ISO/DIS 6183
(Main)Fire protection equipment -- Carbon dioxide extinguishing systems for use on premises -- Design and installation
Fire protection equipment -- Carbon dioxide extinguishing systems for use on premises -- Design and installation
Équipement de protection contre l'incendie -- Installations fixes d'extinction par dioxyde de carbone utilisées dans les bâtiments -- Conception et installation
General Information
RELATIONS
Standards Content (sample)
DRAFT INTERNATIONAL STANDARD
ISO/DIS 6183
ISO/TC 21/SC 8 Secretariat: SA
Voting begins on: Voting terminates on:
2021-03-09 2021-06-01
Fire protection equipment — Carbon dioxide extinguishing
systems for use on premises — Design and installation
Équipement de protection contre l'incendie — Installations fixes d'extinction par dioxyde de carbone
utilisées dans les bâtiments — Conception et installationICS: 13.220.10
THIS DOCUMENT IS A DRAFT CIRCULATED
FOR COMMENT AND APPROVAL. IT IS
THEREFORE SUBJECT TO CHANGE AND MAY
NOT BE REFERRED TO AS AN INTERNATIONAL
STANDARD UNTIL PUBLISHED AS SUCH.
IN ADDITION TO THEIR EVALUATION AS
BEING ACCEPTABLE FOR INDUSTRIAL,
This document is circulated as received from the committee secretariat.
TECHNOLOGICAL, COMMERCIAL AND
USER PURPOSES, DRAFT INTERNATIONAL
STANDARDS MAY ON OCCASION HAVE TO
BE CONSIDERED IN THE LIGHT OF THEIR
POTENTIAL TO BECOME STANDARDS TO
WHICH REFERENCE MAY BE MADE IN
Reference number
NATIONAL REGULATIONS.
ISO/DIS 6183:2021(E)
RECIPIENTS OF THIS DRAFT ARE INVITED
TO SUBMIT, WITH THEIR COMMENTS,
NOTIFICATION OF ANY RELEVANT PATENT
RIGHTS OF WHICH THEY ARE AWARE AND TO
PROVIDE SUPPORTING DOCUMENTATION. ISO 2021
---------------------- Page: 1 ----------------------
ISO/DIS 6183:2021(E)
COPYRIGHT PROTECTED DOCUMENT
© ISO 2021
All rights reserved. Unless otherwise specified, or required in the context of its implementation, no part of this publication may
be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting
on the internet or an intranet, without prior written permission. Permission can be requested from either ISO at the address
below or ISO’s member body in the country of the requester.ISO copyright office
CP 401 • Ch. de Blandonnet 8
CH-1214 Vernier, Geneva
Phone: +41 22 749 01 11
Email: copyright@iso.org
Website: www.iso.org
Published in Switzerland
ii © ISO 2021 – All rights reserved
---------------------- Page: 2 ----------------------
ISO/DIS 6183:2021(E)
Contents Page
Foreword ..........................................................................................................................................................................................................................................v
Introduction ................................................................................................................................................................................................................................vi
1 Scope ................................................................................................................................................................................................................................. 1
2 Normative references ...................................................................................................................................................................................... 1
3 Terms and definitions ..................................................................................................................................................................................... 1
4 Use and limitations ............................................................................................................................................................................................ 4
4.1 General ........................................................................................................................................................................................................... 4
4.2 Uses for carbon dioxide systems ............................................................................................................................................. 4
4.3 Limitations for carbon dioxide systems ............................................................................................................................ 5
4.4 Temperature limitations ................................................................................................................................................................. 5
5 Safety ................................................................................................................................................................................................................................ 5
5.1 Hazard to personnel ........................................................................................................................................................................... 5
5.2 Safety precautions ................................................................................................................................................................................ 5
5.2.1 Normally occupied and normally unoccupied areas ........................................................................ 5
5.2.2 Warning notices for occupiable areas ........................................................................................................... 6
5.2.3 Warning notices for unoccupiable areas ..................................................................................................... 9
5.3 Electrical hazards ..............................................................................................................................................................................10
5.4 Electrical earthing .............................................................................................................................................................................11
5.5 Electrostatic discharge ..................................................................................................................................................................11
6 System design .......................................................................................................................................................................................................11
6.1 General ........................................................................................................................................................................................................11
6.1.1 Specifications ...................................................................................................................................................................11
6.1.2 Working documents ...................................................................................................................................................12
6.2 Carbon dioxide supply ...................................................................................................................................................................12
6.2.1 Quality ....................................................................................................................................................................................12
6.2.2 Quantity ................................................................................................................................................................................12
6.2.3 Container arrangement ...........................................................................................................................................13
6.2.4 Storage containers .......................................................................................................................................................14
6.3 Distribution .............................................................................................................................................................................................15
6.3.1 General...................................................................................................................................................................................15
6.3.2 Piping ......................................................................................................................................................................................16
6.3.3 Fittings ...................................................................................................................................................................................16
