IEC 61784-5-8:2024
(Main)Industrial networks - Profiles - Part 5-8: Installation of fieldbuses - Installation profiles for CPF 8
Industrial networks - Profiles - Part 5-8: Installation of fieldbuses - Installation profiles for CPF 8
IEC 61784-5-8:2024 specifies the installation profiles for CPF 8 (CC-LinkTM[1]). The installation profiles are specified in the annexes. These annexes are read in conjunction with IEC 61918:2018, IEC 61918:2018/AMD1:2022 and IEC 61918:2018/AMD2:2024.
[1] CC-Link™, CC-Link/LT™ and CC‑Link IE™ are trade names of Mitsubishi Electric Co., control of trade name use is given to CCLink Partner Association. This information is given for the convenience of users of this document and does not constitute an endorsement by IEC of the trademark holder or any of its products. Compliance to this profile does not require use of the trade name. Use of the trade name requires permission of the trade name holder.
Réseaux industriels - Profils - Partie 5-8: Installation des bus de terrain - Profils d'installation pour la CPF 8
L’IEC 61784-5-8:2024 spécifie les profils d’installation pour la CPF 8 (CC‑Link™[1]). Les profils d’installation sont spécifiés dans les annexes. Ces annexes sont à lire conjointement avec l’IEC 61918:2018, l’IEC 61918:2018/AMD1:2022 et l’IEC 61918:2018/AMD2:2024.
[1] CC-Link™, CC-Link/LT™ et CC‑Link IE™ sont des appellations commerciales de Mitsubishi Electric Co., dont le contrôle d’utilisation est donné à CC-Link Partner Association. Cette information est donnée à l’intention des utilisateurs du présent document et ne signifie nullement que l’IEC approuve l’emploi du produit ainsi désigné. La conformité à ce profil n’exige pas l’utilisation de l’appellation commerciale. L’utilisation de l’appellation commerciale exige l’autorisation du détenteur de celle-ci.
General Information
Relations
Standards Content (Sample)
IEC 61784-5-8 ®
Edition 3.0 2024-04
REDLINE VERSION
INTERNATIONAL
STANDARD
colour
inside
Industrial communication networks – Profiles –
Part 5-8: Installation of fieldbuses – Installation profiles for CPF 8
All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any form
or by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from
either IEC or IEC's member National Committee in the country of the requester. If you have any questions about IEC
copyright or have an enquiry about obtaining additional rights to this publication, please contact the address below or
your local IEC member National Committee for further information.
IEC Secretariat Tel.: +41 22 919 02 11
3, rue de Varembé info@iec.ch
CH-1211 Geneva 20 www.iec.ch
Switzerland
About the IEC
The International Electrotechnical Commission (IEC) is the leading global organization that prepares and publishes
International Standards for all electrical, electronic and related technologies.
About IEC publications
The technical content of IEC publications is kept under constant review by the IEC. Please make sure that you have the
latest edition, a corrigendum or an amendment might have been published.
IEC publications search - webstore.iec.ch/advsearchform IEC Products & Services Portal - products.iec.ch
The advanced search enables to find IEC publications by a Discover our powerful search engine and read freely all the
variety of criteria (reference number, text, technical publications previews, graphical symbols and the glossary.
committee, …). It also gives information on projects, replaced With a subscription you will always have access to up to date
and withdrawn publications. content tailored to your needs.
IEC Just Published - webstore.iec.ch/justpublished
Electropedia - www.electropedia.org
Stay up to date on all new IEC publications. Just Published
The world's leading online dictionary on electrotechnology,
details all new publications released. Available online and once
containing more than 22 500 terminological entries in English
a month by email.
and French, with equivalent terms in 25 additional languages.
Also known as the International Electrotechnical Vocabulary
IEC Customer Service Centre - webstore.iec.ch/csc
(IEV) online.
If you wish to give us your feedback on this publication or need
further assistance, please contact the Customer Service
Centre: sales@iec.ch.
IEC 61784-5-8 ®
Edition 3.0 2024-04
REDLINE VERSION
INTERNATIONAL
STANDARD
colour
inside
Industrial communication networks – Profiles –
Part 5-8: Installation of fieldbuses – Installation profiles for CPF 8
INTERNATIONAL
ELECTROTECHNICAL
COMMISSION
ICS 25.040.40; 35.100.40 ISBN 978-2-8322-8695-1
– 2 – IEC 61784-5-8:2024 RLV © IEC 2024
CONTENTS
FOREWORD . 7
INTRODUCTION . 2
1 Scope . 11
2 Normative references . 11
3 Terms, definitions and abbreviated terms . 11
4 CPF 8: Overview of installation profiles . 12
5 Installation profile conventions. 12
6 Conformance to installation profiles . 13
Annex A (normative) CP 8/1 and CP 8/2 (CC-Link™/V1 and CC-Link™/V2) specific
installation profile . 14
A.1 Installation profile scope . 14
A.2 Normative references . 14
A.3 Installation profile terms, definitions, and abbreviated terms . 14
A.3.1 Terms and definitions . 14
A.3.2 Abbreviated terms . 14
A.3.3 Conventions for installation profiles . 14
A.4 Installation planning . 14
A.4.1 General . 14
A.4.2 Planning requirements . 15
A.4.3 Network capabilities . 15
A.4.4 Selection and use of cabling components . 17
A.4.5 Cabling planning documentation . 22
A.4.6 Verification of cabling planning specification . 22
A.5 Installation implementation. 22
A.5.1 General requirements . 22
A.5.2 Cable installation . 23
A.5.3 Connector installation . 24
A.5.4 Terminator installation . 24
A.5.5 Device installation . 25
A.5.6 Coding and labelling . 25
A.5.7 Earthing and bonding of equipment and devices and shield cabling . 25
A.5.8 As-implemented cabling documentation . 25
A.6 Installation verification and installation acceptance test . 26
A.6.1 General . 26
A.6.2 Installation verification . 26
A.6.3 Installation acceptance test . 27
A.7 Installation administration . 27
A.8 Installation maintenance and installation troubleshooting . 27
Annex B (normative) CP 8/3 (CC-Link/LT™) specific installation profile . 28
B.1 Installation profile scope . 28
B.2 Normative references . 28
B.3 Installation profile terms, definitions, and abbreviated terms . 28
B.3.1 Terms and definitions . 28
B.3.2 Abbreviated terms . 28
B.3.3 Conventions for installation profiles . 28
B.4 Installation planning . 28
B.4.1 General . 28
B.4.2 Planning requirements . 29
B.4.3 Network capabilities . 29
B.4.4 Selection and use of cabling components . 32
B.4.5 Cabling planning documentation . 39
B.4.6 Verification of cabling planning specification . 39
B.5 Installation implementation. 39
B.5.1 General requirements . 39
B.5.2 Cable installation . 39
B.5.3 Connector installation . 40
B.5.4 Terminator installation . 41
B.5.5 Device installation . 41
B.5.6 Coding and labelling . 41
B.5.7 Earthing and bonding of equipment and devices and shield cabling . 41
B.5.8 As-implemented cabling documentation . 41
B.6 Installation verification and installation acceptance test . 42
B.6.1 General . 42
B.6.2 Installation verification . 42
B.6.3 Installation acceptance test . 43
B.7 Installation administration . 43
B.8 Installation maintenance and installation troubleshooting . 43
Annex C (normative) CP 8/4 (CC-Link IE™ Controller Network) specific installation
profile . 44
C.1 Installation profile scope . 44
