Space systems — Space launch complexes, integration sites and other facilities — General testing guidelines

This document is applicable to new projects and programs and to redesigned and upgraded launch pad and integration sites. This document describes the testing phases, goals, and general aspects for launch space complexes and complexes for assembly and tests of a vehicle and spacecraft and the associated equipment that, after successful testing, will be ready for launch vehicle processing and launch. This document can be applied to the creation of international launch pad and integration sites. At creation of new launching space complexes and complexes for assembly and tests of a vehicle and spacecraft (or at their modernization) within the framework of one country, the rules established by that country can be applied.

Systèmes spatiaux — Complexes de lancement spatial, sites d'intégration et autres installations — Lignes directrices pour les essais

General Information

Status
Published
Publication Date
11-Aug-2021
Current Stage
6060 - International Standard published
Start Date
12-Aug-2021
Due Date
05-Jul-2021
Completion Date
12-Aug-2021
Ref Project

Relations

Buy Standard

Technical report
ISO/TR 17400:2021 - Space systems -- Space launch complexes, integration sites and other facilities -- General testing guidelines
English language
23 pages
sale 15% off
Preview
sale 15% off
Preview
Draft
ISO/PRF TR 17400:Version 19-jun-2021 - Space systems -- Space launch complexes, integration sites and other facilities -- General testing guidelines
English language
23 pages
sale 15% off
Preview
sale 15% off
Preview

Standards Content (Sample)

TECHNICAL ISO/TR
REPORT 17400
Second edition
2021-08
Space systems — Space launch
complexes, integration sites and other
facilities — General testing guidelines
Systèmes spatiaux — Complexes de lancement spatial, sites
d'intégration et autres installations — Lignes directrices pour les
essais
Reference number
ISO/TR 17400:2021(E)
©
ISO 2021

---------------------- Page: 1 ----------------------
ISO/TR 17400:2021(E)

COPYRIGHT PROTECTED DOCUMENT
© ISO 2021
All rights reserved. Unless otherwise specified, or required in the context of its implementation, no part of this publication may
be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting
on the internet or an intranet, without prior written permission. Permission can be requested from either ISO at the address
below or ISO’s member body in the country of the requester.
ISO copyright office
CP 401 • Ch. de Blandonnet 8
CH-1214 Vernier, Geneva
Phone: +41 22 749 01 11
Email: copyright@iso.org
Website: www.iso.org
Published in Switzerland
ii © ISO 2021 – All rights reserved

---------------------- Page: 2 ----------------------
ISO/TR 17400:2021(E)

Contents Page
Foreword .iv
Introduction .v
1 Scope . 1
2 Normative references . 1
3 Terms and definitions . 1
4 General characteristics . 2
5 Testing and acceptance phases and goals for launch pad and integration site .5
5.1 Testing phases . 5
5.2 Acceptance phases . 5
5.3 Facility testing and acceptance . 5
5.4 Main system factory testing . 5
5.5 Main system field testing . 6
5.6 Launch pad and integration site end-to-end testing . 6
6 General characteristics for testing and acceptance . 7
6.1 General considerations . 7
6.2 Test and acceptance procedure . 7
6.3 Main system factory testing . 8
6.4 Main system field testing .10
6.5 Acceptance of the main system and facility after field test.13
6.6 Launch pad and integration site end-to-end testing .15
6.7 Launch pad or integration site acceptance after end-to-end testing .18
7 Main system and facility modifications .20
Bibliography .23
© ISO 2021 – All rights reserved iii

---------------------- Page: 3 ----------------------
ISO/TR 17400:2021(E)

Foreword
ISO (the International Organization for Standardization) is a worldwide federation of national standards
bodies (ISO member bodies). The work of preparing International Standards is normally carried out
through ISO technical committees. Each member body interested in a subject for which a technical
committee has been established has the right to be represented on that committee. International
organizations, governmental and non-governmental, in liaison with ISO, also take part in the work.
ISO collaborates closely with the International Electrotechnical Commission (IEC) on all matters of
electrotechnical standardization.
The procedures used to develop this document and those intended for its further maintenance are
described in the ISO/IEC Directives, Part 1. In particular, the different approval criteria needed for the
different types of ISO documents should be noted. This document was drafted in accordance with the
editorial rules of the ISO/IEC Directives, Part 2 (see www .iso .org/ directives).
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. ISO shall not be held responsible for identifying any or all such patent rights. Details of
any patent rights identified during the development of the document will be in the Introduction and/or
on the ISO list of patent declarations received (see www .iso .org/ patents).
Any trade name used in this document is information given for the convenience of users and does not
constitute an endorsement.
For an explanation of the voluntary nature of standards, the meaning of ISO specific terms and
expressions related to conformity assessment, as well as information about ISO's adherence to the
World Trade Organization (WTO) principles in the Technical Barriers to Trade (TBT), see www .iso .org/
iso/ foreword .html.
This document was prepared by Technical Committee ISO/TC 20, Aircraft and space vehicles,
Subcommittee SC 14, Space systems and operations.
This second edition cancels and replaces the first edition (ISO/TR 17400:2003), which has been
technically revised.
The main changes compared to the previous edition are as follows:
— in the document all recommendations (“should”) were replaced by other verbs (“is”, “are”), all
permissions (“may”) were replaced by “can”;
— the term “main system” was updated;
— 3.1, 5.5, 6.3.3, 6.6.5, 6.6.8 were specified according to comments and proposals of the subcommittee
experts.
Any feedback or questions on this document should be directed to the user’s national standards body. A
complete listing of these bodies can be found at www .iso .org/ members .html.
iv © ISO 2021 – All rights reserved