6.3.4 Pipe and valve support ............................................................................................................................................17
6.3.5 Valves ......................................................................................................................................................................................17
6.3.6 Nozzles ..................................................................................................................................................................................18
6.4 Enclosures (total flooding) ........................................................................................................................................................19
6.4.1 Structural strength ......................................................................................................................................................19
6.4.2 Loss through openings .................. ......................................................................................................................... ..19
6.4.3 Ventilation systems .....................................................................................................................................................19
6.5 Detection, actuation and control systems.....................................................................................................................20
6.5.1 General...................................................................................................................................................................................20
6.5.2 Shut-down of plant and equipment ..............................................................................................................20
6.5.3 Automatic detection ...................................................................................................................................................20
6.5.4 Operating devices .........................................................................................................................................................20
6.5.5 Control equipment ......................................................................................................................................................21
6.5.6 Audible alarms and visual indicators ..........................................................................................................22
6.6 Local control (LC) and local control stations (LCS) ..............................................................................................23
7 Carbon dioxide flow and concentration calculations ..................................................................................................23
7.1 General ........................................................................................................................................................................................................23
7.2 System flow calculations .............................................................................................................................................................23
7.2.1 General...................................................................................................................................................................................23
7.2.2 Friction losses..................................................................................................................................................................24
© ISO 2021 – All rights reserved iii---------------------- Page: 3 ----------------------
ISO/DIS 6183:2021(E)
7.2.3 Pressure drop ..................................................................................................................................................................24
7.2.4 Valves and fittings ........................................................................................................................................................24
7.2.5 As-installed calculations ........................................................................................................................................24
7.2.6 Specific requirements ...............................................................................................................................................25
7.3 Carbon dioxide concentration requirements.............................................................................................................25
7.3.1 Flame extinguishment ........................................................................................................................................... ...25
7.3.2 Inerting ..................................................................................................................................................................................25
7.4 Total flooding quantity ..................................................................................................................................................................26
7.4.1 General...................................................................................................................................................................................26
7.4.2 Design quantity ..............................................................................................................................................................26
7.4.3 K factor ...............................................................................................................................................................................26
7.5 Design of local application systems ...................................................................................................................................29
7.5.1 General...................................................................................................................................................................................29
7.5.2 Carbon dioxide requirements ............................................................................................................................29
7.5.3 Rate by area method ..................................................................................................................................................29
7.5.4 Rate by volume method ..........................................................................................................................................31
7.6 Duration of protection – Total flooding systems.....................................................................................................33
7.7 System performance .......................................................................................................................................................................33
7.7.1 Discharge time ................................................................................................................................................................33
7.7.2 Extended discharge ....................................................................................................................................................33
8 Commissioning and acceptance .........................................................................................................................................................34
8.1 General ........................................................................................................................................................................................................34
8.2 Tests ...............................................................................................................................................................................................................34
8.2.1 General...................................................................................................................................................................................34
8.2.2 Enclosure check .............................................................................................................................................................34
8.2.3 Review of mechanical components ..............................................................................................................34
8.2.4 Review of enclosure integrity ............................................................................................................................35
8.2.5 Review of electrical components ....................................................................................................................35
