ETSI ETS 300 796-2 ed.1 (1998-04)
Broadband Integrated Services Digital Network (B-ISDN); Digital Subscriber Signalling System No. two (DSS2) protocol; Generic functional protocol; Core aspects; Part 2: Protocol Implementation Conformance Statement (PICS) proforma specification
Broadband Integrated Services Digital Network (B-ISDN); Digital Subscriber Signalling System No. two (DSS2) protocol; Generic functional protocol; Core aspects; Part 2: Protocol Implementation Conformance Statement (PICS) proforma specification
DE/SPS-05101-2
Širokopasovno digitalno omrežje z integriranimi storitvami (B-ISDN) - Protokol digitalne naročniške signalizacije št. 2 (DSS2) - Generični funkcijski protokol - Jedrni vidiki - 2. del: Izjava o skladnosti izvedbe protokola (PICS) - Proforma specifikacije
General Information
Standards Content (Sample)
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.VSHFLILNDFLMHBroadband Integrated Services Digital Network (B-ISDN); Digital Subscriber Signalling System No. two (DSS2) protocol; Generic functional protocol; Core aspects; Part 2: Protocol Implementation Conformance Statement (PICS) proforma specification33.080Digitalno omrežje z integriranimi storitvami (ISDN)Integrated Services Digital Network (ISDN)ICS:Ta slovenski standard je istoveten z:ETS 300 796-2 E13SIST ETS 300 796-2:1998en01-DSULO-19983SIST ETS 300 796-2:1998SLOVENSKI
STANDARD
SIST ETS 300 796-2:1998
DRAFTEUROPEANprETS 300 796-2TELECOMMUNICATIONFebruary 1997STANDARDSource: ETSI TC-SPSReference: DE/SPS-05101-2ICS:33.020Key words:B-ISDN, DSS2, layer 3, functional, generic, supplementary service, PICSBroadband Integrated Services Digital Network (B-ISDN);Digital Subscriber Signalling System No. two (DSS2) protocol;Generic functional protocol;Core aspects;Part 2: Protocol Implementation Conformance Statement (PICS)proforma specificationETSIEuropean Telecommunications Standards InstituteETSI SecretariatPostal address: F-06921 Sophia Antipolis CEDEX - FRANCEOffice address: 650 Route des Lucioles - Sophia Antipolis - Valbonne - FRANCEX.400: c=fr, a=atlas, p=etsi, s=secretariat - Internet: secretariat@etsi.frTel.: +33 4 92 94 42 00 - Fax: +33 4 93 65 47 16Copyright Notification: No part may be reproduced except as authorized by written permission. The copyright and theforegoing restriction extend to reproduction in all media.© European Telecommunications Standards Institute 1997. All rights reserved.SIST ETS 300 796-2:1998
Page 2Draft prETS 300 796-2: February 1997Whilst every care has been taken in the preparation and publication of this document, errors in content,typographical or otherwise, may occur. If you have comments concerning its accuracy, please write to"ETSI Editing and Committee Support Dept." at the address shown on the title page.SIST ETS 300 796-2:1998
Page 3Draft prETS 300 796-2: February 1997ContentsForeword.51Scope.72Normative references.73Definitions and abbreviations.83.1Definitions.83.2Abbreviations.84Conformance.9Annex A (normative):PICS proforma.10A.1Guidance for completing the PICS proforma.10A.1.1Purpose and structure.10A.1.2Abbreviations and conventions.10A.1.3Instructions for completing the PICS proforma.11A.2Identification of the implementation.11A.2.1Date of the statement.12A.2.2Implementation Under Test (IUT) identification.12A.2.3System Under Test (SUT) identification.12A.2.4Product supplier.12A.2.5Client.13A.2.6PICS contact person.13A.3Identification of the protocol to which this PICS proforma applies.14A.4PICS proforma tables.14A.4.1Correspondence to a physical interface.14A.4.2Structure of the tables.14A.4.3Support for received PDU parameters.14A.5Global statement of conformance.15A.6Roles.15A.7Major capabilities.16A.8Subsidiary capabilities.16A.9Protocol Data Units (PDUs).17A.9.1Messages received.17A.9.2Messages transmitted.17A.10PDU parameters.18A.10.1Bearer-related transport mechanism.18A.10.1.1PDU parameters received.18A.10.1.2PDU parameters transmitted.20A.10.2Connection-oriented bearer-independent transport mechanism.23A.10.2.1PDU parameters received.23A.10.2.2PDU parameters transmitted.25A.10.3Connectionless bearer-independent transport mechanism.27A.10.3.1PDU parameters received.27A.10.3.2PDU parameters transmitted.28SIST ETS 300 796-2:1998
Page 4Draft prETS 300 796-2: February 1997A.11Facility information element structure.28A.12Timers.29History.30SIST ETS 300 796-2:1998
