General Information

Abstract

The present document specifies an evolved version of the Green Abstraction Layer capable of operating within ETSI
NFV environments.

Status
Published
Publication Date
16-Apr-2024
Current Stage
6060 - National Implementation/Publication (Adopted Project)
Start Date
15-Apr-2024
Due Date
20-Jun-2024
Completion Date
17-Apr-2024
Mandate
M/462

Buy Documents

Standard

ETSI ES 203 682 V1.2.0 (2024-01) - Environmental Engineering (EE); Green Abstraction Layer (GAL); Power management capabilities of the future energy telecommunication fixed network nodes; Enhanced Interface for power management in Network Function Virtualisation (NFV) environments

English language (113 pages)
sale 15% off
Preview
sale 15% off
Preview
Standard

ETSI ES 203 682 V1.2.1 (2024-03) - Environmental Engineering (EE); Green Abstraction Layer (GAL); Power management capabilities of the future energy telecommunication fixed network nodes; Enhanced Interface for power management in Network Functions Virtualisation (NFV) environments

English language (113 pages)
sale 15% off
Preview
sale 15% off
Preview
Standardization document

SIST ES 203 682 V1.2.1:2024 - BARVE

English language (113 pages)
Preview
Preview
e-Library read for
×1 day

Overview

SIST ES 203 682 V1.2.1:2024 sets out requirements and specifications for enhanced power management in fixed telecommunication networks, focusing on environmental engineering and energy efficiency. This standard defines the Green Abstraction Layer (GAL) and its capability to support power management functions and interfaces within Network Function Virtualisation (NFV) environments. By aligning with ETSI ES 203 682, this document advances the management of energy consumption in next-generation telecom network nodes through standardised interfaces and procedures.

Key Topics

  • Green Abstraction Layer (GAL): Standardised abstraction to unify control and monitoring of power consumption in telecommunication networks.
  • Enhanced Power Management: Expanded capabilities for monitoring, controlling, and optimising power usage at the network node and virtual resource levels.
  • NFV Integration: Specification of interfaces compatible with virtualised network functions, ensuring effective energy management as networks move toward software-based infrastructures.
  • Virtual Energy-Aware States: Definitions for energy states in virtual network components, supporting dynamic scaling, operation, and orchestration.
  • Operational Interfaces: Procedures and operations for provisioning, updating, monitoring, and querying the state of network services and resources related to power consumption.

Applications

The environmental engineering principles within this standard deliver practical benefits across several real-world scenarios:

  • Telecom Operators: Deploying energy-efficient fixed network nodes using virtualised infrastructure, supporting green initiatives and reducing operational costs.
  • Network Design and Planning: Integrating GAL interfaces during the planning phase, enabling future-proof energy management strategies.
  • NFV Orchestration: Facilitating dynamic and automated power control in virtual network functions for optimal resource usage.
  • Energy Reporting and Compliance: Streamlining data collection for sustainability reporting and meeting regulatory energy efficiency requirements.
  • Vendor Interoperability: Ensuring different equipment and software vendors can interoperate through a harmonised set of power management interfaces, promoting a more sustainable technology ecosystem.

Related Standards

Organizations implementing SIST ES 203 682 V1.2.1:2024 should also consider the following related standards for comprehensive energy management in telecommunications:

  • ETSI ES 203 682 - The original European reference standard upon which the SIST standard is based.
  • ETSI NFV Architectural Framework - Provides general architecture guidance for NFV environments, ensuring compatibility with GAL specifications.
  • IEC 19.040 - Pertains to environmental testing, relevant for verifying power management features in network equipment.
  • ICS 33.040.01 - Covers general telecommunication systems and ensures coordination with other telecom network standards.

Summary

Adopting SIST ES 203 682 V1.2.1:2024 enables the telecommunication sector to enhance the sustainability and efficiency of next-generation networks. By leveraging the Green Abstraction Layer with support for NFV environments, network operators, vendors, and system integrators can achieve unified, efficient, and environmentally friendly power management across increasingly virtualised network infrastructures. This standard is a crucial asset in aligning operational goals with sustainability commitments in the telecom industry.

Buy Documents

Standard

ETSI ES 203 682 V1.2.0 (2024-01) - Environmental Engineering (EE); Green Abstraction Layer (GAL); Power management capabilities of the future energy telecommunication fixed network nodes; Enhanced Interface for power management in Network Function Virtualisation (NFV) environments

English language (113 pages)
sale 15% off
Preview
sale 15% off
Preview
Standard

ETSI ES 203 682 V1.2.1 (2024-03) - Environmental Engineering (EE); Green Abstraction Layer (GAL); Power management capabilities of the future energy telecommunication fixed network nodes; Enhanced Interface for power management in Network Functions Virtualisation (NFV) environments

English language (113 pages)
sale 15% off
Preview
sale 15% off
Preview
Standardization document

SIST ES 203 682 V1.2.1:2024 - BARVE

English language (113 pages)
Preview
Preview
e-Library read for
×1 day

Get Certified

Connect with accredited certification bodies for this standard

ANCE

Mexican certification and testing association.

EMA Mexico Verified

IMP NDT d.o.o.

Non-destructive testing services. Radiography, ultrasonic, magnetic particle, penetrant, visual inspection.

SA Slovenia Verified

Inštitut za kovinske materiale in tehnologije

Institute of Metals and Technology. Materials testing, metallurgical analysis, NDT.

SA Slovenia Verified

Sponsored listings

Frequently Asked Questions

SIST ES 203 682 V1.2.1:2024 is a standard published by the Slovenian Institute for Standardization (SIST). Its full title is "Environmental Engineering (EE) - Green Abstraction Layer (GAL); Power management capabilities of the future energy telecommunication fixed network nodes - Enhanced Interface for power management in Network Function Virtualisation (NFV) environments". This standard covers: The present document specifies an evolved version of the Green Abstraction Layer capable of operating within ETSI NFV environments.

The present document specifies an evolved version of the Green Abstraction Layer capable of operating within ETSI NFV environments.

SIST ES 203 682 V1.2.1:2024 is classified under the following ICS (International Classification for Standards) categories: 19.040 - Environmental testing; 33.040.01 - Telecommunication systems in general. The ICS classification helps identify the subject area and facilitates finding related standards.

SIST ES 203 682 V1.2.1:2024 is associated with the following European legislation: Standardization Mandates: M/462. When a standard is cited in the Official Journal of the European Union, products manufactured in conformity with it benefit from a presumption of conformity with the essential requirements of the corresponding EU directive or regulation.

SIST ES 203 682 V1.2.1:2024 is available in PDF format for immediate download after purchase. The document can be added to your cart and obtained through the secure checkout process. Digital delivery ensures instant access to the complete standard document.

