Carbon dioxide capture, transportation and geological storage — Carbon dioxide storage using enhanced oil recovery (CO2-EOR)

1.1 Applicability This document applies to carbon dioxide (CO2) that is injected in enhanced recovery operations for oil and other hydrocarbons (CO2-EOR) for which quantification of CO2 that is safely stored long-term in association with the CO2-EOR project is sought. Recognizing that some CO2-EOR projects use non-anthropogenic CO2 in combination with anthropogenic CO2, the document also shows how allocation ratios could be utilized for optional calculations of the anthropogenic portion of the associated stored CO2 (see Annex B). 1.2 Non-applicability This document does not apply to quantification of CO2 injected into reservoirs where no hydrocarbon production is anticipated or occurring. Storage of CO2 in geologic formations that do not contain hydrocarbons is covered by ISO 27914 even if located above or below hydrocarbon producing reservoirs. If storage of CO2 is conducted in a reservoir from which hydrocarbons were previously produced but will no longer be produced in paying or commercial quantities, or where the intent of CO2 injection is not to enhance hydrocarbon recovery, such storage would also be subject to the requirements of ISO 27914. 1.3 Standard boundary 1.3.1 Inclusions The conceptual boundary of this document for CO2 stored in association with CO2-EOR includes: a) safe, long-term containment of CO2 within the EOR complex; b) CO2 leakage from the EOR complex through leakage pathways; and c) on-site CO2-EOR project loss of CO2 from wells, equipment or other facilities. 1.3.2 Exclusions This document does not include the following: a) lifecycle emissions, including but not limited to CO2 emissions from capture or transportation of CO2, on-site emissions from combustion or power generation, and CO2 emissions resulting from the combustion of produced hydrocarbons; b) storage of CO2 above ground; c) buffer and seasonal storage of CO2 below ground (similar to natural gas storage); d) any technique or product that does not involve injection of CO2 into the subsurface; and e) emissions of any GHGs other than CO2. NOTE Some authorities might require other GHG components of the CO2 stream to be quantified.

Captage, transport et stockage géologique du dioxyde de carbone — Stockage du dioxyde de carbone au moyen de la récupération assistée du pétrole (RAP-CO2)

1.1 Applicabilité Le présent document s'applique au dioxyde de carbone (CO2) qui est injecté lors d'opérations de récupération assistée du pétrole et d'autres hydrocarbures (RAP-CO2) pour lesquelles il est souhaitable de déterminer la quantité de CO2 stockée de manière sécurisée sur le long terme dans le cadre du projet de RAP-CO2. Reconnaissant que certains projets RAP-CO2 utilisent du CO2 non anthropique associé à du CO2 anthropique, le présent document montre également comment utiliser des ratios d'allocation pour des calculs optionnels de la part anthropique du CO2 associé stocké (voir l'Annexe B). 1.2 Non-applicabilité Le présent document ne s'applique pas à la quantification du CO2 injecté dans des réservoirs pour lesquels aucune production d'hydrocarbures n'est prévue ou existante. Le stockage de CO2 dans des formations géologiques ne contenant pas d'hydrocarbures est couvert par l'ISO 27914 même si elles sont situées au-dessus ou en dessous de réservoirs producteurs d'hydrocarbures. Si le stockage du CO2 est effectué dans un ancien réservoir producteur d'hydrocarbures qui ne produit plus de quantités rentables ou commerciales, ou pour lequel l'injection de CO2 n'est pas destinée à améliorer la récupération d'hydrocarbures, ce stockage est également soumis aux exigences de l'ISO 27914. 1.3 Périmètre de la norme 1.3.1 Inclusions Le périmètre conceptuel du présent document relatif au CO2 stocké dans le cadre d'un procédé de RAP-CO2 englobe: a) le confinement sécurisé sur le long terme de CO2 au sein du complexe de RAP; b) les fuites de CO2 du complexe de RAP à travers des cheminements de fuite; et c) les pertes de CO2 sur le site du projet de RAP-CO2 au niveau des puits, des équipements ou d'autres installations. 1.3.2 Exclusions Le présent document n'inclut pas: a) les émissions associées au cycle de vie, comprenant sans toutefois s'y limiter les émissions de CO2 lors du captage ou du transport du CO2, les émissions sur site résultant d'une combustion ou de la génération d'électricité, et les émissions de CO2 résultant de la combustion des hydrocarbures produits; b) le stockage du CO2 en surface; c) le stockage souterrain tampon et saisonnier de CO2 (similaire au stockage de gaz naturel); d) toute technique ou produit n'impliquant pas l'injection de CO2 dans le sous-sol; et e) toute émission de tous les GES autres que le CO2. NOTE Certaines autorités sont susceptibles d'exiger la quantification d'autres GES présents dans le flux de CO2.