Page 5Draft prETS 300 796-2: February 1997ForewordThis draft European Telecommunication Standard (ETS) has been produced by the Signalling Protocolsand Switching (SPS) Technical Committee of the European Telecommunications Standards Institute(ETSI), and is now submitted for the Public Enquiry phase of the ETSI standards approval procedure.This ETS is part 2 of a multi-part standard covering the Integrated Services Digital Network (ISDN) DigitalSubscriber Signalling System No. two (DSS2) core aspects of the generic functional protocol for thesupport of supplementary services as described below:Part 1:"Protocol specification [ITU-T Recommendation Q.2932.1, modified]";Part 2:"Protocol Implementation Conformance Statement (PICS) proforma specification";Part 3:"Test Suite Structure and Test Purposes (TSS&TP) specification for the user";Part 4:"Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing(PIXIT) proforma specification for the user";Part 5:"TSS&TP specification for the network";Part 6:"ATS and partial PIXIT proforma specification for the network".NOTE:The final structure of the parts containing the test specifications is currently understudy.To evaluate conformance of a particular implementation, it is necessary to have a statement of whichcapabilities and options have been implemented for a given Open Systems Interconnection (OSI)protocol. Such a statement is called a Protocol Implementation Conformance Statement (PICS).Proposed transposition datesDate of latest announcement of this ETS (doa):3 months after ETSI publicationDate of latest publication of new National Standardor endorsement of this ETS (dop/e):6 months after doaDate of withdrawal of any conflicting National Standard (dow):6 months after doaSIST ETS 300 796-2:1998
Page 6Draft prETS 300 796-2: February 1997Blank pageSIST ETS 300 796-2:1998
Page 7Draft prETS 300 796-2: February 19971ScopeThis second part of ETS 300 796 is applicable to the stage three of the generic functional protocol coreaspects for the support of supplementary services for the pan-European Broadband Integrated ServicesDigital Network (B-ISDN) as provided by European public telecommunications operators at the TBreference point or coincident SB and TB reference point (as defined in ITU-T Recommendation I.413 [9])by means of the Digital Subscriber Signalling System No. two (DSS2) protocol. Stage three identifies theprotocol procedures and switching functions needed to support a telecommunication service (see CCITTRecommendation I.130 [8]).This ETS provides the Protocol Implementation Conformance Statement (PICS) proforma for the B-ISDNDSS2 generic functional protocol core aspects for the support of supplementary services as specified inETS 300 796-1 [5] in compliance with the relevant requirements and in accordance with the relevantguidance given in ISO/IEC 9646-7 [7].The supplier of a protocol implementation which is claimed to conform to ETS 300 796-1 [5] is required tocomplete a copy of the PICS proforma provided in annex A of this ETS and is required to provide theinformation necessary to identify both the supplier and the implementation.2Normative referencesThis ETS incorporates by dated and undated reference, provisions from other publications. Thesenormative references are cited at the appropriate places in the text and the publications are listedhereafter. For dated references, subsequent amendments to or revisions of any of these publicationsapply to this ETS only when incorporated in it by amendment or revision. For undated references the latestedition of the publication referred to applies.[1]ETS 300 443-1: "Broadband Integrated Services Digital Network (B-ISDN);Digital Subscriber Signalling System No. two (DSS2) protocol; B-ISDN user-network interface layer 3 specification for basic call/bearer control; Part 1:Protocol specification [ITU-T Recommendation Q.2931 (1995), modified]".[2]ETS 300 443-2: "Broadband Integrated Services Digital Network (B-ISDN);Digital Subscriber Signalling System No. two (DSS2) protocol; B-ISDN user-network interface layer 3 specification for basic call/bearer control; Part 2:Protocol Implementation Conformance Statement (PICS) proformaspecification".[3]ETS 300 662-2 (1996): "Broadband Integrated Services Digital Network(B-ISDN); Digital Subscriber Signalling System No. two (DSS2) protocol;Multiple Subscriber Number (MSN) supplementary service; Part 2: ProtocolImplementation Conformance Statement (PICS) proforma specification".[4]ETS 300 667-2 (1996): "Broadband Integrated Services Digital Network(B-ISDN); Digital Subscriber Signalling System No. two (DSS2) protocol;Subaddressing (SUB) supplementary service; Part 2: Protocol ImplementationConformance Statement (PICS) proforma specification".[5]ETS 300 796-1: "Broadband Integrated Services Digital Network (B-ISDN);Digital Subscriber Signalling System No. two (DSS2) protocol; Genericfunctional protocol; Core aspects; Part 1: Protocol specification [ITU-TRecommendation Q.2932.1, modified]".[6]ISO/IEC 9646-1: "Information technology - Open Systems Interconnection -Conformance testing methodology and framework - Part 1: General concepts".[7]ISO/IEC 9646-7: "Information technology - Open Systems Interconnection -Conformance testing methodology and framework - Part 7: ImplementationConformance Statements".SIST ETS 300 796-2:1998