Standards Content (Sample)


Final draft ETSI ES 203 682 V1.2.0 (2024-01)

ETSI STANDARD
Environmental Engineering (EE);
Green Abstraction Layer (GAL);
Power management capabilities of the future
energy telecommunication fixed network nodes;
Enhanced Interface for power management in
Network Functions Virtualisation (NFV) environments

2 Final draft ETSI ES 203 682 V1.2.0 (2024-01)

Reference
RES/EE-EEPS43
Keywords
energy management, NFV
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE

Tel.: +33 4 92 94 42 00  Fax: +33 4 93 65 47 16

Siret N° 348 623 562 00017 - APE 7112B
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° w061004871

Important notice
The present document can be downloaded from:
https://www.etsi.org/standards-search
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the prevailing version of an ETSI
deliverable is the one made publicly available in PDF format at www.etsi.org/deliver.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at
https://portal.etsi.org/TB/ETSIDeliverableStatus.aspx
If you find errors in the present document, please send your comment to one of the following services:
https://portal.etsi.org/People/CommiteeSupportStaff.aspx
If you find a security vulnerability in the present document, please report it through our
Coordinated Vulnerability Disclosure Program:
https://www.etsi.org/standards/coordinated-vulnerability-disclosure
Notice of disclaimer & limitation of liability
The information provided in the present deliverable is directed solely to professionals who have the appropriate degree of
experience to understand and interpret its content in accordance with generally accepted engineering or
other professional standard and applicable regulations.
No recommendation as to products and services or vendors is made or should be implied.
No representation or warranty is made that this deliverable is technically accurate or sufficient or conforms to any law
rule and/or regulation and further, no representation or warranty is made of merchantability or fitness
and/or governmental
for any particular purpose or against infringement of intellectual property rights.
In no event shall ETSI be held liable for loss of profits or any other incidental or consequential damages.

Any software contained in this deliverable is provided "AS IS" with no warranties, express or implied, including but not
limited to, the warranties of merchantability, fitness for a particular purpose and non-infringement of intellectual property
rights and ETSI shall not be held liable in any event for any damages whatsoever (including, without limitation, damages
for loss of profits, business interruption, loss of information, or any other pecuniary loss) arising out of or related to the use
of or inability to use the software.
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and
microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.

