ETSI GS ENI 001 V2.1.1 (2019-09)
Experiential Networked Intelligence (ENI); ENI use cases
Experiential Networked Intelligence (ENI); ENI use cases
RGS/ENI-008_Use_cases
General Information
Standards Content (Sample)
ETSI GS ENI 001 V2.1.1 (2019-09)
GROUP SPECIFICATION
Experiential Networked Intelligence (ENI);
ENI use cases
Disclaimer
The present document has been produced and approved by the Experiential Networked Intelligence (ENI) ETSI Industry
Specification Group (ISG) and represents the views of those members who participated in this ISG.
It does not necessarily represent the views of the entire ETSI membership.
---------------------- Page: 1 ----------------------
2 ETSI GS ENI 001 V2.1.1 (2019-09)
Reference
RGS/ENI-008
Keywords
artificial intelligence, management, network, use
case
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE
Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16
Siret N° 348 623 562 00017 - NAF 742 C
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° 7803/88
Important notice
The present document can be downloaded from:
http://www.etsi.org/standards-search
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the prevailing version of an ETSI
deliverable is the one made publicly available in PDF format at www.etsi.org/deliver.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at
https://portal.etsi.org/TB/ETSIDeliverableStatus.aspx
If you find errors in the present document, please send your comment to one of the following services:
https://portal.etsi.org/People/CommiteeSupportStaff.aspx
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying
and microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.
© ETSI 2019.
All rights reserved.
DECT™, PLUGTESTS™, UMTS™ and the ETSI logo are trademarks of ETSI registered for the benefit of its Members.
3GPP™ and LTE™ are trademarks of ETSI registered for the benefit of its Members and
of the 3GPP Organizational Partners.
oneM2M™ logo is a trademark of ETSI registered for the benefit of its Members and
of the oneM2M Partners.
®
GSM and the GSM logo are trademarks registered and owned by the GSM Association.
ETSI
---------------------- Page: 2 ----------------------
3 ETSI GS ENI 001 V2.1.1 (2019-09)
Contents
Intellectual Property Rights . 8
Foreword . 8
Modal verbs terminology . 8
1 Scope . 9
2 References . 9
2.1 Normative references . 9
2.2 Informative references . 9
3 Definition of terms, symbols and abbreviations . 10
3.1 Terms . 10
3.2 Symbols . 10
3.2 Abbreviations . 10
4 Overview . 11
4.1 Background . 11
4.2 Overview of the ENI System . 12
4.2.1 Brief Description . 12
4.2.2 Expected Benefits . 12
5 General use cases . 13
5.1 Introduction . 13
5.2 Infrastructure Management . 14
5.2.1 Use Case #1-1: Policy-driven IDC Traffic Steering . 14
5.2.1.1 Use case context . 14
5.2.1.2 Description of the use case . 15
5.2.1.2.1 Overview . 15
5.2.1.2.2 Motivation . 15
5.2.1.2.3 Actors and Roles. 16
5.2.1.2.4 Initial context configuration . 16
5.2.1.2.5 Trigger conditions . 16
5.2.1.2.6 Operational Flow of the actions . 16
5.2.1.2.7 Post-conditions . 17
5.2.2 Use Case #1-2: Handling of Peak Planned Occurrences. 17
5.2.2.1 Use case context . 17
5.2.2.2 Description of the use case . 18
5.2.2.2.1 Overview . 18
5.2.2.2.2 Motivation . 18
5.2.2.2.3 Actors and Roles. 18
5.2.2.2.4 Initial context configuration . 19
5.2.2.2.5 Triggering conditions . 19
5.2.2.2.6 Operational flow of actions . 19
5.2.2.2.7 Post-conditions . 19
5.2.3 Use Case #1-3: Energy optimization using AI . 19
5.2.3.1 Use case context . 19
5.2.3.2 Description of the use case . 20
5.2.3.2.1 Overview . 20
5.2.3.2.2 Motivation . 20
5.2.3.2.3 Actors and Roles. 21
5.2.3.2.4 Initial context configuration . 21
5.2.3.2.5 Triggering conditions . 21
5.2.3.2.6 Operational flow of actions . 21
5.2.3.2.7 Post-conditions . 22
5.2.3.3 Mapping to ENI reference architecture . 22
5.2.3.3.1 Functional blocks. 22
5.2.3.3.2 Interfaces . 23
5.2.3.3.3 Flow of information . 23
5.3 Network Operations . 24
ETSI
---------------------- Page: 3 ----------------------
4 ETSI GS ENI 001 V2.1.1 (2019-09)
5.3.1 Use Case #2-1: Policy-driven IP managed networks . 24
5.3.1.1 Use case context . 24
5.3.1.2 Description of the use case . 24
5.3.1.2.1 Overview . 24
5.3.1.2.2 Motivation . 24
5.3.1.2.3 Actors and Roles. 25
5.3.1.2.4 Initial context configuration . 25
5.3.1.2.5 Triggering conditions . 25