C.2 Normative references . 44
C.3 Installation profile terms, definitions, and abbreviated terms . 44
C.3.1 Terms and definitions . 44
C.3.2 Abbreviated terms . 44
C.3.3 Conventions for installation profiles . 44
C.4 Installation planning . 44
C.4.1 General . 44
C.4.2 Planning requirements . 44
C.4.3 Network capabilities . 45
C.4.4 Selection and use of cabling components . 46
C.4.5 Cabling planning documentation . 52
C.4.6 Verification of cabling planning specification . 52
C.5 Installation implementation. 52
C.5.1 General requirements . 52
C.5.2 Cable installation . 53
C.5.3 Connector installation . 54
C.5.4 Terminator installation . 54
C.5.5 Device installation . 55
C.5.6 Coding and labelling . 55
C.5.7 Earthing and bonding of equipment and devices and shield cabling . 55
C.5.8 As-implemented cabling documentation . 56
C.6 Installation verification and installation acceptance test . 56
C.6.1 General . 56
C.6.2 Installation verification . 56
C.6.3 Installation acceptance test . 57
– 4 – IEC 61784-5-8:2024 RLV © IEC 2024
C.7 Installation administration . 57
C.8 Installation maintenance and installation troubleshooting . 57
Annex D (normative) CP 8/5 (CC-Link IE™ Field Network) specific installation profile . 58
D.1 Installation profile scope . 58
D.2 Normative references . 58
D.3 Installation profile terms, definitions, and abbreviated terms . 58
D.3.1 Terms and definitions . 58
D.3.2 Abbreviated terms . 58
D.3.3 Conventions for installation profiles . 58
D.4 Installation planning . 58
D.4.1 General . 58
D.4.2 Planning requirements . 58
D.4.3 Network capabilities . 59
D.4.4 Selection and use of cabling components . 60
D.4.5 Cabling planning documentation . 65
D.4.6 Verification of cabling planning specification . 65
D.5 Installation implementation. 65
D.5.1 General requirements . 65
D.5.2 Cable installation . 65
D.5.3 Connector installation . 67
D.5.4 Terminator installation . 67
D.5.5 Device installation . 67
D.5.6 Coding and labelling . 67
D.5.7 Earthing and bonding of equipment and devices and shield cabling . 67
D.5.8 As-implemented cabling documentation . 68
D.6 Installation verification and installation acceptance test . 68
D.6.1 General . 68
D.6.2 Installation verification . 68
D.6.3 Installation acceptance test . 69
D.7 Installation administration . 70
D.8 Installation maintenance and installation troubleshooting . 70
Annex E (normative) CP 8/6 (CC-Link IE™ TSN) specific installation profile . 71
E.1 Installation profile scope . 71
E.2 Normative references . 71
E.3 Installation profile terms, definitions, and abbreviated terms . 71
E.3.1 Terms and definitions . 71
E.3.2 Abbreviated terms . 71
E.3.3 Conventions for installation profiles . 71
E.4 Installation planning . 71
E.4.1 General . 71
E.4.2 Planning requirements . 72
E.4.3 Network capabilities . 72
E.4.4 Selection and use of cabling components . 74
E.4.5 Cabling planning documentation . 80
E.4.6 Verification of cabling planning specification . 80
E.5 Installation implementation. 81
E.5.1 General requirements . 81
E.5.2 Cable installation . 81
E.5.3 Connector installation . 82
E.5.4 Terminator installation . 83
E.5.5 Device installation . 83
E.5.6 Coding and labelling . 83
E.5.7 Earthing and bonding of equipment and devices and shield cabling . 83
E.5.8 As-implemented cabling documentation . 84
E.6 Installation verification and installation acceptance test . 84
E.6.1 General . 84
E.6.2 Installation verification . 84
E.6.3 Installation acceptance test . 85
E.7 Installation administration . 85
E.8 Installation maintenance and installation troubleshooting . 85
Bibliography . 86
Figure 1 – Standards relationships . 10
Figure A.1 – Pass-through connector configuration . 16
Figure A.2 – Bus t-branch topology . 16
Figure A.3 – Wiring . 19
Figure B.1 – Powered network topology . 30
Figure B.2 – Bus t-branch topology . 30
Figure B.3 – Flat cable cross section – with key . 32
Figure B.4 – Flat cable cross section – without key . 32
Figure B.5 – Flat cable polarity marking . 33
Figure B.6 – Wiring . 34
Figure B.7 – Flat cable connector and terminal cover . 35
Table A.1 – Basic network characteristics for balanced cabling not based on Ethernet . 17
Table A.2 – Bus t-branch network characteristics . 17
Table A.3 – Information relevant to copper cable: fixed cables . 18
Table A.4 – Connectors for copper cabling CPs not based on Ethernet . 19
Table A.5 – Parameters for balanced cables . 23
Table A.6 – Cable conductor assignments . 24
Table B.1 – Basic network characteristics for balanced cabling not based on Ethernet . 31
Table B.2 – CP 8/3 additional topology length limits . 31
Table B.3 – Information relevant to copper cable: cords . 33
Table B.4 – Connectors for copper cabling CPs not based on Ethernet . 36
Table B.5 – Parameters for balanced cables . 39
Table B.6 – Flat cable conductor assignments . 40
Table C.1 – Network characteristics for balanced cabling based on Ethernet . 46
Table C.2 – Network characteristics for optical fibre cabling . 46
Table C.3 – Information relevant to copper cable: fixed cables . 47
Table C.4 – Information relevant to optical fibre cables . 48
Table C.5 – Connectors for balanced cabling CPs based on Ethernet . 48
Table C.6 – Optical fibre connecting hardware . 49
Table C.7 – Relationship between FOC and fibre types (CP 8/4) . 49
– 6 – IEC 61784-5-8:2024 RLV © IEC 2024
Table C.8 – Parameters for balanced cables . 53
Table C.9 – Parameters for silica optical fibre cables . 53
Table D.1 – Network characteristics for balanced cabling based on Ethernet . 60
Table D.2 – Information relevant to copper cable: fixed cables . 61
Table D.3 – Connectors for balanced cabling CPs based on Ethernet . 62
Table D.4 – Parameters for balanced cables . 66
Table E.1 – Network characteristics for balanced cabling based on Ethernet . 73
Table E.2 – Network characteristics for optical fibre cabling . 74
Table E.3 – Information relevant to copper cable: fixed cables . 75
Table E.4 – Information relevant to optical fibre cables . 76
Table E.5 – Connectors for balanced cabling CPs based on Ethernet . 77
Table E.6 – Optical fibre connecting hardware . 77
Table E.7 – Relationship between FOC and fibre types (CP 8/6) . 77
Table E.8 – Parameters for balanced cables . 81
Table E.9 – Parameters for silica optical fibre cables . 81
INTERNATIONAL ELECTROTECHNICAL COMMISSION
____________
INDUSTRIAL COMMUNICATION NETWORKS –
PROFILES –
Part 5-8: Installation of fieldbuses –
Installation profiles for CPF 8
FOREWORD
1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising
all national electrotechnical committees (IEC National Committees). The object of IEC is to promote international
co-operation on all questions concerning standardization in the electrical and electronic fields. To this end and
in addition to other activities, IEC publishes International Standards, Technical Specifications, Technical Reports,
Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC Publication(s)”). Their
preparation is entrusted to technical committees; any IEC National Committee interested in the subject dealt with
may participate in this preparatory work. International, governmental and non-governmental organizations liaising
with the IEC also participate in this preparation. IEC collaborates closely with the International Organization for
Standardization (ISO) in accordance with conditions determined by agreement between the two organizations.
