LTE; Telecommunication management; Performance Management (PM); Performance measurements Evolved Packet Core (EPC) network (3GPP TS 32.426 version 9.6.0 Release 9)

RTS/TSGS-0532426v960

General Information

Status
Published
Publication Date
06-Oct-2019
Technical Committee
Current Stage
12 - Completion
Completion Date
07-Oct-2019
Ref Project

Buy Standard

Standard
ETSI TS 132 426 V9.6.0 (2019-10) - LTE; Telecommunication management; Performance Management (PM); Performance measurements Evolved Packet Core (EPC) network (3GPP TS 32.426 version 9.6.0 Release 9)
English language
51 pages
sale 15% off
Preview
sale 15% off
Preview

Standards Content (Sample)

ETSI TS 132 426 V9.6.0 (2019-10)






TECHNICAL SPECIFICATION
LTE;
Telecommunication management;
Performance Management (PM);
Performance measurements Evolved Packet Core (EPC)
network
(3GPP TS 32.426 version 9.6.0 Release 9)

---------------------- Page: 1 ----------------------
3GPP TS 32.426 version 9.6.0 Release 9 1 ETSI TS 132 426 V9.6.0 (2019-10)



Reference
RTS/TSGS-0532426v960
Keywords
LTE
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE

Tel.: +33 4 92 94 42 00  Fax: +33 4 93 65 47 16

Siret N° 348 623 562 00017 - NAF 742 C
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° 7803/88

Important notice
The present document can be downloaded from:
http://www.etsi.org/standards-search
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the prevailing version of an ETSI
deliverable is the one made publicly available in PDF format at www.etsi.org/deliver.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at
https://portal.etsi.org/TB/ETSIDeliverableStatus.aspx
If you find errors in the present document, please send your comment to one of the following services:
https://portal.etsi.org/People/CommiteeSupportStaff.aspx
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying
and microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.

© ETSI 2019.
All rights reserved.

DECT™, PLUGTESTS™, UMTS™ and the ETSI logo are trademarks of ETSI registered for the benefit of its Members.

3GPP™ and LTE™ are trademarks of ETSI registered for the benefit of its Members and
of the 3GPP Organizational Partners.
oneM2M™ logo is a trademark of ETSI registered for the benefit of its Members and
of the oneM2M Partners.
®
GSM and the GSM logo are trademarks registered and owned by the GSM Association.
ETSI

---------------------- Page: 2 ----------------------
3GPP TS 32.426 version 9.6.0 Release 9 2 ETSI TS 132 426 V9.6.0 (2019-10)
Intellectual Property Rights
Essential patents
IPRs essential or potentially essential to normative deliverables may have been declared to ETSI. The information
pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found
in ETSI SR 000 314: "Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in
respect of ETSI standards", which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web
server (https://ipr.etsi.org/).
Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee
can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web
server) which are, or may be, or may become, essential to the present document.
Trademarks
The present document may include trademarks and/or tradenames which are asserted and/or registered by their owners.
ETSI claims no ownership of these except for any which are indicated as being the property of ETSI, and conveys no
right to use or reproduce any trademark and/or tradename. Mention of those trademarks in the present document does
not constitute an endorsement by ETSI of products, services or organizations associated with those trademarks.
Legal Notice
This Technical Specification (TS) has been produced by ETSI 3rd Generation Partnership Project (3GPP).
The present document may refer to technical specifications or reports using their 3GPP identities. These shall be
interpreted as being references to the corresponding ETSI deliverables.
The cross reference between 3GPP and ETSI identities can be found under http://webapp.etsi.org/key/queryform.asp.
Modal verbs terminology
In the present document "shall", "shall not", "should", "should not", "may", "need not", "will", "will not", "can" and
"cannot" are to be interpreted as described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of
provisions).
"must" and "must not" are NOT allowed in ETSI deliverables except when used in direct citation.
ETSI