Page 8Draft prETS 300 796-2: February 1997[8]CCITT Recommendation I.130 (1988): "Method for the characterization oftelecommunication services supported by an ISDN and network capabilities ofan ISDN".[9]ITU-T Recommendation I.413 (1993): "B-ISDN user-network interfaces".3Definitions and abbreviations3.1DefinitionsFor the purposes of this ETS, the following definitions apply, in addition to those given inETS 300 796-1 [5]:Protocol Implementation Conformance Statement (PICS): A statement made by the supplier of anOpen Systems Interconnection (OSI) implementation or system, stating which capabilities have beenimplemented for a given OSI protocol (see ISO/IEC 9646-1 [6]).PICS proforma: A document, in the form of a questionnaire, designed by the protocol specifier orconformance test suite specifier, which when completed for an OSI implementation or system becomesthe PICS (see ISO/IEC 9646-1 [6]).static conformance review: A review of the extent to which the static conformance requirements are metby the IUT, accomplished by comparing the PICS with the static conformance requirements expressed inthe relevant standard(s) (see ISO/IEC 9646-1 [6]).3.2AbbreviationsFor the purposes of this ETS, the following abbreviations apply:ANDBoolean "and"B-ISDNBroadband ISDNDSS2Digital Subscriber Signalling System No. twoIERInformation Elements ReceivedIETInformation Elements TransmittedISDNIntegrated Services Digital NetworkIUTImplementation Under TestMMandatory requirement (to be observed in all cases)MCMajor CapabilitiesMRMessages ReceivedMTMessages TransmittedN/Anot applicable, not supported or the conditions for status are not metNonot supportedNOTBoolean "not"OOption (may be selected to suit the implementation, provided that anyrequirements applicable to the option are observed)O.nOptions, but support required for either at least one or only one of the options inthe group labelled with the same numeral "n"ORBoolean "or"OSIOpen Systems InterconnectionPICSProtocol Implementation Conformance StatementRRoleROSERemote Operations Service ElementSCSubsidiary CapabilitiesSCSSystem Conformance StatementSUTSystem Under TestTMPrefix for index numbers for the timers groupYessupportedSIST ETS 300 796-2:1998
Page 9Draft prETS 300 796-2: February 19974ConformanceA PICS proforma which conforms to this PICS proforma specification shall be technically equivalent toannex A, and shall preserve the numbering and ordering of the items in annex A.A PICS which conforms to this PICS proforma specification shall:a)describe an implementation which conforms to ETS 300 796-1 [5];b)be a conforming PICS proforma, which has been completed in accordance with the instructions forcompletion given in clause A.1;c)include the information necessary to uniquely identify both the supplier and the implementation.SIST ETS 300 796-2:1998
Page 10Draft prETS 300 796-2: February 1997Annex A (normative):PICS proformaNotwithstanding the provisions of the copyright clause related to the text of this ETS, ETSI grants thatusers of this ETS may freely reproduce the PICS proforma in this annex so that it can be used for itsintended purposes and may further publish the completed PICS.A.1Guidance for completing the PICS proformaA.1.1Purpose and structureThe purpose of this PICS proforma is to provide a mechanism whereby a supplier of an implementation ofthe requirements defined in ETS 300 796-1 [5] may provide information in a standardized manner.The PICS proforma is subdivided into subclauses for the following categories of information:A.1:guidance for completing the ICS proforma;A.2:identification of the implementation;A.3:identification of the protocol to which this PICS proforma applies;A.4:explanation of the PICS proforma tables;A.5:global statement of conformance;A.6:questions to determine roles;A.7:questions for major capabilities;A.8:questions for subsidiary capabilities;A.9:questions for protocol data units;A.10:questions for protocol data unit parameters;A.11:questions for the facility information element structure;A.12:questions for timers.A.1.2Abbreviations and conventionsThe PICS proforma contained in this annex is comprised of information in tabular form in accordance withthe guidelines presented in ISO/IEC 9646-7 [7].Item columnThe item column contains a unique reference (a mnemonic plus a number) for each item within the PICSproforma. Items are not always numbered sequentially.Item description columnThe item description contains a brief summary of the static requirement for which a support answer isrequired.Conditions for status columnThe conditions for status column contains a specification, if appropriate, of the predicate upon which acondition status is based.Status columnThe following notations, defined in ISO/IEC 9646-7 [7], are used for the status column:IIrrelevant or out-of-scope - this capability is outside the scope of the ETS towhich this PICS proforma applies and is not subject to conformance testing inthis context;MMandatory - the capability is required to be supported;N/ANot Applicable - in the given context, it is impossible to use the capability. Noanswer in the support column is required;SIST ETS 300 796-2:1998