2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international
consensus of opinion on the relevant subjects since each technical committee has representation from all
interested IEC National Committees.
3) IEC Publications have the form of recommendations for international use and are accepted by IEC National
Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC
Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any
misinterpretation by any end user.
4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications
transparently to the maximum extent possible in their national and regional publications. Any divergence between
any IEC Publication and the corresponding national or regional publication shall be clearly indicated in the latter.
5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity
assessment services and, in some areas, access to IEC marks of conformity. IEC is not responsible for any
services carried out by independent certification bodies.
6) All users should ensure that they have the latest edition of this publication.
7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and
members of its technical committees and IEC National Committees for any personal injury, property damage or
other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and
expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC
Publications.
8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is
indispensable for the correct application of this publication.
9) IEC draws attention to the possibility that the implementation of this document may involve the use of (a)
patent(s). IEC takes no position concerning the evidence, validity or applicability of any claimed patent rights in
respect thereof. As of the date of publication of this document, IEC had not received notice of (a) patent(s), which
may be required to implement this document. However, implementers are cautioned that this may not represent
the latest information, which may be obtained from the patent database available at https://patents.iec.ch. IEC
shall not be held responsible for identifying any or all such patent rights. IEC shall not be held responsible for
identifying any or all such patent rights.
This redline version of the official IEC Standard allows the user to identify the changes
made to the previous edition IEC 61784-5-8:2018. A vertical bar appears in the margin
wherever a change has been made. Additions are in green text, deletions are in
strikethrough red text.
– 8 – IEC 61784-5-8:2024 RLV © IEC 2024
IEC 61784-5-8 has been prepared by subcommittee 65C: Industrial networks, of IEC technical
committee 65: Industrial-process measurement, control and automation. It is an International
Standard.
This document is to be used in conjunction with IEC 61918:2018, IEC 61918:2018/AMD1:2022
and IEC 61918:2018/AMD2:2024.
This third edition cancels and replaces the second edition published in 2018. This edition
constitutes a technical revision.
This edition includes the following significant technical changes with respect to the previous
edition:
a) Annex E and related references have been added.
The text of this International Standard is based on the following documents:
Draft Report on voting
65C/1280/FDIS 65C/1295/RVD
Full information on the voting for its approval can be found in the report on voting indicated in
the above table.
The language used for the development of this International Standard is English.
This document was drafted in accordance with the ISO/IEC Directives, Part 2, and developed
in accordance with ISO/IEC Directives, Part 1 and ISO/IEC Directives, IEC Supplement,
available at www.iec.ch/members_experts/refdocs. The main document types developed by IEC
are described in greater detail at www.iec.ch/publications.
A list of all parts of IEC 61784-5 series, published under the general title Industrial networks –
Profiles – Installation of fieldbuses, can be found on the IEC website.
The committee has decided that the contents of this document will remain unchanged until the
stability date indicated on the IEC website under webstore.iec.ch in the data related to the
specific document. At this date, the document will be
• reconfirmed,
• withdrawn, or
• revised.
IMPORTANT – The "colour inside" logo on the cover page of this document indicates
that it contains colours which are considered to be useful for the correct understanding
of its contents. Users should therefore print this document using a colour printer.
INTRODUCTION
This document is one of a series produced to facilitate the use of communication networks in
industrial control systems.
IEC 61918:2018, IEC 61918:2018/AMD1:2022 and IEC 61918:2018/AMD2:2024 provide the
common requirements for the installation of communication networks in industrial control
systems. This installation profile standard provides the installation profiles of the
communication profiles (CP) of a specific communication profile family (CPF) by stating which
requirements of IEC 61918:2018 and IEC 61918:2018/AMD1:2022 fully apply and, where
necessary, by supplementing, modifying, or replacing the other requirements (see Figure 1).
For general background on fieldbuses, their profiles, and relationship between the installation
profiles specified in this document, see IEC 61158-1.
Each CP installation profile is specified in a separate annex of this document. Each annex is
structured exactly as the reference standard IEC 61918:2018 for the benefit of the persons
representing the roles in the fieldbus installation process as defined in IEC 61918:2018 (planner,
installer, verification personnel, validation personnel, maintenance personnel, administration
personnel). By reading the installation profile in conjunction with IEC 61918:2018, these
persons immediately know which requirements are common for the installation of all CPs and
which are modified or replaced. The conventions used to draft this document are defined in
Clause 5.
The provision of the installation profiles in one standard for each CPF (for example
IEC 61784-5-8 for CPF 8) allows readers to work with standards of a convenient size.
– 10 – IEC 61784-5-8:2024 RLV © IEC 2024
Figure 1 – Standards relationships
INDUSTRIAL COMMUNICATION NETWORKS –
PROFILES –
Part 5-8: Installation of fieldbuses –
Installation profiles for CPF 8
1 Scope
TM1
This part of IEC 61784-5 specifies the installation profiles for CPF 8 (CC-Link ).
The installation profiles are specified in the annexes. These annexes are read in conjunction
with IEC 61918:2018, IEC 61918:2018/AMD1:2022 and IEC 61918:2018/AMD2:2024.
2 Normative references
The following documents are referred to in the text in such a way that some or all of their content
constitutes requirements of this document. For dated references, only the edition cited applies.
For undated references, the latest edition of the referenced document (including any
amendments) applies.
IEC 61918:2018 , Industrial communication networks – Installation of communication networks
in industrial premises
IEC 61918:2018/AMD1:2022
IEC 61918:2018/AMD2:2024
The normative references of IEC 61918:2018, Clause 2, apply.
NOTE For profile specific normative references, see Clauses A.2, B.2, C.2and D.2 and E.2 respectively.
