Standard Details

Drain and sewer systems outside buildings - Management and control of activities - Part 3: Cleaning

This European Standard establishes requirements for the management and control of activities in drain and sewer systems outside buildings and specifies requirements for development and implementation of work programmes, and the selection of techniques.
This document covers the management and control of sewer cleaning.
It is applicable to drain and sewer systems from the point where wastewater leaves a building, roof drainage system, or paved area, to the point where it is discharged into a wastewater treatment plant or receiving water body.
Drains and sewers below buildings are included provided that they do not form part of the drainage system of the building.

Entwässerungssysteme außerhalb von Gebäuden - Management und Überwachung von Maßnahmen - Teil 3: Reinigung

Dieses Dokument stellt die Anforderungen an das Management und an die Überwachung von Maßnahmen in Entwässerungssystemen außerhalb von Gebäuden auf und legt Anforderungen an die Entwicklung und Umsetzung der Arbeitsprogramme und die Auswahl von Maßnahmen fest.
Dieses Dokument behandelt das Management und die Überwachung der Kanalreinigung.
Es gilt für Entwässerungssysteme von dem Punkt an, wo das Abwasser das Gebäude, die Dachentwässerung oder die befestigte Fläche verlässt, bis zu dem Punkt, an dem das Abwasser in eine Kläranlage oder in ein aufnehmendes Gewässer eingeleitet wird.
Abwasserleitungen und -kanäle unterhalb von Gebäuden sind hierbei eingeschlossen, solange sie nicht Bestandteil der Gebäudeentwässerung sind.

Réseaux d'évacuation et d'assainissement à l'extérieur des bâtiments - Gestion et contrôle des activités opérationnelles - Partie 3: Curage

Le présent document établit les prescriptions de gestion et de contrôle des activités dans les réseaux d’évacuation et d’assainissement à l’extérieur des bâtiments, et spécifie les prescriptions concernant l’élaboration et la mise en oeuvre de programmes de travaux, ainsi que le choix des techniques employées.
Le présent document traite de la gestion et du contrôle du curage des collecteurs.
Il s’applique aux réseaux d’évacuation et d’assainissement à partir du point où les eaux usées quittent un bâtiment, un système d’évacuation de toiture ou une surface revêtue, jusqu’au point où elles se déversent dans une station d’épuration ou un milieu récepteur aquatique.
Les branchements et les collecteurs d’assainissement situés sous les bâtiments sont également visés dès l’instant qu’ils ne font pas partie du système d’évacuation propre au bâtiment.

Sistemi za odvod odpadne vode in kanalizacijo zunaj stavb - Upravljanje in nadzor aktivnosti - 3. del: Čiščenje

General Information

Status
Not Published
Public Enquiry End Date
04-Jul-2019
Current Stage
4020 - Public enquire (PE) (Adopted Project)
Start Date
18-Apr-2019
Due Date
05-Sep-2019
Completion Date
07-Aug-2019

RELATIONS

Buy Standard

Draft
oSIST prEN 14654-3:2019
English language
22 pages
sale 10% off
Preview
sale 10% off
Preview

e-Library read for
1 day

Standards Content (sample)

SLOVENSKI STANDARD
oSIST prEN 14654-3:2019
01-julij-2019

Sistemi za odvod odpadne vode in kanalizacijo zunaj stavb - Upravljanje in nadzor

aktivnosti - 3. del: Čiščenje

Drain and sewer systems outside buildings - Management and control of activities - Part

3: Cleaning
Entwässerungssysteme außerhalb von Gebäuden - Management und Überwachung von
Maßnahmen - Teil 3: Reinigung

Réseaux d'évacuation et d'assainissement à l'extérieur des bâtiments - Gestion et

contrôle des activités opérationnelles - Partie 3: Curage
Ta slovenski standard je istoveten z: prEN 14654-3
ICS:
93.030 Zunanji sistemi za odpadno External sewage systems
vodo
oSIST prEN 14654-3:2019 en,fr,de