General Information

Status
Published
Publication Date
29-Jan-2019
Current Stage
Ref Project

Buy Standard

Standard
ISO 27916:2019 - Carbon dioxide capture, transportation and geological storage -- Carbon dioxide storage using enhanced oil recovery (CO2-EOR)
English language
55 pages
sale 15% off
Preview
sale 15% off
Preview
Standard
ISO 27916:2019 - Captage, transport et stockage géologique du dioxyde de carbone -- Stockage du dioxyde de carbone au moyen de la récupération assistée du pétrole (RAP-CO2)
French language
59 pages
sale 15% off
Preview
sale 15% off
Preview

Standards Content (Sample)


INTERNATIONAL ISO
STANDARD 27916
First edition
2019-01
Carbon dioxide capture, transportation
and geological storage — Carbon
dioxide storage using enhanced oil
recovery (CO -EOR)
Captage, transport et stockage géologique du dioxyde de carbone —
Stockage du dioxyde de carbone au moyen de la récupération assistée
du pétrole (RAP-CO )
Reference number
©
ISO 2019
© ISO 2019
All rights reserved. Unless otherwise specified, or required in the context of its implementation, no part of this publication may
be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting
on the internet or an intranet, without prior written permission. Permission can be requested from either ISO at the address
below or ISO’s member body in the country of the requester.
ISO copyright office
CP 401 • Ch. de Blandonnet 8
CH-1214 Vernier, Geneva
Phone: +41 22 749 01 11
Fax: +41 22 749 09 47
Email: copyright@iso.org
Website: www.iso.org
Published in Switzerland
ii © ISO 2019 – All rights reserved

Contents Page
Foreword .v
Introduction .vi
1 Scope . 1
1.1 Applicability . 1
1.2 Non-applicability . 1
1.3 Standard boundary. 1
1.3.1 Inclusions . 1
1.3.2 Exclusions . 1
2 Normative references . 2
3 Terms and definitions . 2
4 Documentation . 4
4.1 Purpose . 4
4.2 Use of existing data . 4
4.3 Initial documentation . 5
4.4 Periodic documentation . 5
5 EOR complex description, qualification, and construction . 5
5.1 General . 5
5.2 Geological characterization and containment assessment of the EOR complex . 6
5.3 Description of the facilities within the CO -EOR project . 6
5.4 Existing wells within the EOR complex . 6
5.5 Operations history of the project reservoir . 7
6 Containment assurance and monitoring within the EOR complex .7
6.1 Containment assurance and EOR operation management plan . 7
6.1.1 EOR operations management plan. 7
6.1.2 Initial containment assurance . 7
6.1.3 Operational containment assurance . 8
6.2 Monitoring program, methods, and implementation . 8
6.2.1 Monitoring of potential leakage pathways . 8
6.2.2 Monitoring methods . 8
6.2.3 Monitoring program implementation . 9
7 Well construction . 9
7.1 New well construction . 9
7.2 Well intervention . 9
8 Quantification .10
8.1 General .10
8.2 Quantification principles .10
8.3 Quantification of input [m ] .11
input
8.4 Quantification of loss .11
8.4.1 Quantification of operational loss [m ] .11
loss operations
8.4.2 Leakage from facilities .12
8.4.3 Venting and flaring from operations .12
8.4.4 Entrained CO in products.12
8.4.5 Transfer of CO .
2 12
8.4.6 Loss from EOR complex .12
8.5 Allocation ratio for anthropogenic CO .
2 13
8.6 De minimis losses .13
8.7 Avoidance of double-counting .13
9 Recordkeeping and missing data .13
9.1 Record retention .13
9.2 Missing data procedures.13
10 Project termination .13
10.1 General .13
10.2 Periodic assurance of containment .14
10.3 Termination plan .14
10.4 Requisites for termination .14
10.5 CO -EOR project termination .14
10.6 Post termination .15
Annex A (informative) Introduction to CO -EOR .16
Annex B (informative) Example quantification calculation .33
Annex C (informative) Unit conversion .41
Bibliography .42
iv © ISO 2019 – All rights reserved

