Zero-touch network and Service Management (ZSM); Proof of Concept Framework

RGS/ZSM-006ed121_PoC_Fwk

General Information

Status
Not Published
Current Stage
12 - Completion
Due Date
24-Mar-2022
Completion Date
25-Feb-2022
Ref Project
Standard
ETSI GS ZSM 006 V1.2.1 (2022-02) - Zero-touch network and Service Management (ZSM); Proof of Concept Framework
English language
13 pages
sale 15% off
Preview
sale 15% off
Preview

Standards Content (Sample)


GROUP SPECIFICATION
Zero-touch network and Service Management (ZSM);
Proof of Concept Framework
Disclaimer
The present document has been produced and approved by the Zero-touch network and Service Management (ZSM) ETSI
Industry Specification Group (ISG) and represents the views of those members who participated in this ISG.
It does not necessarily represent the views of the entire ETSI membership.

2 ETSI GS ZSM 006 V1.2.1 (2022-02)

Reference
RGS/ZSM-006ed121_PoC_Fwk
Keywords
automation, proof of concept
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE

Tel.: +33 4 92 94 42 00  Fax: +33 4 93 65 47 16

Siret N° 348 623 562 00017 - APE 7112B
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° w061004871

Important notice
The present document can be downloaded from:
http://www.etsi.org/standards-search
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the prevailing version of an ETSI
deliverable is the one made publicly available in PDF format at www.etsi.org/deliver.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at
https://portal.etsi.org/TB/ETSIDeliverableStatus.aspx
If you find errors in the present document, please send your comment to one of the following services:
https://portal.etsi.org/People/CommiteeSupportStaff.aspx
Notice of disclaimer & limitation of liability
The information provided in the present deliverable is directed solely to professionals who have the appropriate degree of
experience to understand and interpret its content in accordance with generally accepted engineering or
other professional standard and applicable regulations.
No recommendation as to products and services or vendors is made or should be implied.
No representation or warranty is made that this deliverable is technically accurate or sufficient or conforms to any law
and/or governmental rule and/or regulation and further, no representation or warranty is made of merchantability or fitness
for any particular purpose or against infringement of intellectual property rights.
In no event shall ETSI be held liable for loss of profits or any other incidental or consequential damages.

Any software contained in this deliverable is provided "AS IS" with no warranties, express or implied, including but not
limited to, the warranties of merchantability, fitness for a particular purpose and non-infringement of intellectual property
rights and ETSI shall not be held liable in any event for any damages whatsoever (including, without limitation, damages
for loss of profits, business interruption, loss of information, or any other pecuniary loss) arising out of or related to the use
of or inability to use the software.
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and
microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.

© ETSI 2022.
All rights reserved.
ETSI
3 ETSI GS ZSM 006 V1.2.1 (2022-02)
Contents
Intellectual Property Rights . 4
Foreword . 4
Modal verbs terminology . 4
1 Scope . 5
2 References . 5
2.1 Normative references . 5
2.2 Informative references . 5
3 Definition of terms, symbols and abbreviations . 6
3.1 Terms . 6
3.2 Symbols . 6
3.3 Abbreviations . 6
4 PoC framework . 6
4.0 Rationale. 6
4.1 Roles and responsibilities . 7
4.2 PoC activity process . 7
4.3 PoC proposal acceptance criteria . 11
4.4 PoC report acceptance criteria . 12
5 PoC support tools . 12
5.0 General . 12
5.1 PoC mailing list . 12
5.2 PoC WIKI . 12
History . 13