---------------------- Page: 4 ----------------------
ISO/TR 17400:2021(E)

Introduction
The purpose of this document is describing the uniform practices for organizing the tests and promoting
verification of all parameters and characteristics of various launch complexes. It is necessary to define
the functions and to coordinate the activities of all the test participants, namely, the developers of
complexes and systems, the manufacturers of systems and equipment, the organizers of tests, the
customer, and others.
This document describes test activities and lists who will be responsible for the testing at launch pad
and integration sites for launch vehicle and spacecraft.
© ISO 2021 – All rights reserved v

---------------------- Page: 5 ----------------------
TECHNICAL REPORT ISO/TR 17400:2021(E)
Space systems — Space launch complexes, integration sites
and other facilities — General testing guidelines
1 Scope
This document is applicable to new projects and programs and to redesigned and upgraded launch pad
and integration sites. This document describes the testing phases, goals, and general aspects for launch
space complexes and complexes for assembly and tests of a vehicle and spacecraft and the associated
equipment that, after successful testing, will be ready for launch vehicle processing and launch. This
document can be applied to the creation of international launch pad and integration sites. At creation
of new launching space complexes and complexes for assembly and tests of a vehicle and spacecraft (or
at their modernization) within the framework of one country, the rules established by that country can
be applied.
2 Normative references
The following documents are referred to in the text in such a way that some or all of their content
constitutes requirements of this document. For dated references, only the edition cited applies. For
undated references, the latest edition of the referenced document (including any amendments) applies.
ISO 9000, Quality management systems — Fundamentals and vocabulary
3 Terms and definitions
For the purposes of this document, the terms and definitions given in ISO 9000 and the following apply.
ISO and IEC maintain terminology databases for use in standardization at the following addresses:
— ISO Online browsing platform: available at https:// www .iso .org/ obp
— IEC Electropedia: available at https:// www .electropedia .org/
3.1
integration site
equipment and facility designed for launch vehicle storage, assembly and testing, and launch vehicle
(space rocket) and spacecraft/payload(s) integration, post-integration testing, and launch preparation,
maintenance, servicing and preparation for transportation to the launch pad (3.3)
3.2
international launch pad and integration sites
land, ground/airborne/marine facilities, equipment, utilities, and infrastructure, created with the
cooperation of several countries or the entities that belong to more than one country, necessary for the
launch operations of launch vehicle and payload and for in-flight operations during the launch phase
3.3
launch pad
equipment and facility designed to provide for the pre-launch and launch operations of spacecraft
3.4
end-to-end testing
launch pad (3.3) or integration site (3.1) development phase including the testing and evaluation of its
overall readiness to support a launch vehicle and a spacecraft
© ISO 2021 – All rights reserved 1

---------------------- Page: 6 ----------------------
ISO/TR 17400:2021(E)

3.5
support system
integral part of the launch complex or integration site (3.1), which ensures the functioning of
technological units (systems) and the conditions of normal life of the operating personnel
3.6
main system
constituent part of launch pad (3.3) or constituent part of integration site (3.1) primarily responsible for
providing preparation and launch of a launch vehicle or spacecraft
3.7
main system factory testing
launch pad (3.3) or integration site (3.1) development phase that includes the testing of a completely
assembled and checked out main system (3.6) to determine its operational readiness to be shipped to
the operational launch pad or integration site for further testing or operation
3.8
main system field testing
launch pad (3.3) or integration site (3.1) development phase including the testing of an assembled, fully
equipped, and checked out (or factory tested) main system (3.6), which is conducted at the operational
launch pad or integration site to determine the system readiness for further testing or operation
3.9
test supervision team
acceptance team
group of experts formed by the customer (organization, company, etc.) with the goal of coordinating
work during specific testing or acceptance phases
4 General characteristics
4.1 Testing of launch pad and integration sites and the main systems is conducted in accordance with
the regulatory and design documentation specifications.
4.2 The test supervision team coordinates use of the launch pad and integration site and the system
testing process and work management.
4.3 The launch pad and integration site developer provides technical management during the launch
pad and integration site and system testing.
4.4 Appointments to test supervision and acceptance team are determined according to company or
agency recommendations before the beginning of a related testing phase.
Customer representatives participate in team activities and sign respective documents in the event the
representatives are employees of the company or agency.
4.5 As an option, customer representatives, participating in the testing, work in a joint control and
acceptance group (JCAG). JCAG functions are determined in agreements developed by the customer.
4.6 The system testing and acceptance team has the authority to convene representatives of design
and unit manufacturing organizations. These representatives are involved in:
— factory testing (the system manufacturing organization);
— field testing (the test organization);
— end-to-end testing (the team chairman).
2 © ISO 2021 – All rights reserved

---------------------- Page: 7 ----------------------
ISO/TR 17400:2021(E)

