behaviour.
5 Test Purposes (TP)
5.1 Introduction
5.1.1 TP definition conventions
The TP definition is built according to EG 202 798 [i.1].
5.1.2 TP Identifier naming conventions
The identifier of the TP is built according to table 2.
Table 2: TP naming convention
Identifier: TP////
= root DEN
= group MSGF Message transmission - Message format
 EVGN Message transmission - Event Generation
 EVUP Message transmission - Event Update
 EVTR Message transmission - Event Termination
 EVRP Message transmission - Message Repetition
 MSRV Message reception
 KAFW Keep-alive Forwarding
= type of testing BV Valid Behaviour tests
= sequential number 01 to 99

5.1.3 Rules for the behaviour description
The description of the TP is built according to EG 202 798 [i.1].
ETSI

---------------------- Page: 7 ----------------------
8 ETSI TS 102 869-2 V1.3.1 (2014-05)
EN 302 637-3 [1] does not use the finite state machine concept. As consequence, the test purposes use a generic "Initial
State" that corresponds to a state where the IUT is ready for starting the test execution. Furthermore, the IUT shall be
left in this "Initial State", when the test is completed.
Being in the "Initial State" refers to the starting point of the initial device configuration. There are no pending actions,
no instantiated buffers or variables, which could disturb the execution of a test.
5.1.4 Sources of TP definitions
All TPs are specified according to EN 302 637-3 [1].
5.1.5 Mnemonics for PICS reference
To avoid an update of all TPs when the PICS document is changed, table 3 introduce mnemonics name and the
correspondence with the real PICS item number
Table 3: Mnemonics for PICS reference
Mnemonic PICS item
PICS_KAF A.2/5 [2]

5.2 Test purposes for DEN
5.2.1 Message Transmission
5.2.1.1 Message Format
TP Id TP/DEN/ MSGF/BV-01
Test objective Check that protocolVersion is set to 1 and messageID is set to 1
Reference
EN 302 637-3 [1], clause B.1
PICS Selection

Initial conditions
with {
the IUT being in the "initial state"
}
Expected behaviour
ensure that {
when {
 the IUT receives an AppDENM_Trigger request from the application layer
}
then {
 the IUT sends a valid DENM
  containing ITS PDU header
  containing protocolVersion
   indicating value 1
  and containing messageID
   indicating value 1
}

ETSI

---------------------- Page: 8 ----------------------
9 ETSI TS 102 869-2 V1.3.1 (2014-05)
TP Id TP/DEN/ MSGF/BV-02
Test objective Check that sent DENM contains at least one 'trace' DE
Reference EN 302 637-3 [1], clause 6.1.3.2
PICS Selection
Initial conditions
with {
the IUT being in the "initial state"
}
Expected behaviour
ensure that {
when {
 the IUT receives an AppDENM_Trigger request from the application layer
}
then {
 the IUT sends a valid DENM
  containing location container
  containing at least one 'trace'
}

5.2.1.2 Event Generation
TP Id TP/DEN/EVGN/BV-01
Test objective Check that DEN Basic Service generates a new DENM on reception of a valid
AppDENM_Trigger request
Reference EN 302 637-3 [1], clause 6.1.2.1
PICS Selection
Initial conditions
with {
the IUT being in the "initial state"
}
Expected behaviour
ensure that {
when {
 the IUT receives an AppDENM_Trigger request from the application layer
}
then {
 the IUT sends a valid DENM
}
}

TP Id TP/DEN/EVGN/BV-02
Test objective Check that a new ActionID value is assigned for each generated DENM
Reference EN 302 637-3 [1], clause 6.1.1
PICS Selection
Initial conditions
with {
the IUT being in the "initial state"
and the IUT having generated several events
}
Expected behaviour
ensure that {
when {
 the IUT is requested to generate a new event
}
then {
 the IUT sends a valid DENM
  containing management container
  containing actionID
   indicating an unused value
}
}

ETSI

---------------------- Page: 9 ----------------------
10 ETSI TS 102 869-2 V1.3.1 (2014-05)
TP Id TP/DEN/EVGN/BV-03
Test objective Check that newly created ActionID contains the originator ITS-S ID
Reference EN 302 637-3 [1], clause 6.1.1
PICS Selection
Initial conditions
with {
the IUT being in the "initial state"
}
Expected behaviour
ensure that {
when {
 the IUT is requested to generate a new event
}
then {
 the IUT sends a valid DENM
  containing management container
  containing actionID
   containing originatorStationID
   indicating its own StationID
}
}

TP Id TP/DEN/EVGN/BV-04
Test objective Check that Cause and subcause values included in DENM as provided by application
Reference EN 302 637-3 [1], clause 7.1.3
PICS Selection
Initial conditions
with {
the IUT being in the "initial state"
}
Expected behaviour
ensure that {
when {
 the IUT receives an AppDENM_trigger request from the application layer
  containing situation container
  containing eventType
   containing causeCode
   indicating Value1
   containing subCauseCode
   indicating Value2
}
then {
 the IUT sends a valid DENM
  containing situation container
  containing eventType
   containing causeCode
   indicating Value1
   containing subCauseCode
   indicating Value2
}
}