© ETSI 2024.
All rights reserved.
ETSI
3 Final draft ETSI ES 203 682 V1.2.0 (2024-01)
Contents
Intellectual Property Rights . 11
Foreword . 11
Modal verbs terminology . 11
Introduction . 11
1 Scope . 13
2 References . 13
2.1 Normative references . 13
2.2 Informative references . 14
3 Definition of terms, symbols and abbreviations . 14
3.1 Terms . 14
3.2 Symbols . 15
3.3 Abbreviations . 15
4 Foreground . 16
4.1 Green Abstraction Layer . 16
4.2 NFV architectural framework . 16
5 Use case . 18
5.1 Foreground - Virtualised Network Function scaling . 18
5.2 Scenario illustrating a VNF Energy-Aware States . 19
5.3 Actors and roles . 23
5.4 Pre-conditions . 23
5.5 Post-conditions . 23
5.6 Flow description . 24
6 Virtual energy-aware states definition. 24
6.1 Identification of the ETSI NFV components . 24
6.1.0 NFV components . 24
6.1.1 Identification of a Network Service . 24
6.1.2 Identification of a Virtualised Network Function . 24
6.1.3 Identification of a Virtualised Network Function Component . 25
6.1.4 Identification of a managed container infrastructure object . 25
6.1.5 Identification of a compute domain . 25
6.1.6 Identification of a VNFC instance energy-aware state . 25
6.1.7 Identification of a VNF instance energy-aware state . 25
6.1.8 Identification of a NS instance energy-aware state . 25
6.2 VNFC virtual energy-aware states definition . 26
6.2.1 When the Vdu is realized by a virtual compute resource . 26
6.2.1.1 Virtual compute resource required virtual energy-aware states . 26
6.2.2 When the Vdu is realized by a set of OS Containers resource . 27
6.2.2.1 OS Container and MCIO resource required virtual energy-aware states . 27
6.2.2.1.1 Resources association can be done at two different levels . 27
6.2.2.1.2 OS Container resource required virtual energy-aware states . 27
6.2.2.1.3 MCIO resource required virtual energy-aware states . 27
6.2.3 VNFC required virtual energy-aware states in the VduProfile information element . 28
6.3 VNF virtual energy-aware states definition . 28
6.3.1 VNF required virtual energy-aware states in the VNFD information element . 28
6.3.2 VNF required virtual energy-aware states in the VnfDf information element . 29
6.3.3 VNF required virtual energy-aware states in the InstantiationLevel information element . 29
6.3.4 VNF required virtual energy-aware states in the VduLevel information element . 29
6.3.5 VNF required virtual energy-aware states in the ScalingAspect information element . 29
6.3.6 VNF required virtual energy-aware states in the AspectDeltaDetails information element . 29
6.4 NS virtual energy-aware states definition . 30
6.4.1 NS required virtual energy-aware states in the NSD information element . 30
ETSI
4 Final draft ETSI ES 203 682 V1.2.0 (2024-01)
6.4.2 NS required virtual energy-aware states in the Network Service Deployment Flavour information
ele me nt . 30
6.4.3 NS required virtual energy-aware states in the NsScalingAspect information element . 30
6.4.4 NS required virtual energy-aware states in the NsLevel information element . 30
6.4.5 NS required virtual energy-aware states in the VnfToLevelMapping information element . 31
6.4.6 NS required virtual energy-aware states in the VnfProfile information element . 31
7 GAL Green Standard Interface . 31
7.0 NFV-MANO architectural framework . 31
7.1 Provisioning operations . 31
7.1.0 Generality . 31
7.1.1 Os-Ma-Nfvo reference point . 31
7.1.1.1 Instantiate NS operation . 31
7.1.1.1.1 Description . 31
7.1.1.1.2 Input parameters . 32
7.1.1.1.3 Output parameters . 32
7.1.1.1.4 Operation results . 32
7.1.1.2 Scale NS operation . 32
7.1.1.2.1 Description . 32
7.1.1.2.2 Input parameters . 32
7.1.1.2.3 Output parameters . 34
7.1.1.2.4 Operation results . 34
7.1.1.3 Update NS operation . 34
7.1.1.3.1 Description . 34
7.1.1.3.2 Input parameters . 34
7.1.1.3.3 Output parameters . 36
7.1.1.3.4 Operation results . 36
7.1.1.4 Query NS operation. 37
7.1.1.4.1 Description . 37
7.1.1.4.2 Input parameters . 37
7.1.1.4.3 Output parameters . 37
7.1.1.4.4 Operation results . 38
7.1.1.5 Notify (NsLcmOperationOccurenceNotification) operation . 38
7.1.1.5.1 Description . 38
7.1.1.5.2 NsLcmOperationOccurrenceNotification . 39
7.1.2 Or-Vnfm reference point . 40
7.1.2.1 Grant VNF Lifecycle Operation operation . 40
7.1.2.1.1 Description . 40
7.1.2.1.2 Input parameters . 40
7.1.2.1.3 Output parameters . 41
7.1.2.1.4 Operation results . 41
7.1.2.2 Instantiate VNF operation . 41
7.1.2.2.1 Description . 41
7.1.2.2.2 Input parameters . 41
7.1.2.2.3 Output parameters . 42
7.1.2.2.4 Operation results . 42
7.1.2.3 Scale VNF operation . 42
7.1.2.3.1 Description . 42
7.1.2.3.2 Input parameters . 42
7.1.2.3.3 Output parameters . 43
7.1.2.3.4 Operation results . 43
7.1.2.4 Scale VNF to Level operation . 43
7.1.2.4.1 Description . 43
7.1.2.4.2 Input parameters . 43
7.1.2.4.3 Output parameters . 44
7.1.2.4.4 Operation results . 44
7.1.2.5 Change VNF Flavour operation . 44
7.1.2.5.1 Description . 44
7.1.2.5.2 Input parameters . 44
7.1.2.5.3 Output parameters . 44
7.1.2.5.4 Operation results . 45
7.1.2.6 Query VNF operation . 45
ETSI
5 Final draft ETSI ES 203 682 V1.2.0 (2024-01)
7.1.2.6.1 Description . 45
7.1.2.6.2 Input parameters . 45
7.1.2.6.3 Output parameters . 45
7.1.2.6.4 Operation results . 46
7.1.2.7 Operate VNF operation . 46
7.1.2.7.1 Description . 46
7.1.2.7.2 Input parameters . 46
7.1.2.7.3 Output parameters . 47
7.1.2.7.4 Operation results . 47
7.1.2.8 Notify (VnfLcmOperationOccurrenceNotification) operation . 47