4.7 Depending on the results of the analysis of malfunctions or failures found in the course of testing,
the team has the authority to:
— continue testing without repeating the operations completed earlier;
— repeat the testing starting with a specific phase;
— repeat the testing from the beginning;
— stop testing before finding out the cause of the failure.
4.8 If failures occurred in the testing or the system was subjected to changes, the test supervision team
has the authority to increase the scope of testing as necessary.
4.9 The test supervision team has the authority to suspend or terminate testing in the event of the
following situations:
— occurrence of an emergency posing a hazard to personnel safety;
— failures;
— systems revealed to be out of conformance with the design specifications or documentation.
In these cases, the team reports to the body that appointed the team indicating the reasons for such a
termination (suspension) and provides the necessary documentation.
4.10 Testing suspended in accordance with 4.9 can be restarted only upon permission from the body
that appointed the team.
4.11 Personnel permitted to perform testing have the skills required to operate the main systems
within the range of their operational duties and have passed tests on the knowledge of the equipment, its
operating instructions, safety regulations, and test programs and procedures.
4.12 Personnel working in hazardous conditions or with harmful substances undergo a medical
examination prior to commencement of duties and annually thereafter.
4.13 Prior to the start of the tests or work at the site, measures are taken to ensure the safety of the
operating personnel and the environment.
4.14 The organization ensures safety requirements are observed and appropriate safety documents are
maintained.
4.15 During system testing and acceptance, interested organizations can conduct experimental and
research projects under special programs.
4.16 In the event experimental and research activities require the use of mock-ups of launch vehicles,
spacecraft, or testing equipment, the special programs and reports are cleared with the space complex
development organization.
4.17 Those main system items that fail during the tests are replaced upon the team decision.
4.18 When any test fails, the cause of the failure is established and eliminated.
4.19 Verify that the cause of the failure has been eliminated and continue testing:
— in case of a first-time (including independent elimination) failure - test team chairman, the tests
continue from the moment of the termination;
© ISO 2021 – All rights reserved 3

---------------------- Page: 8 ----------------------
ISO/TR 17400:2021(E)

— in case of recurrence of the same failure - test team chairman, the amount of retest is determined by
the test team chairman depending on character of failure;
— in case of occurrence of the same failure in a third time - enterprise-developer of the main system
together with the enterprise-manufacturer and representative customer, the tests are completely
repeated. The differences among the developer of the main system, manufacturer, and representative
customer are resolved by the developer of the launch pad (integration site) and customer.
4.20 Malfunctions and failures identified in the course of testing are eliminated by the organizations
responsible for the cause of these malfunctions and failures.
4.21 During test preparation, performance, and finalization and during the acceptance of the launch
pad and integration sites, main systems, and facilities, the organization in charge of the related work
processes reports under the procedure established in accordance with its respective national aerospace
industry practices.
4.22 The final decision on the results of the main system test and acceptance for operation is made by
the launch pad and integration site developers.
4.23 During the testing of main systems, a test log is maintained. The following is entered into the log:
— list of completed operations;
— test progress report;
— defects, malfunctions, failures, deviations or functioning irregularities of the main system found
during testing;
— methods for correcting the defects, malfunctions and failures;
— information on fine tuning or adjustments that were made;
— information about replaced components;
— main system nonconformities with the design documentation specifications;
— main system operating times on a daily or per-operation basis;
— decisions regarding test programs and/or procedure updates;
— suggestions for main system design and schemes improvement.
4.24 The main system and the changes required for the elimination of failures are implemented on
the basis of the design documents authorizing the changes. If necessary, the design documentation is
changed.
4.25 The procedure and timing for the submission of claims for faulty or incomplete main systems or
for poor quality are established in accordance with the regulations accepted in the respective national
space industry.
4.26 Companies finalize (approve and adopt) test programs and procedures within 30 calendar days of
receipt (or agreed specified date between related organizations).
4.27 In performing the facility and assembly work, the test organization and the chief engineering
system and facilities development organization, on a regular basis, ensure job quality control, building
code compliance control, technical specification conformance control, and design document requirement
conformance control. Experts from the operations or test organizations and the customer are involved in
the control.
4 © ISO 2021 – All rights reserved

---------------------- Page: 9 ----------------------
ISO/TR 17400:2021(E)

5 Testing and acceptance phases and goals for launch pad and integration site
5.1 Testing phases
The following main system and launch pad and integration site testing phases are adopted:
— main system factory testing;
— main system field testing;
— launch pad and integration site end-to-end testing (including space complex flight testing).
If necessary or on demand of the customer, other extra phases of tests are possible also.
5.2 Acceptance phases
The following main system and launch pad and integration site acceptance phases are adopted:
— main system acceptance after factory testing;
— main system and facility acceptance after field testing;
— launch pad and integration site acceptance after end-to-end testing.
5.3 Facility testing and acceptance
Facility testing and acceptance are accomplished in conformance with the established respective
national aviation and space industry practice and the facility specifications.
5.4 Main system factory testing
Main system factory testing is conducted to verify the main system conformance to the design
specifications and documentation, the operational readiness requirements, the main system acceptance
by the customer’s representatives, and system readiness for shipping to the assembly launch pad or
integration site for further testing. The goals of the main system factory testing are:
— verification of main system completeness;
— verification of main system operational readiness and functioning interfaces and conformance to
the design specifications and documentation;
— verification of the correct interaction and functioning of the item;
— verification of system compatibility and operation with the components of the launch vehicles,
spacecraft, and main systems of the launch pad, as necessary;
— verification of the accuracy of the adopted design approaches;
— verification of the feasibility of the assembly process;
— verification of the serviceability of the protective devices and electrical interlocks in emergency
modes;
— verification of the main system operational readiness and strength at the extreme parameter values
indicated in the design specifications;
— verification of the adequacy and completeness of operations documentation;
— verification of the adequacy and applicability of the tools, devices, and instruments required for the
main system operation;
— verification of the adequacy of the operational safety provisions;
© ISO 2021 – All rights reserved 5