3 Terms, definitions and abbreviated terms
For the purposes of this document, the terms, definitions and abbreviated terms given in
IEC 61918:2018, Clause 3 and IEC 61918:2018/AMD1:2022, Clause 3 apply.
ISO and IEC maintain terminology databases for use in standardization at the following
addresses:
• IEC Electropedia: available at https://www.electropedia.org/
• ISO Online browsing platform: available at https://www.iso.org/obp
NOTE For profile specific normative references, see Clauses A.3, B.3, C.3 and D.3 respectively.
___________
CC-Link™, CC-Link/LT™ and CC-Link IE™ are trade names of Mitsubishi Electric Co., control of trade name use
is given to CCLink Partner Association. This information is given for the convenience of users of this document
and does not constitute an endorsement by IEC of the trademark holder or any of its products. Compliance to
this profile does not require use of the trade name. Use of the trade name requires permission of the trade name
holder.
The normative references of IEC 61918:2018, Clause 2, IEC 61918:2018/AMD1:2022, Clause 2 and
IEC 61918:2018/AMD2:2024, Clause 2, apply.
– 12 – IEC 61784-5-8:2024 RLV © IEC 2024
4 CPF 8: Overview of installation profiles
CPF 8 consists of 5 six communication profiles as specified in IEC 61784-1:— and
IEC 61784-2:— IEC 61784-1-8 and IEC 61784-2-8.
TM TM
The installation requirements for CP 8/1 (CC-Link /V1) and CP 8/2 (CC-Link /V2) are
specified in Annex A.
TM
The installation requirements for CP 8/3 (CC-Link/LT ) are specified in Annex B.
TM
The installation requirements for CP 8/4 (CC-Link IE Controller Network) are specified in
Annex C.
TM
The installation requirements for CP 8/5 (CC-Link IE Field Network) are specified in Annex D.
TM
The installation requirements for CP 8/6 (CC-Link IE TSN) are specified in Annex E.
5 Installation profile conventions
The numbering of the clauses and subclauses in the annexes of this document corresponds to
the numbering of IEC 61918 main clauses and subclauses.
The annex clauses and subclauses of this document supplement, modify, or replace the
respective clauses and subclauses in IEC 61918.
Where there is no corresponding subclause of IEC 61918 in the normative annexes in this
document, the subclause of IEC 61918 applies without modification.
The annex heading letter represents the installation profile assigned in Clause 4. The annex
heading number shall represent the corresponding numbering of IEC 61918.
EXAMPLE "Subclause B.4.4" in IEC 61784-5-8 means that CP 8/3 specifies 4.4 of IEC 61918:2018 and
IEC 61918:2018/AMD1:2022.
All main clauses of IEC 61918 are cited and apply in full unless otherwise stated in each
normative installation profile annex.
If all subclauses of a (sub)clause are omitted, then the corresponding IEC 61918 (sub)clause
applies.
If in a (sub)clause it is written "Not applicable", then the corresponding IEC 61918 (sub)clause
does not apply.
If in a (sub)clause it is written "Addition:", then the corresponding IEC 61918 (sub)clause
applies with the additions written in the profile.
If in a (sub)clause it is written "Replacement:", then the text provided in the profile replaces the
text of the corresponding IEC 61918 (sub)clause.
NOTE A replacement can also comprise additions.
If in a (sub)clause it is written "Modification:", then the corresponding IEC 61918 (sub)clause
applies with the modifications written in the profile.
If all (sub)clauses of a (sub)clause are omitted but in this (sub)clause it is written "(Sub)clause
x has addition:" (or "replacement:") or "(Sub)clause x is not applicable.", then (sub)clause x
becomes valid as declared and all the other corresponding IEC 61918 (sub)clauses apply.
6 Conformance to installation profiles
Each installation profile within this document includes parts of IEC 61918:2018 and
IEC 61918:2018/AMD1:2022. It may also include defined additional specifications.
A statement of compliance with an installation profile of this document shall be stated as either
Compliance to with IEC 61784-5-8:— 2024 for CP 8/m or
Compliance to with IEC 61784-5-8 (Ed.23.0) for CP 8/m
where the name within the angle brackets < > is optional and the angle brackets are shall not
to be included. The m within CP 8/m shall be replaced by the profile number 1 to 5 6.
NOTE The name may can be the name of the profile, as: CC-Link/V1, CC-Link/V2, CC-Link/LT,
CC-Link IE Controller Network, CC-Link IE Field Network, or CC-Link IE TSN.
If the name is a trade name then the permission of the trade name holder shall be required.
Product standards shall not include any conformity assessment aspects (including quality
management provisions), neither normative nor informative, other than provisions for product
testing (evaluation and examination).
___________
In accordance with ISO/IEC Directives.
The date should not be used when the edition number is used.
– 14 – IEC 61784-5-8:2024 RLV © IEC 2024
Annex A
(normative)
CP 8/1 and CP 8/2 (CC-Link™/V1 and CC-Link™/V2) specific installation
profile
A.1 Installation profile scope
Addition:
™
This annex specifies the installation profile for Communication Profile CP 8/1 (CC-Link /V1)
TM
and CP 8/2 (CC-Link /V2). The CP 8/1 and CP 8/2 are specified in IEC 61784-1-8.
CP 8/1 and CP 8/2 networks implement a medium attachment unit compliant with ISO/IEC 8482
and is a derivative of ANSI TIA/EIA-485-A.
A.2 Normative references
Addition:
ISO/IEC 8482, Information technology – Telecommunications and information exchange
between systems – Twisted pair multipoint interconnections
ANSI TIA/EIA-485-A, Electrical Characteristics of Generators and Receivers for Use in
Balanced Digital Multipoint Systems
A.3 Installation profile terms, definitions, and abbreviated terms
A.3.1 Terms and definitions
A.3.2 Abbreviated terms
A.3.3 Conventions for installation profiles
Not applicable.
A.4 Installation planning
A.4.1 General
A.4.1.1 Objective
A.4.1.2 Cabling in industrial premises
Addition:
Generic cabling in accordance with ISO/IEC 11801-3 is not suitable for the cabling of CP 8/1 or
CP 8/2 networks.
A.4.1.3 The planning process
A.4.1.4 Specific requirements for CPs
Not applicable.
A.4.1.5 Specific requirements for generic cabling in accordance with
ISO/IEC 11801-3
A.4.2 Planning requirements
A.4.2.1 Safety
A.4.2.1.1 General
A.4.2.1.2 Electrical safety
A.4.2.1.3 Functional safety
A.4.2.1.4 Intrinsic safety
Not applicable.
A.4.2.1.5 Safety of optical fibre communication systems
Not applicable.
A.4.2.2 Security
A.4.2.3 Environmental considerations and EMC
A.4.2.4 Specific requirements for generic cabling in accordance with
ISO/IEC 11801-3
A.4.3 Network capabilities
A.4.3.1 Network topology
A.4.3.1.1 Common description
A.4.3.1.2 Basic physical topologies for passive networks
Modification:
CP 8/1 and CP 8/2 support bus and complex bus t-branch configurations (see A.4.3.1.5.2). A
pure star is not recommended since there is no defined trunk line ends for terminator placement.
