LTE; Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Packet Core (EPC); User Equipment (UE) conformance specification; Part 1: Protocol conformance specification (3GPP TS 36.523-1 version 15.6.1 Release 15)

RTS/TSGR-0536523-1vf61

General Information

Status
Published
Publication Date
01-Apr-2020
Current Stage
12 - Completion
Completion Date
02-Apr-2020
Ref Project

Buy Standard

Standard
ETSI TS 136 523-1 V15.6.1 (2020-04) - LTE; Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Packet Core (EPC); User Equipment (UE) conformance specification; Part 1: Protocol conformance specification (3GPP TS 36.523-1 version 15.6.1 Release 15)
English language
148 pages
sale 15% off
Preview
sale 15% off
Preview

Standards Content (Sample)

ETSI TS 136 523-1 V15.6.1 (2020-04)






TECHNICAL SPECIFICATION
LTE;
Evolved Universal Terrestrial Radio Access (E-UTRA) and
Evolved Packet Core (EPC);
User Equipment (UE) conformance specification;
Part 1: Protocol conformance specification
(3GPP TS 36.523-1 version 15.6.1 Release 15)



---------------------- Page: 1 ----------------------
3GPP TS 36.523-1 version 15.6.1 Release 15 1 ETSI TS 136 523-1 V15.6.1 (2020-04)



Reference
RTS/TSGR-0536523-1vf61
Keywords
LTE
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE

Tel.: +33 4 92 94 42 00  Fax: +33 4 93 65 47 16

Siret N° 348 623 562 00017 - NAF 742 C
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° 7803/88

Important notice
The present document can be downloaded from:
http://www.etsi.org/standards-search
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the prevailing version of an ETSI
deliverable is the one made publicly available in PDF format at www.etsi.org/deliver.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at
https://portal.etsi.org/TB/ETSIDeliverableStatus.aspx
If you find errors in the present document, please send your comment to one of the following services:
https://portal.etsi.org/People/CommiteeSupportStaff.aspx
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying
and microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.

© ETSI 2020.
All rights reserved.

DECT™, PLUGTESTS™, UMTS™ and the ETSI logo are trademarks of ETSI registered for the benefit of its Members.

3GPP™ and LTE™ are trademarks of ETSI registered for the benefit of its Members and
of the 3GPP Organizational Partners.
oneM2M™ logo is a trademark of ETSI registered for the benefit of its Members and
of the oneM2M Partners.
®
GSM and the GSM logo are trademarks registered and owned by the GSM Association.
ETSI

---------------------- Page: 2 ----------------------
3GPP TS 36.523-1 version 15.6.1 Release 15 2 ETSI TS 136 523-1 V15.6.1 (2020-04)
Intellectual Property Rights
Essential patents
IPRs essential or potentially essential to normative deliverables may have been declared to ETSI. The information
pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found
in ETSI SR 000 314: "Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in
respect of ETSI standards", which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web
server (https://ipr.etsi.org/).
Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee
can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web
server) which are, or may be, or may become, essential to the present document.
Trademarks
The present document may include trademarks and/or tradenames which are asserted and/or registered by their owners.
ETSI claims no ownership of these except for any which are indicated as being the property of ETSI, and conveys no
right to use or reproduce any trademark and/or tradename. Mention of those trademarks in the present document does
not constitute an endorsement by ETSI of products, services or organizations associated with those trademarks.
Legal Notice
This Technical Specification (TS) has been produced by ETSI 3rd Generation Partnership Project (3GPP).
The present document may refer to technical specifications or reports using their 3GPP identities. These shall be
interpreted as being references to the corresponding ETSI deliverables.
The cross reference between 3GPP and ETSI identities can be found under http://webapp.etsi.org/key/queryform.asp.
Modal verbs terminology
In the present document "shall", "shall not", "should", "should not", "may", "need not", "will", "will not", "can" and
"cannot" are to be interpreted as described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of
provisions).
"must" and "must not" are NOT allowed in ETSI deliverables except when used in direct citation.
ETSI

---------------------- Page: 3 ----------------------
3GPP TS 36.523-1 version 15.6.1 Release 15 3 ETSI TS 136 523-1 V15.6.1 (2020-04)
Contents
Intellectual Property Rights . 2
Legal Notice . 2
Modal verbs terminology . 2
Foreword . 4
Introduction . 4
1 Scope . 5
2 References . 5
3 Definitions, symbols and abbreviations . 5
4 Overview . 6
4.1 Test methodology . 6
5 to 4 Void . 6
Annex A (informative): Change history . 7
History . 147

