ETSI GS NFV-SOL 016 V5.1.1 (2024-08)
Network Functions Virtualisation (NFV) Release 5; Protocols and Data Models; NFV-MANO procedures specification
Network Functions Virtualisation (NFV) Release 5; Protocols and Data Models; NFV-MANO procedures specification
RGS/NFV-SOL016ed511
General Information
Standards Content (Sample)
GROUP SPECIFICATION
Network Functions Virtualisation (NFV) Release 5;
Protocols and Data Models;
NFV-MANO procedures specification
Disclaimer
The present document has been produced and approved by the Network Functions Virtualisation (NFV) ETSI Industry
Specification Group (ISG) and represents the views of those members who participated in this ISG.
It does not necessarily represent the views of the entire ETSI membership.
2 ETSI GS NFV-SOL 016 V5.1.1 (2024-08)
Reference
RGS/NFV-SOL016ed511
Keywords
management, MANO, NFV, procedure
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE
Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16
Siret N° 348 623 562 00017 - APE 7112B
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° w061004871
Important notice
The present document can be downloaded from the
ETSI Search & Browse Standards application.
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the prevailing version of an ETSI
deliverable is the one made publicly available in PDF format on ETSI deliver.
Users should be aware that the present document may be revised or have its status changed,
this information is available in the Milestones listing.
If you find errors in the present document, please send your comments to
the relevant service listed under Committee Support Staff.
If you find a security vulnerability in the present document, please report it through our
Coordinated Vulnerability Disclosure (CVD) program.
Notice of disclaimer & limitation of liability
The information provided in the present deliverable is directed solely to professionals who have the appropriate degree of
experience to understand and interpret its content in accordance with generally accepted engineering or
other professional standard and applicable regulations.
No recommendation as to products and services or vendors is made or should be implied.
No representation or warranty is made that this deliverable is technically accurate or sufficient or conforms to any law
and/or governmental rule and/or regulation and further, no representation or warranty is made of merchantability or fitness
for any particular purpose or against infringement of intellectual property rights.
In no event shall ETSI be held liable for loss of profits or any other incidental or consequential damages.
Any software contained in this deliverable is provided "AS IS" with no warranties, express or implied, including but not
limited to, the warranties of merchantability, fitness for a particular purpose and non-infringement of intellectual property
rights and ETSI shall not be held liable in any event for any damages whatsoever (including, without limitation, damages
for loss of profits, business interruption, loss of information, or any other pecuniary loss) arising out of or related to the use
of or inability to use the software.
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and
microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.
© ETSI 2024.
All rights reserved.
ETSI
3 ETSI GS NFV-SOL 016 V5.1.1 (2024-08)
Contents
Intellectual Property Rights . 8
Foreword . 8
Modal verbs terminology . 8
1 Scope . 9
2 References . 9
2.1 Normative references . 9
2.2 Informative references . 10
3 Definition of terms, symbols and abbreviations . 10
3.1 Terms . 10
3.2 Symbols . 10
3.3 Abbreviations . 10
4 Overview of NFV-MANO procedures . 10
4.1 Introduction . 10
4.2 List of NFV-MANO procedures . 11
4.3 Security considerations . 11
4.3.1 Overview . 11
4.3.2 Security information on NFV-MANO functional entity . 11
4.3.2.1 Overview . 11
4.3.2.2 NFV-MANO configuration settings approach . 12
5 NFV-MANO procedures . 12
5.1 VNF Package on-boarding procedure . 12
5.1.1 Introduction. 12
5.1.2 Pre-conditions . 12
5.1.3 Procedure flow . 12
5.1.4 Post-conditions . 15