8.2.6 Preliminary functional tests .................. ..............................................................................................................36
8.2.7 System functional operational test................................................................................................................37
8.2.8 Remote monitoring operations (if applicable) ...................................................................................37
8.2.9 Control panel primary power source ..........................................................................................................37
8.2.10 Completion of functional tests ..........................................................................................................................37
8.3 Completion certificate and documentation.................................................................................................................38
9 Inspection, maintenance, testing and training...................................................................................................................38
9.1 General ........................................................................................................................................................................................................38
9.2 Inspection .................................................................................................................................................................................................38
9.2.1 General...................................................................................................................................................................................38
9.2.2 Container .............................................................................................................................................................................38
9.2.3 Hose .........................................................................................................................................................................................38
9.2.4 Enclosures ..........................................................................................................................................................................38
9.3 Maintenance ...........................................................................................................................................................................................39
9.3.1 General...................................................................................................................................................................................39
9.3.2 User's programme of inspection .....................................................................................................................39
9.3.3 Service schedule ............................................................................................................................................................39
9.4 Training ......................................................................................................................................................................................................39
Annex A (normative) Working Documents .................................................................................................................................................40
Annex B (normative) Carbon dioxide system pipe and orifice size determination ..........................................46
Annex D (informative) General information on carbon dioxide ...........................................................................................55
Annex E (informative) Examples of calculations ...................................................................................................................................60
Bibliography .............................................................................................................................................................................................................................64
iv © ISO 2021 – All rights reserved---------------------- Page: 4 ----------------------
ISO/DIS 6183:2021(E)
Foreword
ISO (the International Organization for Standardization) is a worldwide federation of national standards
bodies (ISO member bodies). The work of preparing International Standards is normally carried out
through ISO technical committees. Each member body interested in a subject for which a technical
committee has been established has the right to be represented on that committee. International
organizations, governmental and non-governmental, in liaison with ISO, also take part in the work.
ISO collaborates closely with the International Electrotechnical Commission (IEC) on all matters of
electrotechnical standardization.The procedures used to develop this document and those intended for its further maintenance are
described in the ISO/IEC Directives, Part 1. In particular, the different approval criteria needed for the
different types of ISO documents should be noted. This document was drafted in accordance with the
editorial rules of the ISO/IEC Directives, Part 2 (see www .iso .org/ directives).
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. ISO shall not be held responsible for identifying any or all such patent rights. Details of
any patent rights identified during the development of the document will be in the Introduction and/or
on the ISO list of patent declarations received (see www .iso .org/ patents).Any trade name used in this document is information given for the convenience of users and does not
constitute an endorsement.For an explanation of the voluntary nature of standards, the meaning of ISO specific terms and
expressions related to conformity assessment, as well as information about ISO's adherence to the
World Trade Organization (WTO) principles in the Technical Barriers to Trade (TBT), see www .iso .org/
iso/ foreword .html.This document was prepared by Technical Committee ISO/TC 21, Equipment for fire protection and
firefighting, Subcommittee SC 8, Gaseous media and firefighting systems using gas.
This second edition cancels and replaces the first edition (ISO 6183:1990), together with ISO 5923:1989,
which have been technically revised.Any feedback or questions on this document should be directed to the user’s national standards body. A
complete listing of these bodies can be found at www .iso .org/ members .html.© ISO 2021 – All rights reserved v
---------------------- Page: 5 ----------------------
ISO/DIS 6183:2021(E)
Introduction
This International Standard is intended for use by those concerned with purchasing, designing,
installing, testing, inspecting, approving, operating and maintaining carbon dioxide (CO2) extinguishing
systems.This International Standard applies only to carbon dioxide fixed fire-extinguishing systems in buildings
and other premises on land. Although the general principles could well apply to other uses (e.g. maritime
use), for these other uses additional considerations will almost certainly have to be taken into account
and the application of the requirements given in this International Standard is therefore unlikely to be
fully satisfactory. General information about carbon dioxide as an extinguishing medium is given in
Annex D. This can be useful background information for those unfamiliar with the characteristics of
this medium.It has been assumed in the preparation of ISO 6183 that the execution of its provisions will be entrusted
to those persons appropriately qualified and experienced in the specification, design, installation,
testing, approval, inspection, operation and maintenance of systems and equipment, for whose guidance
it has been prepared, and who can be expected to exercise a duty of care to avoid unnecessary release
of carbon dioxide. New requirements to minimize the need to release carbon dioxide during testing and
commissioning procedures are included in this edition. These are linked to the inclusion of enclosure
integrity testing.Carbon dioxide has for many years been a recognized effective medium for the extinction of flammable
liquid fires as well as fires in the presence of electrical and ordinary Class A hazards. Nevertheless,
it ought not be forgotten, in the planning of comprehensive schemes, that there could be hazards for
which this media is not suitable, or that in certain circumstances or situations there can be dangers in
its use requiring special precautions.The use of carbon dioxide is no longer recommended for total flooding of occupied areas. ISO 14520
provides requirements for other extinguishing agents that can be more appropriately used in these areas.