A.4.3.1.3 Basic physical topologies for active networks
Not applicable.
A.4.3.1.4 Combination of basic topologies
A.4.3.1.5 Specific requirements for CPs
Replacement:
A.4.3.1.5.1 Bus topology pass-through configuration
The bus topology pass-through configuration is implemented with a dedicated cable and pass-
through type connectors, one for each device as shown in Figure A.1.
– 16 – IEC 61784-5-8:2024 RLV © IEC 2024
NOTE The minimum cable distance device-to-device is 20 cm.
Figure A.1 – Pass-through connector configuration
A.4.3.1.5.2 Bus t-branch topology
The bus t-branch topology is shown in Figure A.2. This is a modification of the bus topology in
that branch lines, which differ from spurs, may be added to a trunk segment.
The cable types may be mixed in the network, but shall remain consistent for a given branch
line or trunk segment.
NOTE 1 The minimum cable distance between the master or local station to another station depends on
...
IEC 61784-5-8 ®
Edition 3.0 2024-04
INTERNATIONAL
STANDARD
NORME
INTERNATIONALE
Industrial networks – Profiles –
Part 5-8: Installation of fieldbuses – Installation profiles for CPF 8
Réseaux industriels – Profils –
Partie 5-8: Installation des bus de terrain – Profils d'installation pour la CPF 8
All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any form
or by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from
either IEC or IEC's member National Committee in the country of the requester. If you have any questions about IEC
copyright or have an enquiry about obtaining additional rights to this publication, please contact the address below or
your local IEC member National Committee for further information.
Droits de reproduction réservés. Sauf indication contraire, aucune partie de cette publication ne peut être reproduite ni
utilisée sous quelque forme que ce soit et par aucun procédé, électronique ou mécanique, y compris la photocopie et
les microfilms, sans l'accord écrit de l'IEC ou du Comité national de l'IEC du pays du demandeur. Si vous avez des
questions sur le copyright de l'IEC ou si vous désirez obtenir des droits supplémentaires sur cette publication, utilisez
les coordonnées ci-après ou contactez le Comité national de l'IEC de votre pays de résidence.
IEC Secretariat Tel.: +41 22 919 02 11
3, rue de Varembé info@iec.ch
CH-1211 Geneva 20 www.iec.ch
Switzerland
About the IEC
The International Electrotechnical Commission (IEC) is the leading global organization that prepares and publishes
International Standards for all electrical, electronic and related technologies.
About IEC publications
The technical content of IEC publications is kept under constant review by the IEC. Please make sure that you have the
latest edition, a corrigendum or an amendment might have been published.
IEC publications search - webstore.iec.ch/advsearchform IEC Products & Services Portal - products.iec.ch
The advanced search enables to find IEC publications by a Discover our powerful search engine and read freely all the
variety of criteria (reference number, text, technical publications previews, graphical symbols and the glossary.
committee, …). It also gives information on projects, replaced With a subscription you will always have access to up to date
and withdrawn publications. content tailored to your needs.
IEC Just Published - webstore.iec.ch/justpublished
Electropedia - www.electropedia.org
Stay up to date on all new IEC publications. Just Published
The world's leading online dictionary on electrotechnology,
details all new publications released. Available online and once
containing more than 22 500 terminological entries in English
a month by email.
and French, with equivalent terms in 25 additional languages.
Also known as the International Electrotechnical Vocabulary
IEC Customer Service Centre - webstore.iec.ch/csc
(IEV) online.
If you wish to give us your feedback on this publication or need
further assistance, please contact the Customer Service
Centre: sales@iec.ch.
A propos de l'IEC
La Commission Electrotechnique Internationale (IEC) est la première organisation mondiale qui élabore et publie des
Normes internationales pour tout ce qui a trait à l'électricité, à l'électronique et aux technologies apparentées.
A propos des publications IEC
Le contenu technique des publications IEC est constamment revu. Veuillez vous assurer que vous possédez l’édition la
plus récente, un corrigendum ou amendement peut avoir été publié.
Recherche de publications IEC - IEC Products & Services Portal - products.iec.ch
webstore.iec.ch/advsearchform Découvrez notre puissant moteur de recherche et consultez
La recherche avancée permet de trouver des publications IEC gratuitement tous les aperçus des publications, symboles
en utilisant différents critères (numéro de référence, texte, graphiques et le glossaire. Avec un abonnement, vous aurez
comité d’études, …). Elle donne aussi des informations sur les toujours accès à un contenu à jour adapté à vos besoins.
projets et les publications remplacées ou retirées.
Electropedia - www.electropedia.org
IEC Just Published - webstore.iec.ch/justpublished
Le premier dictionnaire d'électrotechnologie en ligne au monde,
Restez informé sur les nouvelles publications IEC. Just
avec plus de 22 500 articles terminologiques en anglais et en
Published détaille les nouvelles publications parues.
français, ainsi que les termes équivalents dans 25 langues
Disponible en ligne et une fois par mois par email.
additionnelles. Egalement appelé Vocabulaire
Electrotechnique International (IEV) en ligne.
Service Clients - webstore.iec.ch/csc
Si vous désirez nous donner des commentaires sur cette
publication ou si vous avez des questions contactez-nous:
sales@iec.ch.
