Bituminous mixtures - Test method - Part 33: Specimen prepared by roller compactor

This European Standard specifies the methods for compacting parallelepipedal specimens (slabs) of bituminous mixtures, to be used directly for subsequent testing, or from which test specimens are cut.
For a given mass of bituminous mixture, the specimens are prepared either under controlled compaction energy, or until a specified volume and therefore air voids content is obtained.
This European Standard describes the following methods of compaction:
-   pneumatic tyre method;
-   steel roller method;
-   steel roller sector method.
This European Standard is applicable to bituminous mixtures manufactured in the laboratory or in a mixing plant.

Asphalt - Prüfverfahren - Teil 33: Probestückvorbereitung mittels Walzverdichtungsgerät

Diese Europäische Norm legt die Verfahren für die Verdichtung von quaderförmigen Probekörpern (Platten) aus Asphalt fest, die entweder direkt für die anschließende(n) Prüfung(en) verwendet werden oder aus denen Probekörper geschnitten werden.
Von einem vorgegebenen Asphaltmischgut können Probekörper entweder mit einer geregelten Verdichtungsenergie oder bis zum Erreichen eines bestimmten Volumens und infolgedessen eines bestimmten Hohlraumgehaltes hergestellt werden.
Diese Europäische Norm beschreibt die folgenden Verdichtungsverfahren:
-   Luftreifen-Verfahren;
-   Stahlwalzen-Verfahren;
-   Stahlwalzensegment-Verfahren.
Diese Europäische Norm gilt für Asphalte, die im Labor oder im Asphaltwerk hergestellt wurden.

Mélanges bitumineux - Méthodes d'essai - Partie 33 : Préparation de corps d'épreuve au compacteur de plaque

La présente Norme européenne spécifie les méthodes de compactage des éprouvettes parallélépipédiques (plaques) de mélanges bitumineux, qui doivent être utilisées directement pour des essais ultérieurs ou à partir desquelles des éprouvettes sont prélevées.
Pour une masse donnée de mélange bitumineux, les éprouvettes peuvent être préparées soit à une énergie de compactage contrôlée, soit à volume spécifié, et par conséquent à pourcentage de vide spécifié.
La présente norme décrit les méthodes de compactage suivantes :
méthode utilisant des équipées de pneumatiques,
méthode utilisant un rouleau en acier lisse,
méthode utilisant un secteur de rouleau en acier
La présente Norme européenne s’applique aux mélanges bitumineux fabriqués en laboratoire ou en centrale d’enrobage.

Bitumenske zmesi - Preskusne metode - 33. del: Preskušanci, pripravljeni z valjastim zgoščevalnikom

Ta evropski standard določa metode za zgoščevanje paralelepipednih preskušancev (plošč) iz bitumenskih zmesi, ki se uporabljajo neposredno za nadaljnje preskušanje ali iz katerih se izrežejo preskušanci.
Pri določeni masi bitumenske zmesi se preskušanci pripravijo z regulirano zgoščevalno energijo, ali dokler ni dosežena določena prostornina in posledično vsebnost zračnih votlin.
Ta evropski standard opisuje naslednje metode zgoščevanja:
– metoda s pnevmatikami;
– metoda z jeklenimi valji;
– metoda s predeli jeklenih valjev.
Ta evropski standard se uporablja za bitumenske zmesi, izdelane v laboratoriju ali obratu za mešanje.

General Information

Status
Published
Public Enquiry End Date
19-Oct-2017
Publication Date
04-Apr-2019
Technical Committee
Current Stage
6060 - National Implementation/Publication (Adopted Project)
Start Date
18-Mar-2019
Due Date
23-May-2019
Completion Date
05-Apr-2019

Relations

Buy Standard

Standard
EN 12697-33:2019
English language
22 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.Asphalt - Prüfverfahren - Teil 33: Probestückvorbereitung mittels WalzverdichtungsgerätMélanges bitumineux - Méthodes d'essai - Partie 33 : Préparation de corps d'épreuve au compacteur de plaqueBituminous mixtures - Test method - Part 33: Specimen prepared by roller compactor93.080.20Materiali za gradnjo cestRoad construction materialsICS:Ta slovenski standard je istoveten z:EN 12697-33:2019SIST EN 12697-33:2019en,fr,de01-maj-2019SIST EN 12697-33:2019SLOVENSKI
STANDARDSIST EN 12697-33:2004+A1:20071DGRPHãþD