7.1.2.8.1 Description . 47
7.1.3 Or-Vi reference point . 48
7.1.3.1 Allocate Virtualised Compute Resource operation . 48
7.1.3.1.1 Description . 48
7.1.3.1.2 Input parameters . 48
7.1.3.1.3 Output parameters . 48
7.1.3.1.4 Operation results . 49
7.1.3.2 Update Virtualised Compute Resource operation . 49
7.1.3.2.1 Description . 49
7.1.3.2.2 Input parameters . 49
7.1.3.2.3 Output parameters . 49
7.1.3.2.4 Operation results . 49
7.1.3.3 Operate Virtualised Compute Resource operation . 50
7.1.3.3.1 Description . 50
7.1.3.3.2 Input parameters . 50
7.1.3.3.3 Output parameters . 50
7.1.3.3.4 Operation results . 50
7.1.3.4 Scale Virtualised Compute Resource operation . 50
7.1.3.4.1 Description . 50
7.1.3.4.2 Input parameters . 51
7.1.3.4.3 Output parameters . 51
7.1.3.4.4 Operation results . 51
7.1.3.5 Migrate Virtualised Compute Resource operation . 51
7.1.3.5.1 Description . 51
7.1.3.5.2 Input parameters . 52
7.1.3.5.3 Output parameters . 52
7.1.3.5.4 Operation results . 52
7.1.3.6 Notify (VirtualisedResourceChangeNotification) operation . 52
7.1.3.6.1 Description . 52
7.1.3.7 Notify (InformationChangeNotification) operation . 53
7.1.3.7.1 Description . 53
7.1.3.8 Query Virtualised Compute Resource Information operation . 53
7.1.3.8.1 Description . 53
7.1.3.8.2 Input parameters . 54
7.1.3.8.3 Output parameters . 54
7.1.3.8.4 Operation results . 54
7.1.3.9 Query Compute Capacity operation . 54
7.1.3.9.1 Description . 54
7.1.3.9.2 Input parameters . 54
7.1.3.9.3 Output parameters . 55
7.1.3.9.4 Operation results . 55
7.1.3.10 Notify (CapacityChangeNotification) operation . 55
7.1.3.10.1 Description . 55
7.1.3.11 Query Compute Resource Zone operation . 55
7.1.3.11.1 Description . 55
7.1.3.11.2 Input Parameters . 56
7.1.3.11.3 Output Parameters . 56
7.1.3.11.4 Operation Results . 56
7.1.3.12 Create Compute Flavour operation . 56
7.1.3.12.1 Description . 56
7.1.3.12.2 Input parameters . 56
7.1.3.12.3 Output parameters . 57
ETSI
6 Final draft ETSI ES 203 682 V1.2.0 (2024-01)
7.1.3.12.4 Operation Results . 57
7.1.3.13 Query Compute Flavour operation . 57
7.1.3.13.1 Description . 57
7.1.3.13.2 Input parameters . 57
7.1.3.13.3 Output parameters . 57
7.1.3.13.4 Operation Results . 57
7.1.3.14 Create Compute Resource Reservation operation . 58
7.1.3.14.1 Description . 58
7.1.3.14.2 Input parameters . 58
7.1.3.14.3 Output parameters . 58
7.1.3.14.4 Operation Results . 59
7.1.3.15 Query Compute Resource Reservation operation . 59
7.1.3.15.1 Description . 59
7.1.3.15.2 Input parameters . 60
7.1.3.15.3 Output parameters . 60
7.1.3.15.4 Operation Results . 60
7.1.3.16 Update Compute Resource Reservation operation . 60
7.1.3.16.1 Description . 60
7.1.3.16.2 Input parameters . 61
7.1.3.16.3 Output parameters . 61
7.1.3.16.4 Operation Results . 62
7.1.3.17 Create Compute Resource Quota operation . 62
7.1.3.17.1 Description . 62
7.1.3.17.2 Input parameters . 62
7.1.3.17.3 Output parameters . 63
7.1.3.17.4 Operation Results . 63
7.1.3.18 Query Compute Resource Quota operation . 63
7.1.3.18.1 Description . 63
7.1.3.18.2 Input parameters . 63
7.1.3.18.3 Output parameters . 64
7.1.3.18.4 Operation Results . 64
7.1.3.19 Update Compute Resource Quota operation . 64
7.1.3.19.1 Description . 64
7.1.3.19.2 Input parameters . 64
7.1.3.19.3 Output parameters . 65
7.1.3.19.4 Operation Results . 65
7.1.3.20 Create Compute Host Reservation operation . 65
7.1.3.20.1 Description . 65
7.1.3.20.2 Input parameters . 65
7.1.3.20.3 Output parameters . 65
7.1.3.20.4 Operation Results . 65
7.1.3.21 Query Compute Host Reservation operation . 66
7.1.3.21.1 Description . 66
7.1.3.21.2 Input parameters . 66
7.1.3.21.3 Output parameters . 66
7.1.3.21.4 Operation Results . 66
7.1.3.22 Update Compute Host Reservation operation . 66
7.1.3.22.1 Description . 66
7.1.3.22.2 Input parameters . 66
7.1.3.22.3 Output parameters . 67
7.1.3.22.4 Operation Results . 67
7.1.3.23 Query Compute Host Capacity operation . 67
7.1.3.23.1 Description . 67
7.1.3.23.2 Input parameters . 67
7.1.3.23.3 Output parameters . 67
7.1.3.23.4 Operation Results . 67
7.1.3.24 Notify (Host CapacityChangeNotification) operation . 67
7.1.3.24.1 Description . 67
7.1.4 Vi-Vnfm reference point . 68
7.1.4.1 Allocate Virtualised Compute Resource operation . 68
7.1.4.1.1 Description . 68
7.1.4.1.2 Input parameters . 68
ETSI
7 Final draft ETSI ES 203 682 V1.2.0 (2024-01)
7.1.4.1.3 Output parameters . 69
7.1.4.1.4 Operation results . 69
7.1.4.2 Query Virtualised Compute Resource operation . 69
7.1.4.2.1 Description . 69
7.1.4.2.2 Input parameters . 69
7.1.4.2.3 Output parameters . 69
7.1.4.2.4 Operation results . 70
7.1.4.3 Update Virtualised Compute Resource operation . 70
7.1.4.3.1 Description . 70
7.1.4.3.2 Input parameters . 70
7.1.4.3.3 Output parameters . 70
7.1.4.3.4 Operation results . 70
7.1.4.4 Operate Virtualised Compute Resource operation . 71
7.1.4.4.1 Description . 71
7.1.4.4.2 Input parameters . 71
7.1.4.4.3 Output parameters . 71
7.1.4.4.4 Operation results . 71
7.1.4.5 Scale Virtualised Compute Resource operation . 71
7.1.4.5.1 Description . 71
7.1.4.5.2 Input parameters . 72
7.1.4.5.3 Output parameters . 72
7.1.4.5.4 Operation results . 72
7.1.4.6 Migrate Virtualised Compute Resource operation . 72
7.1.4.6.1 Description . 72
7.1.4.6.2 Input parameters . 73
7.1.4.6.3 Output parameters . 73
7.1.4.6.4 Operation results . 73
7.1.4.7 Notify (VirtualisedResourceChangeNotification) operation . 73
7.1.4.7.1 Description .
...