5.1.5 Key information exchanged in the procedure . 16
5.1.5.1 VNF package id creation . 16
5.1.5.2 VNF package upload . 16
5.1.5.3 VNF package on-boarding complete . 17
5.1.5.4 Creating compute flavours . 17
5.1.6 Execution of dependent and non-dependent side procedures . 18
5.1.6.1 Introduction . 18
5.1.6.2 Non-dependent side procedures . 18
5.1.6.2.1 VNF Package management . 18
5.1.6.2.2 NSD management . 19
5.1.6.2.3 VNF lifecycle management . 19
5.1.6.3 Dependent side procedures. 19
5.1.6.3.1 VNF Package management . 19
5.1.6.3.2 NSD management . 19
5.1.6.3.3 NS lifecycle management . 19
5.1.6.3.4 VNF lifecycle management . 20
5.1.6.3.5 VNF lifecycle granting . 20
5.1.6.4 Error cases and other considerations . 20
5.1.6.4.1 VNF Package management . 20
5.2 NS instantiation procedure . 20
5.2.1 Introduction. 20
5.2.2 Pre-conditions . 20
5.2.3 Procedure flow . 21
5.2.4 Post-conditions . 30
5.2.5 Key information exchanged in the procedure . 30
5.2.5.1 Create NS instance resource . 30
5.2.5.2 Instantiate NS instance . 31
5.2.5.3 Create VNF instance resource . 31
5.2.5.4 Modification of VNF information and virtualised resource configuration data . 32
ETSI
4 ETSI GS NFV-SOL 016 V5.1.1 (2024-08)
5.2.5.5 Instantiate VNF instance . 34
5.2.5.6 VNF LCM granting exchange . 34
5.2.5.7 VNF lifecycle change notifications . 36
5.2.5.8 VNF lifecycle management operation occurrences . 37
5.2.5.9 Link ports . 37
5.2.5.10 Virtualised resources provisioning for the VNF Instance . 38
5.2.5.11 containerized resources provisioning for the VNF Instance . 40
5.2.6 Execution of dependent and non-dependent side procedures . 41
5.2.6.1 Introduction . 41
5.2.6.2 Non-dependent side procedures . 41
5.2.6.2.1 VNF Package management . 41
5.2.6.2.2 NSD management . 41
5.2.6.2.3 NS lifecycle management . 42
5.2.6.2.4 NS fault management . 42
5.2.6.2.5 NS performance management . 42
5.2.6.2.6 VNF lifecycle management . 42
5.2.6.2.7 VNF fault management . 43
5.2.6.2.8 VNF performance management . 43
5.2.6.2.9 VNF indicators . 43
5.2.6.3 Dependent side procedures. 44
5.2.6.3.1 NS lifecycle management . 44
5.2.6.3.2 VNF lifecycle management . 44
5.2.6.3.3 NSD management . 44
5.2.6.4 Error cases and other considerations . 44
5.2.6.4.1 VNF Package management . 44
5.2.6.4.2 NSD management . 44
5.2.7 Other information . 45
5.2.7.1 Creation of VNF instance from VNFD . 45
5.2.7.2 Fetch VNFD . 45
5.2.7.3 Fetch VNF Package Artifacts . 45
5.3 NS termination procedure . 46
5.3.1 Introduction. 46
5.3.2 Pre-conditions . 47
5.3.3 Procedure flow . 47
5.3.3.1 Overview . 47
5.3.3.2 Procedure flow terminating and disconnecting the NS constituents . 47
5.3.3.3 Procedure flow using the NS termination operation . 53
5.3.3.4 Procedure flow using combination of terminating individual NS constituents and using NS
termination operation . 58
5.3.4 Post-conditions . 58
5.3.5 Key information exchanged in the procedure . 58
5.3.5.1 Update NS instance to terminate specific VNF instances . 58
5.3.5.2 Terminate VNF instance . 58
5.3.5.3 VNF LCM granting exchange for VNF termination . 59
5.3.5.4 Update NS instance to remove PNFs from the NS instance . 60
5.3.5.5 Terminate NS instance . 60
5.3.5.6 VNF Lifecycle change notifications. 60
5.3.5.7 VNF lifecycle management operation occurrences . 61
5.3.5.8 Containerized resources de-provisioning for the VNF Instance . 62
5.3.6 Execution of dependent and non-dependent side procedures . 62
5.3.6.1 Introduction . 62
5.3.6.2 Non-dependent side procedures . 62
5.3.6.2.1 VNF Package management . 62
5.3.6.2.2 NSD management . 62
5.3.6.2.3 NS lifecycle management . 63
5.3.6.2.4 NS fault management . 63
5.3.6.2.5 NS performance management . 63
5.3.6.2.6 VNF lifecycle management . 63
5.3.6.2.7 VNF fault management . 64
5.3.6.2.8 VNF performance management . 64
5.3.6.2.9 VNF indicators . 64
5.3.6.3 Dependent side procedures. 65
ETSI
5 ETSI GS NFV-SOL 016 V5.1.1 (2024-08)
5.3.6.3.1 VNF Package management . 65
5.3.6.3.2 NSD management . 65
5.3.6.3.3 NS lifecycle management . 65
5.3.6.3.4 NS fault management . 65
5.3.6.3.5 NS performance management . 66
