Intelligent Transport Systems (ITS); Testing; Conformance test specifications for GeoNetworking ITS-G5; Part 1: Test requirements and Protocol Implementation Conformance Statement (PICS) pro forma

RTS/ITS-00352

General Information

Status
Published
Publication Date
29-May-2017
Current Stage
12 - Completion
Due Date
06-Jun-2017
Completion Date
30-May-2017
Ref Project

Buy Standard

Standard
ETSI TS 102 871-1 V1.4.1 (2017-05) - Intelligent Transport Systems (ITS); Testing; Conformance test specifications for GeoNetworking ITS-G5; Part 1: Test requirements and Protocol Implementation Conformance Statement (PICS) pro forma
English language
17 pages
sale 15% off
Preview
sale 15% off
Preview

Standards Content (Sample)

ETSI TS 102 871-1 V1.4.1 (2017-05)






TECHNICAL SPECIFICATION
Intelligent Transport Systems (ITS);
Testing;
Conformance test specifications for GeoNetworking ITS-G5;
Part 1: Test requirements and Protocol Implementation
Conformance Statement (PICS) pro forma

---------------------- Page: 1 ----------------------
2 ETSI TS 102 871-1 V1.4.1 (2017-05)



Reference
RTS/ITS-00352
Keywords
ITS, network, PICS, testing
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE

Tel.: +33 4 92 94 42 00  Fax: +33 4 93 65 47 16

Siret N° 348 623 562 00017 - NAF 742 C
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° 7803/88

Important notice
The present document can be downloaded from:
http://www.etsi.org/standards-search
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the only prevailing document is the
print of the Portable Document Format (PDF) version kept on a specific network drive within ETSI Secretariat.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at
https://portal.etsi.org/TB/ETSIDeliverableStatus.aspx
If you find errors in the present document, please send your comment to one of the following services:
https://portal.etsi.org/People/CommiteeSupportStaff.aspx
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying
and microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.

© European Telecommunications Standards Institute 2017.
All rights reserved.

TM TM TM
DECT , PLUGTESTS , UMTS and the ETSI logo are Trade Marks of ETSI registered for the benefit of its Members.
TM
3GPP and LTE™ are Trade Marks of ETSI registered for the benefit of its Members and
of the 3GPP Organizational Partners.
oneM2M logo is protected for the benefit of its Members
GSM® and the GSM logo are Trade Marks registered and owned by the GSM Association.
ETSI

---------------------- Page: 2 ----------------------
3 ETSI TS 102 871-1 V1.4.1 (2017-05)
Contents
Intellectual Property Rights . 4
Foreword . 4
Modal verbs terminology . 4
1 Scope . 5
2 References . 5
2.1 Normative references . 5
2.2 Informative references . 5
3 Definitions and abbreviations . 5
3.1 Definitions . 5
3.2 Abbreviations . 6
4 Conformance requirement concerning PICS . 6
5 Mnemonics for PICS reference . 6
Annex A (normative): GEONETW PICS pro forma (Media independent) . 8
A.1 Partial cancellation of copyright . 8
A.2 Guidance for completing the ICS pro forma . 8
A.2.1 Purposes and structure . 8
A.2.2 Abbreviations and conventions . 8
A.2.3 Instructions for completing the ICS pro forma . 10
A.3 Identification of the implementation . 10
A.3.1 Introduction . 10
A.3.2 Date of the statement . 10
A.3.3 Implementation Under Test (IUT) identification . 11
A.3.4 System Under Test (SUT) identification . 11
A.3.5 Product supplier . 11
A.3.6 Client (if different from product supplier) . 12
A.3.7 ICS contact person. 12
A.4 Identification of the protocol . 13
A.5 Global statement of conformance . 13
A.6 Tables . 13
A.6.1 Introduction . 13
A.6.2 Media independent . 13
A.6.2.1 Introduction. 13
A.6.2.2 Protocol operation . 13
A.6.2.3 Protocol constants . 15
History . 17

ETSI

---------------------- Page: 3 ----------------------
4 ETSI TS 102 871-1 V1.4.1 (2017-05)
Intellectual Property Rights
IPRs essential or potentially essential to the present document may have been declared to ETSI. The information
pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found
in ETSI SR 000 314: "Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in
respect of ETSI standards", which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web
server (https://ipr.etsi.org/).
Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee
can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web
server) which are, or may be, or may become, essential to the present document.
Foreword
This Technical Specification (TS) has been produced by ETSI Technical Committee Intelligent Transport Systems
(ITS).
The present document is part 1 of a multi-part deliverable covering Conformance test specifications for Geonetworking
ITS-G5 as identified below:
Part 1: "Test requirements and Protocol Implementation Conformance Statement (PICS) pro forma";
Part 2: "Test Suite Structure and Test Purposes (TSS & TP)";
Part 3: "Abstract Test Suite (ATS) and Protocol Implementation eXtra Information for Testing (PIXIT)".
Modal verbs terminology
In the present document "shall", "shall not", "should", "should not", "may", "need not", "will", "will not", "can" and
"cannot" are to be interpreted as described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of
provisions).
"must" and "must not" are NOT allowed in ETSI deliverables except when used in direct citation.
ETSI