IEC 61784-5-8 ®
Edition 3.0 2024-04
INTERNATIONAL
STANDARD
NORME
INTERNATIONALE
Industrial networks – Profiles –
Part 5-8: Installation of fieldbuses – Installation profiles for CPF 8
Réseaux industriels – Profils –
Partie 5-8: Installation des bus de terrain – Profils d'installation pour la CPF 8
INTERNATIONAL
ELECTROTECHNICAL
COMMISSION
COMMISSION
ELECTROTECHNIQUE
INTERNATIONALE
ICS 25.040.40, 35.100.40 ISBN 978-2-8322-8349-3
– 2 – IEC 61784-5-8:2024 © IEC 2024
CONTENTS
FOREWORD . 7
INTRODUCTION . 9
1 Scope . 10
2 Normative references . 10
3 Terms, definitions and abbreviated terms . 10
4 CPF 8: Overview of installation profiles . 11
5 Installation profile conventions. 11
6 Conformance to installation profiles . 12
Annex A (normative) CP 8/1 and CP 8/2 (CC-Link™/V1 and CC-Link™/V2) specific
installation profile . 13
A.1 Installation profile scope . 13
A.2 Normative references . 13
A.3 Installation profile terms, definitions, and abbreviated terms . 13
A.3.1 Terms and definitions . 13
A.3.2 Abbreviated terms . 13
A.3.3 Conventions for installation profiles . 13
A.4 Installation planning . 13
A.4.1 General . 13
A.4.2 Planning requirements . 14
A.4.3 Network capabilities . 14
A.4.4 Selection and use of cabling components . 16
A.4.5 Cabling planning documentation . 21
A.4.6 Verification of cabling planning specification . 21
A.5 Installation implementation. 21
A.5.1 General requirements . 21
A.5.2 Cable installation . 22
A.5.3 Connector installation . 23
A.5.4 Terminator installation . 23
A.5.5 Device installation . 24
A.5.6 Coding and labelling . 24
A.5.7 Earthing and bonding of equipment and devices and shield cabling . 24
A.5.8 As-implemented cabling documentation . 24
A.6 Installation verification and installation acceptance test . 25
A.6.1 General . 25
A.6.2 Installation verification . 25
A.6.3 Installation acceptance test . 26
A.7 Installation administration . 26
A.8 Installation maintenance and installation troubleshooting . 26
Annex B (normative) CP 8/3 (CC-Link/LT™) specific installation profile . 27
B.1 Installation profile scope . 27
B.2 Normative references . 27
B.3 Installation profile terms, definitions, and abbreviated terms . 27
B.3.1 Terms and definitions . 27
B.3.2 Abbreviated terms . 27
B.3.3 Conventions for installation profiles . 27
B.4 Installation planning . 27
B.4.1 General . 27
B.4.2 Planning requirements . 28
B.4.3 Network capabilities . 28
B.4.4 Selection and use of cabling components . 31
B.4.5 Cabling planning documentation . 38
B.4.6 Verification of cabling planning specification . 38
B.5 Installation implementation. 38
B.5.1 General requirements . 38
B.5.2 Cable installation . 38
B.5.3 Connector installation . 39
B.5.4 Terminator installation . 40
B.5.5 Device installation . 40
B.5.6 Coding and labelling . 40
B.5.7 Earthing and bonding of equipment and devices and shield cabling . 40
B.5.8 As-implemented cabling documentation . 40
B.6 Installation verification and installation acceptance test . 41
B.6.1 General . 41
B.6.2 Installation verification . 41
B.6.3 Installation acceptance test . 42
B.7 Installation administration . 42
B.8 Installation maintenance and installation troubleshooting . 42
Annex C (normative) CP 8/4 (CC-Link IE™ Controller Network) specific installation
profile . 43
C.1 Installation profile scope . 43
C.2 Normative references . 43
C.3 Installation profile terms, definitions, and abbreviated terms . 43
C.3.1 Terms and definitions . 43
C.3.2 Abbreviated terms . 43
C.3.3 Conventions for installation profiles . 43
C.4 Installation planning . 43
C.4.1 General . 43
C.4.2 Planning requirements . 43
C.4.3 Network capabilities . 44
C.4.4 Selection and use of cabling components . 45
C.4.5 Cabling planning documentation . 51
C.4.6 Verification of cabling planning specification . 51
C.5 Installation implementation. 51
C.5.1 General requirements . 51
C.5.2 Cable installation . 52
C.5.3 Connector installation . 53
C.5.4 Terminator installation . 53
C.5.5 Device installation . 54
C.5.6 Coding and labelling . 54
C.5.7 Earthing and bonding of equipment and devices and shield cabling . 54
C.5.8 As-implemented cabling documentation . 55
C.6 Installation verification and installation acceptance test . 55
C.6.1 General . 55
C.6.2 Installation verification . 55
C.6.3 Installation acceptance test . 56
– 4 – IEC 61784-5-8:2024 © IEC 2024
C.7 Installation administration . 56
C.8 Installation maintenance and installation troubleshooting . 56
Annex D (normative) CP 8/5 (CC-Link IE™ Field Network) specific installation profile . 57
D.1 Installation profile scope . 57
D.2 Normative references . 57
D.3 Installation profile terms, definitions, and abbreviated terms . 57
D.3.1 Terms and definitions . 57
D.3.2 Abbreviated terms . 57
D.3.3 Conventions for installation profiles . 57
D.4 Installation planning . 57
D.4.1 General . 57
D.4.2 Planning requirements . 57
D.4.3 Network capabilities . 58
D.4.4 Selection and use of cabling components . 59
D.4.5 Cabling planning documentation . 64
D.4.6 Verification of cabling planning specification . 64
D.5 Installation implementation. 64
D.5.1 General requirements . 64
D.5.2 Cable installation . 64
D.5.3 Connector installation . 66
D.5.4 Terminator installation . 66
D.5.5 Device installation . 66
D.5.6 Coding and labelling . 66
D.5.7 Earthing and bonding of equipment and devices and shield cabling . 66
D.5.8 As-implemented cabling documentation . 67
D.6 Installation verification and installation acceptance test . 67
D.6.1 General . 67
D.6.2 Installation verification . 67
D.6.3 Installation acceptance test . 68
D.7 Installation administration . 69
D.8 Installation maintenance and installation troubleshooting . 69
Annex E (normative) CP 8/6 (CC-Link IE™ TSN) specific installation profile . 70
E.1 Installation profile scope . 70
E.2 Normative references . 70
E.3 Installation profile terms, definitions, and abbreviated terms . 70
E.3.1 Terms and definitions . 70
E.3.2 Abbreviated terms . 70
E.3.3 Conventions for installation profiles . 70
E.4 Installation planning . 70
E.4.1 General . 70
E.4.2 Planning requirements . 71
E.4.3 Network capabilities . 71
E.4.4 Selection and use of cabling components . 73
E.4.5 Cabling planning documentation . 79
E.4.6 Verification of cabling planning specification . 79
E.5 Installation implementation. 80
E.5.1 General requirements . 80
E.5.2 Cable installation . 80
E.5.3 Connector installation . 81
E.5.4 Terminator installation . 82
E.5.5 Device installation . 82
E.5.6 Coding and labelling . 82
E.5.7 Earthing and bonding of equipment and devices and shield cabling . 82
E.5.8 As-implemented cabling documentation . 83
E.6 Installation verification and installation acceptance test . 83
E.6.1 General . 83
E.6.2 Installation verification . 83
E.6.3 Installation acceptance test . 84
E.7 Installation administration . 84
E.8 Installation maintenance and installation troubleshooting . 84
Bibliography . 85
Figure 1 – Standards relationships . 9
Figure A.1 – Pass-through connector configuration . 15
Figure A.2 – Bus t-branch topology . 15
Figure A.3 – Wiring . 18
Figure B.1 – Powered network topology . 29
Figure B.2 – Bus t-branch topology . 29
Figure B.3 – Flat cable cross section – with key . 31
Figure B.4 – Flat cable cross section – without key . 31
Figure B.5 – Flat cable polarity marking . 32
Figure B.6 – Wiring . 33
Figure B.7 – Flat cable connector and terminal cover . 34
Table A.1 – Basic network characteristics for balanced cabling not based on Ethernet . 16
Table A.2 – Bus t-branch network characteristics . 16
Table A.3 – Information relevant to copper cable: fixed cables . 17
Table A.4 – Connectors for copper cabling CPs not based on Ethernet . 18
Table A.5 – Parameters for balanced cables . 22
Table A.6 – Cable conductor assignments . 23
Table B.1 – Basic network characteristics for balanced cabling not based on Ethernet . 30
Table B.2 – CP 8/3 additional topology length limits . 30
Table B.3 – Information relevant to copper cable: cords . 32
Table B.4 – Connectors for copper cabling CPs not based on Ethernet . 35
Table B.5 – Parameters for balanced cables . 38
Table B.6 – Flat cable conductor assignments . 39