---------------------- Page: 10 ----------------------
ISO/TR 17400:2021(E)

— verification of maintenance and repair accessibility;
— verification of the quality of manufacturing, assembly, and checkout;
— dating the scope of the main system field testing;
— verification of transportability;
— evaluation of the main system’s reliability;
— verification of the availability of component reliability documents (for experimental items only);
— verification of test metrological support.
5.5 Main system field testing
The main system field testing is conducted for the purpose of verifying main system operational
readiness and determining system readiness for end-to-end testing (in the event the main systems are
designated to undergo the end-to-end testing) or commissioning, if main systems aren’t designed to
undergo the end-to-end testing. The main system field testing goals are:
— verification of main system completeness;
— verification of main system assembly and checkout quality;
— verification of main system operational readiness and functioning interfaces and conformance to
the design specifications and documentation;
— verification of the main system compatibility and operation with the launch pad and integration
site’s other main systems and facilities, as necessary;
— verification of the adequacy of the main system operation safety instructions indicated in the
operations documentation;
— verification of maintenance and repair accessibility;
— verification of the human habitability conditions (lighting, ventilation, heating, harmful gas content,
etc.);
— verification of the adequacy of the operations personnel;
— verification of the efficiency of modifications made based on the factory test results;
— verification of the sufficiency and serviceability of the tools, devices, and instruments required for
main system operation;
— evaluation of the main system’s reliability;
— verification of test metrological support;
— systems readiness assessment for end-to-end testing or commissioning, if systems aren’t designed
to undergo the end-to-end testing.
5.6 Launch pad and integration site end-to-end testing
The end-to-end testing is conducted for the purpose of verifying the launch pad and integration site
operational readiness and determining the launch pad and integration site readiness for launch or
other subsequent tests (if necessary). The end-to-end launch pad and integration site testing goals are:
— verification of the launch pad and integration site operational readiness and its conformance to
the design specifications and documentation during standard operations involving launch vehicles
6 © ISO 2021 – All rights reserved

---------------------- Page: 11 ----------------------
ISO/TR 17400:2021(E)

and spacecraft under conditions closely approximating those conditions of actual operations but in
which testing does not require the actual launching of a launch vehicle;
— verification that the launch pad and integration site is complete;
— verification and update of the operational sequences of the main items during launch vehicle
preparation, launch, aborted launch, and preparation for a post-abort launch;
— verification and update of the time requirements for the main system operational procedures;
— verification of the accuracy of the adopted design approaches;
— verification of the compatibility of the main systems in the process sequences as well as with launch
vehicles and spacecraft;
— verification and update of the requirements and skill level of the operations personnel;
— verification and update of the completeness and adequacy of the operations documentation;
— verification of the adequacy of the safety maintenance of the launch pad and integration site and
main systems, including emergency situations;
— evaluation of the supply of spare parts and tools;
— update of the procedure for launch pad and integration site maintenance and post-launch
refurbishment;
— verification of the adequacy of the measures taken to eliminate failures and malfunctions based on
the results of previous and end-to-end testing;
— evaluation of launch pad and integration site reliability;
— verification of metrological support.
6 General characteristics for testing and acceptance
6.1 General considerations
Nature of the testing toward acceptance of the launch pad and integration launch pad and integration
site and the duties of each participating organizations are described generally in this section. Exact
definition of the acceptance condition, testing, and the duties of the participating organizations are
identified in the individual contract document.
6.2 Test and acceptance procedure
The following procedure is adopted for test and acceptance:
a) facility and support system test and acceptance are conducted in accordance with the national
aviation and space industry practice;
b) factory main system test;
c) main system acceptance after factory test;
d) main system field testing;
e) main system and facility acceptance after field test;
f) end-to-end testing;
g) launch pad and integration site acceptance for operation as part of the space complex.
© ISO 2021 – All rights reserved 7

---------------------- Page: 12 ----------------------
ISO/TR 17400:2021(E)

6.3 Main system factory testing
6.3.1 The factory test team is formed by the manufacturing organization at least 30 calendar days prior
to the beginning of testing (or agreed specified date between related organizations).
6.3.2 During the factory testing involving individual items of the launch vehicle, spacecraft, and other
main systems, the factory test team includes representatives of the organizations in charge of the launch
vehicle, spacecraft, and other main system development and grants the representatives the status of
team members.
6.3.3 10 working days before the test (or agreed specified date between the related organizations), the
manufacturing organization submits the following documentation to the team:
a) design specifications;
b) complete set of the design documentation updated as of the date the testing begins, including:
1) test program and procedures;
2) measurement procedures, as necessary.
c) documents for the test equipment (benches, devices, instruments, etc.) that verify readiness for
testing;
d) test schedule;
e) list of deviations from the design documentation that occurred during the manufacturing of the
main system at the manufacturing organization;
f) records and technical reports on the test results of specific items;
g) report on the verification of the electric insulation resistance of electronic components and
network cabling included in the main system(s);
h) acceptance records for the assembly of grounding and static electricity protection devices;
i) list of design identified modifications during the testing process as well as the set of documents
authorizing these modifications;
j) reports on the testing or work completed before the beginning of the factory testing;
k) submission note;
l) test log.
6.3.4 During the factory testing, the supervision team and the organizations participating in tests
(the launch pad (integ
...