ETSI

---------------------- Page: 4 ----------------------
3GPP TS 36.523-1 version 15.6.1 Release 15 4 ETSI TS 136 523-1 V15.6.1 (2020-04)
Foreword
rd
This Technical Specification has been produced by the 3 Generation Partnership Project (3GPP).
The contents of the present document are subject to continuing work within the TSG and may change following formal
TSG approval. Should the TSG modify the contents of the present document, it will be re-released by the TSG with an
identifying change of release date and an increase in version number as follows:
Version x.y.z
where:
x the first digit:
1 presented to TSG for information;
2 presented to TSG for approval;
3 or greater indicates TSG approved document under change control.
y the second digit is incremented for all changes of substance, i.e. technical enhancements, corrections,
updates, etc.
z the third digit is incremented when editorial only changes have been incorporated in the document.
Introduction
The present document is the first part of a multi-part conformance specification. 3GPP TS 36.523-2 [18] contains a pro-
forma for the Implementation Conformance Statement (ICS) and an applicability table, indicating the release from
which each test case is applicable. 3GPP TS 36.523-3 [19] contains a TTCN-3 design frame work, test model and Test
Suites (the detailed test specifications in TTCN-3).
For at least a minimum set of services, the prose descriptions of test cases will have a matching detailed test case
implemented in TTCN [19].
The present document may contain descriptions of tests for additional services, but these tests may not have matching
TTCN test cases.
The present document will not contain any tests on the USIM, or the interface between the UE and the USIM. These
tests are documented elsewhere.
ETSI

---------------------- Page: 5 ----------------------
3GPP TS 36.523-1 version 15.6.1 Release 15 5 ETSI TS 136 523-1 V15.6.1 (2020-04)
1 Scope
rd
The present document specifies the protocol conformance testing for the 3 Generation E-UTRAN User Equipment
(UE).
This is the first part of a multi-part test specification. The following information can be found in this part:
- the overall test structure;
- the test configurations;
- the conformance requirement and reference to the core specifications;
- the test purposes; and
- a brief description of the test procedure, the specific test requirements and short message exchange table.
The following information relevant to testing could be found in accompanying specifications:
- the default setting of the test parameters [18];
- the applicability of each test case [19].
rd
A detailed description of the expected sequence of messages could be found in the 3 part of this test specification.
nd
The Implementation Conformance Statement (ICS) pro-forma could be found in the 2 part of the present document.
The present document is valid for UE implemented according to 3GPP releases starting from Release 8 up to the
Release indicated on the cover page of the present document.
2 References
The following documents contain provisions which, through reference in this text, constitute provisions of the present
document.
• References are either specific (identified by date of publication, edition number, version number, etc.) or
non-specific.
• For a specific reference, subsequent revisions do not apply.
• For a non-specific reference, the latest version applies. In the case of a reference to a 3GPP document (including
a GSM document), a non-specific reference implicitly refers to the latest version of that document in the same
Release as the present document unless the context in which the reference is made suggests a different Release is
relevant (information on the applicable release in a particular context can be found in e.g. test case title,
description or applicability, message description or content).
[1] to [58] (void)
[59] 3GPP TS 36.523-1 Release 16: "Evolved Universal Terrestrial Radio Access (E-UTRA) and
Evolved Packet Core (EPC); User Equipment (UE) conformance specification; Part 1: Protocol
conformance specification "
3 Definitions, symbols and abbreviations
Void
ETSI

---------------------- Page: 6 ----------------------
3GPP TS 36.523-1 version 15.6.1 Release 15 6 ETSI TS 136 523-1 V15.6.1 (2020-04)
4 Overview
4.1 Test methodology
The requirements of the present document are provided in 3GPP TS 36.523-1 Release 16 [59].

5 to 24 Void

ETSI

---------------------- Page: 7 ----------------------
3GPP TS 36.523-1 version 15.6.1 Release 15 7 ETSI TS 136 523-1 V15.6.1 (2020-04)
Annex A (informative):
Change history
ETSI

