ETSI GS ZSM 006 V1.1.1 (2018-05)
Zero touch network and Service Management (ZSM); Proof of Concept Framework
Zero touch network and Service Management (ZSM); Proof of Concept Framework
DGS/ZSM-006ed111_POC_FWK
General Information
Standards Content (Sample)
ETSI GS ZSM 006 V1.1.1 (2018-05)
GROUP SPECIFICATION
Zero touch network and Service Management (ZSM);
Proof of Concept Framework
Disclaimer
The present document has been produced and approved by the Zero touch network and Service Management (ZSM) ETSI
Industry Specification Group (ISG) and represents the views of those members who participated in this ISG.
It does not necessarily represent the views of the entire ETSI membership.
---------------------- Page: 1 ----------------------
2 ETSI GS ZSM 006 V1.1.1 (2018-05)
Reference
DGS/ZSM-006ed111_POC_FWK
Keywords
proof of concept
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE
Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16
Siret N° 348 623 562 00017 - NAF 742 C
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° 7803/88
Important notice
The present document can be downloaded from:
http://www.etsi.org/standards-search
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the only prevailing document is the
print of the Portable Document Format (PDF) version kept on a specific network drive within ETSI Secretariat.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at
https://portal.etsi.org/TB/ETSIDeliverableStatus.aspx
If you find errors in the present document, please send your comment to one of the following services:
https://portal.etsi.org/People/CommiteeSupportStaff.aspx
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying
and microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.
© ETSI 2018.
All rights reserved.
TM TM TM
DECT , PLUGTESTS , UMTS and the ETSI logo are trademarks of ETSI registered for the benefit of its Members.
TM TM
3GPP and LTE are trademarks of ETSI registered for the benefit of its Members and
of the 3GPP Organizational Partners.
oneM2M logo is protected for the benefit of its Members.
®
GSM and the GSM logo are trademarks registered and owned by the GSM Association.
ETSI
---------------------- Page: 2 ----------------------
3 ETSI GS ZSM 006 V1.1.1 (2018-05)
Contents
Intellectual Property Rights . 4
Foreword . 4
Modal verbs terminology . 4
1 Scope . 5
2 References . 5
2.1 Normative references . 5
2.2 Informative references . 5
3 Definitions and abbreviations . 6
3.1 Definitions . 6
3.2 Abbreviations . 6
4 PoC framework . 6
4.0 Rationale. 6
4.1 Roles and responsibilities . 7
4.2 PoC activity process . 7
4.3 PoC proposal acceptance criteria . 11
4.4 PoC report acceptance criteria . 12
5 PoC support tools . 12
5.0 General . 12
5.1 PoC mailing list . 12
5.2 PoC WIKI . 12
History . 13
ETSI
---------------------- Page: 3 ----------------------
4 ETSI GS ZSM 006 V1.1.1 (2018-05)
Intellectual Property Rights
Essential patents
IPRs essential or potentially essential to normative deliverables may have been declared to ETSI. The information
pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found
in ETSI SR 000 314: "Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in
respect of ETSI standards", which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web
server (https://ipr.etsi.org/).
Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee
can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web
server) which are, or may be, or may become, essential to the present document.
Trademarks
The present document may include trademarks and/or tradenames which are asserted and/or registered by their owners.
ETSI claims no ownership of these except for any which are indicated as being the property of ETSI, and conveys no
right to use or reproduce any trademark and/or tradename. Mention of those trademarks in the present document does
not constitute an endorsement by ETSI of products, services or organizations associated with those trademarks.
Foreword
This Group Specification (GS) has been produced by ETSI Industry Specification Group (ISG) Zero touch network and
Service Management (ZSM).
Modal verbs terminology
In the present document "shall", "shall not", "should", "should not", "may", "need not", "will", "will not", "can" and
"cannot" are to be interpreted as described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of
provisions).
"must" and "must not" are NOT allowed in ETSI deliverables except when used in direct citation.
ETSI
---------------------- Page: 4 ----------------------
5 ETSI GS ZSM 006 V1.1.1 (2018-05)
1 Scope
The present document defines a framework to be used by ETSI ISG ZSM to coordinate and promote multi stakeholder
Proofs of Concept (PoC) projects illustrating key aspects of ZSM. Proofs of Concept are an important tool to
demonstrate the viability of a new technology during its early days and or pre-standardization phase.
The main objectives of the ZSM PoC framework are:
• to ensure the PoC projects are scoped around relevant topics for ISG ZSM that require from-the-field input;
• to ensure that the PoC results, lessons learnt and identified gaps are feedback to ISG ZSM;
• to build confidence on the viability of ZSM;
• to encourage the development of a diverse and open ecosystem by fostering the integration of components
from different players;
• to support standardization and industry promotion activities of ISG ZSM.
This framework describes:
• the different roles and responsibilities in the PoC activity process;
• the PoC activity process;
• the acceptance criteria for PoC proposals and reports.
2 References
2.1 Normative references
References are either specific (identified by date of publication and/or edition number or version number) or
non-specific. For specific references, only the cited version applies. For non-specific references, the latest version of the
referenced document (including any amendments) applies.
Referenced documents which are not found to be publicly available in the expected location might be found at
http://docbox.etsi.org/Reference.
NOTE: While any hyperlinks included in this clause were valid at the time of publication, ETSI cannot guarantee
their long term validity.
The following referenced documents are necessary for the application of the present document.
Not applicable.
2.2 Informative references
References are either specific (identified by date of publication and/or edition number or version number) or
non-specific. For specific references, only the cited version applies. For non-specific references, the latest version of the
referenced document (including any amendments) applies.
NOTE: While any hyperlinks included in this clause were valid at the time of publication, ETSI cannot guarantee
their long term validity.
The following referenced documents are not necessary for the application of the present document but they assist the
user with regard to a particular subject area.
Not applicable.
ETSI
---------------------- Page: 5 ----------------------
6 ETSI GS ZSM 006 V1.1.1 (2018-05)
3 Definitions and abbreviations
3.1 Definitions
For the purposes of the present document, the following terms and definitions apply:
expected contribution: input/feedback expected from the PoC team on a specific PoC topic
network provider: organization that provides a network for the provision of telecommunications services
NOTE: If the same organization also offers services it also becomes the service provider.
PoC demo: public demonstration of a PoC project
PoC management team: manages the PoC activity process and promotes the PoC framework
PoC project: multi-party endeavour targeting to prove some concepts in the context of a given technology
PoC proposal: initial description of a multiparty PoC project, and the feedback it will provide
PoC report: compilation of test results, lessons learned, contributions and recommendations provided by a PoC team
during or at the end of a PoC project
PoC team: organizations participating in the PoC project
PoC test plan: description of the test objectives of each targeted scenario
PoC topic: specific topic identified by the ISG ZSM, where some from-the-field input or feedback is required from the
PoCs
service provider: organization that provides a service; a network service is excluded
supplier: organization who provides things such as hardware, software or application
3.2 Abbreviations
For the purposes of the present document, the following abbreviations apply:
CTI Centre for Testing and Interoperability
ISG Industry Specification Group
PoC Proof of Concept
ZSM Zero touch network and Service Management
4 PoC framework
4.0 Rationale
ZSM strives to enable network and service management in an automated way, ideally with 100 % automation, which is
expected to
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.