Fire protection — Automatic sprinkler systems — Part 2: Requirements and test methods for sprinkler system alarm valves, check valves, water motor alarms, retard devices and accelerators (ISO 6182-2:2025)

This document specifies performance, requirements, methods of test and marking requirements for the following equipment for use in automatic fire protection systems:
— wet alarm valves;
— retard devices;
— water motor alarms;
— dry pipe valves;
— accelerators;
— deluge valves;
— preaction valves;
— check valves.
Performance and test requirements for trim valves for alarm valves are not covered by this document.
The requirements for pressure reducing valves and fire pump relief valves are provided by ISO 6182-16 and ISO 6182-17.

Protection contre l'incendie — Systèmes d'extinction automatiques du type sprinkler — Partie 2: Exigences et méthodes d'essai des soupapes d'alarme hydrauliques, des limiteurs de surpression et des dispositifs d'alarme à moteur hydraulique (ISO 6182-2:2025)

Požarna zaščita - Avtomatski sprinklerski sistemi - 2. del: Zahteve in preskusne metode za alarmne ventile sprinkler sistemov, kontrolne ventile, alarmne naprave na vodni pogon, zadrževalne komore in pospeševalnike (ISO 6182-2:2025)

General Information

Status
Published
Publication Date
21-Oct-2025
Technical Committee
Current Stage
6060 - National Implementation/Publication (Adopted Project)
Start Date
20-Oct-2025
Due Date
25-Dec-2025
Completion Date
22-Oct-2025

Relations

Standard
SIST ISO 6182-2:2025
English language
34 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day
Standard
ISO 6182-2:2025 - Fire protection — Automatic sprinkler systems — Part 2: Requirements and test methods for sprinkler system alarm valves, check valves, water motor alarms, retard devices and accelerators Released:7. 07. 2025
English language
29 pages
sale 15% off
Preview
sale 15% off
Preview

Standards Content (Sample)


SLOVENSKI STANDARD
01-december-2025
Nadomešča:
SIST ISO 6182-2:2018
SIST ISO 6182-3:2018
SIST ISO 6182-5:2018
Požarna zaščita - Avtomatski sprinklerski sistemi - 2. del: Zahteve in preskusne
metode za alarmne ventile sprinkler sistemov, kontrolne ventile, alarmne naprave
na vodni pogon, zadrževalne komore in pospeševalnike (ISO 6182-2:2025)
Fire protection — Automatic sprinkler systems — Part 2: Requirements and test methods
for sprinkler system alarm valves, check valves, water motor alarms, retard devices and
accelerators (ISO 6182-2:2025)
Protection contre l'incendie — Systèmes d'extinction automatiques du type sprinkler —
Partie 2: Exigences et méthodes d'essai des soupapes d'alarme hydrauliques, des
limiteurs de surpression et des dispositifs d'alarme à moteur hydraulique (ISO 6182-
2:2025)
Ta slovenski standard je istoveten z: ISO 6182-2:2025
ICS:
13.220.20 Požarna zaščita Fire protection
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

International
Standard
ISO 6182-2
Fourth edition
Fire protection — Automatic
2025-07
sprinkler systems —
Part 2:
Requirements and test methods
for sprinkler system alarm valves,
check valves, water motor alarms,
retard devices and accelerators
Protection contre l'incendie — Systèmes d'extinction
automatiques du type sprinkler —
Partie 2: Exigences et méthodes d'essai des soupapes d'alarme
hydrauliques, des limiteurs de surpression et des dispositifs
d'alarme à moteur hydraulique
Reference number
© ISO 2025
All rights reserved. Unless otherwise specified, or required in the context of its implementation, no part of this publication may
be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting on
the internet or an intranet, without prior written permission. Permission can be requested from either ISO at the address below
or ISO’s member body in the country of the requester.
ISO copyright office
CP 401 • Ch. de Blandonnet 8
CH-1214 Vernier, Geneva
Phone: +41 22 749 01 11
Email: copyright@iso.org
Website: www.iso.org
Published in Switzerland
ii
Contents Page
Foreword .v
1 Scope . 1
2 Normative references . 1
3 Terms and definitions . 1
4 Production testing and quality control . 6
4.1 Responsibility .6
4.2 Production body strength test .6
4.3 Production operation test .6
4.4 Production leakage test .6
5 Requirements . 6
5.1 Overview .6
5.2 Nominal size .6
5.3 Connections .6
5.4 Rated working pressure .7
5.5 Body and cover .7
5.6 Strength (see 6.2) .7
5.7 Access for maintenance .7
5.8 Components (see 6.3, 6.4 and 6.12) .7
5.9 Leakage (see 6.5) .8
5.10 Non-metallic components (excluding gaskets, seals and other elastomeric parts) (see
6.5, 6.6, 6.7 and 6.11) . .9
5.11 Sealing assembly elements (see 6.8) .9
5.12 Clearances (see 6.9) .9
5.13 Hydraulic friction loss (see 6.10) . 13
5.14 Endurance (see 6.11) . 13
5.15 Operational performance (see 6.12) . 13
5.16 Equilibrium time (see 6.15) .14
5.17 Drains (see 6.4) . 15
5.18 Alarms (see 6.11) . 15
5.19 Retard devices (6.16) . 15
5.19.1 General . 15
5.19.2 Strength . 15
5.19.3 Strainer . 15
5.19.4 Support .16
5.19.5 Retard chamber drain .16
5.19.6 Components (see 6.6, 6.7, 6.12) .16
5.20 Height limitations for wet pilot lines (see 6.12) .16
5.21 Water motor alarms (see 6.17) .17
5.22 Water motor alarm connections (see 6.17) .17
5.23 Water motor alarm nozzles and strainers .17
5.24 Water motor alarm operation (see 6.17) .17
5.25 Water motor alarm bodies and covers .17
5.26 Water motor alarm audibility (see 6.17) .18
6 Tests . 19
6.1 Samples .19
6.2 Body strength (see 5.6) . 20
6.3 Spring and diaphragm test (see 5.8.5) . 20
6.4 Anti-reseating test of dry, preaction and deluge valves (see 5.8.6) . 20
6.5 Leakage and deformation tests (see 5.9).21
6.5.1 Body leakage test .21
6.5.2 Sealing assembly test .21
6.5.3 Wet and check valve leakage .21