5.3.6.3.6 VNF lifecycle management . 66
5.3.6.3.7 VNF fault management . 66
5.3.6.3.8 VNF performance management . 66
5.3.6.3.9 VNF indicators . 67
5.3.6.4 Error cases and other considerations . 67
5.3.6.4.1 VNF Package management . 67
5.3.6.4.2 NSD management . 67
5.4 VNF scaling triggered through scale NS procedure . 67
5.4.1 Introduction. 67
5.4.2 Pre-conditions . 67
5.4.3 Procedure flow . 68
5.4.4 Post-conditions . 72
5.4.5 Key information exchanged in the procedure . 72
5.4.5.1 Scale NS instance to scale specific VNF instances . 72
5.4.5.2 Scale VNF instance . 72
5.4.5.3 Scale VNF instance to level . 73
5.4.5.4 VNF LCM granting exchange for VNF scaling . 73
5.4.5.5 VNF lifecycle change notifications . 74
5.4.5.6 VNF lifecycle management operation occurrences . 75
5.4.5.7 Manage virtualised resources . 76
5.4.5.8 containerized resources modifying for the VNF Instance . 76
5.4.6 Execution of dependent and non-dependent side procedures . 76
5.4.6.1 Introduction . 76
5.4.6.2 Non-dependent side procedures . 76
5.4.6.2.1 VNF Package management . 76
5.4.6.2.2 NSD management . 77
5.4.6.2.3 NS lifecycle management . 77
5.4.6.2.4 NS fault management . 77
5.4.6.2.5 NS performance management . 77
5.4.6.2.6 VNF lifecycle management . 77
5.4.6.2.7 VNF fault management . 78
5.4.6.2.8 VNF performance management . 78
5.4.6.2.9 VNF indicators . 78
5.4.6.3 Dependent side procedures. 78
5.4.6.3.1 NS performance management . 78
5.4.6.3.2 VNF performance management . 79
5.4.6.4 Error cases and other considerations . 79
5.4.6.4.1 VNF Package management . 79
5.4.6.4.2 NSD management . 79
5.5 Change external VNF connectivity triggered through NS update procedure . 79
5.5.1 Introduction. 79
5.5.2 Pre-conditions . 79
5.5.3 Procedure flow . 80
5.5.4 Post-conditions . 84
5.5.5 Key information exchanged in the procedure . 84
5.5.5.1 Update NS instance to change external connectivity of specific VNF instances . 84
5.5.5.2 Change external connectivity of VNF instance . 84
5.5.5.3 VNF LCM granting exchange for change external VNF connectivity . 85
5.5.5.4 VNF lifecycle change notifications . 86
5.5.5.5 VNF lifecycle management operation occurrences . 87
5.5.5.6 Network connectivity . 88
5.5.6 Execution of dependent and non-dependent side procedures . 88
5.5.6.1 Introduction . 88
5.5.6.2 Non-dependent side procedures . 89
5.5.6.2.1 VNF Package management . 89
5.5.6.2.2 NSD management . 89
5.5.6.2.3 NS lifecycle management . 89
ETSI
6 ETSI GS NFV-SOL 016 V5.1.1 (2024-08)
5.5.6.2.4 NS fault management . 89
5.5.6.2.5 NS performance management . 90
5.5.6.2.6 VNF lifecycle management . 90
5.5.6.2.7 VNF fault management . 90
5.5.6.2.8 VNF performance management . 90
5.5.6.2.9 VNF indicators . 91
5.5.6.3 Dependent side procedures. 91
5.5.6.4 Error cases and other considerations . 91
5.5.6.4.1 VNF Package management . 91
5.5.6.4.2 NSD management . 91
5.5.6.4.3 VNF performance management . 91
5.6 VNF snapshot creation through NS update procedure . 91
5.6.1 Introduction. 91
5.6.2 Pre-conditions . 92
5.6.3 Procedure flow . 92
5.6.4 Post-conditions . 96
5.6.5 Key information exchanged in the procedure . 96
5.6.5.1 Update NS instance to create VNF snapshot of VNF instance belonging to the NS instance. 96
5.6.5.2 Create Individual VNF snapshot resource . 96
5.6.5.3 Create VNF snapshot . 97
5.6.5.4 VNF LCM granting exchange for creating VNF snapshot . 97
5.6.5.5 VNF lifecycle change notifications . 97
5.6.5.6 VNF lifecycle management operation occurrences . 98
5.6.5.7 LCM coordination . 99
5.6.6 Execution of dependent and non-dependent side procedures . 99
5.6.6.1 Introduction . 99
5.6.6.2 Non-dependent side procedures . 100
5.6.6.2.1 VNF Package management . 100
5.6.6.2.2 NSD management . 100
5.6.6.2.3 NS lifecycle management . 100
5.6.6.2.4 NS fault management . 100
5.6.6.2.5 NS performance management . 100
5.6.6.2.6 VNF lifecycle management . 101
5.6.6.2.7 VNF fault management . 101
5.6.6.2.8 VNF performance management . 101
5.6.6.2.9 VNF indicators . 101
5.6.6.3 Void. 102
5.6.6.4 Error cases and other considerations . 102
5.6.6.4.1 VNF Package management . 102