TECHNICAL ISO/TR
REPORT 17400
Second edition
Space systems — Space launch
complexes, integration sites and other
facilities — General testing guidelines
Systèmes spatiaux — Complexes de lancement spatial, sites
d'intégration et autres installations — Lignes directrices pour les
essais
PROOF/ÉPREUVE
Reference number
ISO/TR 17400:2021(E)
©
ISO 2021

---------------------- Page: 1 ----------------------
ISO/TR 17400:2021(E)

COPYRIGHT PROTECTED DOCUMENT
© ISO 2021
All rights reserved. Unless otherwise specified, or required in the context of its implementation, no part of this publication may
be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting
on the internet or an intranet, without prior written permission. Permission can be requested from either ISO at the address
below or ISO’s member body in the country of the requester.
ISO copyright office
CP 401 • Ch. de Blandonnet 8
CH-1214 Vernier, Geneva
Phone: +41 22 749 01 11
Email: copyright@iso.org
Website: www.iso.org
Published in Switzerland
ii PROOF/ÉPREUVE © ISO 2021 – All rights reserved

---------------------- Page: 2 ----------------------
ISO/TR 17400:2021(E)

Contents Page
Foreword .iv
Introduction .v
1 Scope . 1
2 Normative references . 1
3 Terms and definitions . 1
4 General characteristics . 2
5 Testing and acceptance phases and goals for launch pad and integration site .5
5.1 Testing phases . 5
5.2 Acceptance phases . 5
5.3 Facility testing and acceptance . 5
5.4 Main system factory testing . 5
5.5 Main system field testing . 6
5.6 Launch pad and integration site end-to-end testing . 6
6 General characteristics for testing and acceptance . 7
6.1 General considerations . 7
6.2 Test and acceptance procedure . 7
6.3 Main system factory testing . 8
6.4 Main system field testing .10
6.5 Acceptance of the main system and facility after field test.13
6.6 Launch pad and integration site end-to-end testing .15
6.7 Launch pad or integration site acceptance after end-to-end testing .18
7 Main system and facility modifications .20
Bibliography .23
© ISO 2021 – All rights reserved PROOF/ÉPREUVE iii

---------------------- Page: 3 ----------------------
ISO/TR 17400:2021(E)

Foreword
ISO (the International Organization for Standardization) is a worldwide federation of national standards
bodies (ISO member bodies). The work of preparing International Standards is normally carried out
through ISO technical committees. Each member body interested in a subject for which a technical
committee has been established has the right to be represented on that committee. International
organizations, governmental and non-governmental, in liaison with ISO, also take part in the work.
ISO collaborates closely with the International Electrotechnical Commission (IEC) on all matters of
electrotechnical standardization.
The procedures used to develop this document and those intended for its further maintenance are
described in the ISO/IEC Directives, Part 1. In particular, the different approval criteria needed for the
different types of ISO documents should be noted. This document was drafted in accordance with the
editorial rules of the ISO/IEC Directives, Part 2 (see www .iso .org/ directives).
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. ISO shall not be held responsible for identifying any or all such patent rights. Details of
any patent rights identified during the development of the document will be in the Introduction and/or
on the ISO list of patent declarations received (see www .iso .org/ patents).
Any trade name used in this document is information given for the convenience of users and does not
constitute an endorsement.
For an explanation of the voluntary nature of standards, the meaning of ISO specific terms and
expressions related to conformity assessment, as well as information about ISO's adherence to the
World Trade Organization (WTO) principles in the Technical Barriers to Trade (TBT), see www .iso .org/
iso/ foreword .html.
This document was prepared by Technical Committee ISO/TC 20, Aircraft and space vehicles,
Subcommittee SC 14, Space systems and operations.
This second edition cancels and replaces the first edition (ISO/TR 17400:2003), which has been
technically revised.
The main changes compared to the previous edition are as follows:
— in the document all recommendations (“should”) were replaced by other verbs (“is”, “are”), all
permissions (“may”) were replaced by “can”;
— the term “main system” was updated;
— 3.1, 5.5, 6.3.3, 6.6.5, 6.6.8 were specified according to comments and proposals of the subcommittee
experts.
Any feedback or questions on this document should be directed to the user’s national standards body. A
complete listing of these bodies can be found at www .iso .org/ members .html.
iv PROOF/ÉPREUVE © ISO 2021 – All rights reserved

---------------------- Page: 4 ----------------------
ISO/TR 17400:2021(E)

Introduction
The purpose of this document is describing the uniform practices for organizing the tests and promoting
verification of all parameters and characteristics of various launch complexes. It is necessary to define
the functions and to coordinate the activities of all the test participants, namely, the developers of
complexes and systems, the manufacturers of systems and equipment, the organizers of tests, the
customer, and others.
This document describes test activities and lists who will be responsible for the testing at launch pad
and integration sites for launch vehicle and spacecraft.
© ISO 2021 – All rights reserved PROOF/ÉPREUVE v