2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------
oSIST prEN 14654-3:2019
---------------------- Page: 2 ----------------------
oSIST prEN 14654-3:2019
DRAFT
EUROPEAN STANDARD
prEN 14654-3
NORME EUROPÉENNE
EUROPÄISCHE NORM
April 2019
ICS 93.030
English Version
Drain and sewer systems outside buildings - Management
and control of activities - Part 3: Cleaning

Réseaux d'évacuation et d'assainissement à l'extérieur Entwässerungssysteme außerhalb von Gebäuden -

des bâtiments - Gestion et contrôle des activités Management und Überwachung von Maßnahmen - Teil

opérationnelles - Partie 3: Curage 3: Reinigung

This draft European Standard is submitted to CEN members for enquiry. It has been drawn up by the Technical Committee

CEN/TC 165.

If this draft becomes a European Standard, CEN members are bound to comply with the CEN/CENELEC Internal Regulations

which stipulate the conditions for giving this European Standard the status of a national standard without any alteration.

This draft European Standard was established by CEN in three official versions (English, French, German). A version in any other

language made by translation under the responsibility of a CEN member into its own language and notified to the CEN-CENELEC

Management Centre has the same status as the official versions.

CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia,

Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania,

Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Serbia, Slovakia, Slovenia, Spain, Sweden, Switzerland,

Turkey and United Kingdom.

Recipients of this draft are invited to submit, with their comments, notification of any relevant patent rights of which they are

aware and to provide supporting documentation.

Warning : This document is not a European Standard. It is distributed for review and comments. It is subject to change without

notice and shall not be referred to as a European Standard.
EUROPEAN COMMITTEE FOR STANDARDIZATION
COMITÉ EUROPÉEN DE NORMALISATION
EUROPÄISCHES KOMITEE FÜR NORMUNG
CEN-CENELEC Management Centre: Rue de la Science 23, B-1040 Brussels

© 2019 CEN All rights of exploitation in any form and by any means reserved Ref. No. prEN 14654-3:2019 E

worldwide for CEN national Members.
---------------------- Page: 3 ----------------------
oSIST prEN 14654-3:2019
prEN 14654-3:2019 (E)
Contents Page

European foreword ....................................................................................................................................................... 4

1 Scope .................................................................................................................................................................... 5

2 Normative references .................................................................................................................................... 5

3 Terms and definitions ................................................................................................................................... 5

3.1 General ................................................................................................................................................................ 6

3.2 Deposits .............................................................................................................................................................. 6

3.3 Cleaning methods ............................................................................................................................................ 6

4 General ................................................................................................................................................................ 7

5 Integrated sewer system management planning ................................................................................ 8

5.1 Introduction ...................................................................................................................................................... 8

5.2 Cleaning aims .................................................................................................................................................... 8

6 Preparation of the cleaning programme ................................................................................................ 8

6.1 Introduction ...................................................................................................................................................... 8

6.2 Review of the cleaning activities planning ............................................................................................. 8

6.3 Investigation ..................................................................................................................................................... 9

6.3.1 Introduction ...................................................................................................................................................... 9

6.3.2 Review of previous investigations ............................................................................................................ 9

6.3.3 Further investigations ................................................................................................................................... 9

6.4 Assessment ..................................................................................................................................................... 10

6.5 Develop the programme ............................................................................................................................ 10

6.5.1 Introduction ................................................................................................................................................... 10

6.5.2 Specification of objectives ......................................................................................................................... 11

6.5.3 Developing options ...................................................................................................................................... 11

6.5.4 Assess feasibility of solutions .................................................................................................................. 11

6.5.5 Select optimum solution ............................................................................................................................ 11

6.5.6 Producing the programme ........................................................................................................................ 12

7 Preparation of the project specification .............................................................................................. 12

7.1 Introduction ................................................................................................................................................... 12

7.2 Review of the project description and project objectives ............................................................. 12

7.3 Investigation .................................................................................................................................................. 12

7.4 Assessment ..................................................................................................................................................... 12

7.5 Drafting the project specification........................................................................................................... 12