Page 11Draft prETS 300 796-2: February 1997OOptional - the capability may be supported or not;O.iqualified optional - for mutually exclusive or selectable options from a set. "i" isan integer that identifies an unique group of related optional items and the logicof their selection, defined below the table;XeXcluded or prohibited - there is a requirement not to use this capability in agiven context.Reference columnExcept where explicitly stated, the reference column refers to the appropriate text of ETS 300 796-1 [5]describing the particular item.NOTE:A reference indicates only the location of the most essential information about an item.All additional requirements contained in ETS 300 796-1 [5] have also to be taken intoaccount when making a statement about the conformance of that particular item.Support columnThe following notation, defined in ISO/IEC 9646-7 [7], is used for the support column:[ ] YesTick "Yes" if item is supported.[ ] NoTick "No" if item is not supported.[ ] N/ATick "N/A" if item is "not applicable".Prerequisite lineA prerequisite line takes the form: Prerequisite: .A prerequisite line after a subclause heading or table title indicates that the whole clause or the wholetable is not required to be completed if the predicate is FALSE.A.1.3Instructions for completing the PICS proformaThe supplier of the implementation shall complete the PICS proforma. For each row in each PICSproforma table the supplier shall enter an explicit answer (i.e. by ticking the appropriate "Yes", "No", or"N/A" in each of the support column boxes provided). Where a support column is left blank, or where it ismarked "N/A" without any tickbox, no answer is required.If necessary, the supplier may enter additional comments at the end of each table, or separately.More detailed instructions may be found at the beginning of each subclause of the proforma.A.2Identification of the implementationIdentification of the Implementation Under Test (IUT) and the system in which it resides (the SystemUnder Test (SUT)) should be filled in to provide as much detail as possible regarding version numbersand configuration options.The product supplier and client information should both be filled in if they are different.A person who can answer queries regarding information supplied in the PICS should be named as thecontact person.SIST ETS 300 796-2:1998
Page 12Draft prETS 300 796-2: February 1997A.2.1Date of the statement.A.2.2Implementation Under Test (IUT) identificationIUT name:.IUT version:.A.2.3System Under Test (SUT) identificationSUT name:.Hardware configuration:.Operating system:.A.2.4Product supplierName:.Address:.Telephone number:.Facsimile number:.E-mail address:.SIST ETS 300 796-2:1998
Page 13Draft prETS 300 796-2: February 1997Additional information:.A.2.5ClientName:.Address:.Telephone number:.Facsimile number:.E-mail address:.Additional information:.A.2.6PICS contact personName:.Telephone number:.Facsimile number:.E-mail address:.SIST ETS 300 796-2:1998
Page 14Draft prETS 300 796-2: February 1997Additional information:.A.3Identification of the protocol to which this PICS proforma appliesThis PICS proforma applies to the following standard:ETS 300 796-1: "Broadband Integrated Services Digital Network (B-ISDN); Digital Subscriber SignallingSystem No. two (DSS2) protocol; Generic functional protocol for the support of supplementary services;Core aspects; Part 1: Protocol specification".A.4PICS proforma tablesA.4.1Correspondence to a physical interfaceThe "implementation" (IUT) about which this PICS proforma asks questions corresponds to a layer 3implementation on top of one physical interface. If the SUT implements more than one configuration, thena layer 3 PICS shall be created for each type of interface (and for each configuration of each interface)provided by the SUT.A.4.2Structure of the tablesThe supplier shall provide answers to the questions concerning the major roles of the IUT (table A.1). Thesupplier shall then provide answers to the questions relating to the capabilities of the IUT in one of themajor roles as appropriate.A.4.3Support for received PDU parametersIn the PDU parameter tables (see subclause A.10), the PICS proforma asks questions about theinformation elements (parameters) supported in messages (PDUs) received by the IUT. This subclauseexplains, in the context of ETS 300 796-1 [5], what "to support a received PDU parameter" means.The requirement that an IUT is able to parse an information element in a received message is alreadyimplied by claiming support for the receipt of that received message. This means that "to support areceived PDU parameter" implies more.Information elements in received messages are regarded as either transparent or non-transparent.A non-transparent information element is one that causes the protocol control entity to vary its behaviourin accordance with the content of the information element. To support a non-transparent informationelement means an IUT can process the received parameter and behave according to the proceduresdescribed in ETS 300 796-1 [5].An information element is transparent if the actions taken according to its contents are not detectable inthe subsequent behaviour of the pro
...