---------------------- Page: 8 ----------------------
3GPP TS 36.523-1 version 15.6.1 Release 15 8 ETSI TS 136 523-1 V15.6.1 (2020-04)
Date TSG # TSG Doc. CR Rev Subject/Comment Version Version
Old New
2007-08 R5-072514  Initial version  0.0.1
2007-11   Template updated 0.0.1 0.0.2
2008-02   Addition 6 new RRC test cases 0.0.2 0.1.0
2008-04   Addition of new RRC and PDCP test cases 0.1.0 0.2.0
agreed in RAN5#39.
Alignment with latest core specifications.
2008-07   Addition of new MAC, RLC, RRC and EMM test 0.2.0 0.3.0
cases and corrections agreed in RAN5#39bis.
Alignment with latest core specifications.
2008-09   Addition of new MAC, RLC, PDCP and RRC 0.3.0 1.0.0
test cases and corrections agreed in RAN5#40.
2008-10   Addition of new test cases agreed by email 1.0.0 1.1.0
after RAN5#40 and at RAN5#40bis.
2008-11   Addition of new test cases and test case 1.1.0 2.0.0
corrections agreed at RAN5#41.
2008-12 RAN#42 R5-080969  Approval of version 2.0.0 at RAN#42, then put 2.0.0 8.0.0
to version 8.0.0.
2008-01   Editorial corrections 8.0.0 8.0.1
2009-03 RAN#43 R5-090102 0060 - Correction to E-UTRA RLC test case 7.2.3.1 8.0.1 8.1.0
2009-03 RAN#43 R5-090103 0061 - Correction to E-UTRA RLC test case 7.2.3.2 8.0.1 8.1.0
2009-03 RAN#43 R5-090124 0062 - Batch 2 -Update to test case 7.2.2.8 8.0.1 8.1.0
2009-03 RAN#43 R5-090125 0063 - Batch 1B -Update to test case 7.2.2.9 8.0.1 8.1.0
2009-03 RAN#43 R5-090128 0064 - Batch 1A -Update to test case 8.1.1.1 8.0.1 8.1.0
2009-03 RAN#43 R5-090132 0065 - Batch 1A - Update to test case 8.2.4.1 8.0.1 8.1.0
2009-03 RAN#43 R5-090133 0066 - Batch 2 - Update to test case 8.2.4.2 8.0.1 8.1.0
2009-03 RAN#43 R5-090136 0067 - Batch 2 - Update to test case 8.2.4.6 8.0.1 8.1.0
2009-03 RAN#43 R5-090137 0068 - Batch 2 - Update to test case 8.2.4.7 8.0.1 8.1.0
2009-03 RAN#43 R5-090138 0069 - Batch 2 - Update to test case 8.2.4.9 8.0.1 8.1.0
2009-03 RAN#43 R5-090144 0070 - Batch 2 - Addition of new test case 8.4.1.8 8.0.1 8.1.0
2009-03 RAN#43 R5-090145 0071 - Batch 2 - Correction to Idle mode test method 8.0.1 8.1.0
2009-03 RAN#43 R5-090146 0072 - Batch 1A - Update to test case 8.5.4.1 8.0.1 8.1.0
2009-03 RAN#43 R5-090151 0073 - Batch 2 - Addition of new test case 9.2.3.2.10 8.0.1 8.1.0
2009-03 RAN#43 R5-090153 0074 - Batch 2 - Addition of new test case 9.2.3.2.15 8.0.1 8.1.0
2009-03 RAN#43 R5-090199 0075 - Removal of EMM test cases 9.2.2.2.4, 8.0.1 8.1.0