7.5.1 Introduction ................................................................................................................................................... 12

7.5.2 Prepare detailed solutions ....................................................................................................................... 13

7.5.3 Assess feasibility of solutions .................................................................................................................. 13

7.5.4 Select optimal solution ............................................................................................................................... 13

7.5.5 Detailed design of optimal solution ....................................................................................................... 13

7.5.6 Prepare project specification .................................................................................................................. 14

7.6 Performance indicators ............................................................................................................................. 15

7.6.1 Introduction ................................................................................................................................................... 15

7.6.2 Indicators for the assessment of the work quality ........................................................................... 15

7.6.3 Indicators for the assessment of the effectiveness of the project or programme ................ 15

8 Implementation of projects ...................................................................................................................... 15

8.1 Introduction ................................................................................................................................................... 15

8.2 Select cleaning technique .......................................................................................................................... 16

8.3 Health and safety .......................................................................................................................................... 16

---------------------- Page: 4 ----------------------
oSIST prEN 14654-3:2019
prEN 14654-3:2019 (E)

8.4 Environmental impact ................................................................................................................................ 17

8.5 Cleaning report .............................................................................................................................................. 17

9 Measurement of conformity ..................................................................................................................... 18

9.1 Measuring conformity with the project specification ..................................................................... 18

9.2 Non-conformities .......................................................................................................................................... 18

10 Review of plan and programme .............................................................................................................. 18

Annex A (informative) Example of cleaning report form ............................................................................ 19

Annex B (informative) Cleaning methods ......................................................................................................... 20

B.1 General ............................................................................................................................................................. 20

B.2 Jetting ................................................................................................................................................................ 20

B.3 Jetting with suction ...................................................................................................................................... 20

B.4 Winching .......................................................................................................................................................... 21

B.5 Rodding ............................................................................................................................................................ 21

B.6 Remote controlled equipment ................................................................................................................. 21

B.7 Flushing ............................................................................................................................................................ 21

B.8 Cleaning balls/scouring plates ................................................................................................................ 21

B.9 Manual or mechanical excavation .......................................................................................................... 21

Bibliography ................................................................................................................................................................. 22

---------------------- Page: 5 ----------------------
oSIST prEN 14654-3:2019
prEN 14654-3:2019 (E)
European foreword

This document (prEN 14654-3:2019) has been prepared by Technical Committee CEN/TC 165

“Wastewater Engineering”, the secretariat of which is held by DIN.
This document is currently submitted to the CEN Enquiry.
This document will supersede EN 14654-1:2014.

The changes to the text in this document are editorial and relate to the separation of the duplicated text.

There are no technical changes.

EN 14654 consists of the following parts, under the general title Drain and sewer systems outside

buildings — Management and control of activities:
— Part 1: General; (the present document)
— Part 2: Rehabilitation
— Part 3: Sewer cleaning
— Part 4: Control of inputs
Other parts, dealing with other activities, may be added later.

In drafting this part of EN 14654, account has been taken of other available standards, in particular

EN 752, Drain and sewer systems outside buildings” and EN 13508 Investigation and assessment of drain

and sewer systems outside buildings”.
---------------------- Page: 6 ----------------------
oSIST prEN 14654-3:2019
prEN 14654-3:2019 (E)
1 Scope

This document establishes requirements for the management and control of activities in drain and

sewer systems outside buildings and specifies requirements for development and implementation of

work programmes, and the selection of techniques.
This document covers the management and control of sewer cleaning.

It is applicable to drain and sewer systems from the point where wastewater leaves a building, roof

drainage system, or paved area, to the point where it is discharged into a wastewater treatment plant or

receiving water body.

Drains and sewers below buildings are included provided that they do not form part of the drainage

system of the building.
2 Normative references

The following documents are referred to in the text in such a way that some or all of their content

constitutes requirements of this document. For dated references, only the edition cited applies. For

undated references, the latest edition of the referenced document (including any amendments) applies.