---------------------- Page: 3 ----------------------
3GPP TS 32.426 version 9.6.0 Release 9 3 ETSI TS 132 426 V9.6.0 (2019-10)
Contents
Intellectual Property Rights . 2
Legal Notice . 2
Modal verbs terminology . 2
1 Scope . 9
2 References . 9
3 Measurement family and abbreviations. 10
3.1 Measurement family . 10
3.2 Abbreviations . 10
4 Measurements related to the MME . 10
4.1 Mobility Management . 10
4.1.1 EPS attach procedures . 10
4.1.1.1 Attempted EPS attach procedures . 11
4.1.1.2 Successful EPS attach procedures . 11
4.1.1.3 Failed EPS attach procedures . 11
4.1.2 UE-initiated EPS Detach procedure . 12
4.1.2.1 Attempted EPS detach procedures by UE . 12
4.1.2.2 Successful EPS detach procedures by UE . 12
4.1.3 MME-initiated EPS Detach procedure . 12
4.1.3.1 Attempted EPS detach procedures by MME . 12
4.1.3.2 Successful EPS detach procedures by MME . 13
4.1.4 HSS-initiated EPS Detach procedure . 13
4.1.4.1 Attempted EPS detach procedures by HSS . 13
4.1.4.2 Successful EPS detach procedures by HSS . 13
4.1.5 Tracking area update procedure with Serving GW change . 14
4.1.5.1 Attempted tracking area update procedure with Serving GW change . 14
4.1.5.2 Successful tracking area update procedure with Serving GW change . 14
4.1.5.3 Failed tracking area update procedure with Serving GW change . 14
4.1.6 Tracking area update procedure without Serving GW change. 15
4.1.6.1 Attempted tracking area update procedure without Serving GW change . 15
4.1.6.2 Successful tracking area update procedure without Serving GW change . 15
4.1.6.3 Failed tracking area update procedure without Serving GW change . 16
4.1.9 EPS paging procedures . 16
4.1.9.1 Attempted EPS paging procedures . 16
4.1.9.2 Successful EPS paging procedures . 17
4.1.9.3 Failed EPS paging procedures. 17
4.1.10 MME control of overload related measurements for EPC . 17
4.1.10.1 Attempted Overload Start procedure . 17
4.1.10.2 Attempted Overload Stop procedure . 18
4.1.11 EMM-Registered subscribers. 18
4.1.11.1 Mean number of EMM-Registered subscribers . 18
4.1.11.2 Maximum number of EMM-Registered subscribers . 18
4.1.12 Handover related measurements . 19
4.1.12.1 Inter RAT handover . 19
4.1.12.1.1 Incoming inter RAT handover . 19
4.1.12.1.1.1 Attempted incoming inter RAT handover. 19
4.1.12.1.1.2 Successful incoming inter RAT handover . 19
4.1.12.1.2 Outgoing inter RAT handover . 19
4.1.12.1.2.1 Attempted outgoing inter RAT handover . 19
4.1.12.1.2.2 Successful outgoing inter RAT handover . 20
4.1.13 Routeing area update with MME interaction . 20
4.1.13.1 Attempted routeing area update with MME interaction . 20
4.1.13.2 Successful routeing area update with MME interaction and without S-GW change . 21
4.1.13.3 Failed routeing area update with MME interaction and without S-GW change . 21
4.1.13.4 Successful routeing area update with MME interaction and with S-GW change . 21
ETSI