9.2.2.2.6, 9.2.2.2.7 and 9.2.2.2.8.
2009-03 RAN#43 R5-090201 0076 - Batch 1:Corrections to MAC test case 7.1.2.1 8.0.1 8.1.0
2009-03 RAN#43 R5-090203 0077 - Batch 1:Corrections to MAC test case 7.1.2.4 8.0.1 8.1.0
2009-03 RAN#43 R5-090230 0078 - Batch 1:Corrections to MAC test case 7.1.2.5 8.0.1 8.1.0
2009-03 RAN#43 R5-090235 0079 - Batch 1:Corrections to MAC test case 7.1.3.6 8.0.1 8.1.0
2009-03 RAN#43 R5-090236 0080 - Batch 1:Corrections to MAC test case 7.1.4.11 8.0.1 8.1.0
2009-03 RAN#43 R5-090347 0081 - Batch 2 - Update to MAC test case 7.1.4.3 8.0.1 8.1.0
2009-03 RAN#43 R5-090453 0082 - Batch 1A - Update of E-UTRA RLC (AM) test 8.0.1 8.1.0
case 7.2.3.5
2009-03 RAN#43 R5-090455 0083 - Batch 2 - Update of E-UTRA RLC (AM) test 8.0.1 8.1.0
case 7.2.3.16
2009-03 RAN#43 R5-090498 0084 - Batch 1B: Correction to E-UTRA RLC test case 8.0.1 8.1.0
7.2.2.7
2009-03 RAN#43 R5-090511 0085 - Addition of a new LTE test case” 7.3.3.2 8.0.1 8.1.0
Correct functionality of EPS UP encryption
algorithms (SNOW 3G)”
2009-03 RAN#43 R5-090512 0086 - Addition of a new LTE test case “7.3.3.1 8.0.1 8.1.0
Correct functionality of EPS AS encryption
algorithms (SNOW 3G)”
2009-03 RAN#43 R5-090513 0087 - Addition of a new LTE test case “7.3.3.3 8.0.1 8.1.0
Correct functionality of EPS AS encryption
algorithms (AES)”
2009-03 RAN#43 R5-090514 0088 - Addition of a new LTE test case “7.3.3.4 8.0.1 8.1.0
Correct functionality of EPS UP encryption
algorithms (AES)”
2009-03 RAN#43 R5-090552 0089 - Batch 1:Corrections to MAC test case 7.1.2.7 8.0.1 8.1.0
2009-03 RAN#43 R5-090553 0090 - Batch 1:Corrections to MAC test case 7.1.2.8 8.0.1 8.1.0
2009-03 RAN#43 R5-090554 0091 - .Batch 1:Corrections to MAC test case 7.1.3.4 8.0.1 8.1.0
2009-03 RAN#43 R5-090555 0092 - Batch 1:Corrections to MAC test case 7.1.3.5 8.0.1 8.1.0
2009-03 RAN#43 R5-090556 0093 - Batch 1:Corrections to MAC test case 7.1.4.15 8.0.1 8.1.0
2009-03 RAN#43 R5-090557 0094 - Batch 1:Corrections to MAC test case 7.1.4.16 8.0.1 8.1.0
2009-03 RAN#43 R5-090570 0095 - Update of 36.523-1 Reference list 8.0.1 8.1.0
2009-03 RAN#43 R5-090605 0096 - Batch 2: Update of LTE TC 8.1.2.3 RRC - RRC 8.0.1 8.1.0
Connection Establishment in RRC Idle state:
return to idle state after T300 timeout
2009-03 RAN#43 R5-090607 0097 - Batch 2: Addition of EMM TC 9.2.1.2.4 for 8.0.1 8.1.0
Successful combined attach procedure, EPS
service only / CS domain not available.
ETSI