SIST EN 12697-33:2019



EUROPEAN STANDARD NORME EUROPÉENNE EUROPÄISCHE NORM
EN 12697-33
March
t r s { ICS
{ uä r z rä t r Supersedes EN
s t x { yæ u uã t r r u ªA sã t r r yEnglish Version
Bituminous mixtures æ Test method æ Part
u uã Specimen prepared by roller compactor Mélanges bitumineux æ Méthodes d 5essai æ Partie
u u ã Préparation de corps d 5épreuve au compacteur de plaque
Asphalt æ Prüfverfahren æ Teil
u uã Probestückvorbereitung mittels Walzverdichtungsgerät This European Standard was approved by CEN on
s { November
t r s zä
egulations which stipulate the conditions for giving this European Standard the status of a national standard without any alterationä Upætoædate lists and bibliographical references concerning such national standards may be obtained on application to the CENæCENELEC Management Centre or to any CEN memberä
translation under the responsibility of a CEN member into its own language and notified to the CENæCENELEC Management Centre has the same status as the official versionsä
CEN members are the national standards bodies of Austriaá Belgiumá Bulgariaá Croatiaá Cyprusá Czech Republicá Denmarká Estoniaá Finlandá Former Yugoslav Republic of Macedoniaá Franceá Germanyá Greeceá Hungaryá Icelandá Irelandá Italyá Latviaá Lithuaniaá Luxembourgá Maltaá Netherlandsá Norwayá Polandá Portugalá Romaniaá Serbiaá Slovakiaá Sloveniaá Spainá Swedená Switzerlandá Turkey and United Kingdomä
EUROPEAN COMMITTEE FOR STANDARDIZATION COMITÉ EUROPÉEN DE NORMALISATION EUROPÄISCHES KOMITEE FÜR NORMUNG
CEN-CENELEC Management Centre:
Rue de la Science 23,
B-1040 Brussels
9
t r s { CEN All rights of exploitation in any form and by any means reserved worldwide for CEN national Membersä Refä Noä EN
s t x { yæ u uã t r s { ESIST EN 12697-33:2019



EN 12697-33:2019 (E) 2 Contents Page European foreword . 3 1 Scope . 4 2 Normative references . 4 3 Terms and definitions . 4 4 Principle . 6 5 Apparatus . 6 5.1 Method using a wheel or two wheels fitted with pneumatic tyres . 6 5.2 Methods using a smooth steel roller . 7 5.2.1 Smooth steel roller . 7 5.2.2 Steel roller used on wheel fitted with pneumatic tyres . 7 5.3 Method using a steel roller sector . 8 5.3.1 General . 8 5.3.2 Roller sector . 8 5.3.3 Compaction mould . 8 5.3.4 Loading device . 8 5.3.5 Demoulding facilities . 8 5.3.6 Other . 8 5.4 Method using a roller running on vertical sliding steel plates . 9 6 Preparation . 10 6.1 Mass of bituminous mixture . 10 6.2 Filling the mould. 11 7 Compaction procedure . 11 7.1 Method using wheels fitted with pneumatic tyres . 11 7.1.1 Test conditions . 11 7.1.2 Compaction . 12 7.2 Methods using a smooth steel roller . 12 7.2.1 General . 12 7.2.2 Compaction by a specified energy . 13 7.2.3 Compaction with controlled compaction energy. 13 7.2.4 Compaction to obtain a specified air voids content or compaction degree . 13 7.3 Method using a steel roller sector . 13 7.3.1 General . 13 7.3.2 Compaction with combined height-controlled precompaction and force-controlled main-compaction . 13 7.3.3 Height-controlled compaction. 15 7.3.4 Compaction with controlled compaction energy. 15 7.4 Method using a roller running on vertical sliding steel plates . 16 7.5 Demoulding of the slab . 16 8 Test report . 16
SIST EN 12697-33:2019