---------------------- Page: 4 ----------------------
3GPP TS 32.426 version 9.6.0 Release 9 4 ETSI TS 132 426 V9.6.0 (2019-10)
4.1.13.5 Failed routeing area update with MME interaction and with S-GW change. 22
4.2 Session Management . 22
4.2.1 Number of dedicated EPS bearers in active mode (Mean) . 22
4.2.2 Number of dedicated EPS bearers in active mode (Maximum) . 22
4.2.3 Dedicated bearer set-up time by MME (Mean) . 23
4.2.4 MME initiated dedicated bearer activation . 23
4.2.4.1 Attempted dedicated bearer activation procedures by MME . 23
4.2.4.2 Successful dedicated bearer activation procedures by MME . 23
4.2.4.3 Failed dedicated bearer activation procedures by MME . 24
4.2.5 MME initiated dedicated bearer deactivation . 24
4.2.5.1 Attempted dedicated bearer deactivation procedures by MME . 24
4.2.5.2 Successful dedicated bearer deactivation procedures by MME . 24
4.2.6. MME initiated EPS bearer modification . 25
4.2.6.1 Attempted EPS bearer modification procedures by MME . 25
4.2.6.2 Successful EPS bearer modification procedures by MME . 25
4.2.6.3 Failed EPS bearer modification procedures by MME . 25
4.2.7 Total EPS Service Request . 26
4.2.7.1 Total Attempted EPS Service Request procedures. . 26
4.2.7.2 Total Successful EPS Service Request procedures. . 26
4.2.7.3 Total failed EPS Service Request procedures. . 26
4.3 Subscriber management for MME . 27
4.3.1 Attempted insert subscriber data requests received from a HSS . 27
4.3.2 Attempted delete subscriber data requests received from a HSS . 27
4.4 S1-MME data volume related measurements . 27
4.4.1 Number of incoming IP data packets on the S1-MME interface from eNodeB to MME . 27
4.4.2 Number of outgoing IP data packets on the S1-MME interface from MME to eNodeB . 28
4.4.3 Number of octets of incoming IP data packets on the S1-MME interface from eNodeB to MME . 28
4.4.4 Number of octets of outgoing IP data packets on the S1-MME interface from MME to eNodeB . 28
4.5 Equipment resource . 29
4.5.1 MME Processor usage . 29
4.5.1.1 Mean Processor Usage . 29
4.5.1.2 Peak processor usage. 29
5 Measurements related to the PDN-GW for a GTP based S5/S8 . 30
5.1 Session Management . 30
5.1.1 PDN-GW initiated Dedicated Bearer Creation . 30
5.1.1.1 Attempted number of PDN-GW initiated Dedicated Bearer Creation . 30
5.1.1.2 Successful number of PDN-GW initiated Dedicated Bearer Creation . 30
5.1.1.3 Failed number of PDN-GW initiated Dedicated Bearer Creation . 30
5.1.2 PDN-GW initiated Dedicated Bearer Deletion . 31
5.1.2.1 Attempted number of PDN-GW initiated Dedicated Bearer Deletion . 31
5.1.2.2 Successful number of PDN-GW initiated Dedicated Bearer Deletion . 31
5.1.2.3 Failed number of PDN-GW initiated Dedicated Bearer Deletion . 31
5.1.3 PDN-GW initiated Dedicated Bearer Modification with QoS update procedure . 32
5.1.3.1 Attempted number of PDN-GW initiated Dedicated Bearer Modification with QoS update . 32
5.1.3.2 Successful PDN-GW initiated Dedicated Bearer Modification with QoS update . 32
5.1.3.3 Failed PDN-GW initiated Dedicated Bearer Modification with QoS update . 33
5.1.4 PDN-GW initiated Dedicated Bearer Modification without QoS update procedure . 33
5.1.4.1 Attempted number of PDN-GW initiated Dedicated Bearer Modification without QoS update . 33
5.1.4.2 Successful number of PDN-GW initiated Dedicated Bearer Modification without QoS update . 33
5.1.4.3 Failed number of PDN-GW initiated Dedicated Bearer Modification without QoS update . 34
5.1.5 Active EPS Bearers related measurements for EPC . 34
5.1.5.1 Mean Number of Active EPS Bearers . 34
5.1.5.2 Max Number of Active EPS Bearers . 34
5.1.6 UE requested bearer resource modification related measurements for EPC . 35
5.1.6.1 Attempted UE requested bearer resource modification procedure . 35
5.1.6.2 Successful UE requested bearer resource modification procedure . 35
5.1.6.3 Failed UE requested bearer resource modification procedure . 35
5.1.7 PDN Connections related measurements for EPC . 36
5.1.7.1 Mean Number of PDN Connections, per APN . 36
5.1.7.2 Max Number of PDN Connections, per APN . 36
5.2 SGi related measurements . 37
ETSI