Table C.1 – Network characteristics for balanced cabling based on Ethernet . 45
Table C.2 – Network characteristics for optical fibre cabling . 45
Table C.3 – Information relevant to copper cable: fixed cables . 46
Table C.4 – Information relevant to optical fibre cables . 47
Table C.5 – Connectors for balanced cabling CPs based on Ethernet . 47
Table C.6 – Optical fibre connecting hardware . 48
Table C.7 – Relationship between FOC and fibre types (CP 8/4) . 48
– 6 – IEC 61784-5-8:2024 © IEC 2024
Table C.8 – Parameters for balanced cables . 52
Table C.9 – Parameters for silica optical fibre cables . 52
Table D.1 – Network characteristics for balanced cabling based on Ethernet . 59
Table D.2 – Information relevant to copper cable: fixed cables . 60
Table D.3 – Connectors for balanced cabling CPs based on Ethernet . 61
Table D.4 – Parameters for balanced cables . 65
Table E.1 – Network characteristics for balanced cabling based on Ethernet . 72
Table E.2 – Network characteristics for optical fibre cabling . 73
Table E.3 – Information relevant to copper cable: fixed cables . 74
Table E.4 – Information relevant to optical fibre cables . 75
Table E.5 – Connectors for balanced cabling CPs based on Ethernet . 76
Table E.6 – Optical fibre connecting hardware . 76
Table E.7 – Relationship between FOC and fibre types (CP 8/6) . 76
Table E.8 – Parameters for balanced cables . 80
Table E.9 – Parameters for silica optical fibre cables . 80
INTERNATIONAL ELECTROTECHNICAL COMMISSION
____________
INDUSTRIAL NETWORKS –
PROFILES –
Part 5-8: Installation of fieldbuses –
Installation profiles for CPF 8
FOREWORD
1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising
all national electrotechnical committees (IEC National Committees). The object of IEC is to promote international
co-operation on all questions concerning standardization in the electrical and electronic fields. To this end and
in addition to other activities, IEC publishes International Standards, Technical Specifications, Technical Reports,
Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC Publication(s)”). Their
preparation is entrusted to technical committees; any IEC National Committee interested in the subject dealt with
may participate in this preparatory work. International, governmental and non-governmental organizations liaising
with the IEC also participate in this preparation. IEC collaborates closely with the International Organization for
Standardization (ISO) in accordance with conditions determined by agreement between the two organizations.
2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international
consensus of opinion on the relevant subjects since each technical committee has representation from all
interested IEC National Committees.
3) IEC Publications have the form of recommendations for international use and are accepted by IEC National
Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC
Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any
misinterpretation by any end user.
4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications
transparently to the maximum extent possible in their national and regional publications. Any divergence between
any IEC Publication and the corresponding national or regional publication shall be clearly indicated in the latter.
5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity
assessment services and, in some areas, access to IEC marks of conformity. IEC is not responsible for any
services carried out by independent certification bodies.
6) All users should ensure that they have the latest edition of this publication.
7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and
members of its technical committees and IEC National Committees for any personal injury, property damage or
other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and
expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC
Publications.
8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is
indispensable for the correct application of this publication.
9) IEC draws attention to the possibility that the implementation of this document may involve the use of (a)
patent(s). IEC takes no position concerning the evidence, validity or applicability of any claimed patent rights in
respect thereof. As of the date of publication of this document, IEC had not received notice of (a) patent(s), which
may be required to implement this document. However, implementers are cautioned that this may not represent
the latest information, which may be obtained from the patent database available at https://patents.iec.ch. IEC
shall not be held responsible for identifying any or all such patent rights. IEC shall not be held responsible for
identifying any or all such patent rights.
IEC 61784-5-8 has been prepared by subcommittee 65C: Industrial networks, of IEC technical
committee 65: Industrial-process measurement, control and automation. It is an International
Standard.
This document is to be used in conjunction with IEC 61918:2018, IEC 61918:2018/AMD1:2022
and IEC 61918:2018/AMD2:2024.
This third edition cancels and replaces the second edition published in 2018. This edition
constitutes a technical revision.
This edition includes the following significant technical changes with respect to the previous
edition:
– 8 – IEC 61784-5-8:2024 © IEC 2024
a) Annex E and related references have been added.
The text of this International Standard is based on the following documents:
Draft Report on voting
65C/1280/FDIS 65C/1295/RVD
Full information on the voting for its approval can be found in the report on voting indicated in
the above table.
The language used for the development of this International Standard is English.
This document was drafted in accordance with the ISO/IEC Directives, Part 2, and developed
in accordance with ISO/IEC Directives, Part 1 and ISO/IEC Directives, IEC Supplement,
available at www.iec.ch/members_experts/refdocs. The main document types developed by IEC
are described in greater detail at www.iec.ch/publications.
A list of all parts of IEC 61784-5 series, published under the general title Industrial networks –
Profiles – Installation of fieldbuses, can be found on the IEC website.
The committee has decided that the contents of this document will remain unchanged until the
stability date indicated on the IEC website under webstore.iec.ch in the data related to the
specific document. At this date, the document will be
• reconfirmed,
• withdrawn, or
• revised.
IMPORTANT – The "colour inside" logo on the cover page of this document indicates
that it contains colours which are considered to be useful for the correct understanding
of its contents. Users should therefore print this document using a colour printer.
INTRODUCTION
This document is one of a series produced to facilitate the use of communication networks in
industrial control systems.
IEC 61918:2018, IEC 61918:2018/AMD1:2022 and IEC 61918:2018/AMD2:2024 provide the
common requirements for the installation of communication networks in industrial control
systems. This installation profile standard provides the installation profiles of the
communication profiles (CP) of a specific communication profile family (CPF) by stating which
requirements of IEC 61918:2018 and IEC 61918:2018/AMD1:2022 fully apply and, where
necessary, by supplementing, modifying, or replacing the other requirements (see Figure 1).
For general background on fieldbuses, their profiles, and relationship between the installation
profiles specified in this document, see IEC 61158-1.
Each CP installation profile is specified in a separate annex of this document. Each annex is
structured exactly as the reference standard IEC 61918:2018 for the benefit of the persons
representing the roles in the fieldbus installation process as defined in IEC 61918:2018 (planner,
installer, verification personnel, validation personnel, maintenance personnel, administration
personnel). By reading the installation profile in conjunction with IEC 61918:2018, these
persons immediately know which requirements are common for the installation of all CPs and
which are modified or replaced. The conventions used to draft this document are defined in
Clause 5.