---------------------- Page: 5 ----------------------
TECHNICAL REPORT ISO/TR 17400:2021(E)
Space systems — Space launch complexes, integration sites
and other facilities — General testing guidelines
1 Scope
This document is applicable to new projects and programs and to redesigned and upgraded launch pad
and integration sites. This document describes the testing phases, goals, and general aspects for launch
space complexes and complexes for assembly and tests of a vehicle and spacecraft and the associated
equipment that, after successful testing, will be ready for launch vehicle processing and launch. This
document can be applied to the creation of international launch pad and integration sites. At creation
of new launching space complexes and complexes for assembly and tests of a vehicle and spacecraft (or
at their modernization) within the framework of one country, the rules established by that country can
be applied.
2 Normative references
The following documents are referred to in the text in such a way that some or all of their content
constitutes requirements of this document. For dated references, only the edition cited applies. For
undated references, the latest edition of the referenced document (including any amendments) applies.
ISO 9000, Quality management systems — Fundamentals and vocabulary
3 Terms and definitions
For the purposes of this document, the terms and definitions given in ISO 9000 and the following apply.
ISO and IEC maintain terminology databases for use in standardization at the following addresses:
— ISO Online browsing platform: available at https:// www .iso .org/ obp
— IEC Electropedia: available at https:// www .electropedia .org/
3.1
integration site
equipment and facility designed for launch vehicle storage, assembly and testing, and launch vehicle
(space rocket) and spacecraft/payload(s) integration, post-integration testing, and launch preparation,
maintenance, servicing and preparation for transportation to the launch pad (3.3)
3.2
international launch pad and integration sites
land, ground/airborne/marine facilities, equipment, utilities, and infrastructure, created with the
cooperation of several countries or the entities that belong to more than one country, necessary for the
launch operations of launch vehicle and payload and for in-flight operations during the launch phase
3.3
launch pad
equipment and facility designed to provide for the pre-launch and launch operations of spacecraft
3.4
end-to-end testing
launch pad (3.3) or integration site (3.1) development phase including the testing and evaluation of its
overall readiness to support a launch vehicle and a spacecraft
© ISO 2021 – All rights reserved PROOF/ÉPREUVE 1

---------------------- Page: 6 ----------------------
ISO/TR 17400:2021(E)

3.5
support system
integral part of the launch complex or integration site (3.1), which ensures the functioning of
technological units (systems) and the conditions of normal life of the operating personnel
3.6
main system
constituent part of launch pad (3.3) or constituent part of integration site (3.1) primarily responsible for
providing preparation and launch of a launch vehicle or spacecraft
3.7
main system factory testing
launch pad (3.3) or integration site (3.1) development phase that includes the testing of a completely
assembled and checked out main system (3.6) to determine its operational readiness to be shipped to
the operational launch pad or integration site for further testing or operation
3.8
main system field testing
launch pad (3.3) or integration site (3.1) development phase including the testing of an assembled, fully
equipped, and checked out (or factory tested) main system (3.6), which is conducted at the operational
launch pad or integration site to determine the system readiness for further testing or operation
3.9
test supervision team
acceptance team
group of experts formed by the customer (organization, company, etc.) with the goal of coordinating
work during specific testing or acceptance phases
4 General characteristics
4.1 Testing of launch pad and integration sites and the main systems is conducted in accordance with
the regulatory and design documentation specifications.
4.2 The test supervision team coordinates use of the launch pad and integration site and the system
testing process and work management.
4.3 The launch pad and integration site developer provides technical management during the launch
pad and integration site and system testing.
4.4 Appointments to test supervision and acceptance team are determined according to company or
agency recommendations before the beginning of a related testing phase.
Customer representatives participate in team activities and sign respective documents in the event the
representatives are employees of the company or agency.
4.5 As an option, customer representatives, participating in the testing, work in a joint control and
acceptance group (JCAG). JCAG functions are determined in agreements developed by the customer.
4.6 The system testing and acceptance team has the authority to convene representatives of design
and unit manufacturing organizations. These representatives are involved in:
— factory testing (the system manufacturing organization);
— field testing (the test organization);
— end-to-end testing (the team chairman).
2 PROOF/ÉPREUVE © ISO 2021 – All rights reserved

---------------------- Page: 7 ----------------------
ISO/TR 17400:2021(E)