ETSI STANDARD
Environmental Engineering (EE);
Green Abstraction Layer (GAL);
Power management capabilities of the future energy
telecommunication fixed network nodes;
Enhanced Interface for power management in Network
Functions Virtualisation (NFV) environments

2 ETSI ES 203 682 V1.2.1 (2024-03)

Reference
RES/EE-EEPS43
Keywords
energy management, NFV
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE

Tel.: +33 4 92 94 42 00  Fax: +33 4 93 65 47 16

Siret N° 348 623 562 00017 - APE 7112B
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° w061004871

Important notice
The present document can be downloaded from:
https://www.etsi.org/standards-search
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the prevailing version of an ETSI
deliverable is the one made publicly available in PDF format at www.etsi.org/deliver.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at
https://portal.etsi.org/TB/ETSIDeliverableStatus.aspx
If you find errors in the present document, please send your comment to one of the following services:
https://portal.etsi.org/People/CommiteeSupportStaff.aspx
If you find a security vulnerability in the present document, please report it through our
Coordinated Vulnerability Disclosure Program:
https://www.etsi.org/standards/coordinated-vulnerability-disclosure
Notice of disclaimer & limitation of liability
The information provided in the present deliverable is directed solely to professionals who have the appropriate degree of
experience to understand and interpret its content in accordance with generally accepted engineering or
other professional standard and applicable regulations.
No recommendation as to products and services or vendors is made or should be implied.
No representation or warranty is made that this deliverable is technically accurate or sufficient or conforms to any law
her, no representation or warranty is made of merchantability or fitness
and/or governmental rule and/or regulation and furt
for any particular purpose or against infringement of intellectual property rights.
In no event shall ETSI be held liable for loss of profits or any other incidental or consequential damages.

Any software contained in this deliverable is provided "AS IS" with no warranties, express or implied, including but not
limited to, the warranties of merchantability, fitness for a particular purpose and non-infringement of intellectual property
rights and ETSI shall not be held liable in any event for any damages whatsoever (including, without limitation, damages
for loss of profits, business interruption, loss of information, or any other pecuniary loss) arising out of or related to the use
of or inability to use the software.
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and
microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.