---------------------- Page: 5 ----------------------
3GPP TS 32.426 version 9.6.0 Release 9 5 ETSI TS 132 426 V9.6.0 (2019-10)
5.2.1 SGi incoming link usage . 37
5.2.2 SGi outgoing link usage . 37
6 Measurements related to the S-GW . 38
6.1 GTP related measurements . 38
6.1.1 GTP S5/S8 . 38
6.1.1.1 Number of outgoing GTP data packets on the S5/S8 interface, from S-GW to PDN-GW . 38
6.1.1.2 Number of incoming GTP data packets on the S5/S8 interface, from PDN-GW to S-GW . 38
6.1.1.3 Number of octets of outgoing GTP data packets on the S5/S8 interface, from S-GW to PDN-GW . 38
6.1.1.4 Number of octets of incoming GTP data packets on the S5/S8 interface, from PDN-GW to S-
GW . 39
6.1.1.5 Number of outgoing GTP signalling packets on the S5/S8 interface, from S-GW to PDN-GW . 39
6.1.1.6 Number of incoming GTP signalling packets on the S5/S8 interface, from PDN-GW to S-GW . 39
6.1.1.7 Number of octets of outgoing GTP signalling packets on the S5/S8 interface, from S-GW to
PDN-GW . 40
6.1.1.8 Number of octets of incoming GTP signalling packets on the S5/S8 interface, from PDN-GW to
S-GW . 40
7 Measurements related to the SGW . 41
7.1 S1-U data volume related measurements . 41
7.1.1 Number of outgoing GTP data packets on the S1-U interface, from S-GW to eNodeB . 41
7.1.1.2 Number of incoming GTP data packets on the S1-U interface, from eNodeB to S-GW . 41
7.1.1.3 Number of octets of outgoing GTP data packets on the S1-U interface, from S-GW to eNodeB . 41
7.1.1.4 Number of octets of incoming GTP data packets on the S1-U interface, from eNodeB to S-GW . 42
Annex A (informative): Use case for measurements . 43
A.1 Use case for mobility management related measurements . 43
A.2 Use case for detach related measurements . 43
A.3 Use case for tracking and routeing area update related measurements . 43
A.4 Use case for session related measurements . 44
A.5 Use case for EPS paging procedures . 44
A.6 Use case of PDN-GW initiated Dedicated Bearer Management related measurements for EPC . 44
A.7 Use case of PDN-GW initiated Dedicated Bearer Management related measurements for EPC . 44
A.8 Use case of PDN-GW initiated Dedicated Bearer Management related measurements for EPC . 45
A.9 Use case of PDN-GW initiated Dedicated Bearer Management related measurements for EPC . 45
A.10 Use case of GTP S5/S8 data volume related measurements . 45
A.11 Use case of S1-U data volume related measurements . 45
A.12 Use case of SGi related measurements for EPC . 45
A.13 Use case of subscriber management for MME related measurements . 46
A.14 Use case of S1-MME data volume related measurements . 46
A.15 Use case of Active EPS Bearers related measurements for EPC . 46
A.16 Use case of MME control of overload related measurements for EPC . 46
A.17 Use case of UE requested bearer resource modification related measurements for EPC . 47
A.18 Use case for registered subscribers related measurements for EPC . 47
A.19 Use case of PDN Connections related measurements for EPC . 47
A.20 Use case of MME processor usage . 47
A.21 Use case for EPS Service Request related Measurements . 47
Annex B (informative): Change history . 49
ETSI

---------------------- Page: 6 ----------------------
3GPP TS 32.426 version 9.6.0 Release 9 6 ETSI TS 132 426 V9.6.0 (2019-10)
History . 50

ETSI

---------------------- Page: 7 ----------------------
3GPP TS 32.426 version 9.6.0 Release 9 7 ETSI TS 132 426 V9.6.0 (2019-10)
Foreword
rd
This Technical Specification has been produced by the 3 Generation Partnership Project (3GPP).
The contents of the present document are subject to continuing work within the TSG and may change following formal
TSG approval. Should the TSG modify the contents of the present document, it will be re-released by the TSG with an
identifying change of release date and an increase in version number as follows:
Version x.y.z
where:
x the first digit:
1 presented to TSG for information;
2 presented to TSG for approval;
3 or greater indicates TSG approved document under change control.
y the second digit is incremented for all changes of substance, i.e. technical enhancements, corrections,
updates, etc.
z the third digit is incremented when editorial only changes have been incorporated in the document.
Introduction
The present document is part of a TS-family covering the 3rd Generation Partnership Project; Technical Specification
Group Services and System Aspects; Telecommunication management; as identified below:
32.401 Performance Management (PM); Concept and requirements
52.402 Performance Management (PM); Performance measurements - GSM
32.404 Performance Management (PM); Performance measurements - Definitions and template
32.405 Performance Management (PM); Performance measurements Universal Terrestrial Radio Access
Network (UTRAN)
32.406 Performance Management (PM); Performance measurements Core Network (CN) Packet Switched
(PS) domain
32.407 Performance Management (PM); Performance measurements Core Network (CN) Circuit
Switched (CS) domain
32.408 Performance Management (PM); Performance measurements Teleservice
32.409 Performance Management (PM); Performance measurements IP Multimedia Subsystem (IMS)
32.425 Performance Management (PM); Performance measurements Evolved Universal Terrestrial Radio
Access Network (E-UTRAN)
32.426 Performance Management (PM); Performance measurements Evolved Packet Core network
(EPC)
The present document is part of a set of specifications, which describe the requirements and information model
necessary for the standardised Operation, Administration and Maintenance (OA&M) of a multi-vendor LTE SAE-
system.
During the lifetime of a LTE SAE network, its logical and physical configuration will undergo changes of varying
degrees and frequencies in order
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.