Foreword
ISO (the International Organization for Standardization) is a worldwide federation of national standards
bodies (ISO member bodies). The work of preparing International Standards is normally carried out
through ISO technical committees. Each member body interested in a subject for which a technical
committee has been established has the right to be represented on that committee. International
organizations, governmental and non-governmental, in liaison with ISO, also take part in the work.
ISO collaborates closely with the International Electrotechnical Commission (IEC) on all matters of
electrotechnical standardization.
The procedures used to develop this document and those intended for its further maintenance are
described in the ISO/IEC Directives, Part 1. In particular the different approval criteria needed for the
different types of ISO documents should be noted. This document was drafted in accordance with the
editorial rules of the ISO/IEC Directives, Part 2 (see www .iso .org/directives).
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. ISO shall not be held responsible for identifying any or all such patent rights. Details of
any patent rights identified during the development of the document will be in the Introduction and/or
on the ISO list of patent declarations received (see www .iso .org/patents).
Any trade name used in this document is information given for the convenience of users and does not
constitute an endorsement.
For an explanation on the voluntary nature of standards, the meaning of ISO specific terms and
expressions related to conformity assessment, as well as information about ISO's adherence to the
World Trade Organization (WTO) principles in the Technical Barriers to Trade (TBT) see the following
URL: www .iso .org/iso/foreword .html.
This document was prepared by Technical Committee ISO/TC 265, Carbon dioxide capture,
transportation, and geological storage.
Any feedback or questions on this document should be directed to the user’s national standards body. A
complete lis
...


NORME ISO
INTERNATIONALE 27916
Première édition
2019-01
Captage, transport et stockage
géologique du dioxyde de carbone —
Stockage du dioxyde de carbone au
moyen de la récupération assistée du
pétrole (RAP-CO )
Carbon dioxide capture, transportation and geological storage —
Carbon dioxide storage using enhanced oil recovery (CO -EOR)
Numéro de référence
©
ISO 2019
DOCUMENT PROTÉGÉ PAR COPYRIGHT
© ISO 2019
Tous droits réservés. Sauf prescription différente ou nécessité dans le contexte de sa mise en œuvre, aucune partie de cette
publication ne peut être reproduite ni utilisée sous quelque forme que ce soit et par aucun procédé, électronique ou mécanique,
y compris la photocopie, ou la diffusion sur l’internet ou sur un intranet, sans autorisation écrite préalable. Une autorisation peut
être demandée à l’ISO à l’adresse ci-après ou au comité membre de l’ISO dans le pays du demandeur.
ISO copyright office
Case postale 401 • Ch. de Blandonnet 8
CH-1214 Vernier, Genève
Tél.: +41 22 749 01 11
Fax: +41 22 749 09 47
E-mail: copyright@iso.org
Web: www.iso.org
Publié en Suisse
ii © ISO 2019 – Tous droits réservés