---------------------- Page: 9 ----------------------
3GPP TS 36.523-1 version 15.6.1 Release 15 9 ETSI TS 136 523-1 V15.6.1 (2020-04)
Date TSG # TSG Doc. CR Rev Subject/Comment Version Version
Old New
2009-03 RAN#43 R5-090611 0098 - Batch 1:Corrections to EMM test case 9.1.3.1 8.0.1 8.1.0
2009-03 RAN#43 R5-090631 0099 - Batch 1B: Correction to E-UTRA RLC test case 8.0.1 8.1.0
7.2.2.3
2009-03 RAN#43 R5-090645 0100 - Batch 1B: Update of E-UTRAN test case 8.0.1 8.1.0
6.1.1.1
2009-03 RAN#43 R5-090649 0101 - Batch-1B: Introduction of a new EMM test case, 8.0.1 8.1.0
9.2.3.1.4 Normal tracking area update / list of
equivalent PLMNs in the TRACKING AREA
UPDATE ACCEPT message
2009-03 RAN#43 R5-090651 0102 - Batch 1:Corrections to MAC test case 7.1.2.2 8.0.1 8.1.0
2009-03 RAN#43 R5-090653 0103 - Batch 1: Addition of new MAC test case 7.1.3.9 8.0.1 8.1.0
: MAC reset
2009-03 RAN#43 R5-090654 0104 - Batch 1: Addition of new MAC test case 8.0.1 8.1.0
7.1.4.12 : MAC reset
2009-03 RAN#43 R5-090655 0105 - Batch 1A - Update of E-UTRA MAC test case: 8.0.1 8.1.0
7.1.3.3
2009-03 RAN#43 R5-090656 0106 - Batch 2 - Update of E-UTRA MAC test case: 8.0.1 8.1.0
7.1.2.9
2009-03 RAN#43 R5-090665 0107 - Batch 1B - New E-UTRA PDCP test case - 8.0.1 8.1.0
7.3.1.2 Maintenance of PDCP sequence
numbers (user plane, RLC UM)
2009-03 RAN#43 R5-090666 0108 - Batch 1B - Correction to E-UTRA PDCP test 8.0.1 8.1.0
case 7.3.1.1
2009-03 RAN#43 R5-090667 0109 - Batch 1B - New E-UTRA PDCP test case - 8.0.1 8.1.0
7.3.1.3 Maintenance of PDCP sequence
numbers (user plane, RLC UM, long PDCP SN
(12 bits))
2009-03 RAN#43 R5-090669 0110 - Batch 1B -Update to test case 7.2.2.4 8.0.1 8.1.0
2009-03 RAN#43 R5-090670 0111 - Batch 1A -Update to test case 7.2.3.3 8.0.1 8.1.0
2009-03 RAN#43 R5-090671 0112 - Batch 1A -Update to test case 7.2.3.4 8.0.1 8.1.0
2009-03 RAN#43 R5-090672 0113 - Removal of TC 7.3.5.1 8.0.1 8.1.0
2009-03 RAN#43 R5-090674 0114 - Batch 1A - Update of E-UTRA RLC (AM) test 8.0.1 8.1.0
case 7.2.3.17
2009-03 RAN#43 R5-090675 0115 - Batch 1A - Update of E-UTRA RLC (AM) test 8.0.1 8.1.0
case 7.2.3.15
2009-03 RAN#43 R5-090676 0116 - Batch 1B - Update of test case 8.2.2.1 8.0.1 8.1.0