SLOVENSKI STANDARD
SIST ETS 300 796-2:1998
01-september-1998
âLURNRSDVRYQRGLJLWDOQRRPUHåMH]LQWHJULUDQLPLVWRULWYDPL%,6'13URWRNRO
GLJLWDOQHQDURþQLãNHVLJQDOL]DFLMHãW'66*HQHULþQLIXQNFLMVNLSURWRNRO
-HGUQLYLGLNLGHO,]MDYDRVNODGQRVWLL]YHGEHSURWRNROD3,&63URIRUPD
VSHFLILNDFLMH
Broadband Integrated Services Digital Network (B-ISDN); Digital Subscriber Signalling
System No. two (DSS2) protocol; Generic functional protocol; Core aspects; Part 2:
Protocol Implementation Conformance Statement (PICS) proforma specification
Ta slovenski standard je istoveten z: ETS 300 796-2 Edition 1
ICS:
33.080 Digitalno omrežje z Integrated Services Digital
integriranimi storitvami Network (ISDN)
(ISDN)
SIST ETS 300 796-2:1998 en
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
---------------------- Page: 1 ----------------------
SIST ETS 300 796-2:1998
---------------------- Page: 2 ----------------------
SIST ETS 300 796-2:1998
EUROPEAN ETS 300 796-2
TELECOMMUNICATION April 1998
STANDARD
Source: SPS Reference: DE/SPS-05101-2
ICS: 33.020
Key words: B-ISDN, DSS2, layer 3, functional, generic, supplementary service, PICS
Broadband Integrated Services Digital Network (B-ISDN);
Digital Subscriber Signalling System No. two (DSS2) protocol;
Generic functional protocol;
Core aspects;
Part 2: Protocol Implementation Conformance Statement (PICS)
proforma specification
ETSI
European Telecommunications Standards Institute
ETSI Secretariat
Postal address: F-06921 Sophia Antipolis CEDEX - FRANCE
Office address: 650 Route des Lucioles - Sophia Antipolis - Valbonne - FRANCE
Internet: secretariat@etsi.fr - http://www.etsi.fr - http://www.etsi.org
Tel.: +33 4 92 94 42 00 - Fax: +33 4 93 65 47 16
Copyright Notification: No part may be reproduced except as authorized by written permission. The copyright and the
foregoing restriction extend to reproduction in all media.
© European Telecommunications Standards Institute 1998. All rights reserved.
---------------------- Page: 3 ----------------------
SIST ETS 300 796-2:1998
Page 2
ETS 300 796-2: April 1998
Whilst every care has been taken in the preparation and publication of this document, errors in content,
typographical or otherwise, may occur. If you have comments concerning its accuracy, please write to
"ETSI Editing and Committee Support Dept." at the address shown on the title page.
---------------------- Page: 4 ----------------------
SIST ETS 300 796-2:1998
Page 3
ETS 300 796-2: April 1998
Contents
Foreword .5
1 Scope .7
2 Normative references.7
3 Definitions and abbreviations .8
3.1 Definitions .8
3.2 Abbreviations .8
4 Conformance.9
Annex A (normative): PICS proforma for ETS 300 796-1 .10
A.1 Guidance for completing the PICS proforma .10
A.1.1 Purpose and structure .10
A.1.2 Abbreviations and conventions.10
A.1.3 Instructions for completing the PICS proforma.11
A.2 Identification of the implementation.11
A.2.1 Date of the statement .12
A.2.2 Implementation Under Test (IUT) identification .12
A.2.3 System Under Test (SUT) identification .12
A.2.4 Product supplier.12
A.2.5 Client.13
A.2.6 PICS contact person.13
A.3 Identification of the protocol to which this PICS proforma applies .14
A.4 PICS proforma tables.14
A.4.1 Correspondence to a physical interface.14
A.4.2 Structure of the tables.14
A.4.3 Support for received PDU parameters.14
A.5 Global statement of conformance .15
A.6 Roles .15
A.7 Major capabilities.16
A.8 Subsidiary capabilities.16
A.9 Protocol Data Units (PDUs).17
A.9.1 Messages received.17
A.9.2 Messages transmitted.17
A.10 PDU parameters .18
A.10.1 Bearer-related transport mechanism .18
A.10.1.1 PDU parameters received.18
A.10.1.2 PDU parameters transmitted.20
A.10.2 Connection-oriented bearer-independent transport mechanism .23
A.10.2.1 PDU parameters received.23
A.10.2.2 PDU parameters transmitted.25
A.10.3 Connectionless bearer-independent transport mechanism .27
A.10.3.1 PDU parameters received.27
A.10.3.2 PDU parameters transmitted.28
---------------------- Page: 5 ----------------------
SIST ETS 300 796-2:1998
Page 4
ETS 300 796-2: April 1998
A.11 Facility information element structure. 28
A.12 Timers. 29
History. 30
---------------------- Page: 6 ----------------------
SIST ETS 300 796-2:1998
Page 5
ETS 300 796-2: April 1998
Foreword
This European Telecommunication Standard (ETS) has been produced by the Signalling Protocols and
Switching (SPS) Technical Committee of the European Telecommunications Standards Institute (ETSI).