ETSI
4 ETSI GS ZSM 006 V1.2.1 (2022-02)
Intellectual Property Rights
Essential patents
IPRs essential or potentially essential to normative deliverables may have been declared to ETSI. The declarations
pertaining to these essential IPRs, if any, are publicly available for ETSI members and non-members, and can be
found in ETSI SR 000 314: "Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to
ETSI in respect of ETSI standards", which is available from the ETSI Secretariat. Latest updates are available on the
ETSI Web server (https://ipr.etsi.org/).
Pursuant to the ETSI Directives including the ETSI IPR Policy, no investigation regarding the essentiality of IPRs,
including IPR searches, has been carried out by ETSI. No guarantee can be given as to the existence of other IPRs not
referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become,
essential to the present document.
Trademarks
The present document may include trademarks and/or tradenames which are asserted and/or registered by their owners.
ETSI claims no ownership of these except for any which are indicated as being the property of ETSI, and conveys no
right to use or reproduce any trademark and/or tradename. Mention of those trademarks in the present document does
not constitute an endorsement by ETSI of products, services or organizations associated with those trademarks.
DECT™, PLUGTESTS™, UMTS™ and the ETSI logo are trademarks of ETSI registered for the benefit of its

Members. 3GPP™ and LTE™ are trademarks of ETSI registered for the benefit of its Members and of the 3GPP
Organizational Partners. oneM2M™ logo is a trademark of ETSI registered for the benefit of its Members and of the ®
oneM2M Partners. GSM and the GSM logo are trademarks registered and owned by the GSM Association.
Foreword
This Group Specification (GS) has been produced by ETSI Industry Specification Group (ISG) Zero-touch network and
Service Management (ZSM).
Modal verbs terminology
In the present document "shall", "shall not", "should", "should not", "may", "need not", "will", "will not", "can" and
"cannot" are to be interpreted as described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of
provisions).
"must" and "must not" are NOT allowed in ETSI deliverables except when used in direct citation.
ETSI
5 ETSI GS ZSM 006 V1.2.1 (2022-02)
1 Scope
The present document defines a framework to be used by ETSI ISG ZSM to coordinate and promote multi stakeholder
Proof of Concept (PoC) projects illustrating key aspects of ZSM. Proofs of Concept are an important tool to
demonstrate the viability of a new technology during its early days and or pre-standardization phase.
The main objectives of the ZSM PoC framework are:
• to ensure the PoC projects are scoped around relevant topics for ISG ZSM that require from-the-field input;
• to ensure that the PoC results, lessons learnt and identified gaps are feedback to ISG ZSM;
• to build confidence on the viability of ZSM;
• to encourage the development of a diverse and open ecosystem by fostering the integration of components
from different players;
• to support standardization and industry promotion activities of ISG ZSM.
This framework describes:
• the different roles and responsibilities in the PoC activity process;
• the PoC activity process;
• the acceptance criteria for PoC proposals and reports.
2 References
2.1 Normative references
References are either specific (identified by date of publication and/or edition number or version number) or
non-specific. For specific references, only the cited version applies. For non-specific references, the latest version of the
referenced document (including any amendments) applies.
Referenced documents which are not found to be publicly available in the expected location might be found at
https://docbox.etsi.org/Reference.
NOTE: While any hyperlinks included in this clause were valid at the time of publication, ETSI cannot guarantee
their long term validity.
The following referenced documents are necessary for the application of the present document.
Not applicable.
2.2 Informative references
References are either specific (identified by date of publication and/or edition number or version number) or
non-specific. For specific references, only the cited version applies. For non-specific references, the latest version of the
referenced document (including any amendments) applies.
NOTE: While any hyperlinks included in this clause were valid at the time of publication, ETSI cannot guarantee
their long term validity.
The following referenced documents are not necessary for the application of the present document but they assist the
user with regard to a particular subject area.
Not applicable.
ETSI
6 ETSI GS ZSM 006 V1.2.1 (2022-02)
3 Definition of terms, symbols and abbreviations
3.1 Terms
For the purposes of the present document, the following terms apply:
expected contribution: input/feedback expected from the PoC team on a specific PoC topic
network provider: organization that provides a network for the provision of telecommunications services
NOTE: If the same organization also offers services it also becomes the service provider.
PoC demo: public demonstration of a PoC project
PoC management team: team that manages the PoC activity process and promotes the PoC framework
PoC project: multi-party endeavour targeting to prove some concepts in the context of a given technology
PoC proposal: initial description of a multiparty PoC project, and the feedback it will provide
PoC report: compilation of test results, lessons learned, contributions and recommendations provided by a PoC team
during or at the end of a PoC p
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.

Loading comments...