The provision of the installation profiles in one standard for each CPF (for example
IEC 61784-5-8 for CPF 8) allows readers to work with standards of a convenient size.
Figure 1 – Standards relationships
– 10 – IEC 61784-5-8:2024 © IEC 2024
INDUSTRIAL NETWORKS –
PROFILES –
Part 5-8: Installation of fieldbuses –
Installation profiles for CPF 8
1 Scope
TM1
This part of IEC 61784-5 specifies the installation profiles for CPF 8 (CC-Link ).
The installation profiles are specified in the annexes. These annexes are read in conjunction
with IEC 61918:2018, IEC 61918:2018/AMD1:2022 and IEC 61918:2018/AMD2:2024.
2 Normative references
The following documents are referred to in the text in such a way that some or all of their content
constitutes requirements of this document. For dated references, only the edition cited applies.
For undated references, the latest edition of the referenced document (including any
amendments) applies.
IEC 61918:2018 , Industrial communication networks – Installation of communication networks
in industrial premises
IEC 61918:2018/AMD1:2022
IEC 61918:2018/AMD2:2024
NOTE For profile specific normative references, see Clauses A.2, B.2, and E.2 respectively.
3 Terms, definitions and abbreviated terms
For the purposes of this document, the terms, definitions and abbreviated terms given in
IEC 61918:2018, Clause 3 and IEC 61918:2018/AMD1:2022, Clause 3 apply.
ISO and IEC maintain terminology databases for use in standardization at the following
addresses:
• IEC Electropedia: available at https://www.electropedia.org/
• ISO Online browsing platform: available at https://www.iso.org/obp
___________
CC-Link™, CC-Link/LT™ and CC-Link IE™ are trade names of Mitsubishi Electric Co., control of trade name use
is given to CCLink Partner Association. This information is given for the convenience of users of this document
and does not constitute an endorsement by IEC of the trademark holder or any of its products. Compliance to
this profile does not require use of the trade name. Use of the trade name requires permission of the trade name
holder.
The normative references of IEC 61918:2018, Clause 2, IEC 61918:2018/AMD1:2022, Clause 2 and
IEC 61918:2018/AMD2:2024, Clause 2, apply.
4 CPF 8: Overview of installation profiles
CPF 8 consists of six communication profiles as specified in IEC 61784-1-8 and IEC 61784-2-8.
TM TM
The installation requirements for CP 8/1 (CC-Link /V1) and CP 8/2 (CC-Link /V2) are
specified in Annex A.
TM
The installation requirements for CP 8/3 (CC-Link/LT ) are specified in Annex B.
TM
The installation requirements for CP 8/4 (CC-Link IE Controller Network) are specified in
Annex C.
TM
The installation requirements for CP 8/5 (CC-Link IE Field Network) are specified in Annex D.
TM
The installation requirements for CP 8/6 (CC-Link IE TSN) are specified in Annex E.
5 Installation profile conventions
The numbering of the clauses and subclauses in the annexes of this document corresponds to
the numbering of IEC 61918 main clauses and subclauses.
The annex clauses and subclauses of this document supplement, modify, or replace the
respective clauses and subclauses in IEC 61918.
Where there is no corresponding subclause of IEC 61918 in the normative annexes in this
document, the subclause of IEC 61918 applies without modification.
The annex heading letter represents the installation profile assigned in Clause 4. The annex
heading number shall represent the corresponding numbering of IEC 61918.
EXAMPLE "Subclause B.4.4" in IEC 61784-5-8 means that CP 8/3 specifies 4.4 of IEC 61918:2018 and
IEC 61918:2018/AMD1:2022.
All main clauses of IEC 61918 are cited and apply in full unless otherwise stated in each
normative installation profile annex.
If all subclauses of a (sub)clause are omitted, then the corresponding IEC 61918 (sub)clause
applies.
If in a (sub)clause it is written "Not applicable", then the corresponding IEC 61918 (sub)clause
does not apply.
If in a (sub)clause it is written "Addition:", then the corresponding IEC 61918 (sub)clause
applies with the additions written in the profile.
If in a (sub)clause it is written "Replacement:", then the text provided in the profile replaces the
text of the corresponding IEC 61918 (sub)clause.
NOTE A replacement can also comprise additions.
If in a (sub)clause it is written "Modification:", then the corresponding IEC 61918 (sub)clause
applies with the modifications written in the profile.
If all (sub)clauses of a (sub)clause are omitted but in this (sub)clause it is written "(Sub)clause
x has addition:" (or "replacement:") or "(Sub)clause x is not applicable.", then (sub)clause x
becomes valid as declared and all the other corresponding IEC 61918 (sub)clauses apply.
– 12 – IEC 61784-5-8:2024 © IEC 2024
6 Conformance to installation profiles
Each installation profile within this document includes parts of IEC 61918:2018 and
IEC 61918:2018/AMD1:2022. It may also include defined additional specifications.
A statement of compliance with an installation profile of this document shall be stated as either
Compliance with IEC 61784-5-8:2024 for CP 8/m or
Compliance with IEC 61784-5-8 (Ed.3.0) for CP 8/m
where the name within the angle brackets < > is optional and the angle brackets shall not be
included. The m within CP 8/m shall be replaced by the profile number 1 to 6.
NOTE The name can be the name of the profile, as: CC-Link/V1, CC-Link/V2, CC-Link/LT, CC-Link IE Controller
Network, CC-Link IE Field Network, or CC-Link IE TSN.
If the name is a trade name then the permission of the trade name holder shall be required.
Product standards shall not include any conformity assessment aspects (including quality
management provisions), neither normative nor informative, other than provisions for product
testing (evaluation and examination).
Annex A
(normative)
CP 8/1 and CP 8/2 (CC-Link™/V1 and CC-Link™/V2) specific installation
profile
A.1 Installation profile scope
Addition:
™
This annex specifies the installation profile for Communication Profile CP 8/1 (CC-Link /V1)
TM
and CP 8/2 (CC-Link /V2). The CP 8/1 and CP 8/2 are specified in IEC 61784-1-8.
CP 8/1 and CP 8/2 networks implement a medium attachment unit compliant with ISO/IEC 8482
and is a derivative of ANSI TIA/EIA-485-A.
A.2 Normative references
Addition:
ISO/IEC 8482, Information technology – Telecommunications and information exchange
between systems – Twisted pair multipoint interconnections
ANSI TIA/EIA-485-A, Electrical Characteristics of Generators and Receivers for Use in
Balanced Digital Multipoint Systems
A.3 Installation profile terms, definitions, and abbreviated terms
A.3.1 Terms and definitions
A.3.2 Abbreviated terms
A.3.3 Conventions for installation profiles
Not applicable.
A.4 Installation planning
A.4.1 General
A.4.1.1 Objective
A.4.1.2 Cabling in industrial premises
Addition:
Generic cabling in accordance with ISO/IEC 11801-3 is not suitable for the cabling of CP 8
...