This ETS is part 2 of a multi-part standard covering the Integrated Services Digital Network (ISDN) Digital
Subscriber Signalling System No. two (DSS2) core aspects of the generic functional protocol for the
support of supplementary services as described below:
Part 1: "Protocol specification [ITU-T Recommendation Q.2932.1, modified]";
Part 2: "Protocol Implementation Conformance Statement (PICS) proforma specification";
Part 3: "Test Suite Structure and Test Purposes (TSS&TP) specification for the user";
Part 4: "Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing
(PIXIT) proforma specification for the user";
Part 5: "TSS&TP specification for the network";
Part 6: "ATS and partial PIXIT proforma specification for the network".
NOTE: The final structure of the parts containing the test specifications is currently under
study.
To evaluate conformance of a particular implementation, it is necessary to have a statement of which
capabilities and options have been implemented for a given Open Systems Interconnection (OSI)
protocol. Such a statement is called a Protocol Implementation Conformance Statement (PICS).
Transposition dates
Date of adoption of this ETS: 20 March 1998
Date of latest announcement of this ETS (doa): 31 July 1998
Date of latest publication of new National Standard
or endorsement of this ETS (dop/e): 31 January 1999
Date of withdrawal of any conflicting National Standard (dow): 31 January 1999
---------------------- Page: 7 ----------------------
SIST ETS 300 796-2:1998
Page 6
ETS 300 796-2: April 1998
Blank page
---------------------- Page: 8 ----------------------
SIST ETS 300 796-2:1998
Page 7
ETS 300 796-2: April 1998
1 Scope
This second part of ETS 300 796 is applicable to the stage three of the generic functional protocol core
aspects for the support of supplementary services for the pan-European Broadband Integrated Services
Digital Network (B-ISDN) as provided by European public telecommunications operators at the T
B
reference point or coincident S and T reference point (as defined in ITU-T Recommendation I.413 [9])
B B
by means of the Digital Subscriber Signalling System No. two (DSS2) protocol. Stage three identifies the
protocol procedures and switching functions needed to support a telecommunication service (see CCITT
Recommendation I.130 [8]).
This ETS provides the Protocol Implementation Conformance Statement (PICS) proforma for the B-ISDN
DSS2 generic functional protocol core aspects for the support of supplementary services as specified in
ETS 300 796-1 [5] in compliance with the relevant requirements and in accordance with the relevant
guidance given in ISO/IEC 9646-7 [7].
The supplier of a protocol implementation which is claimed to conform to ETS 300 796-1 [5] is required to
complete a copy of the PICS proforma provided in annex A of this ETS and is required to provide the
information necessary to identify both the supplier and the implementation.
2 Normative references
This ETS incorporates by dated and undated reference, provisions from other publications. These
normative references are cited at the appropriate places in the text and the publications are listed
hereafter. For dated references, subsequent amendments to or revisions of any of these publications
apply to this ETS only when incorporated in it by amendment or revision. For undated references the latest
edition of the publication referred to applies.
[1] ETS 300 443-1: "Broadband Integrated Services Digital Network (B-ISDN);
Digital Subscriber Signalling System No. two (DSS2) protocol; B-ISDN user-
network interface layer 3 specification for basic call/bearer control; Part 1:
Protocol specification [ITU-T Recommendation Q.2931 (1995), modified]".
[2] ETS 300 443-2: "Broadband Integrated Services Digital Network (B-ISDN);
Digital Subscriber Signalling System No. two (DSS2) protocol; B-ISDN user-
network interface layer 3 specification for basic call/bearer control; Part 2:
Protocol Implementation Conformance Statement (PICS) proforma
specification".
[3] ETS 300 662-2 (1996): "Broadband Integrated Services Digital Network
(B-ISDN); Digital Subscriber Signalling System No. two (DSS2) protocol;
Multiple Subscriber Number (MSN) supplementary service; Part 2: Protocol
Implementation Conformance Statement (PICS) proforma specification".
[4] ETS 300 667-2 (1996): "Broadband Integrated Services Digital Network
(B-ISDN); Digital Subscriber Signalling System No. two (DSS2) protocol;
Subaddressing (SUB) supplementary service; Part 2: Protocol Implementation
Conformance Statement (PICS) proforma specification".
[5] ETS 300 796-1: "Broadband Integrated Services Digital Network (B-ISDN);
Digital Subscriber Signalling System No. two (DSS2) protocol; Generic
functional protocol; Core aspects; Part 1: Protocol specification [ITU-T
Recommendation Q.2932.1, modified]".
[6] ISO/IEC 9646-1: "Information technology - Open Systems Interconnection -
Conformance testing methodology and framework - Part 1: General concepts".
[7] ISO/IEC 9646-7: "Information technology - Open Systems Interconnection -
Conformance testing methodology and framework - Part 7: Implementation
Conformance Statements".