EN 752, Drain and sewer systems outside buildings - Sewer system management

EN 1829-1, High pressure water jet machines - Safety requirements - Part 1: Machines

EN 1829-2, High-pressure water jet machines - Safety requirements - Part 2: Hoses, hose lines and

connectors

EN 13508-1:2012, Investigation and assessment of drain and sewer systems outside buildings - Part 1:

General Requirements

prEN 14654-1:2019 Drain and sewer systems outside buildings — Management and control of

activities — Part 1: General
3 Terms and definitions

For the purposes of this document, the terms and definitions given in EN 16323:2014,

prEN 14654-1:2019 and the following apply.

ISO and IEC maintain terminological databases for use in standardization at the following addresses:

— IEC Electropedia: available at http://www.electropedia.org/
— ISO Online browsing platform: available at http://www.iso.org/obp

Note 1 to entry: Certain key definitions from EN 16323:2014 have been repeated below for clarity. The

following additional terms used in this European Standard are defined in EN 16323:2014.

— drain
— foul wastewater
— sewer
— sewer system
— receiving water body
— surface receiving water body
— wastewater treatment plant
---------------------- Page: 7 ----------------------
oSIST prEN 14654-3:2019
prEN 14654-3:2019 (E)
3.1 General
3.1.1
cleaning activities

removal or partial removal of settled deposits, attached deposits, roots and other obstacles from a drain

or sewer system
3.1.2
degree of cleaning
extent to which complete removal of deposits is achieved
3.1.3
removal

extraction of deposits after collecting at the working area or the intentional use of the flow in the drain

or sewer to carry the re-entrained solids to a specified point of extraction
3.1.4
self-cleansing

ability of the flow in a drain or sewer to carry away solid particles which would otherwise be deposited

in the pipe
[SOURCE: EN 16323:2014, 2.2.1.13]
3.1.5
supernatant liquor
liquor in a tank lying above the deposited solids
[SOURCE: EN 16323:2014, 2.1.2.16]
3.1.6
wastewater

water composed of any combination of water discharged from domestic, industrial or commercial

premises, surface run-off and accidentally any sewer infiltration water
[SOURCE: EN 16323:2014, definition 2.3.10.65]
3.2 Deposits
3.2.1
attached deposits

material attached to the wall of elements of the drain or sewer system by physical or chemical bonding

3.2.2
settled deposits

material deposited by gravity in the invert or benching of elements of the drain or sewer system

3.3 Cleaning methods
3.3.1
cleaning ball

spherical device, having an indented surface, designed to be carried through a drain or sewer by the

flow to facilitate removal of sediments
---------------------- Page: 8 ----------------------
oSIST prEN 14654-3:2019
prEN 14654-3:2019 (E)
3.3.2
combined jetting

simultaneous use of high-pressure water jetting equipment together with a suction action, to remove

obstructions or sediments from drains or sewers
[SOURCE: EN 16323:2014, 2.2.1.10]
3.3.3
flushing

use of a temporary and substantially increased flow to facilitate the removal of obstructions or

sediments from drains or sewers
[SOURCE: EN 16323:2014, 2.2.1.16]
3.3.4
jetting
use of water under defined conditions of pressure, through a nozzle
[SOURCE: EN 16323:2014, 2.2.1.18]
3.3.5
rodding

use of appropriate device on the end of flexible rods to facilitate the removal of obstructions (or

sediments) from drains or sewers
[SOURCE: EN 16323:2014, 2.2.1.11]
3.3.6
scouring plate

device used to clean a drain or sewer by concentrating the flow into a small cross section thereby

increasing the flow velocity
3.3.7
winching

use of a device pulled through a drain or sewer to facilitate removal of sediments (or obstructions)

[SOURCE: EN 16323:2014, 2.2.1.12]
4 General

Cleaning activities in drains and sewers can be carried out pro-actively, to prevent problems occurring

or to clean a drain or sewer before particular operations (e.g. an inspection or renovation work) or

reactively in response to problems that have occurred.