5.6.6.4.2 NSD management . 102
5.7 VNF snapshot package creation . 102
5.7.1 Introduction. 102
5.7.2 Pre-conditions . 102
5.7.3 Procedure flow . 103
5.7.4 Post-conditions . 105
5.7.5 Key information exchanged in the procedure . 105
5.7.5.1 Create VNF snapshot package info . 105
5.7.5.2 Modify VNF snapshot package . 105
5.7.5.3 Build VNF snapshot package . 106
5.7.6 Execution of dependent and non-dependent side procedures . 106
5.7.6.1 Introduction . 106
5.7.6.2 Non-dependent side procedures . 106
5.7.6.2.1 VNF package management . 106
5.7.6.2.2 NSD management . 106
5.7.6.2.3 VNF lifecycle management . 107
5.7.6.2.4 NS lifecycle management . 107
5.7.6.3 Dependent side procedures. 107
5.7.6.3.1 VNF snapshot package management . 107
5.7.6.4 Error cases and other considerations . 107
5.7.6.4.1 VNF Package management . 107
5.7.6.4.2 NSD management . 107
ETSI
7 ETSI GS NFV-SOL 016 V5.1.1 (2024-08)
Annex A (normative): Authorization scope values . 108
A.1 Overview . 108
A.2 VNF Package on-boarding procedures . 108
A.3 NS instantiation procedures . 108
A.4 NS termination procedure . 109
A.5 VNF scaling triggered through scale NS procedure . 109
A.6 Change external VNF connectivity triggered through NS update procedure . 110
A.7 VNF snapshot creation through NS update procedure . 110
A.8 VNF snapshot package creation procedure . 111
Annex B (informative): Change History . 112
History . 115
ETSI
8 ETSI GS NFV-SOL 016 V5.1.1 (2024-08)
Intellectual Property Rights
Essential patents
IPRs essential or potentially essential to normative deliverables may have been declared to ETSI. The declarations
pertaining to these essential IPRs, if any, are publicly available for ETSI members and non-members, and can be
found in ETSI SR 000 314: "Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to
ETSI in respect of ETSI standards", which is available from the ETSI Secretariat. Latest updates are available on the
ETSI Web server (https://ipr.etsi.org/).
Pursuant to the ETSI Directives including the ETSI IPR Policy, no investigation regarding the essentiality of IPRs,
including IPR searches, has been carried out by ETSI. No guarantee can be given as to the existence of other IPRs not
referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become,
essential to the present document.
Trademarks
The present document may include trademarks and/or tradenames which are asserted and/or registered by their owners.
ETSI claims no ownership of these except for any which are indicated as being the property of ETSI, and conveys no
right to use or reproduce any trademark and/or tradename. Mention of those trademarks in the present document does
not constitute an endorsement by ETSI of products, services or organizations associated with those trademarks.
DECT™, PLUGTESTS™, UMTS™ and the ETSI logo are trademarks of ETSI registered for the benefit of its
Members. 3GPP™ and LTE™ are trademarks of ETSI registered for the benefit of its Members and of the 3GPP
Organizational Partners. oneM2M™ logo is a trademark of ETSI registered for the benefit of its Members and of the ®
oneM2M Partners. GSM and the GSM logo are trademarks registered and owned by the GSM Association.
Foreword
This Group Specification (GS) has been produced by ETSI Industry Specification Group (ISG) Network Functions
Virtualisation (NFV).
Modal verbs terminology
In the present document "shall", "shall not", "should", "should not", "may", "need not", "will", "will not", "can" and
"cannot" are to be interpreted as described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of
provisions).
"must" and "must not" are NOT allowed in ETSI deliverables except when used in direct citation.
ETSI
9 ETSI GS NFV-SOL 016 V5.1.1 (2024-08)
1 Scope
The present document specifies NFV-MANO procedures involving multiple interfaces that reference the operations
specified in ETSI GS NFV-SOL 003 [3], ETSI GS NFV-SOL 002 [2] and ETSI GS NFV-SOL 005 [4], and the
information from NFV descriptors as specified in ETSI GS
...








Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.
Loading comments...