Sommaire Page
Avant-propos .v
Introduction .vi
1 Domaine d’application . 1
1.1 Applicabilité . 1
1.2 Non-applicabilité . 1
1.3 Périmètre de la norme . 1
1.3.1 Inclusions . 1
1.3.2 Exclusions . 1
2 Références normatives . 2
3 Termes et définitions . 2
4 Documentation . 4
4.1 Finalité . 4
4.2 Utilisation de données existantes . 5
4.3 Documentation initiale . 5
4.4 Documentation périodique . 5
5 Description, qualification et construction du complexe de RAP . 6
5.1 Généralités . 6
5.2 Caractérisation géologique et évaluation du confinement du complexe de RAP . 6
5.3 Description des installations présentes dans le projet de RAP-CO .
2 6
5.4 Puits existants dans le complexe de RAP . 7
5.5 Historique des opérations du réservoir du projet . 7
6 Assurance du confinement et surveillance à l’intérieur du complexe de RAP .7
6.1 Assurance du confinement et plan de management des opérations de RAP . 7
6.1.1 Plan de management des opérations de RAP. 7
6.1.2 Assurance initiale du confinement . 8
6.1.3 Assurance opérationnelle du confinement . 8
6.2 Programme, méthodes et mise en œuvre de la surveillance . 9
6.2.1 Surveillance des cheminements de fuite potentiels . 9
6.2.2 Méthodes de surveillance . 9
6.2.3 Mise en œuvre du programme de surveillance . 9
7 Construction des puits . 9
7.1 Construction de nouveaux puits . 9
7.2 Intervention sur puits .10
8 Quantification .10
8.1 Généralités .10
8.2 Principes de quantification .11
8.3 Quantification de l’entrée [m ] .12
entrée
8.4 Quantification des pertes .12
8.4.1 Quantification de la perte opérationnelle [m ] .12
perte, opérations
8.4.2 Fuite au niveau des installations .13
8.4.3 Mise à l’atmosphère et torchage liés aux opérations .13
8.4.4 CO entraîné dans les produits .13
8.4.5 Transfert du CO .
2 13
8.4.6 Perte au niveau du complexe de RAP .14
8.5 Ratio d’allocation du CO anthropique .14
8.6 Pertes négligeables .14
8.7 Prévention d’un double comptage .14
9 Enregistrement et données manquantes .14
9.1 Conservation des enregistrements .14
9.2 Procédures relatives aux données manquantes .14
10 Achèvement du projet .15
10.1 Généralités .15
10.2 Assurance périodique du confinement .15
10.3 Plan d’achèvement .15
10.4 Conditions d’achèvement . .15
10.5 Achèvement du projet de RAP-CO .
2 16
10.6 Post-achèvement .16
Annexe A (informative) Présentation du procédé de RAP-CO .17
Annexe B (informative) Exemple de calcul de quantification .36
Annexe C (informative) Conversion des unités .44
Bibliographie .45
iv © ISO 2019 – Tous droits réservés

Avant-propos
L’ISO (Organisation internationale de normalisation) est une fédération mondiale d’organismes
nationaux de normalisation (comités membres de l’ISO). L’élaboration des Normes internationales est
en général confiée aux comités techniques de l’ISO. Chaque comité membre intéressé par une étude
a le droit de faire partie du comité technique créé à cet effet. Les organisations internationales,
gouvernementales et non gouvernementales, en liaison avec l’ISO participent également aux travaux.
L’ISO collabore étroitement avec la Commission électrotechnique internationale (IEC) en ce qui
concerne la normalisation électrotechnique.
Les procédures utilisées pour élaborer le présent document et celles destinées à sa mise à jour sont
décrites dans les Directives ISO/IEC, Partie 1. Il convient, en particulier de prendre note des différents
critères d’approbation requis pour les différents types de documents ISO. Le présent document a été
rédigé conformément aux règles de rédaction données dans les Directives ISO/IEC, Partie 2 (voir www
.iso .org/directives).
L’attention est attirée sur le fait que certains des éléments du présent document peuvent faire l’objet de
droits de propriété intellectuelle ou de droits analogues. L’ISO ne saurait être tenue pour responsable
de ne pas avoir identifié de tels droits de propriété et averti de leur existence. Les détails concernant
les références aux droits de propriété intellectuelle ou autres droits analogues identifiés lors de
l’élaboration du document sont indiqués dans l’Introduction et/ou dans la liste des déclarations de
brevets reçues par l’ISO (voir www .iso .org/brevets).
Les appellations commerciales éventuellement mentionnées dans le présent document sont données
pour information, par souci de commodité, à l’intention des utilisateurs et ne sauraient constituer un
engagement.
Pour une explication de la nature volontaire des normes, la signification des termes et expressions
spécifiques de l’ISO liés à l’évaluation de la conformité, ou pour toute information au sujet de l’adhésion
de l’ISO aux principes de l’Organisation mondiale du commerce (OMC) concernant les obstacles
techniques au commerce (OTC), voir le lien suivant: www .iso .org/iso/fr/avant -propos.
Le présent document a été élaboré par le comité technique ISO/TC 265, Captage du dioxyde de carbone,
transport et stockage géologique.
Il convient que l’utilisateur adresse tout retour d’information ou toute question concernant le présent
document à l’organisme national de normalisation de son pays. Une liste exhaustive
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.