It is important that the fire protection of a building or plant be considered as a whole. Carbon dioxide
systems form only a part, though an important part, of the available facilities. It cannot be assumed
that their adoption necessarily removes the need to consider supplementary measures, such as the
provision of portable fire extinguishers or other mobile appliances for first aid or emergency use, or to
deal with special hazards.Advice on these matters can be obtained from the appropriate manufacturer of the carbon dioxide
or the extinguishing system. Information can also be sought from the appropriate fire authority, the
health and safety authorities and insurers. In addition, reference will need to be made, as necessary, to
other national standards and statutory regulations of the particular country.It is essential that firefighting equipment be carefully maintained to ensure instant readiness when
required. Routine maintenance is liable to be overlooked or given insufficient attention by the owner of
the system. It is, however, neglected at peril to the lives of occupants of the premises and at the risk of
crippling financial loss. The importance of maintenance cannot be too highly emphasized. Inspection
— preferably by a third party — should include an evaluation concluding that the extinguishing system
continues to provide adequate protection for the risk (protected zones as well as state of the art can
change over time).vi © ISO 2021 – All rights reserved
---------------------- Page: 6 ----------------------
DRAFT INTERNATIONAL STANDARD ISO/DIS 6183:2021(E)
Fire protection equipment — Carbon dioxide extinguishing
systems for use on premises — Design and installation
1 Scope
This International Standard specifies requirements and gives recommendations for the design,
installation, testing, maintenance and safety of fixed carbon dioxide firefighting systems in buildings,
plant or other structures. It is not applicable to extinguishing systems on ships, in aircraft, on vehicles
and mobile fire appliances, or to below-ground systems in the mining industry; nor does it apply to
carbon dioxide pre-inerting systems.Design of systems where unclosable opening(s) exceed a specified area and where the opening(s) can be
subject to the effect of wind is not specified, although general guidance on the procedure to be followed
in such cases is given (see 7.4.3.2).2 Normative references
The following documents are referred to in the text in such a way that some or all of their content
constitutes requirements of this document. For dated references, only the edition cited applies. For
undated references, the latest edition of the referenced document (including any amendments) applies.
ISO 7240-2, Fire detection and alarm systems — Part 2: Fire detection control and indicating equipment
ISO 7240-23, Fire detection and alarm systems — Part 23: Visual alarm devicesISO 7731, Ergonomics — Danger signals for public and work areas — Auditory danger signals
ISO 8201, Alarm systems — Audible emergency evacuation signal — RequirementsISO 14520-1:2015, Gaseous fire-extinguishing systems — Physical properties and system design — Part 1:
General requirementsISO 16003:2008, Components for fire-extinguishing systems using gas— Requirements and test methods —
Container valve assemblies and their actuators; selector valves and their actuators; nozzles; flexible and
rigid connectors; and check valves and non-return valves3 Terms and definitions
For the purposes of this document, the following terms and definitions apply.
ISO and IEC maintain terminological databases for use in standardization at the following addresses:
— ISO Online browsing platform: available at https:// www .iso .org/ obp— IEC Electropedia: available at http:// www .electropedia .org/
3.1
approved
acceptable to a relevant authority (3.2)
Note 1 to entry: In determining the acceptability of installations or procedures,
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.