© ETSI 2024.
All rights reserved.
ETSI
3 ETSI ES 203 682 V1.2.1 (2024-03)
Contents
Intellectual Property Rights . 11
Foreword . 11
Modal verbs terminology . 11
Introduction . 11
1 Scope . 13
2 References . 13
2.1 Normative references . 13
2.2 Informative references . 14
3 Definition of terms, symbols and abbreviations . 14
3.1 Terms . 14
3.2 Symbols . 15
3.3 Abbreviations . 15
4 Foreground . 16
4.1 Green Abstraction Layer . 16
4.2 NFV architectural framework . 16
5 Use case . 18
5.1 Foreground - Virtualised Network Function scaling . 18
5.2 Scenario illustrating a VNF Energy-Aware States . 19
5.3 Actors and roles . 23
5.4 Pre-conditions . 23
5.5 Post-conditions . 23
5.6 Flow description . 24
6 Virtual energy-aware states definition. 24
6.1 Identification of the ETSI NFV components . 24
6.1.0 NFV components . 24
6.1.1 Identification of a Network Service . 24
6.1.2 Identification of a Virtualised Network Function . 24
6.1.3 Identification of a Virtualised Network Function Component . 25
6.1.4 Identification of a managed container infrastructure object . 25
6.1.5 Identification of a compute domain . 25
6.1.6 Identification of a VNFC instance energy-aware state . 25
6.1.7 Identification of a VNF instance energy-aware state . 25
6.1.8 Identification of a NS instance energy-aware state . 25
6.2 VNFC virtual energy-aware states definition . 26
6.2.1 When the Vdu is realized by a virtual compute resource . 26
6.2.1.1 Virtual compute resource required virtual energy-aware states . 26
6.2.2 When the Vdu is realized by a set of OS Containers resource . 27
6.2.2.1 OS Container and MCIO resource required virtual energy-aware states . 27
6.2.2.1.1 Resources association can be done at two different levels . 27
6.2.2.1.2 OS Container resource required virtual energy-aware states . 27
6.2.2.1.3 MCIO resource required virtual energy-aware states . 27
6.2.3 VNFC required virtual energy-aware states in the VduProfile information element . 28
6.3 VNF virtual energy-aware states definition . 28
6.3.1 VNF required virtual energy-aware states in the VNFD information element . 28
6.3.2 VNF required virtual energy-aware states in the VnfDf information element . 29
6.3.3 VNF required virtual energy-aware states in the InstantiationLevel information element . 29
6.3.4 VNF required virtual energy-aware states in the VduLevel information element . 29
6.3.5 VNF required virtual energy-aware states in the ScalingAspect information element . 29
6.3.6 VNF required virtual energy-aware states in the AspectDeltaDetails information element . 29
6.4 NS virtual energy-aware states definition . 30
6.4.1 NS required virtual energy-aware states in the NSD information element . 30
ETSI
4 ETSI ES 203 682 V1.2.1 (2024-03)
6.4.2 NS required virtual energy-aware states in the Network Service Deployment Flavour information
ele me nt . 30
6.4.3 NS required virtual energy-aware states in the NsScalingAspect information element . 30
6.4.4 NS required virtual energy-aware states in the NsLevel information element . 30
6.4.5 NS required virtual energy-aware states in the VnfToLevelMapping information element . 31
6.4.6 NS required virtual energy-aware states in the VnfProfile information element . 31
7 GAL Green Standard Interface . 31
7.0 NFV-MANO architectural framework . 31
7.1 Provisioning operations . 31
7.1.0 Generality . 31
7.1.1 Os-Ma-Nfvo reference point . 31
7.1.1.1 Instantiate NS operation . 31
7.1.1.1.1 Description . 31
7.1.1.1.2 Input parameters . 32
7.1.1.1.3 Output parameters . 32
7.1.1.1.4 Operation results . 32
7.1.1.2 Scale NS operation . 32
7.1.1.2.1 Description . 32
7.1.1.2.2 Input parameters . 32
7.1.1.2.3 Output parameters . 34
7.1.1.2.4 Operation results . 34
7.1.1.3 Update NS operation . 34
7.1.1.3.1 Description . 34
7.1.1.3.2 Input parameters . 34
7.1.1.3.3 Output parameters . 36
7.1.1.3.4 Operation results . 36
7.1.1.4 Query NS operation. 37
7.1.1.4.1 Description . 37
7.1.1.4.2 Input parameters . 37
7.1.1.4.3 Output parameters . 37
7.1.1.4.4 Operation results . 38
7.1.1.5 Notify (NsLcmOperationOccurenceNotification) operation . 38
7.1.1.5.1 Description . 38
7.1.1.5.2 NsLcmOperationOccurrenceNotification . 39
7.1.2 Or-Vnfm reference point . 40
7.1.2.1 Grant VNF Lifecycle Operation operation . 40
7.1.2.1.1 Description . 40
7.1.2.1.2 Input parameters . 40
7.1.2.1.3 Output parameters . 41
7.1.2.1.4 Operation results . 41
7.1.2.2 Instantiate VNF operation . 41
7.1.2.2.1 Description . 41
7.1.2.2.2 Input parameters . 41
7.1.2.2.3 Output parameters . 42
7.1.2.2.4 Operation results . 42
7.1.2.3 Scale VNF operation . 42
7.1.2.3.1 Description . 42
7.1.2.3.2 Input parameters . 42
7.1.2.3.3 Output parameters . 43
7.1.2.3.4 Operation results . 43
7.1.2.4 Scale VNF to Level operation . 43
7.1.2.4.1 Description . 43
7.1.2.4.2 Input parameters . 43
7.1.2.4.3 Output parameters . 44
7.1.2.4.4 Operation results . 44
7.1.2.5 Change VNF Flavour operation . 44
7.1.2.5.1 Description . 44
7.1.2.5.2 Input parameters . 44
7.1.2.5.3 Output parameters . 44
7.1.2.5.4 Operation results . 45
7.1.2.6 Query VNF operation . 45
ETSI
5 ETSI ES 203 682 V1.2.1 (2024-03)
7.1.2.6.1 Description . 45
7.1.2.6.2 Input parameters . 45
7.1.2.6.3 Output parameters . 45
7.1.2.6.4 Operation results . 46
7.1.2.7 Operate VNF operation . 46
7.1.2.7.1 Description . 46
7.1.2.7.2 Input parameters . 46
7.1.2.7.3 Output parameters . 47
7.1.2.7.4 Operation results . 47
7.1.2.8 Notify (VnfLcmOperationOccurrenceNotification) operation . 47
7.1.2.8.1 Description . 47
7.1.3 Or-Vi reference point . 48
7.1.3.1 Allocate Virtualised Compute Resource operation . 48
7.1.3.1.1 Description . 48
7.1.3.1.2 Input parameters . 48
7.1.3.1.3 Output parameters . 48
7.1.3.1.4 Operation results . 49
7.1.3.2 Update Virtualised Compute Resource operation . 49
7.1.3.2.1 Description . 49
7.1.3.2.2 Input parameters . 49
7.1.3.2.3 Output parameters . 49
7.1.3.2.4 Operation results . 49
7.1.3.3 Operate Virtualised Compute Resource operation . 50
7.1.3.3.1 Description . 50
7.1.3.3.2 Input parameters . 50
7.1.3.3.3 Output parameters . 50
7.1.3.3.4 Operation results . 50
7.1.3.4 Scale Virtualised Compute Resource operation . 50
7.1.3.4.1 Description . 50
7.1.3.4.2 Input parameters . 51
7.1.3.4.3 Output parameters . 51
7.1.3.4.4 Operation results . 51
7.1.3.5 Migrate Virtualised Compute Resource operation . 51
7.1.3.5.1 Description . 51
7.1.3.5.2 Input parameters . 52
7.1.3.5.3 Output parameters . 52
7.1.3.5.4 Operation results . 52
7.1.3.6 Notify (VirtualisedResourceChangeNotification) operation . 52
7.1.3.6.1 Description . 52
7.1.3.7 Notify (InformationChangeNotification) operation . 53
7.1.3.7.1 Description . 53
7.1.3.8 Query Virtualised Compute Resource Information operation . 53
7.1.3.8.1 Description . 53
7.1.3.8.2 Input parameters . 54
7.1.3.8.3 Output parameters . 54
7.1.3.8.4 Operation results . 54
7.1.3.9 Query Compute Capacity operation . 54
7.1.3.9.1 Description . 54
7.1.3.9.2 Input parameters . 54
7.1.3.9.3 Output parameters . 55
7.1.3.9.4 Operation results . 55
7.1.3.10 Notify (CapacityChangeNotification) operation . 55
7.1.3.10.1 Description . 55
7.1.3.11 Query Compute Resource Zone operation . 55
7.1.3.11.1 Description . 55
7.1.3.11.2 Input Parameters . 56
7.1.3.11.3 Output Parameters . 56
7.1.3.11.4 Operation Results . 56
7.1.3.12 Create Compute Flavour operation . 56
7.1.3.12.1 Description . 56
7.1.3.12.2 Input parameters . 56
7.1.3.12.3 Output parameters . 57
ETSI
6 ETSI ES 203 682 V1.2.1 (2024-03)
7.1.3.12.4 Operation Results . 57
7.1.3.13 Query Compute Flavour operation . 57
7.1.3.13.1 Description . 57
7.1.3.13.2 Input parameters . 57
7.1.3.13.3 Output parameters . 57
7.1.3.13.4 Operation Results . 57
7.1.3.14 Create Compute Resource Reservation operation . 58
7.1.3.14.1 Description . 58
7.1.3.14.2 Input parameters . 58
7.1.3.14.3 Output parameters . 58
7.1.3.14.4 Operation Results . 59
7.1.3.15 Query Compute Resource Reservation operation . 59
7.1.3.15.1 Description . 59
7.1.3.15.2 Input parameters . 60
7.1.3.15.3 Output parameters . 60
7.1.3.15.4 Operation Results . 60
7.1.3.16 Update Compute Resource Reservation operation . 60
7.1.3.16.1 Description . 60
7.1.3.16.2 Input parameters . 61
7.1.3.16.3 Output parameters . 61
7.1.3.16.4 Operation Results . 62
7.1.3.17 Create Compute Resource Quota operation . 62
7.1.3.17.1 Description . 62
7.1.3.17.2 Input parameters . 62
7.1.3.17.3 Output parameters . 63
7.1.3.17.4 Operation Results . 63
7.1.3.18 Query Compute Resource Quota operation . 63
7.1.3.18.1 Description . 63
7.1.3.18.2 Input parameters . 63
7.1.3.18.3 Output parameters . 64
7.1.3.18.4 Operation Results . 64
7.1.3.19 Update Compute Resource Quota operation . 64
7.1.3.19.1 Description . 64
7.1.3.19.2 Input parameters . 64
7.1.3.19.3 Output parameters . 65
7.1.3.19.4 Operation Results . 65
7.1.3.20 Create Compute Host Reservation operation . 65
7.1.3.20.1 Description . 65
7.1.3.20.2 Input parameters . 65
7.1.3.20.3 Output parameters . 65
7.1.3.20.4 Operation Results . 65
7.1.3.21 Query Compute Host Reservation operation . 66
7.1.3.21.1 Description . 66
7.1.3.21.2 Input parameters . 66
7.1.3.21.3 Output parameters . 66
7.1.3.21.4 Operation Results . 66
7.1.3.22 Update Compute Host Reservation operation . 66
7.1.3.22.1 Description . 66
7.1.3.22.2 Input parameters . 66
7.1.3.22.3 Output parameters . 67
7.1.3.22.4 Operation Results . 67
7.1.3.23 Query Compute Host Capacity operation . 67
7.1.3.23.1 Description . 67
7.1.3.23.2 Input parameters . 67
7.1.3.23.3 Output parameters . 67
7.1.3.23.4 Operation Results . 67
7.1.3.24 Notify (Host CapacityChangeNotification) operation . 67
7.1.3.24.1 Description . 67
7.1.4 Vi-Vnfm reference point . 68
7.1.4.1 Allocate Virtualised Compute Resource operation . 68
7.1.4.1.1 Description . 68
7.1.4.1.2 Input parameters . 68
ETSI
7 ETSI ES 203 682 V1.2.1 (2024-03)
7.1.4.1.3 Output parameters . 69
7.1.4.1.4 Operation results . 69
7.1.4.2 Query Virtualised Compute Resource operation . 69
7.1.4.2.1 Description . 69
7.1.4.2.2 Input parameters . 69
7.1.4.2.3 Output parameters . 69
7.1.4.2.4 Operation results . 70
7.1.4.3 Update Virtualised Compute Resource operation . 70
7.1.4.3.1 Description . 70
7.1.4.3.2 Input parameters . 70
7.1.4.3.3 Output parameters . 70
7.1.4.3.4 Operation results . 70
7.1.4.4 Operate Virtualised Compute Resource operation . 71
7.1.4.4.1 Description . 71
7.1.4.4.2 Input parameters . 71
7.1.4.4.3 Output parameters . 71
7.1.4.4.4 Operation results . 71
7.1.4.5 Scale Virtualised Compute Resource operation . 71
7.1.4.5.1 Description . 71
7.1.4.5.2 Input parameters . 72
7.1.4.5.3 Output parameters . 72
7.1.4.5.4 Operation results . 72
7.1.4.6 Migrate Virtualised Compute Resource operation . 72
7.1.4.6.1 Description . 72
7.1.4.6.2 Input parameters . 73
7.1.4.6.3 Output parameters . 73
7.1.4.6.4 Operation results . 73
7.1.4.7 Notify (VirtualisedResourceChangeNotification) operation . 73
7.1.4.7.1 Description .
...