---------------------- Page: 9 ----------------------
SIST ETS 300 796-2:1998
Page 8
ETS 300 796-2: April 1998
[8] CCITT Recommendation I.130 (1988): "Method for the characterization of
telecommunication services supported by an ISDN and network capabilities of
an ISDN".
[9] ITU-T Recommendation I.413 (1993): "B-ISDN user-network interfaces".
3 Definitions and abbreviations
3.1 Definitions
For the purposes of this ETS, the following definitions apply, in addition to those given in
ETS 300 796-1 [5]:
Protocol Implementation Conformance Statement (PICS): A statement made by the supplier of an
Open Systems Interconnection (OSI) implementation or system, stating which capabilities have been
implemented for a given OSI protocol (see ISO/IEC 9646-1 [6]).
PICS proforma: A document, in the form of a questionnaire, designed by the protocol specifier or
conformance test suite specifier, which when completed for an OSI implementation or system becomes
the PICS (see ISO/IEC 9646-1 [6]).
static conformance review: A review of the extent to which the static conformance requirements are met
by the IUT, accomplished by comparing the PICS with the static conformance requirements expressed in
the relevant standard(s) (see ISO/IEC 9646-1 [6]).
3.2 Abbreviations
For the purposes of this ETS, the following abbreviations apply:
AND Boolean "and"
B-ISDN Broadband ISDN
DSS2 Digital Subscriber Signalling System No. two
IER Information Elements Received
IET Information Elements Transmitted
ISDN Integrated Services Digital Network
IUT Implementation Under Test
M Mandatory requirement (to be observed in all cases)
MC Major Capabilities
MR Messages Received
MT Messages Transmitted
N/A not applicable, not supported or the conditions for status are not met
No not supported
NOT Boolean "not"
O Option (may be selected to suit the implementation, provided that any
requirements applicable to the option are observed)
O.n Options, but support required for either at least one or only one of the options in
the group labelled with the same numeral "n"
OR Boolean "or"
OSI Open Systems Interconnection
PICS Protocol Implementation Conformance Statement
R Role
ROSE Remote Operations Service Element
SC Subsidiary Capabilities
SCS System Conformance Statement
SUT System Under Test
TM Prefix for index numbers for the timers group
Yes supported
---------------------- Page: 10 ----------------------
SIST ETS 300 796-2:1998
Page 9
ETS 300 796-2: April 1998
4 Conformance
A PICS proforma which conforms to this PICS proforma specification shall be technically equivalent to
annex A, and shall preserve the numbering and ordering of the items in annex A.
A PICS which conforms to this PICS proforma specification shall:
a) describe an implementation which conforms to ETS 300 796-1 [5];
b) be a conforming PICS proforma, which has been completed in accordance with the instructions for
completion given in clause A.1;
c) include the information necessary to uniquely identify both the supplier and the implementation.
---------------------- Page: 11 ----------------------
SIST ETS 300 796-2:1998
Page 10
ETS 300 796-2: April 1998
Annex A (normative): PICS proforma for ETS 300 796-1
Notwithstanding the provisions of the copyright clause related to the text of this ETS, ETSI grants that
users of this ETS may freely reproduce the PICS proforma in this annex so that it can be used for its
intended purposes and may further publish the completed PICS.
A.1 Guidance for completing the PICS proforma
A.1.1 Purpose and structure
The purpose of this PICS proforma is to provide a mechanism whereby a supplier of an implementation of
the requirements defined in ETS 300 796-1 [5] may provide information in a standardized manner.
The PICS proforma is subdivided into subclauses for the following categories of information:
A.1: guidance for completing the ICS proforma;
A.2: identification of the implementation;
A.3: identification of the protocol to which this PICS proforma applies;
A.4: explanation of the PICS proforma tables;
A.5: global statement of conformance;
A.6: questions to determine roles;
A.7: questions for major capabilities;
A.8: questions for subsidiary capabilities;
A.9: questions for protocol data units;
A.10: questions for protocol data unit parameters;
A.11: questions for the facility information element structure;
A.12: questions for timers.
A.1.2 Abbreviations and conventions
The PICS proforma contained in this annex is comprised of information in tabular form in accordance with
the guidelines presented in ISO/IEC 9646-7 [7].
Item column
The item column contains a unique reference (a mnemonic plus a number) for each item within the PICS
proforma. Items are not always numbered sequentially.
Item description column
The item description contains a brief summary of the static requirement for which a support answer is
required.
Conditions for status column
The conditions for status column contains a specification, if appropriate, of the predicate upon which a
condition status is based.