4.7 Depending on the results of the analysis of malfunctions or failures found in the course of testing,
the team has the authority to:
— continue testing without repeating the operations completed earlier;
— repeat the testing starting with a specific phase;
— repeat the testing from the beginning;
— stop testing before finding out the cause of the failure.
4.8 If failures occurred in the testing or the system was subjected to changes, the test supervision team
has the authority to increase the scope of testing as necessary.
4.9 The test supervision team has the authority to suspend or terminate testing in the event of the
following situations:
— occurrence of an emergency posing a hazard to personnel safety;
— failures;
— systems revealed to be out of conformance with the design specifications or documentation.
In these cases, the team reports to the body that appointed the team indicating the reasons for such a
termination (suspension) and provides the necessary documentation.
4.10 Testing suspended in accordance with 4.9 can be restarted only upon permission from the body
that appointed the team.
4.11 Personnel permitted to perform testing have the skills required to operate the main systems
within the range of their operational duties and have passed tests on the knowledge of the equipment, its
operating instructions, safety regulations, and test programs and procedures.
4.12 Personnel working in hazardous conditions or with harmful substances undergo a medical
examination prior to commencement of duties and annually thereafter.
4.13 Prior to the start of the tests or work at the site, measures are taken to ensure the safety of the
operating personnel and the environment.
4.14 The organization ensures safety requirements are observed and appropriate safety documents are
maintained.
4.15 During system testing and acceptance, interested organizations can conduct experimental and
research projects under special programs.
4.16 In the event experimental and research activities require the use of mock-ups of launch vehicles,
spacecraft, or testing equipment, the special programs and reports are cleared with the space complex
development organization.
4.17 Those main system items that fail during the tests are replaced upon the team decision.
4.18 When any test fails, the cause of the failure is established and eliminated.
4.19 Verify that the cause of the failure has been eliminated and continue testing:
— in case of a first-time (including independent elimination) failure - test team chairman, the tests
continue from the moment of the termination;
© ISO 2021 – All rights reserved PROOF/ÉPREUVE 3

---------------------- Page: 8 ----------------------
ISO/TR 17400:2021(E)

— in case of recurrence of the same failure - test team chairman, the amount of retest is determined by
the test team chairman depending on character of failure.
— in case of occurrence of the same failure in a third time - enterprise-developer of the main system
together with the enterprise-manufacturer and representative customer, the tests are completely
repeated. The differences among the developer of the main system, manufacturer, and representative
customer are resolved by the developer of the launch pad (integration site) and customer.
4.20 Malfunctions and failures identified in the course of testing are eliminated by the organizations
responsible for the cause of these malfunctions and failures.
4.21 During test preparation, performance, and finalization and during the acceptance of the launch
pad and integration sites, main systems, and facilities, the organization in charge of the related work
processes reports under the procedure established in accordance with its respective national aerospace
industry practices.
4.22 The final decision on the results of the main system test and acceptance for operation is made by
the launch pad and integration site developers.
4.23 During the testing of main systems, a test log is maintained. The following is entered into the log:
— list of completed operations;
— test progress report;
— defects, malfunctions, failures, deviations or functioning irregularities of the main system found
during testing;
— methods for correcting the defects, malfunctions and failures;
— information on fine tuning or adjustments that were made;
— information about replaced components;
— main system nonconformities with the design documentation specifications;
— main system operating times on a daily or per-operation basis;
— decisions regarding test programs and/or procedure updates;
— suggestions for main system design and schemes improvement.
4.24 The main system and the changes required for the elimination of failures are implemented on
the basis of the design documents authorizing the changes. If necessary, the design documentation is
changed.
4.25 The procedure and timing for the submission of claims for faulty or incomplete main systems or
for poor quality are established in accordance with the regulations accepted in the respective national
space industry.
4.26 Companies finalize (approve and adopt) test programs and procedures within 30 calendar days of
receipt (or agreed specified date between related organizations).
4.27 In performing the facility and assembly work, the test organization and the chief engineering
system and facilities development organization, on a regular basis, ensure job quality control, building
code compliance control, technical specification conformance control, and design document requirement
conformance control. Experts from the operations or test organizations and the customer are involved in
the control.
4 PROOF/ÉPREUVE © ISO 2021 – All rights reserved

---------------------- Page: 9 ----------------------
ISO/TR 17400:2021(E)

5 Testing and acceptance phases and goals for launch pad and integration site
5.1 Testing phases
The following main system and launch pad and integration site testing phases are adopted:
— main system factory testing;
— main system field testing;
— launch pad and integration site end-to-end testing (including space complex flight testing).
If necessary or on demand of the customer, other extra phases of tests are possible also.
5.2 Acceptance phases
The following main system and launch pad and integration site acceptance phases are adopted:
— main system acceptance after factory testing;
— main system and facility acceptance after field testing;
— launch pad and integration site acceptance after end-to-end testing.
5.3 Facility testing and acceptance
Facility testing and acceptance are accomplished in conformance with the established respective
national aviation and space industry practice and the facility specifications.
5.4 Main system factory testing
Main system factory testing is conducted to verify the main system conformance to the design
specifications and documentation, the operational readiness requirements, the main system acceptance
by the customer’s representatives, and system readiness for shipping to the assembly launch pad or
integration site for further testing. The goals of the main system factory testing are:
— verification of main system completeness;
— verification of main system operational readiness and functioning interfaces and conformance to
the design specifications and documentation;
— verification of the correct interaction and functioning of the item;
— verification of system compatibility and operation with the components of the launch vehicles,
spacecraft, and main systems of the launch pad, as necessary;
— verification of the accuracy of the adopted design approaches;
— verification of the feasibility of the assembly process;
— verification of the serviceability of the protective devices and electrical interlocks in emergency
modes;
— verification of the main system operational readiness and strength at the extreme parameter values
indicated in the design specifications;
— verification of the adequacy and completeness of operations documentation;
— verification of the adequacy and applicability of the tools, devices, and instruments required for the
main system operation;
— verification of the adequacy of the operational safety provisions;
© ISO 2021 – All rights reserved PROOF/ÉPREUVE 5