ETSI

---------------------- Page: 10 ----------------------
11 ETSI TS 102 869-2 V1.3.1 (2014-05)
TP Id TP/DEN/EVGN/BV-05
Test objective Check that referenceTime is set to the current time when generating a DENM for a new event
Reference EN 302 637-3 [1], clause 8.1.1.2
PICS Selection
Initial conditions
with {
the IUT being in the "initial state"
and the IUT having generated several events
}
Expected behaviour
ensure that {
when {
 the IUT is requested to generate a new event
}
then {
 the IUT sends a valid DENM
  containing management container
  containing referenceTime
   indicating CLT
}
}

TP Id TP/DEN/EVGN/BV-06
Test objective Check that on startup, sequenceNumber is initialized with latest used value
Reference EN 302 637-3 [1], clause 8.1.1.1
PICS Selection
Initial conditions
with {
the IUT being in the "initial state"
and the IUT having generated several events
and the IUT having generated its last DENM
 containing management container
  containing actionID
  containing sequenceNumber
   indicating SEQ1
and the IUT having been restarted
}
Expected behaviour
ensure that {
when {
 the IUT is requested to generate a new event
}
then {
 the IUT sends a valid DENM
  containing management container
  containing actionID
   containing sequenceNumber
   indicating SEQ1 + 1
}
}

ETSI

---------------------- Page: 11 ----------------------
12 ETSI TS 102 869-2 V1.3.1 (2014-05)
TP Id TP/DEN/EVGN/BV-07
Test objective Check that sequenceNumber is incremented and set to an unused value each time an event is
detected
Reference EN 302 637-3 [1], clauses 6.1.1 and 8.1.1.1
PICS Selection
Initial conditions
with {
the IUT being in the "initial state"
and the IUT having generated several events
and the IUT having generated its last DENM
 containing management container
  containing actionID
  containing sequenceNumber
   indicating SEQ1
and no active event being associated with sequenceNumber SEQ1 + 1
}
Expected behaviour
ensure that {
when {
 the IUT is requested to generate a new event
}
then {
 the IUT sends a valid DENM
  containing management container
  containing actionID
   containing sequenceNumber
   indicating SEQ1 + 1
}
}

TP Id TP/DEN/EVGN/BV-08
Test objective Check that sequenceNumber is incremented and set to an unused value each time an event is
detected
Reference EN 302 637-3 [1], clauses 6.1.1 and 8.1.1.1
PICS Selection
Initial conditions
with {
the IUT being in the "initial state"
and the IUT having generated several events
and the IUT having generated its last DENM
 containing management container
  containing actionID
  containing sequenceNumber
   indicating SEQ1
and an active event being associated with sequenceNumber SEQ1 + 1
and no active event being associated with sequenceNumber SEQ1 + 2
}
Expected behaviour
ensure that {
when {
 the IUT is requested to generate a new event
}
then {
 the IUT sends a valid DENM
  containing management container
  containing actionID
   containing sequenceNumber
   indicating SEQ1 + 2
}
}

ETSI

---------------------- Page: 12 ----------------------
13 ETSI TS 102 869-2 V1.3.1 (2014-05)
TP Id TP/DEN/EVGN/BV-09
Test objective Check that the sequence number restarts from 0 when it reaches its range limit
Reference EN 302 637-3 [1], clause 6.1.1
PICS Selection
Initial conditions
with {
the IUT being in the "initial state"
and the IUT having generated several events
and the IUT having generated its last DENM
 containing management container
  containing actionID
  containing sequenceNumber
   indicating 65535
and no active event being associated with sequenceNumber 0
}
Expected behaviour
ensure that {
when {
 the IUT is requested to generate a new event
}
then {
 the IUT sends a valid DENM
  containing management container
  containing actionID
   containing sequenceNumber
   indicating 0
}
}

5.2.1.3 Event Update
TP Id TP/DEN/EVUP/BV-01
Test objective
Check that DEN Basic Service generates an update DENM on reception of a valid
AppDENM_update request
Reference EN 302 637-3 [1], clause 6.1.2.2
PICS Selection

Initial conditions
with {
the IUT being in the "initial state"
and the IUT having generated an event
}
Expected behaviour
ensure that {
when {
 the IUT receives an AppDENM_update request from the application layer
}
then {
 the IUT sends a valid DENM
}
}