5.3.1.2.6 Operational flow of actions . 26
5.3.1.2.7 Post-conditions . 26
5.3.2 Use Case #2-2: Radio Coverage and capacity optimization . 26
5.3.2.1 Use case context . 26
5.3.2.2 Description of the use case . 27
5.3.2.2.1 Overview . 27
5.3.2.2.2 Motivation . 27
5.3.2.2.3 Actors and Roles. 27
5.3.2.2.4 Initial context configuration . 27
5.3.2.2.5 Triggering conditions . 28
5.3.2.2.6 Operational flow of actions . 28
5.3.2.2.7 Post-conditions . 28
5.3.2.3 Mapping to ENI reference architecture . 28
5.3.2.3.1 Functional blocks. 28
5.3.2.3.2 Interfaces . 29
5.3.2.3.3 Flow of information . 29
5.3.3 Use Case #2-3: Intelligent Software Rollouts . 31
5.3.3.1 Use Case context . 31
5.3.3.2 Description of the Use Case . 31
5.3.3.2.1 Overview . 31
5.3.3.2.2 Motivation . 31
5.3.3.2.3 Actors and Roles. 32
5.3.3.2.4 Initial context configuration . 32
5.3.3.2.5 Triggering conditions . 32
5.3.3.2.6 Operational flow of actions . 32
5.3.3.2.7 Post-conditions . 33
5.3.4 Use Case #2-4: Intelligent Fronthaul Management and Orchestration . 33
5.3.4.1 Use Case context . 33
5.3.4.2 Description of the use case . 33
5.3.4.2.1 Overview . 33
5.3.4.2.2 Motivation . 34
5.3.4.2.3 Actors and Roles. 34
5.3.4.2.4 Initial context configuration . 35
5.3.4.2.5 Triggering conditions . 35
5.3.4.2.6 Operational flow of actions . 35
5.3.4.2.7 Post-conditions . 35
5.3.5 Use Case #2-5: Elastic Resource Management and Orchestration . 35
5.3.5.1 Use case context . 35
5.3.5.2 Description of the use case . 35
5.3.5.2.1 Overview . 35
5.3.5.2.2 Motivation . 36
5.3.5.2.3 Actors and Roles. 36
5.3.5.2.4 Initial context configuration . 37
5.3.5.2.5 Triggering conditions . 37
5.3.5.2.6 Operational flow of actions . 37
5.3.5.2.7 Post-conditions . 37
5.3.5.3 Mapping to ENI reference architecture . 38
5.3.5.3.1 Functional blocks. 38
5.3.5.3.2 Interfaces . 39
5.3.5.3.3 Flow of information . 39
5.3.6 Use Case #2-6: Application Characteristic based Network Operation . 40
5.3.6.1 Use case context . 40
5.3.6.2 Description of the use case . 41
5.3.6.2.1 Overview . 41
ETSI
---------------------- Page: 4 ----------------------
5 ETSI GS ENI 001 V2.1.1 (2019-09)
5.3.6.2.2 Motivation . 41
5.3.6.2.3 Actors and Roles. 41
5.3.6.2.4 Initial context configuration . 42
5.3.6.2.5 Triggering conditions . 42
5.3.6.2.6 Operational flow of actions . 42
5.3.6.2.7 Post-conditions . 43
5.3.6.3 Mapping to ENI reference architecture . 43
5.3.6.3.1 Functional blocks. 43
5.3.6.3.2 Reference Point . 44
5.3.6.3.3 Flow of information . 44
5.3.7 Use Case #2-7: AI enabled network traffic classification . 45
5.3.7.1 Use case context . 45
5.3.7.2 Description of the use case . 46
5.3.7.2.1 Overview . 46
5.3.7.2.2 Motivation . 46
5.3.7.2.3 Actors and Roles. 47
5.3.7.2.4 Initial context configuration . 47
5.3.7.2.5 Triggering conditions . 47
5.3.7.2.6 Operational flow of actions . 47
5.3.7.2.7 Post-conditions . 48
5.3.7.3 Mapping to ENI reference architecture . 48
5.3.7.3.1 Functional blocks. 48
5.3.7.3.2 Interfaces . 49
5.3.7.3.3 Flow of information . 49
5.3.8 Use Case #2-8: Automatic service and resource design framework for cloud service . 51
5.3.8.1 Use case context . 51
5.3.8.2 Description of the use case . 51
5.3.8.2.1 Overview . 51
5.3.8.2.2 Motivation . 52
5.3.8.2.3 Actors and Roles. 53
5.3.8.2.4 Initial context configuration . 53
5.3.8.2.5 Triggering conditions . 53
5.3.8.2.6 Operational flow of actions . 53
5.3.8.2.7 Post-conditions . 54
5.3.9 Use Case #2-9: Intelligent time synchronization of network . 54
5.3.9.1 Use case context . 54
5.3.9.2 Description of the use case . 54
5.3.9.2.1 Overview . 54
5.3.9.2.2 Motivation . 55
5.3.9.2.3 Actors and Roles. 55
5.3.9.2.4 Initial context configuration . 56
5.3.9.2.5 Triggering conditions . 56
5.3.9.2.6 Operational flow of actions . 56
5.3.9.2.7 Post-conditions . 56
5.4 Service Orchestration and Management . 57
5.4.1 Use Case #3-1: Context-aware VoLTE Service Experience Optimization . 57
5.4.1.1 Use case context . 57
5.4.1.2 Description of the use case . 57
5.4.1.2.1 Overview . 57
5.4.1.2.2 Motivation . 57
5.4.1.2.3 Actors and Roles. 58
5.4.1.2.4 Initial context configuration . 58
5.4.1.2.5 Triggering conditions . 58
5.4.1.2.6 Operational flow of actions . 58
5.4.1.2.7 Post-conditions . 58
5.4.1.3 Mapping to ENI reference architecture . 58
5.4.1.3.1 Functional blocks.
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.