---------------------- Page: 10 ----------------------
ISO/TR 17400:2021(E)

— verification of maintenance and repair accessibility;
— verification of the quality of manufacturing, assembly, and checkout;
— dating the scope of the main system field testing;
— verification of transportability;
— evaluation of the main system’s reliability;
— verification of the availability of component reliability documents (for experimental items only);
— verification of test metrological support.
5.5 Main system field testing
The main system field testing is conducted for the purpose of verifying main system operational
readiness and determining system readiness for end-to-end testing (in the event the main systems are
designated to undergo the end-to-end testing) or commissioning, if main systems aren’t designed to
undergo the end-to-end testing. The main system field testing goals are:
— verification of main system completeness;
— verification of main system assembly and checkout quality;
— verification of main system operational readiness and functioning interfaces and conformance to
the design specifications and documentation;
— verification of the main system compatibility and operation with the launch pad and integration
site’s other main systems and facilities, as necessary;
— verification of the adequacy of the main system operation safety instructions indicated in the
operations documentation;
— verification of maintenance and repair accessibility;
— verification of the human habitability conditions (lighting, ventilation, heating, harmful gas content,
etc.);
— verification of the adequacy of the operations personnel;
— verification of the efficiency of modifications made based on the factory test results;
— verification of the sufficiency and serviceability of the tools, devices, and instruments required for
main system operation;
— evaluation of the main system’s reliability;
— verification of test metrological support;
— systems readiness assessment for end-to-end testing or commissioning, if systems aren’t designed
to undergo the end-to-end testing.
5.6 Launch pad and integration site end-to-end testing
The end-to-end testing is conducted for the purpose of verifying the launch pad and integration site
operational readiness and determining the launch pad and integration site readiness for launch or
other subsequent tests (if necessary). The end-to-end launch pad and integration site testing goals are:
— verification of the launch pad and integration site operational readiness and its conformance to
the design specifications and documentation during standard operations involving launch vehicles
6 PROOF/ÉPREUVE © ISO 2021 – All rights reserved

---------------------- Page: 11 ----------------------
ISO/TR 17400:2021(E)

and spacecraft under conditions closely approximating those conditions of actual operations but in
which testing does not require the actual launching of a launch vehicle;
— verification that the launch pad and integration site is complete;
— verification and update of the operational sequences of the main items during launch vehicle
preparation, launch, aborted launch, and preparation for a post-abort launch;
— verification and update of the time requirements for the main system operational procedures;
— verification of the accuracy of the adopted design approaches;
— verification of the compatibility of the main systems in the process sequences as well as with launch
vehicles and spacecraft;
— verification and update of the requirements and skill level of the operations personnel;
— verification and update of the completeness and adequacy of the operations documentation;
— verification of the adequacy of the safety maintenance of the launch pad and integration site and
main systems, including emergency situations;
— evaluation of the supply of spare parts and tools;
— update of the procedure for launch pad and integration site maintenance and post-launch
refurbishment;
— verification of the adequacy of the measures taken to eliminate failures and malfunctions based on
the results of previous and end-to-end testing;
— evaluation of launch pad and integration site reliability;
— verification of metrological support.
6 General characteristics for testing and acceptance
6.1 General considerations
Nature of the testing toward acceptance of the launch pad and integration launch pad and integration
site and the duties of each participating organizations are described generally in this section. Exact
definition of the acceptance condition, testing, and the duties of the participating organizations are
identified in the individual contract document.
6.2 Test and acceptance procedure
The following procedure is adopted for test and acceptance:
a) facility and support system test and acceptance are conducted in accordance with the national
aviation and space industry practice;
b) factory main system test;
c) main system acceptance after factory test;
d) main system field testing;
e) main system and facility acceptance after field test;
f) end-to-end testing;
g) launch pad and integration site acceptance for operation as part of the space complex.
© ISO 2021 – All rights reserved PROOF/ÉPREUVE 7

---------------------- Page: 12 ----------------------
ISO/TR 17400:2021(E)

6.3 Main system factory testing
6.3.1 The factory test team is formed by the manufacturing organization at least 30 calendar days prior
to the beginning of testing (or agreed specified date between related organizations).
6.3.2 During the factory testing involving individual items of the launch vehicle, spacecraft, and other
main systems, the factory test team includes representatives of the organizations in charge of the launch
vehicle, spacecraft, and other main system development and grants the representatives the status of
team members.
6.3.3 Ten working days before the test (or agreed specified date between the related organizations),
the manufacturing organization submits the following documentation to the team:
a) design specifications;
b) complete set of the design documentation updated as of the date the testing begins, including:
1) test program and procedures;
2) measurement procedures, as necessary.
c) documents for the test equipment (benches, devices, instruments, etc.) that verify readiness for
testing;
d) test schedule;
e) list of deviations from the design documentation that occurred during the manufacturing of the
main system at the manufacturing organization;
f) records and technical reports on the test results of specific items;
g) report on the verification of the electric insulation resistance of electronic components and
network cabling included in the main system(s);
h) acceptance records for the assembly of grounding and static electricity protection devices;
i) list of design identified modifications during the testing process as well as the set of documents
authorizing these modifications;
j) reports on the testing or work completed before the beginning of the factory testing;