The requirements for pro-active cleaning can be identified through a rehabilitation plan, a maintenance

plan involving periodic monitoring or as part of an integrated sewer system management plan in

accordance with EN 752. Consideration shall also be given to the feasibility of preventing deposition of

sediments for example by rehabilitation of the sewer.

This document applies the process described in EN 14654-1 for implementing cleaning activities in the

integrated drain and sewer system management plan. This document shall be used in conjunction with

EN 14654-1.
---------------------- Page: 9 ----------------------
oSIST prEN 14654-3:2019
prEN 14654-3:2019 (E)
5 Integrated sewer system management planning
5.1 Introduction

Cleaning activities are one aspect of the maintenance plan, as part of an integrated sewer system

management plan. A maintenance plan, dealing with cleaning activities should be in place for the drain

and sewer system prior to carrying out major programmes of sewer cleaning. However, this is not

always possible if works are required urgently (e.g. in response to a sewer failure).

5.2 Cleaning aims
The principal aims of carrying out cleaning work can include:
a) Pro-active cleaning
1) to ensure that the performance of the drain or sewer system is acceptable;
2) to prolong the operational life and maintain the value of the asset;

3) to control septicity to reduce associated odour, health and potential corrosion problems;

4) to limit polluting discharges into receiving water bodies;
5) to enable inspection or renovation of the drain or sewer system;

6) to optimize the effectiveness of key components of the system at critical times (e.g. prior to

heavy rain seasons, busy periods in tourist sites);
7) to facilitate inspection.
b) Reactive cleaning
1) to remove a blockage in order to restore the flow;
2) to restore the function of the drain or sewer system;
3) to remove sediments in order to reduce septicity and odour problems.
The nature of the aim can determine the degree of cleaning necessary.
6 Preparation of the cleaning programme
6.1 Introduction

The cleaning programme defines the approach to be taken to cleaning in each drain or sewer, either

specifically or as part of a group of drains or sewers. The cleaning programme defines a series of

projects, in line with the integrated sewer system management plan, to ensure that the drain and sewer

system meets the performance requirements.
6.2 Review of the cleaning activities planning

A review should be undertaken of the cleaning aspects of the operations and maintenance plan within

the integrated sewer system management plan.
---------------------- Page: 10 ----------------------
oSIST prEN 14654-3:2019
prEN 14654-3:2019 (E)
6.3 Investigation
6.3.1 Introduction

The location of the sections of drains and sewers where proactive cleaning is to be carried out and the

assessment of the cleaning frequencies shall be based on:

a) an understanding of the characteristics and structural condition of the drain and sewer system;

b) an analysis of its performance;

c) a review of the available information which may include the performance of similar systems

elsewhere.

The different sections of the sewer shall be described according to the information collected in order to

optimize the cleaning programme.

The scope of the investigations necessary to produce the cleaning programme will depend on the extent

of the investigations carried out during the preparation of the integrated sewer system management

plan and on the characteristics of the individual systems.
6.3.2 Review of previous investigations

A review should be undertaken of the information available. The review should include:

a) inventory data

1) type of effluent (foul wastewater, surface water, combined sewage or specific effluents);

2) sewer characteristics (shape, size, slope, depth, material, etc.), presence and characteristics of

combined sewer overflows and other ancillaries;

3) characteristics of the location of the sewer (e.g. aquifer protection zones, ground water level,

trees, proximity of receiving water bodies);

b) condition information from inspection reports (e.g. visual inspection reports, CCTV reports,

sediment measurements);
c) data on flows from measurements or the results of hydraulic models;

d) records of past cleaning (e.g. location of areas of persistent operational problems, working space

and access constraints, effectiveness of previous techniques, personnel input and costs); and

e) performance data (e.g. sewer flooding, sewer blockages, collapses, odours, septicity problems,

premature operation of combined sewer overflows, etc.).
6.3.3 Further investigations

Where there is insufficient information available to plan the cleaning programme, a programme of

investigations shall be carried out to obtain the necessary information.
An example report form is given in Annex A.
Examples of investigations can include:

a) further inspection in parts of the system where the original assessment was based only on sample

inspections;
---------------------- Page: 11 ----------------------
oSIST prEN 14654-3:2019
prEN 14654-3:2019 (E)
b) the use of an appropriate sewer flow simulation model;

c) more detailed studies of the impact of any discharges on receiving waters bodies.