SLOVENSKI STANDARD
01-junij-2024
Okoljski inženiring (EE) - Zelena abstraktna plast (GAL) - Zmožnosti upravljanja
energije v prihodnjih energijskih vozliščih fiksnega telekomunikacijskega omrežja
- Izboljšan vmesnik za upravljanje omrežne energije v okoljih z virtualizacijo
omrežnih funkcij (NFV)
Environmental Engineering (EE) - Green Abstraction Layer (GAL); Power management
capabilities of the future energy telecommunication fixed network nodes - Enhanced
Interface for power management in Network Function Virtualisation (NFV) environments
Ta slovenski standard je istoveten z: ETSI ES 203 682 V1.2.1 (2024-03)
ICS:
19.040 Preskušanje v zvezi z Environmental testing
okoljem
33.040.01 Telekomunikacijski sistemi Telecommunication systems
na splošno in general
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

ETSI STANDARD
Environmental Engineering (EE);
Green Abstraction Layer (GAL);
Power management capabilities of the future energy
telecommunication fixed network nodes;
Enhanced Interface for power management in Network
Functions Virtualisation (NFV) environments

2 ETSI ES 203 682 V1.2.1 (2024-03)

Reference
RES/EE-EEPS43
Keywords
energy management, NFV
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE

Tel.: +33 4 92 94 42 00  Fax: +33 4 93 65 47 16

Siret N° 348 623 562 00017 - APE 7112B
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° w061004871

Important notice
The present document can be downloaded from:
https://www.etsi.org/standards-search
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the prevailing version of an ETSI
deliverable is the one made publicly available in PDF format at www.etsi.org/deliver.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at
https://portal.etsi.org/TB/ETSIDeliverableStatus.aspx
If you find errors in the present document, please send your comment to one of the following services:
https://portal.etsi.org/People/CommiteeSupportStaff.aspx
If you find a security vulnerability in the present document, please report it through our
Coordinated Vulnerability Disclosure Program:
https://www.etsi.org/standards/coordinated-vulnerability-disclosure
Notice of disclaimer & limitation of liability
The information provided in the present deliverable is directed solely to professionals who have the appropriate degree of
experience to understand and interpret its content in accordance with generally accepted engineering or
other professional standard and applicable regulations.
No recommendation as to products and services or vendors is made or should be implied.
No representation or warranty is made that this deliverable is technically accurate or sufficient or conforms to any law
her, no representation or warranty is made of merchantability or fitness
and/or governmental rule and/or regulation and furt
for any particular purpose or against infringement of intellectual property rights.
In no event shall ETSI be held liable for loss of profits or any other incidental or consequential damages.