Status column
The following notations, defined in ISO/IEC 9646-7 [7], are used for the status column:
I Irrelevant or out-of-scope - this capability is outside the scope of the ETS to
which this PICS proforma applies and is not subject to conformance testing in
this context;
M Mandatory - the capability is required to be supported;
N/A Not Applicable - in the given context, it is impossible to use the capability. No
answer in the support column is required;
---------------------- Page: 12 ----------------------
SIST ETS 300 796-2:1998
Page 11
ETS 300 796-2: April 1998
O Optional - the capability may be supported or not;
O.i qualified optional - for mutually exclusive or selectable options from a set. "i" is
an integer that identifies an unique group of related optional items and the logic
of their selection, defined below the table;
X eXcluded or prohibited - there is a requirement not to use this capability in a
given context.
Reference column
Except where explicitly stated, the reference column refers to the appropriate text of ETS 300 796-1 [5]
describing the particular item.
NOTE: A reference indicates only the location of the most essential information about an item.
All additional requirements contained in ETS 300 796-1 [5] have also to be taken into
account when making a statement about the conformance of that particular item.
Support column
The following notation, defined in ISO/IEC 9646-7 [7], is used for the support column:
[ ] Yes Tick "Yes" if item is supported.
[ ] No Tick "No" if item is not supported.
[ ] N/A Tick "N/A" if item is "not applicable".
Prerequisite line
A prerequisite line takes the form: Prerequisite: .
A prerequisite line after a subclause heading or table title indicates that the whole clause or the whole
table is not required to be completed if the predicate is FALSE.
A.1.3 Instructions for completing the PICS proforma
The supplier of the implementation shall complete the PICS proforma. For each row in each PICS
proforma table the supplier shall enter an explicit answer (i.e. by ticking the appropriate "Yes", "No", or
"N/A" in each of the support column boxes provided). Where a support column is left blank, or where it is
marked "N/A" without any tickbox, no answer is required.
If necessary, the supplier may enter additional comments at the end of each table, or separately.
More detailed instructions may be found at the beginning of each subclause of the proforma.
A.2 Identification of the implementation
Identification of the Implementation Under Test (IUT) and the system in which it resides (the System
Under Test (SUT)) should be filled in to provide as much detail as possible regarding version numbers
and configuration options.
The product supplier and client information should both be filled in if they are different.
A person who can answer queries regarding information supplied in the PICS should be named as the
contact person.
---------------------- Page: 13 ----------------------
SIST ETS 300 796-2:1998
Page 12
ETS 300 796-2: April 1998
A.2.1 Date of the statement
........................................................................................................................................................................
A.2.2 Implementation Under Test (IUT) identification
IUT name:
........................................................................................................................................................................
........................................................................................................................................................................
IUT version:
........................................................................................................................................................................
A.2.3 System Under Test (SUT) identification
SUT name:
........................................................................................................................................................................
........................................................................................................................................................................
Hardware configuration:
........................................................................................................................................................................
........................................................................................................................................................................
........................................................................................................................................................................
Operating system:
........................................................................................................................................................................
A.2.4 Product supplier
Name:
........................................................................................................................................................................
Address:
........................................................................................................................................................................
........................................................................................................................................................................
........................................................................................................................................................................
Telephone number:
........................................................................................................................................................................
Facsimile number:
........................................................................................................................................................................
E-mail address:
........................................................................................................................................................................
---------------------- Page: 14 ----------------------
SIST ETS 300 796-2:1998
Page 13
ETS 300 796-2: April 1998
Additional information:
.........................................................................................................................................................................
.........................................................................................................................................................................
.........................................................................................................................................................................
A.2.5 Client
Name:
.........................................................................................................................................................................
Address:
.........................................................................................................................................................................
.........................................................................................................................................................................
.........................................................................................................................................................................
Telephone number:
.........................................................................................................................................................................
Facsimile number:
.........................................................................................................................................................................
E-mail address:
.........................................................................................................................................................................
Additional information:
.........................................................................................................................................................................
.........................................................................................................................................................................
.........................................................................................................................................................................
A.2.6 PICS contact person
Name:
.........................................................................................................................................................................
Telephone number:
.........................................................................................................................................................................
Facsimile number:
.........................................................................................................................................................................
E-mail address:
.........................................................................................................................................................................
---------------------- Page: 15 ----------------------
SIST ETS 300 796-2:1998
Page 14
ETS 300 796-2: April 1998
Additional information:
........................................................................................................................................................................
........................................................................................................................................................................
........................................................................................................................................................................
A.3 Identification of the protocol to which this PICS proforma applies
This PICS proforma applies to the following standard:
ETS 300 796-1: "Broadband Integrated Services Digital Network (B-ISDN); Digital Subscriber Signalling
System No. two (DSS2) protocol; Generic functional protocol for the support of supplementary services;
Core aspects; Part 1: Protocol specification".
A.4 PICS proforma tables
A.4.1 Correspondence to a physical interface
The "implementation" (IUT) about which this PICS proforma asks questions corresponds to a layer 3
implementation on top of one physical interface. If the SUT implements more than one configuration, then
a layer 3 PICS shall be created for each type of interface (and for each configur
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.