Details of investigation techniques for drains and sewers are described in EN 13508-1.

6.4 Assessment

The assessment should identify the location of those components of the drains and sewer system where

proactive or reactive cleaning is to be carried out. This shall be based on:
a) the effect of the deposits on the performance of the system;
b) the sources of such deposits;
c) the typology of the drain or sewer;
d) the nature of the effluent.

The performance of the drain or sewer systems shall be assessed in accordance with EN 13508-1:2012,

Clause 6, using the results of the investigation (see 6.3). The assessments carried out during the

preparation of the integrated sewer system management plan should be reviewed and updated in the

light of any new information identified during the investigations. The performance at each planning

horizon shall be compared to the performance requirements to identify the need for cleaning.

Where inspection is used to determine the current levels of sediment, the effect of the movement of

sediment in dunes, leaving some parts of the pipe clear while other localized parts of the sewer have

significant deposits, should be considered. However, localized sediments may also indicate the presence

of an obstacle.
The typology of drains and sewers can be identified as:

— type 1: drains and sewers which are self-cleansing, where proactive cleaning is exceptional;

— type 2: drains and sewers which are not completely self-cleansing, where proactive cleaning could

be beneficial, the cleaning frequencies depending on the rate of sediment accumulation;

— type 3: drains and sewers with localized problems, which require frequent cleaning.

The typology can change over time.

Other elements of the sewer system, for example sewer connections, gullies, silt traps, inverted siphons,

pumping stations can also require cleaning.
6.5 Develop the programme
6.5.1 Introduction
A cleaning programme shall:
a) identify optimum frequencies for pro-active cleaning operations;

b) maintain or reduce the number of reactive cleaning operations to an acceptable level.

---------------------- Page: 12 ----------------------
oSIST prEN 14654-3:2019
prEN 14654-3:2019 (E)
6.5.2 Specification of objectives

The cleaning objectives should be established in accordance with the cleaning aim. These should be

expressed as a performance requirement, for example:

a) to remove settled and/or attached deposits to a prescribed amount, (for example remove

completely or to a maximum depth); or
b) to restore the flow capacity in a pipe to the design capacity; or
c) to limit the build-up of sediments to a prescribed level; or

d) to limit the deposits to existing levels (maintaining a balance in the sediment movement); or

e) to limit the build-up of deposits so that sewer flooding is limited to prescribed frequencies; or

f) to remove sufficient deposits to avoid blockages; or

g) to remove sufficient sediments to allow an inspection to take place or to facilitate renovation or

repair;

h) to remove bio-films (for example from rising mains to reduce septicity, or from heat exchangers).

6.5.3 Developing options
There are a number of possible cleaning approaches, these include the following:
a) periodic cleaning (cleaning according to fixed time intervals);

b) monitored periodic cleaning (cleaning according to time interval, the subsequent time interval is

updated according to the depth of deposits prior to previous cleaning);

c) planned inspection (by CCTV or other method) and cleaning (inspection at intervals in order to

determine when deposits have reached a threshold level for cleaning);

d) specific cleaning before other works such as CCTV inspection, rehabilitation operations, etc.;

e) reactive cleaning - in those sections of drains and sewers which are normally self-cleansing;

f) action to control discharge of unsuitable materials into the drain or sewer system unsuitable input

(see prEN 14654-4:2019).

Where frequent cleaning is required, or where the consequences of sediment accumulation are severe,

consideration should be given to the feasibility of carrying out rehabilitation works to prevent the

accumulation of sediments.
6.5.4 Assess feasibility of solutions

In addition to the factors specified in prEN 14654-1:2019, 6.5.4 the assessment should consider

whether the options developed would increase the capacity of the sewer system.
6.5.5 Select optimum solution
The optimum solution should be selected in accordance
...