EN 12697-33:2019 (E) 3 European foreword This document (EN 12697-33:2019) has been prepared by Technical Committee CEN/TC 227 “Road materials”, the secretariat of which is held by BSI. This European Standard shall be given the status of a national standard, either by publication of an identical text or by endorsement, at the latest by September 2019, and conflicting national standards shall be withdrawn at the latest by September 2019. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. CEN shall not be held responsible for identifying any or all such patent rights. This document supersedes EN 12697-33:2003+A1:2007. The following is a list of significant technical changes since the previous edition: — the series title no longer makes the method exclusively for hot mix asphalt; — [Clause 1] Scope clarified. Listed methods named according to the standard for consistency; — [Clause 3] [3.1] Deleted. Following sub clauses renumbered; — [3.2] Symbols and abbreviations deleted. Given in relevant clauses; — [5.2.1.1] Inappropriate definition of moulds for steel wheel rollers deleted; — [5.2.1.2] Formula (1) corrected; — [5.3] Method for steel roller sector introduced. Method using a roller running on vertical sliding steel plates now described in new clause [5.4]; — [5.4.4] Hatching for plates in Figure 3 made vertical for clarity; — [6.2] Pre-heating of the mould and other metallic moveable parts clarified and the pre-heating temperature shall be reported; — [7.1.1] Distance between twinned wheels clarified by referring to centre lines; — [7.3] Compaction procedure using steel roller sector introduced. Compaction procedure using a roller running on vertical sliding steel plates now described in new clause [7.4]. A list of all parts in the EN 12697 series can be found on the CEN website. According to the CEN-CENELEC Internal Regulations, the national standards organisations of the following countries are bound to implement this European Standard: Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Serbia, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom. SIST EN 12697-33:2019



EN 12697-33:2019 (E) 4 1 Scope This document specifies the methods for compacting parallelepipedal specimens (slabs) of bituminous mixtures, to be used directly for subsequent testing, or from which test specimens are cut. For a given mass of bituminous mixture, the specimens are prepared either under controlled compaction energy, or until a specified volume and therefore air voids content is obtained. This document describes the following methods of compaction: — method using a wheel or two wheels fitted with pneumatic tyres; — methods using a steel roller, which includes 3 different procedures: — steel roller; — steel roller used on wheel fitted with pneumatic tyres; — steel roller running on vertical sliding steel plates; — method using a steel roller sector. This document is applicable to bituminous mixtures manufactured in the laboratory or in a mixing plant. 2 Normative references The following documents are referred to in the text in such a way that some or all of their content constitutes requirements of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. EN 12697-27, Bituminous mixtures — Test methods — Part 27: Sampling EN 12697-35, Bituminous mixtures — Test methods — Part 35: Laboratory mixing 3 Terms and definitions For the purposes of this document, the following terms and definitions apply. ISO and IEC maintain terminological databases for use in standardization at the following addresses: — IEC Electropedia: available at http://www.electropedia.org/ — ISO Online browsing platform: available at http://www.iso.org/obp 3.1 pass one forward or one backward motion of the rolling load 3.2 slab axis axis of symmetry of slab parallel to the largest dimension of the mould 3.3 lateral axis axis of a pass parallel to largest dimension of a mould; situated at distance a from the slab axis (see Figure 1) SIST EN 12697-33:2019



EN 12697-33:2019 (E) 5 3.4 lateral translation distance a between the slab axis and the lateral axis
Key 1 axis 5 central position 2 lateral axis 6 rear position 3 left side 7 front position 4 right side 8 longitudinal translation of wheels L length l width Figure 1 — Sketch plan of a slab, front face of equipment 3.5 rear position lateral axis furthest from the front face of the equipment 3.6 central position slab axis 3.7 front position lateral axis nearest to the front face of the equipment 3.8 blocked axis mode equipment operating mode in which the height of the wheel shaft stays constant in relation to the upper edge of mould during a pass 3.9 freed axis mode equipment operation mode in which the load applied onto the slab remains constant during a pass SIST EN 12697-33:2019