---------------------- Page: 4 ----------------------
5 ETSI TS 102 871-1 V1.4.1 (2017-05)
1 Scope
The present document provides the Protocol Implementation Conformance Statement (PICS) pro forma for
Conformance test specifications for Geonetworking ITS-G5 as defined in ETSI EN 302 636-4-1 [1] in compliance with
the relevant requirements and in accordance with the relevant guidance given in ISO/IEC 9646-7 [i.2].
2 References
2.1 Normative references
References are either specific (identified by date of publication and/or edition number or version number) or
non-specific. For specific references, only the cited version applies. For non-specific references, the latest version of the
referenced document (including any amendments) applies.
Referenced documents which are not found to be publicly available in the expected location might be found at
https://docbox.etsi.org/Reference/.
NOTE: While any hyperlinks included in this clause were valid at the time of publication, ETSI cannot guarantee
their long term validity.
The following referenced documents are necessary for the application of the present document.
[1] ETSI EN 302 636-4-1 (V1.2.1): "Intelligent Transport Systems (ITS); Vehicular Communications;
GeoNetworking; Part 4: Geographical addressing and forwarding for point-to-point and point-to-
multipoint communications; Sub-part 1: Media-Independent Functionality".
2.2 Informative references
References are either specific (identified by date of publication and/or edition number or version number) or
non-specific. For specific references, only the cited version applies. For non-specific references, the latest version of the
referenced document (including any amendments) applies.
NOTE: While any hyperlinks included in this clause were valid at the time of publication, ETSI cannot guarantee
their long term validity.
The following referenced documents are not necessary for the application of the present document but they assist the
user with regard to a particular subject area.
[i.1] ISO/IEC 9646-1 (1994): "Information technology - Open Systems Interconnection - Conformance
testing methodology and framework - Part 1: General concepts".
[i.2] ISO/IEC 9646-7 (1995): "Information technology - Open Systems Interconnection - Conformance
testing methodology and framework - Part 7: Implementation Conformance Statements".
3 Definitions and abbreviations
3.1 Definitions
For the purposes of the present document, the terms and definitions given in ETSI EN 302 636-4-1 [1],
ISO/IEC 9646-1 [i.1] and ISO/IEC 9646-7 [i.2] apply.
ETSI

---------------------- Page: 5 ----------------------
6 ETSI TS 102 871-1 V1.4.1 (2017-05)
3.2 Abbreviations
For the purposes of the present document, the following abbreviations apply:
CBF Contention-Based Forwarding
GAC Geographically-Scoped Anycast
GBC Geographically-Scoped Broadcast
GUC Geo Unicast
ICS Implementation Conformance Statement
ITS Intelligent Transportation Systems
ITS-G5 5 GHz wireless communication
IUT Implementation Under Test
LS Location Service
PDU Protocol Data Unit
PICS Protocol Implementation Conformance Statement
SHB Single Hop Broadcast
SUT System Under Test
TC Test Case
TSB Topology Scoped Broadcast
4 Conformance requirement concerning PICS
If it claims to conform to the present document, the actual PICS pro forma to be filled in by a supplier shall be
technically equivalent to the text of the PICS pro forma given in annex A, and shall preserve the numbering, naming
and ordering of the pro forma items.
An ICS which conforms to the present document shall be a conforming PICS pro forma completed in accordance with
the instructions for completion given in clause A.2.
5 Mnemonics for PICS reference
To avoid an update of all related documents when the PICS document is changed, table 1 introduces mnemonic names
and the correspondence with the PICS item number.
ETSI