Any software contained in this deliverable is provided "AS IS" with no warranties, express or implied, including but not
limited to, the warranties of merchantability, fitness for a particular purpose and non-infringement of intellectual property
rights and ETSI shall not be held liable in any event for any damages whatsoever (including, without limitation, damages
for loss of profits, business interruption, loss of information, or any other pecuniary loss) arising out of or related to the use
of or inability to use the software.
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and
microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.

© ETSI 2024.
All rights reserved.
ETSI
3 ETSI ES 203 682 V1.2.1 (2024-03)
Contents
Intellectual Property Rights . 11
Foreword . 11
Modal verbs terminology . 11
Introduction . 11
1 Scope . 13
2 References . 13
2.1 Normative references . 13
2.2 Informative references . 14
3 Definition of terms, symbols and abbreviations . 14
3.1 Terms . 14
3.2 Symbols . 15
3.3 Abbreviations . 15
4 Foreground . 16
4.1 Green Abstraction Layer . 16
4.2 NFV architectural framework . 16
5 Use case . 18
5.1 Foreground - Virtualised Network Function scaling . 18
5.2 Scenario illustrating a VNF Energy-Aware States . 19
5.3 Actors and roles . 23
5.4 Pre-conditions . 23
5.5 Post-conditions . 23
5.6 Flow description . 24
6 Virtual energy-aware states definition. 24
6.1 Identification of the ETSI NFV components . 24
6.1.0 NFV components . 24
6.1.1 Identification of a Network Service . 24
6.1.2 Identification of a Virtualised Network Function . 24
6.1.3 Identification of a Virtualised Network Function Component . 25
6.1.4 Identification of a managed container infrastructure object . 25
6.1.5 Identification of a compute domain . 25
6.1.6 Identification of a VNFC instance energy-aware state . 25
6.1.7 Identification of a VNF instance energy-aware state . 25
6.1.8 Identification of a NS instance energy-aware state . 25
6.2 VNFC virtual energy-aware states definition . 26
6.2.1 When the Vdu is realized by a virtual compute resource . 26
6.2.1.1 Virtual compute resource required virtual energy-aware states . 26
6.2.2 When the Vdu is realized by a set of OS Containers resource . 27
6.2.2.1 OS Container and MCIO resource required virtual energy-aware states . 27
6.2.2.1.1 Resources association can be done at two different levels . 27
6.2.2.1.2 OS Container resource required virtual energy-aware states . 27
6.2.2.1.3 MCIO resource required virtual energy-aware states . 27
6.2.3 VNFC required virtual energy-aware states in the VduProfile information element . 28
6.3 VNF virtual energy-aware states definition . 28
6.3.1 VNF required virtual energy-aware states in the VNFD information element . 28
6.3.2 VNF required virtual energy-aware states in the VnfDf information element . 29
6.3.3 VNF required virtual energy-aware states in the InstantiationLevel information element . 29
6.3.4 VNF required virtual energy-aware states in the VduLevel information element . 29
6.3.5 VNF required virtual energy-aware states in the ScalingAspect information element . 29
6.3.6 VNF required virtual energy-aware states in the AspectDeltaDetails information element . 29
6.4 NS virtual energy-aware states definition . 30
6.4.1 NS required virtual energy-aware states in the NSD information element . 30
ETSI
4 ETSI ES 203 682 V1.2.1 (2024-03)
6.4.2 NS required virtual energy-aware states in the Network Service Deployment Flavour information
ele me nt . 30
6.4.3 NS required virtual energy-aware states in the NsScalingAspect information element . 30
6.4.4 NS required virtual energy-aware states in the NsLevel information element . 30
6.4.5 NS required virtual energy-aware states in the VnfToLevelMapping information element . 31
6.4.6 NS required virtual energy-aware states in the VnfProfile information element . 31
7 GAL Green Standard Interface . 31
7.0 NFV-MANO architectural framework . 31
7.1 Provisioning operations . 31
7.1.0 Generality . 31
7.1.1 Os-Ma-Nfvo reference point . 31
7.1.1.1 Instantiate NS operation . 31
7.1.1.1.1 Description . 31
7.1.1.1.2 Input parameters . 32
7.1.1.1.3 Output parameters . 32
7.1.1.1.4 Operation results . 32
7.1.1.2 Scale NS operation . 32
7.1.1.2.1 Description . 32
7.1.1.2.2 Input parameters . 32
7.1.1.2.3 Output parameters . 34
7.1.1.2.4 Operation results . 34
7.1.1.3 Update NS operation . 34
7.1.1.3.1 Description . 34
7.1.1.3.2 Input parameters . 34
7.1.1.3.3 Output parameters . 36
7.1.1.3.4 Operation results . 36
7.1.1.4 Query NS operation. 37
7.1.1.4.1 Description . 37
7.1.1.4.2 Input parameters . 37
7.1.1.4.3 Output parameters . 37
7.1.1.4.4 Operation results . 38
7.1.1.5 Notify (NsLcmOperationOccurenceNotification) operation . 38
7.1.1.5.1 Description . 38
7.1.1.5.2 NsLcmOperationOccurrenceNotification . 39
7.1.2 Or-Vnfm reference point . 40
7.1.2.1 Grant VNF Lifecycle Operation operation . 40
7.1.2.1.1 Description . 40
7.1.2.1.2 Input parameters . 40
7.1.2.1.3 Output parameters . 41
7.1.2.1.4 Operation results . 41
7.1.2.2 Instantiate VNF operation . 41
7.1.2.2.1 Description . 41
7.1.2.2.2 Input parameters . 41
7.1.2.2.3 Output parameters . 42
7.1.2.2.4 Operation results . 42
7.1.2.3 Scale VNF operation . 42
7.1.2.3.1 Description . 42
7.1.2.3.2 Input parameters . 42
7.1.2.3.3 Output parameters . 43
7.1.2.3.4 Operation results . 43
7.1.2.4 Scale VNF to Level operation . 43
7.1.2.4.1 Description . 43
7.1.2.4.2 Input parameters . 43
7.1.2.4.3 Output parameters . 44
7.1.2.4.4 Operation results . 44
7.1.2.5 Change VNF Flavour operation . 44
7.1.2.5.1 Description . 44
7.1.2.5.2 Input parameters . 44
7.1.2.5.3 Output parameters . 44
7.1.2.5.4 Operation results . 45
7.1.2.6 Query VNF operation . 45
ETSI
5 ETSI ES 203 682 V1.2.1 (2024-03)
7.1.2.6.1 Description . 45
7.1.2.6.2 Input parameters . 45
7.1.2.6.3 Output parameters . 45
7.1.2.6.4 Operation results . 46
7.1.2.7 Operate VNF operation . 46
7.1.2.7.1 Description . 46
7.1.2.7.2 Input parameters . 46
7.1.2.7.3 Output parameters . 47
7.1.2.7.4 Operation results . 47
7.1.2.8 Notify (VnfLcmOperationOccurrenceNotification) operation . 47
7.1.2.8.1 Description . 47
7.1.3 Or-Vi reference point . 48
7.1.3.1 Allocate Virtualised Compute Resource operation . 48
7.1.3.1.1 Description . 48
7.1.3.1.2 Input parameters . 48
7.1.3.1.3 Output parameters . 48
7.1.3.1.4 Operation results . 49
7.1.3.2 Update Virtualised Compute Resource operation . 49
7.1.3.2.1 Description . 49
7.1.3.2.2 Input parameters . 49
7.1.3.2.3 Output parameters . 49
7.1.3.2.4 Operation results . 49
7.1.3.3 Operate Virtualised Compute Resource operation . 50
7.1.3.3.1 Description . 50
7.1.3.3.2 Input parameters . 50
7.1.3.3.3 Output parameters . 50
7.1.3.3.4 Operation results . 50
7.1.3.4 Scale Virtualised Compute Resource operation . 50
7.1.3.4.1 Description . 50
7.1.3.4.2 Input parameters . 51
7.1.3.4.3 Output parameters . 51
7.1.3.4.4 Operation results . 51
7.1.3.5 Migrate Virtualised Compute Resource operation . 51
7.1.3.5.1 Description . 51
7.1.3.5.2 Input parameters . 52
7.1.3.5.3 Output parameters . 52
7.1.3.5.4 Operation results . 52
7.1.3.6 Notify (VirtualisedResourceChangeNotification) operation . 52
7.1.3.6.1 Description . 52
7.1.3.7 Notify (InformationChangeNotification) operation . 53
7.1.3.7.1 Description . 53
7.1.3.8 Query Virtualised Compute Resource Information operation . 53
7.1.3.8.1 Description . 53
7.1.3.8.2 Input parameters . 54
7.1.3.8.3 Output parameters . 54
7.1.3.8.4 Operation results . 54
7.1.3.9 Query Compute Capacity operation . 54
7.1.3.9.1 Description . 54
7.1.3.9.2 Input parameters . 54
7.1.3.9.3 Output parameters . 55
7.1.3.9.4 Operation results . 55
7.1.3.10 Notify (CapacityChangeNotification) operation . 55
7.1.3.10.1 Description . 55
7.1.3.11 Query Compute Resource Zone operation . 55
7.1.3.11.1 Description . 55
7.1.3.11.2 Input Parameters . 56
7.1.3.11.3 Output Parameters . 56
7.1.3.11.4 Operation Results . 56
7.1.3.12 Create Compute Flavour operation . 56
7.1.3.12.1 Description . 56
7.1.3.12.2 Input parameters . 56
7.1.3.12.3 Output parameters . 57
ETSI
6 ETSI ES 203 682 V1.2.1 (2024-03)
7.1.3.12.4 Operation Results . 57
7.1.3.13 Query Compute Flavour operation . 57
7.1.3.13.1 Description . 57
7.1.3.13.2 Input parameters . 57
7.1.3.13.3 Output parameters . 57
7.1.3.13.4 Operation Results . 57
7.1.3.14 Create Compute Resource Reservation operation . 58
7.1.3.14.1 Description . 58
7.1.3.14.2 Input parameters . 58
7.1.3.14.3 Output parameters . 58
7.1.3.14.4 Operation Results . 59
7.1.3.15 Query Compute Resource Reservation operation . 59
7.1.3.15.1 Description . 59
7.1.3.15.2 Input parameters . 60
7.1.3.15.3 Output parameters . 60
7.1.3.15.4 Operation Results . 60
7.1.3.16 Update Compute Resource Reservation operation . 60
7.1.3.16.1 Description . 60
7.1.3.16.2 Input parameters . 61
7.1.3.16.3 Output parameters . 61
7.1.3.16.4 Operation Results . 62
7.1.3.17 Create Compute Resource Quota operation . 62
7.1.3.17.1 Description . 62
7.1.3.17.2 Input parameters . 62
7.1.3.17.3 Output parameters . 63
7.1.3.17.4 Operation Results . 63
7.1.3.18 Query Compute Resource Quota operation . 63
7.1.3.18.1 Description . 63
7.1.3.18.2 Input parameters . 63
7.1.3.18.3 Output parameters . 64
7.1.3.18.4 Operation Results . 64
7.1.3.19 Update Compute Resource Quota operation . 64
7.1.3.19.1 Description . 64
7.1.3.19.2 Input parameters . 64
7.1.3.19.3 Output parameters . 65
7.1.3.19.4 Operation Results . 65
7.1.3.20 Create Compute Host Reservation operation . 65
7.1.3.20.1 Description . 65
7.1.3.20.2 Input parameters . 65
7.1.3.20.3 Output parameters . 65
7.1.3.20.4 Operation Results . 65
7.1.3.21 Query Compute Host Reservation operation . 66
7.1.3.21.1 Description . 66
7.1.3.21.2 Input parameters . 66
7.1.3.21.3 Output parameters . 66
7.1.3.21.4 Operation Results . 66
7.1.3.22 Update Compute Host Reservation operation . 66
7.1.3.22.1 Description . 66
7.1.3.22.2 Input parameters . 66
7.1.3.22.3 Output parameters . 67
7.1.3.22.4 Operation Results . 67
7.1.3.23 Query Compute Host Capacity operation . 67
7.1.3.23.1 Description . 67
7.1.3.23.2 Input parameters . 67
7.1.3.23.3 Output parameters . 67
7.1.3.23.4 Operation Results . 67
7.1.3.24 Notify (Host CapacityChangeNotification) operation . 67
7.1.3.24.1 Description . 67
7.1.4 Vi-Vnfm reference point . 68
7.1.4.1 Allocate Virtualised Compute Resource operation . 68
7.1.4.1.1 Description . 68
7.1.4.1.2 Input parameters . 68
ETSI
7 ETSI ES 203 682 V1.2.1 (2024-03)
7.1.4.1.3 Output parameters . 69
7.1.4.1.4 Operation results . 69
7.1.4.2 Query Virtualised Compute Resource operation . 69
7.1.4.2.1 Description . 69
7.1.4.2.2 Input parameters . 69
7.1.4.2.3 Output parameters . 69
7.1.4.2.4 Operation results . 70
7.1.4.3 Update Virtualised Compute Resource operation . 70
7.1.4.3.1 Description . 70
7.1.4.3.2 Input parameters . 70
7.1.4.3.3 Output parameters . 70
7.1.4.3.4 Operation results . 70
7.1.4.4 Operate Virtualised Compute Resource operation . 71
7.1.4.4.1 Description . 71
7.1.4.4.2 Input parameters . 71
7.1.4.4.3 Output parameters . 71
7.1.4.4.4 Operation results . 71
7.1.4.5 Scale Virtualised Compute Resource operation . 71
7.1.4.5.1 Description . 71
7.1.4.5.2 Input parameters . 72
7.1.4.5.3 Output parameters .
...