EN 12697-33:2019 (E) 6 3.10 sweep plan set of modes by which the wheel(s) pass(es) over the slab;
including order of execution, and extent of lateral translation 4 Principle A given mass of bituminous mixture is compacted in a rectangular mould under a load applied by a smooth steel roller or its sector or equivalent, or by one or more wheel(s) fitted with pneumatic tyres. The smooth steel roller may run directly on the bituminous mixture, or on a number of vertical sliding plates, which apply a kneading action to the mixture. The wheel(s) or roller performs passes at constant velocity, according to a specified sweep plan if applicable. 5 Apparatus 5.1 Method using a wheel or two wheels fitted with pneumatic tyres 5.1.1 One or more moulds with specified interior dimensions ± 2 mm. Usual dimensions are: — L = 500 mm, l = 180 mm, h = 100 mm or h = 50 mm, or — L = 600 mm, l = 400 mm, h = 150 mm or h = 200 mm. For moulds 600 mm × 400 mm × 150 mm or 600 mm × 400 mm × 200 mm, dimensions are those of the upper part. In order to facilitate demoulding, moulds may have the shape of a truncated pyramid within the interior dimension ranges specified in order to release the specimen. Other dimensions may be used, according to the requirements of specific test methods. 5.1.2 A device to compact the bituminous mixture which shall: — enable application of an adjustable load, F, in range 1 kN ± 10 % to 10 kN ± 5 %, onto the wheel(s); — comprise of one or more wheels equipped with threadless tyres of 400 m 8 size; — enable translation of the rolling load at constant velocity, Vt ± 10 %; — comprise a system for positioning wheel(s) along the different axes of compaction according to predetermined set values for (a ± 20 mm); — enable operation in blocked axis and freed axis modes; — comprise a system capable of periodically bringing the surface flush with the upper edge of the mould during compaction; — one or more blocks of a suitable size (only required if the required thickness of the slab, e, is less than the height of the mould, h). SIST EN 12697-33:2019



EN 12697-33:2019 (E) 7 5.2 Methods using a smooth steel roller 5.2.1 Smooth steel roller 5.2.1.1 One or more moulds with specified interior dimensions (length L and width l) to ± 1 mm. 5.2.1.2 A device to compact the bituminous mixture in the mould. It may be either a mechanical self-propelled rolling wheel static compactor with forward-reverse control, or a hand driven roller, or a laboratory device, which simulates the operation of a rolling wheel static compactor such as a segmented roller. The wheel shall be able to move back and forth on the mixture in the mould, or the mould shall be placed on a table that moves back and forth beneath a rotating roller.
When the method is used to prepare slabs at a specified volume or air voids content, a vibrating roller or table may also be used. The device shall enable application of a static load, F, such as: F
· l × 2 × D × 10 «5 (1) where F is the load, applied onto wheels or rollers, in newtons (N); l is the interior width of mould, in millimetres (mm); D is the diameter of the wheel(s) or roller, in millimetre (mm). The diameter of the steel roller, D, shall be in the range 350 mm to 1 100 mm. When the method is used to prepare slabs at a specified volume or air voids content, for a mass as specified in 6.1, the width of the steel roller, b, shall be greater than: — the internal width of the mould, l, if the roller compactor is not equipped so that compaction stops when the desired height of the slab is reached, or — the internal width of the mould, l, minus 8 mm if the roller compactor is equipped so that compaction stops when the desired height of the slab is reached. The load, F, shall be of such magnitude that the specified volume or air voids content is achieved at a number of roller passes between 10 and 50. When the method is used to prepare slabs under controlled compaction energy, the width of the steel roller shall be equal to the interior width of the mould minus (10 ± 5) mm. 5.2.2 Steel roller used on wheel fitted with pneumatic tyres 5.2.2.1 One or more moulds as specified in 5.1.1. 5.2.2.2 A device to compact the bituminous mixture which shall conform to the device in 5.1.2 and comprise, if required, a smooth metal cylinder of diameter, D 400 mm to 800 mm, thickness between 4 mm and 8 mm, and width equal to the interior width of the mould minus (5 ± 2) mm. SIST EN 12697-33:2
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.