---------------------- Page: 6 ----------------------
7 ETSI TS 102 871-1 V1.4.1 (2017-05)
Table 1: Mnemonics for PICS reference
Mnemonic PICS item
PICS_GN_LOCAL_GN_ADDR A.16/1
PICS_GN_LOCAL_ADDR_CONF_METHOD A.16/2
PICS_GN_IS_MOBILE A.16/4
PICS_GN_MINIMUM_UPDATE_FREQUENCY_LPV A.16/6
PICS_GN_MAX_SDU_SIZE A.16/8
PICS_GN_MAX_GN_HEADER_SIZE A.16/9
PICS_GN_LIFETIME_LOC_TE A.16/10
PICS_GN_SECURITY A.16/11
PICS_GN_LOCATION_SERVICE_MAX_RETRANS A.16/13
PICS_GN_LOCATION_SERVICE_RETRANSMIT_TIMER A.16/14
PICS_GN_LOCATION_SERVICE_PACKET_BUFFER_SIZE A.16/15
PICS_GN_BEACON_SERVICE_RETRANSMIT_TIMER A.16/16
PICS_GN_BEACON_SERVICE_MAX_JITTER A.16/17
PICS_GN_DEFAULT_HOP_LIMIT A.16/18
PICS_GN_MAX_PACKET_LIFETIME A.16/20
PICS_GN_MAX_GEO_AREA_SIZE A.16/24
PICS_GN_MIN_PACKET_REPETITION_INTERVAL A.16/25
PICS_GN_NON_AREA_FORWARDING_ALGORITHM A.16/26
PICS_GN_AREA_FORWARDING_ALGORITHM A.16/27
PICS_GN_CBF_MIN_TIME A.16/28
PICS_GN_CBF_MAX_TIME A.16/29
PICS_GN_DEFAULT_MAX_COMMUNICATION_RANGE A.16/30
PICS_GN_UC_FORWARDING_PACKET_BUFFER_SIZE A.16/32
PICS_GN_BC_FORWARDING_PACKET_BUFFER_SIZE A.16/33
PICS_GN_BEACON_SRC A.8/1
PICS_GN_BEACON_DST A.8/2
PICS_GUC A.7/7
PICS_GN_GUC_SRC A.11/1
PICS_GN_GUC_DST A.11/3
PICS_GN_GUC_FWD A.11/2
PICS_GBC A.7/10
PICS_GN_GBC_SRC A.14/1
PICS_GN_GBC_DST A.14/2
PICS_GN_GBC_FWD A.14/2
PICS_GAC A.7/11
PICS_GN_GAC_SRC A.15/1
PICS_GN_GAC_DST A.15/2
PICS_GN_GAC_FWD A.15/2
PICS_SHB A.7/9
PICS_GN_SHB_SRC A.13/1
PICS_GN_SHB_DST A.13/2
PICS_TSB A.7/8
PICS_GN_TSB_SRC A.12/1
PICS_GN_TSB_DST A.12/2
PICS_GN_TSB_FWD A.12/2
PICS_GN_LS_REQ_SRC A.10/1
PICS_GN_LS_REQ_RETRANSMISSION A.10/2
PICS_GN_LS_REQ_DST A.9/3
PICS_GN_LS_REP_DST A.10/3
PICS_GN_LS_FWD A.9/2
PICS_GN_ADDR_AUTO A.4/1
PICS_GN_ADDR_MANAGED A.4/2
PICS_GN_ADDR_ANONYMOUS A.4/3
PICS_GN_DAD A.4/4

ETSI

---------------------- Page: 7 ----------------------
8 ETSI TS 102 871-1 V1.4.1 (2017-05)
Annex A (normative):
GEONETW PICS pro forma (Media independent)
A.1 Partial cancellation of copyright
Notwithstanding the provisions of the copyright clause related to the text of the present document, ETSI grants that
users of the present document may freely reproduce the GEONETW PICS pro forma in this annex so that it can be used
for its intended purposes and may further publish the completed GEONETW PICS.
A.2 Guidance for completing the ICS pro forma
A.2.1 Purposes and structure
The purpose of this PICS pro forma is to provide a mechanism whereby a supplier of an implementation of the
requirements defined in ETSI EN 302 636-4-1 [1] may provide information about the implementation in a standardized
manner.
The PICS pro forma is subdivided into clauses for the following categories of information:
• guidance for completing the ICS pro forma;
• identification of the implementation;
• identification of the ETSI EN 302 636-4-1 [1];
• global statement of conformance;
• PICS pro forma tables.
A.2.2 Abbreviations and conventions
The ICS pro forma contained in this annex is comprised of information in tabular form in accordance with the
guidelines presented in ISO/IEC 9646-7 [i.2].
Item column
The item column contains a number which identifies the item in the table.
Item description column
The item description column describes in free text each respective item (e.g. parameters, timers, etc.). It implicitly
means "is supported by the implementation?".
ETSI

---------------------- Page: 8 ----------------------
9 ETSI TS 102 871-1 V1.4.1 (2017-05)
Status column
The following notations, defined in ISO/IEC 9646-7 [i.2], are used for the status column:
m mandatory - the capability is required to be supported.
o optional - the capability may be supported or not.
n/a not applicable - in the given context, it is impossible to use the capability.
x prohibited (excluded) - there is a requirement not to use this capability in the given context.
o.i qualified optional - for mutually exclusive or selectable options from a set. "i" is an integer which
identifies an unique group of related optional items and the logic of their selection which is
defined immediately following the table.
c.i conditional - the requirement on the capability ("m", "o", "x" or "n/a") depends on the support of
other optional or conditional items. "i" is an integer identifying an unique conditional status
expression which is defined immediately following the table.
i irrelevant (out-of-scope) - capability outside the scope of the reference specification. No answer is
requested from the suppli
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.