2009-03 RAN#43 R5-090677 0117 - Update of RRC batch 1B test case 8.2.2.2 RRC 8.0.1 8.1.0
Connection Reconfiguration / SRB/DRB
Reconfiguration: Success
2009-03 RAN#43 R5-090678 0118 - Batch-1: Update to RRC part 3 test case 8.0.1 8.1.0
8.3.3.1
2009-03 RAN#43 R5-090679 0119 - Batch 1A - TC 9.1.2.1 Authentication accepted - 8.0.1 8.1.0
Update of conformance requirements
2009-03 RAN#43 R5-090680 0120 - Batch 1A - TC 9.3.2.1 Paging procedure 8.0.1 8.1.0
revisited
2009-03 RAN#43 R5-090685 0121 - Batch 1A -Update to test case 6.1.2.5 8.0.1 8.1.0
2009-03 RAN#43 R5-090688 0122 - Update of TC 7.3.6.1 PDCP Discard 8.0.1 8.1.0
2009-03 RAN#43 R5-090689 0123 - Addition of new TC 7.3.5.4 8.0.1 8.1.0
2009-03 RAN#43 R5-090690 0124 - Batch 2 - Update of LTE TC 8.5.1.3 RRC - RRC 8.0.1 8.1.0
Connection Re-establishment: Failure: T311
Expiry
2009-03 RAN#43 R5-090691 0125 - Batch 2 -Update to test case 8.1.2.5 8.0.1 8.1.0
2009-03 RAN#43 R5-090692 0126 - Batch 1A -Update to test case 8.1.2.7 8.0.1 8.1.0
2009-03 RAN#43 R5-090693 0127 - Batch 1A -Update to test case 8.1.3.5 8.0.1 8.1.0
2009-03 RAN#43 R5-090694 0128 - Batch 2 - Update to test case 8.2.4.3 8.0.1 8.1.0
2009-03 RAN#43 R5-090695 0129 - Batch 1B - Update to test case 8.2.4.5 8.0.1 8.1.0
2009-03 RAN#43 R5-090707 0130 - Batch 1A - Update of test case 8.2.4.1 8.0.1 8.1.0
2009-03 RAN#43 R5-090709 0131 - Batch 2: Update of RRC part1 TC 8.1.3.6 RRC 8.0.1 8.1.0
Connection Release: redirection from E-
UTRAN to UTRAN
2009-03 RAN#43 R5-090710 0132 - Batch 2: Update of RRC part3 TC 8.3.1.7 8.0.1 8.1.0
Measurement configuration control and
reporting / intra E-UTRAN measurements:
blacklisting
2009-03 RAN#43 R5-090711 0133 - Corrections to LTE idle mode test cases 8.0.1 8.1.0
2009-03 RAN#43 R5-090712 0134 - Batch 1B: Update of test case 6.1.2.6 8.0.1 8.1.0
2009-03 RAN#43 R5-090713 0135 - Batch 2: Update of LTE TC 8.1.2.2 RRC, Reject 8.0.1 8.1.0
with wait time
2009-03 RAN#43 R5-090714 0136 - Update to test case 8.1.3.1 8.0.1 8.1.0
2009-03 RAN#43 R5-090715 0137 - Batch 1B: update of E-UTRA PDCP test case 8.0.1 8.1.0
7.3.6.1
2009-03 RAN#43 R5-090716 0138 - Batch 1B: update of E-UTRA PDCP test case 8.0.1 8.1.0
7.3.6.1
ETSI