iii
6.6 Warm water ageing test for non-metallic components (excluding gaskets and seals and
other elastomeric parts) (see 5.10, 5.19 and 5.21) .21
6.7 Air ageing test for non-metallic components (excluding gaskets and seals and other
elastomeric parts) (see 5.9, 5.18 and 5.20) . 22
6.8 Sealing element tests for valves (see 5.11) . 22
6.9 Salt mist corrosion test (see 5.12.2 and 5.12.7) . 23
6.9.1 Reagents . 23
6.9.2 Apparatus . 23
6.9.3 Procedure . 23
6.10 Hydraulic friction loss test for valves (see 5.13) . 23
6.11 Endurance test (see 5.14, 5.18) .
...


International
Standard
ISO 6182-2
Fourth edition
Fire protection — Automatic
2025-07
sprinkler systems —
Part 2:
Requirements and test methods
for sprinkler system alarm valves,
check valves, water motor alarms,
retard devices and accelerators
Protection contre l'incendie — Systèmes d'extinction
automatiques du type sprinkler —
Partie 2: Exigences et méthodes d'essai des soupapes d'alarme
hydrauliques, des limiteurs de surpression et des dispositifs
d'alarme à moteur hydraulique
Reference number
© ISO 2025
All rights reserved. Unless otherwise specified, or required in the context of its implementation, no part of this publication may
be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting on
the internet or an intranet, without prior written permission. Permission can be requested from either ISO at the address below
or ISO’s member body in the country of the requester.
ISO copyright office
CP 401 • Ch. de Blandonnet 8
CH-1214 Vernier, Geneva
Phone: +41 22 749 01 11
Email: copyright@iso.org
Website: www.iso.org
Published in Switzerland
ii
Contents Page
Foreword .v
1 Scope . 1
2 Normative references . 1
3 Terms and definitions . 1
4 Production testing and quality control . 6
4.1 Responsibility .6
4.2 Production body strength test .6
4.3 Production operation test .6
4.4 Production leakage test .6
5 Requirements . 6
5.1 Overview .6
5.2 Nominal size .6
5.3 Connections .6
5.4 Rated working pressure .7
5.5 Body and cover .7
5.6 Strength (see 6.2) .7
5.7 Access for maintenance .7
5.8 Components (see 6.3, 6.4 and 6.12) .7
5.9 Leakage (see 6.5) .8
5.10 Non-metallic components (excluding gaskets, seals and other elastomeric parts) (see
6.5, 6.6, 6.7 and 6.11) . .9
5.11 Sealing assembly elements (see 6.8) .9
5.12 Clearances (see 6.9) .9
5.13 Hydraulic friction loss (see 6.10) . 13
5.14 Endurance (see 6.11) . 13
5.15 Operational performance (see 6.12) . 13
5.16 Equilibrium time (see 6.15) .14
5.17 Drains (see 6.4) . 15
5.18 Alarms (see 6.11) . 15
5.19 Retard devices (6.16) . 15
5.19.1 General . 15
5.19.2 Strength . 15
5.19.3 Strainer . 15
5.19.4 Support .16
5.19.5 Retard chamber drain .16
5.19.6 Components (see 6.6, 6.7, 6.12) .16
5.20 Height limitations for wet pilot lines (see 6.12) .16
5.21 Water motor alarms (see 6.17) .17
5.22 Water motor alarm connections (see 6.17) .17
5.23 Water motor alarm nozzles and strainers .17
5.24 Water motor alarm operation (see 6.17) .17
5.25 Water motor alarm bodies and covers .17
5.26 Water motor alarm audibility (see 6.17) .18
6 Tests . 19
6.1 Samples .19
6.2 Body strength (see 5.6) . 20
6.3 Spring and diaphragm test (see 5.8.5) . 20
6.4 Anti-reseating test of dry, preaction and deluge valves (see 5.8.6) . 20
6.5 Leakage and deformation tests (see 5.9).21
6.5.1 Body leakage test .21
6.5.2 Sealing assembly test .21
6.5.3 Wet and check valve leakage .21

iii
6.6 Warm water ageing test for non-metallic components (excluding gaskets and seals and
other elastomeric parts) (see 5.10, 5.19 and 5.21) .21
6.7 Air ageing test for non-metallic components (excluding gaskets and seals and other
elastomeric parts) (see 5.9, 5.18 and 5.20) . 22
6.8 Sealing element tests for valves (see 5.11) . 22
6.9 Salt mist corrosion test (see 5.12.2 and 5.12.7) . 23
6.9.1 Reagents . 23
6.9.2 Apparatus . 23
6.9.3 Procedure . 23
6.10 Hydraulic friction loss test for valves (see 5.13) . 23
6.11 Endurance test (see 5.14, 5.18) . 23
6.12 Operational tests (see 5.15, 5.20) .24
6.12.1 General .24
6.12.2 Installation . 25
6.12.3 Dry and preaction valve differential . 25
6.12.4 Preaction valve operation . 25
6.12.5 Preaction operational test in the dry mode (sprinkler operation with detection
fault) .
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.