ETSI

---------------------- Page: 13 ----------------------
14 ETSI TS 102 869-2 V1.3.1 (2014-05)
TP Id TP/DEN/EVUP/BV-02
Test objective Check that the actionID is not changed by DENM update
Reference EN 302 637-3 [1], clauses 6.1.2.2 and 8.1.1.1
PICS Selection
Initial conditions
with {
the IUT being in the "initial state"
and the IUT having generated an event
 containing management container
  containing actionID
  indicating ACTION_ID1
}
Expected behaviour
ensure that {
when {
 the IUT receives an AppDENM_update request associated with ACTION_ID1 from the application layer
}
then {
 the IUT sends a valid DENM
  containing management container
  containing actionID
   indicating ACTION_ID1
}
}

TP Id TP/DEN/EVUP/BV-03
Test objective Check that referenceTime is updated and greater than previous value for each DENM update
Reference EN 302 637-3 [1], clause 6.1.2.2
PICS Selection
Initial conditions
with {
the IUT being in the "initial state"
and the IUT having generated an event
 containing management container
  containing actionID
  indicating ACTION_ID1
  containing referenceTime
  indicating REFERENCETIME1
}
Expected behaviour
ensure that {
when {
 the IUT receives an AppDENM_update request associated with ACTION_ID1 from the application layer
}
then {
 the IUT sends a valid DENM
  containing management container
  containing actionID
   indicating ACTION_ID1
  and containing referenceTime
   indicating REFERENCETIME2 > REFERENCETIME1
}
}


ETSI

---------------------- Page: 14 ----------------------
15 ETSI TS 102 869-2 V1.3.1 (2014-05)
TP Id TP/DEN/EVUP/BV-04
Test objective Check that DEN Basic Service does not send any update DENM if actionID is not in originator
ITS-S message table
Reference EN 302 637-3 [1], clause 8.1.2
PICS Selection
Initial conditions
with {
the IUT being in the "initial state"
and the IUT having generated an event
and the IUT not having sent event being associated with actionID ACTION_ID1
 containing originatorStationID
  indicating its own stationID
 and containing sequenceNumber
  indicating SEQ1
}
Expected behaviour
ensure that {
when {
 the IUT is requested to update an event associated to actionID ACTION_ID1
}
then {
 the IUT does not send any DENM for this event
}
}

5.2.1.4 Event Termination
TP Id TP/DEN/EVTR/BV-01
Test objective Check that DEN Basic Service generates a cancellation DENM when application indicates the
premature termination of an event for which it is the originator
Reference
EN 302 637-3 [1], clauses 6.1.2.4 and 8.1.1.2
PICS Selection
Initial conditions
with {
the IUT being in the "initial state"
and the IUT having generated an event
 containing management container
  containing actionID
  indicating ACTION_ID1
  and containing validityDuration
  indicating DURATION_1
}
Expected behaviour
ensure that {
when {
 the IUT receives an AppDENM_termination request associated to ACTION_ID1 from the application layer
}
then {
 the IUT sends a valid DENM
  containing management container
  containing actionID
   indicating ACTION_ID1
  and containing isCancellation
   indicating value TRUE
}
}

ETSI

---------------------- Page: 15 ----------------------
16 ETSI TS 102 869-2 V1.3.1 (2014-05)
TP Id TP/DEN/EVTR/BV-02
Test objective Check that DEN Basic Service generates a negation DENM when application indicates the
premature termination of an event for which it is not the originator
Reference EN 302 637-3 [1], clause 6.1.2.4
PICS Selection
Initial conditions
with {
the IUT being in the "initial state"
and the IUT having received an event
 containing management container
  containing actionID
  indicating ACTION_ID1
   containing originatorStationID
   indicating stationID different from its own stationID

}
Expected behaviour
ensure that {
when {
 the IUT receives an AppDENM_termination request associated to ACTION_ID1 from the application layer
}
then {
 the IUT sends a valid DENM
  containing management container
  containing actionID
   indicating ACTION_ID1
  and containing isNegation
   indicating value TRUE
}
}

ETSI

---------------------- Page: 16 ----------------------
17 ETSI TS 102 869-2 V1.3.1 (2014-05)
TP Id TP/DEN/EVTR/BV-03
Test objective Check that referenceTime is set to the latest value received for this event in negation DENM
Reference EN 302 637-3 [1], clauses 6.1.2.4 and 8.1.1.2
PICS Selection
Initial conditions
with {
the IUT being in the "initial state"
and the IUT having received an event
 containing management container
  containing actionID
  indicating ACTION_ID1
   containing originatorStationID
   indicating stationID different from its own stationID
  and containing referenceTime
  indicating REFERENCETIME1
and the IUT having received an event
 containing management container
  containing actionID
  indicating ACTION_ID1
  and containing referenceTime
  indicating REFERENCETIME2 > REFERENCETIME1
}
Expected behaviour
ensure that {
when {
 the IUT receives an AppDENM_termination request associated to ACTION_ID1 from the application layer
}
then {
 the IUT sends a valid DENM
  c
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.