---------------------- Page: 10 ----------------------
3GPP TS 36.523-1 version 15.6.1 Release 15 10 ETSI TS 136 523-1 V15.6.1 (2020-04)
Date TSG # TSG Doc. CR Rev Subject/Comment Version Version
Old New
2009-03 RAN#43 R5-090717 0139 - Batch 2 - Update to test case 8.3.1.8 8.0.1 8.1.0
2009-03 RAN#43 R5-090720 0140 - Batch-2: Update to RRC part 3 test case 8.0.1 8.1.0
8.3.1.3
2009-03 RAN#43 R5-090721 0141 - Batch-2: Update to RRC part 3 test case 8.0.1 8.1.0
8.3.1.5
2009-03 RAN#43 R5-090722 0142 - Batch 2: Addition of new EMM TC 9.2.1.2.3: 8.0.1 8.1.0
Successful combined attach procedure, EPS
service only / MSC temporarily not reachable
2009-03 RAN#43 R5-090730 0143 - Batch 1:Corrections to MAC test case 7.1.2.3 8.0.1 8.1.0
2009-03 RAN#43 R5-090732 0144 - Batch 2 - Addition of new test case 9.2.1.2.6 8.0.1 8.1.0
2009-03 RAN#43 R5-090733 0145 - Batch 2 - Addition of new test case 9.2.3.2.6 8.0.1 8.1.0
2009-03 RAN#43 R5-090734 0146 - Batch 1:Corrections to MAC test case 7.1.4.2 8.0.1 8.1.0
2009-03 RAN#43 R5-090735 0147 - Batch 1:Corrections to MAC test case 7.1.3.2 8.0.1 8.1.0
2009-03 RAN#43 R5-090736 0148 - Batch 2: Update of RRC part1 TC 8.1.3.4 RRC 8.0.1 8.1.0
Connection Release: redirection to another E-
UTRAN frequency
2009-03 RAN#43 R5-090740 0149 4 Batch 1A - Update of E-UTRA RLC (AM) test 8.0.1 8.1.0
case 7.2.3.18
2009-05 RAN#44 R5-092052 0150 - GCF Priority 1 - Update of 9.1.2.1 test 8.1.0 8.2.0
procedure sequence and editorials
2009-05 RAN#44 R5-092053 0151 - GCF Priority 2 - Update of TC 9.1.2.3 8.1.0 8.2.0
Authentication not accepted by the network,
GUTI used, authentication reject and re-
authentication
2009-05 RAN#44 R5-092054 0152 - GCF Priority 2 - Update TC 9.1.2.4 8.1.0 8.2.0
Authentication not accepted by the UE MAC
code failure
2009-05 RAN#44 R5-092055 0153 - GCF Priority 2 - New TC 9.1.2.5 Authentication 8.1.0 8.2.0
not accepted by the UE, SQN failure
2009-05 RAN#44 R5-092061 0154 - GCF Priority 1 - Update of RRC test case 8.1.0 8.2.0
9.3.1.1
2009-05 RAN#44 R5-092076 0155 - GCF Priority 2: First Iu mode to S1 mode 8.1.0 8.2.0
intersystem change after attach: go to E-
UTRAN RRC idle: RAU to UTRAN (9.2.3.3.1)
2009-05 RAN#44 R5-092077 0156 - Batch 2: Addition of 8.1.3.9 RRC Redirection 8.1.0 8.2.0
from E-UTRAN to HRPD
2009-05 RAN#44 R5-092078 0157 - Batch 2: Addition of 8.1.3.10 RRC Redirection 8.1.0 8.2.0
from E-UTRAN to CDMA2000-1XRTT
2009-05 RAN#44 R5-092107 0158 - GCF Priority 1 - Update of E-UTRA MAC test 8.1.0 8.2.0
case 7.1.3.1
2009-05 RAN#44 R5-092108 0159 - GCF Priority 1 - Update of E-UTRA MAC test 8.1.0 8.2.0
case 7.1.4.1
2009-05 RAN#44 R5-092109 0160 - GCF Priority 1 - Update of E-UTRA MAC test 8.1.0 8.2.0
case 7.1.4.4
2009-05 RAN#44 R5-092110 0161 - GCF Priority 1 - Update of E-UTRA MAC test 8.1.0 8.2.0
case 7.1.4.5
2009-05 RAN#44 R5-092112 0162 - GCF Priority 1 - Update of E-UTRA MAC test 8.1.0 8.2.0
case 7.1.4.8
2009-05 RAN#44 R5-092113 0163 - GCF Priority 1 - Update of E-UTRA MAC test 8.1.0 8.2.0
case 7.1.4.10
2009-05 RAN#44 R5-092114 0164 - GCF Priority 1 - Update of E-UTRA MAC test 8.1.0 8.2.0
case 7.1.4.13
2009-05 RAN#44 R5-092115 0165 - GCF Priority 1 - Proposal to remove E-UTRA 8.1.0 8.2.0
RLC test case 7.2.3.19
2009-05 RAN#44 R5-092181 0166 - GCF Priority 2 - Update of test case 8.5.1.5 8.1.0 8.2.0
2009-05 RAN#44 R5-092185 0167 - GCF Priority 1 - Update of test case 8.2.3.1 8.1.0 8.2.0
2009-05 RAN#44 R5-092190 0168 - GCF Priority 1 - Update of E-UTRA RLC (AM) 8.1.0 8.2.0
test case 7.2.3.1
2009-05 RAN#44 R5-092191 0169 - GCF Priority 1 - Update of E-UTRA RLC (AM) 8.1.0 8.2.0
test case 7.2.3.2
2009-05 RAN#44 R5-092192 0170 - GCF Priority 1 - Update of E-UTRA RLC (AM) 8.1.0 8.2.0
test case 7.2.3.18
2009-05 RAN#44 R5-092200 0171 - GCF Priority 1 - Update of E-UTRA RLC (AM) 8.1.0 8.2.0
test case 7.2.3.18
2009-05 RAN#44 R5-092213 0172 - Addition of new RRC test case 8.3.2.9 8.1.0 8.2.0
2009-05 RAN#44 R5-092228 0173 - GCF Priority 2 - Update to test case 6.1.2.15 8.1.0 8.2.0
2009-05 RAN#44 R5-092229 0174 - GCF Priority 1 - Update to test case 6.1.2.4 8.1.0 8.2.0
2009-05 RAN#44 R5-092230 0175 - GCF Priority 2 - Update to test case 6.1.2.5 8.1.0 8.2.0
2009-05 RAN#44 R5-092234 0176 - GCF Priority 1 - Update to test case 8.1.1.1 8.1.0 8.2.0
2009-05 RAN#44 R5-092242 0177 - GCF Priority 2 - Update to test case 8.1.3.5 8.1.0 8.2.0
ETSI

---------------------- Page: 11 ----------------------
3GPP TS 36.523-1 version 15.6.1 Release 15 11 ETSI TS 136 523-1 V15.6.1 (2020-04)
Date TSG # TSG Doc. CR Rev Subject/Comment Version Version
Old New
2009-05 RAN#44 R5-092245 0178 - GCF Priority-2: A new EMM test case, 9.2.3.1.8 8.1.0 8.2.0
UE receives an indication that the RRC
connection was released with cause 'load
balancing TAU required''
2009-05 RAN#44 R5-092247 0179 - Introduction of new EMM test cases, 9.2.3.1.10 8.1.0 8.2.0
and 9.2.3.1.11 Normal tracking area update /
Rejected
2009-05 RAN#44 R5-092248 0180 - Introduction of 9.2.3.1.12 ' Normal tracking area 8.1.0 8.2.0
update / rejected / EPS service not allowed'
2009-05 RAN#44 R5-092249 0181 - Introduction of 9.2.3.1.13 'Normal tracking area 8.1.0 8.2.0
update / rejected / UE identity cannot be
derived by the network'
2009-05 RAN#44 R5-092250 0182 - GCF Priority 2 - Addition of a new test case 8.1.0 8.2.0
6.1.2.11 Inter-frequency cell reselection
2009-05 RAN#44 R5-092251 0183 - Introduction of 9.2.3.1.14 ' Normal tracking area 8.1.0 8.2.0
update / rejected / UE implicitly detached'
2009-05 RAN#44 R5-092252 0184 - Introduction of 9.2.3.1.15 ' Normal tracking area 8.1.0 8.2.0
update / rejected / PLMN not allowed'
2009-05 RAN#44 R5-092253 0185 - Introduction of 9.2.3.1.16 ' Normal tracking area 8.1.0 8.2.0
update / rejected / Tracking area not allowed'
2009-05 RAN#44 R5-092258 0186 - GCF Priority 2 - Update of RRC part1 TC 8.1.0 8.2.0
8.1.3.4 RRC Connection Release: redirection to
another E-UTRAN frequency
2009-05 RAN#44 R5-092260 0187 - GCF Priority 2 - Update of RRC part1 TC 8.1.0 8.2.0
8.1.3.6 RRC Connection Release: redirection
from E-UTRAN to UTRAN
2009-05 RAN#44 R5-092262 0188 - GCF Priority 2 - Correction to idle mode test 8.1.0 8.2.0
cases 6.1.2.3 and 6.1.2.6
2009-05 RAN#44 R5-092272 0189 - LTE-SIG:TDD related updates in RRC sections 8.1.0 8.2.0
2009-05 RAN#44 R5-092276 0190 - "GCF priority 1 - Update of the LTE test cases 8.1.0 8.2.0
7.3.3.1 Correct functionality of EPS AS
encryption algorithms (SNOW 3G)ö"
2009-05 RAN#44 R5-092278 0191 - GCF priority 1 - Update of test cases 7.3.3.2 8.1.0 8.2.0
Correct functionality of EPS UP encryption
algorithms (SNOW 3G)ö
2009-05 RAN#44 R5-092280 0192 - GCF Priority 2 - Update to test case 8.2.4.2 8.1.0 8.2.0
2009-05 RAN#44 R5-092281 0193 - GCF Priority 2 - Update to test case 8.2.4.3 8.1.0 8.2.0
2009-05 RAN#44 R5-092283 0194 - GCF Priority 2 - Update to test case 8.2.4.5 8.1.0 8.2.0
2009-05 RAN#44 R5-092284 0195 - GCF Priority 2 - Update to test case 8.2.4.6 8.1.0 8.2.0
2009-05 RAN#44 R5-092285 0196 - GCF Priority 2 - Update to test case 8.2.4.7 8.1.0 8.2.0
2009-05 RAN#44 R5-092288 0197 - GCF Priority 2 - Update to test case 8.3.1.8 8.1.0 8.2.0
2009-05 RAN#44 R5-092295 0198 - Addition of new test case 9.2.1.2.8 8.1.0 8.2.0
2009-05 RAN#44 R5-092296 0199 - Addition of new test case 9.2.1.2.9 8.1.0 8.2.0
2009-05 RAN#44 R5-092297 0200 - Addition of new test case 9.2.1.2.10 8.1.0 8.2.0
2009-05 RAN#44 R5-092299 0201 - Addition of new test case 9.2.3.2.12 8.1.0 8.2.0
2009-05 RAN#44 R5-092300 0202 - Addition of new test case 9.3.1.4 8.1.0 8.2.0
2009-05 RAN#44 R5-092301 0203 - Addition of new test case to test case 10.X.X 8.1.0 8.2.0
2009-05 RAN#44 R5-092327 0204 - GCF Priority 1: Update E-UTRA PDCP TC 8.1.0 8.2.0
7.3.4.1
2009-05 RAN#44 R5-092328 0205 - GCF Priority 1: Update E-UTRA PDCP TC 8.1.0 8.2.0
7.3.4.2
2009-05 RAN#44 R5-092329 0206 - GCF Priority 2: Update E-UTRA PDCP TC 8.1.0 8.2.0
7.3.5.2
2009-05 RAN#44 R5-092330 0207 - GCF Priority 2: Update E-UTRA PDCP TC 8.1.0 8.2.0
7.3.5.3
2009-05 RAN#44 R5-092331 0208 - GCF Priority 2: Update E-UTRA PDCP TC 8.1.0 8.2.0
7.3.5.5
2009-05 RAN#44 R5-092367 0209 - GCF Priority 1 - Update of E-UTRA MAC test 8.1.0 8.2.0
case 7.1.4.6
2009-05 RAN#44 R5-092396 0210 - GCF Priority 2 - Addition of new test case 8.1.0 8.2.0
6.2.2.3
2009-05 RAN#44 R5-092397 0211 - GCF Priority 2 - Addition of new test case 8.1.0 8.2.0
6.2.3.7
2009-05 RAN#44 R5-092398 0212 - GCF Priority 2 - Addition of new test case 8.1.0 8.2.0
6.2.3.8
2009-05 RAN#44 R5-092406 0213 - "GCF Priority 2 - Addition of new LTE test case 8.1.0 8.2.0
7.2.2.11 UM RLC / RLC re-establishment
procedure"
2009-05 RAN#44 R5-092417 0214 - GCF Priority 2:Corrections to EMM test case 8.1.0 8.2.0
9.1.3.2
2009-05 RAN#44
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.