ETSI ES 202 336-1 V1.3.1 (2025-04)
Environmental Engineering (EE); Monitoring and Control Interface for Infrastructure Equipment (Power, Cooling and Building Environment Systems used in Telecommunication Networks) Part 1: Generic Interface
Environmental Engineering (EE); Monitoring and Control Interface for Infrastructure Equipment (Power, Cooling and Building Environment Systems used in Telecommunication Networks) Part 1: Generic Interface
RES/EE-02105
Okoljski inženiring (EE) - Nadzorovalni in krmilni vmesnik za infrastrukturno opremo (elektroenergetski, hladilni in stavbni okoljski sistemi v telekomunikacijskih omrežjih) - 1. del: Generični vmesnik
General Information
Buy Standard
Standards Content (Sample)
Final draft ETSI ES 202 336-1 V1.3.0 (2025-02)
ETSI STANDARD
Environmental Engineering (EE);
Monitoring and Control Interface for Infrastructure Equipment
(Power, Cooling and Building Environment Systems used in
Telecommunication Networks)
Part 1: Generic Interface
2 Final draft ETSI ES 202 336-1 V1.3.0 (2025-02)
Reference
RES/EE-02105
Keywords
control, interface, management, power, system
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE
Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16
Siret N° 348 623 562 00017 - APE 7112B
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° w061004871
Important notice
The present document can be downloaded from the
ETSI Search & Browse Standards application.
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the prevailing version of an ETSI
deliverable is the one made publicly available in PDF format on ETSI deliver repository.
Users should be aware that the present document may be revised or have its status changed,
this information is available in the Milestones listing.
If you find errors in the present document, please send your comments to
the relevant service listed under Committee Support Staff.
If you find a security vulnerability in the present document, please report it through our
Coordinated Vulnerability Disclosure (CVD) program.
Notice of disclaimer & limitation of liability
The information provided in the present deliverable is directed solely to professionals who have the appropriate degree of
experience to understand and interpret its content in accordance with generally accepted engineering or
other professional standard and applicable regulations.
No recommendation as to products and services or vendors is made or should be implied.
No representation or warranty is made that this deliverable is technically accurate or sufficient or conforms to any law
and/or governmental rule and/or regulation and further, no representation or warranty is made of merchantability or fitness
for any particular purpose or against infringement of intellectual property rights.
In no event shall ETSI be held liable for loss of profits or any other incidental or consequential damages.
Any software contained in this deliverable is provided "AS IS" with no warranties, express or implied, including but not
limited to, the warranties of merchantability, fitness for a particular purpose and non-infringement of intellectual property
rights and ETSI shall not be held liable in any event for any damages whatsoever (including, without limitation, damages
for loss of profits, business interruption, loss of information, or any other pecuniary loss) arising out of or related to the use
of or inability to use the software.
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and
microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.
© ETSI 2025.
All rights reserved.
ETSI
3 Final draft ETSI ES 202 336-1 V1.3.0 (2025-02)
Contents
Intellectual Property Rights . 7
Foreword . 7
Modal verbs terminology . 8
Executive summary . 8
Introduction . 8
1 Scope . 9
2 References . 9
2.1 Normative references . 9
2.2 Informative references . 10
3 Definition of terms, symbols and abbreviations . 12
3.1 Terms . 12
3.2 Symbols . 14
3.3 Abbreviations . 14
4 Monitoring and Control (M&C) overview . 16
4.0 General . 16
4.1 Infrastructure equipment management network general description . 17
4.2 Site Internal Communication Architecture . 18
4.3 Infrastructure Equipment Monitoring & Control management network example . 21
4.4 Infrastructure Equipment Monitoring & Control management scenario . 22
5 Infrastructure equipment monitoring & control management interface and network architecture . 25
5.0 General . 25
5.1 Distributed intelligence . 26
5.2 CU, DGU, LMA management interface . 26
5.3 Interface and protocol diversity . 26
5.4 Open interface and software . 28
5.5 Interface levels . 28
5.5.1 Alarm and state loops interface on CU or DGU output . 28
5.5.2 Low level protocol equipment CU mediation by DGU . 29
5.5.3 CU and DGU high level protocol interface . 29
5.6 Transport Control Layer . 30
5.7 Physical and network layer . 30
5.8 Network Management system upgrade . 30
6 Infrastructure equipment monitoring & control main goals . 31
6.1 Data in the infrastructure equipment monitoring & control network . 31
6.1.0 General . 31
6.1.1 Mandatory data in the infrastructure equipment monitoring & control network . 32
6.1.2 Optional data in the infrastructure equipment monitoring & control network . 33
6.3 High level application and data structure flexibility . 33
6.4 Data interface complexity and structure . 34
6.4.1 Information . 34
6.4.2 Status and event . 35
6.4.3 Alarm severity and event class . 35
7 Infrastructure equipment monitoring & control management typical content subsets . 35
7.0 General . 35
7.1 DC power system ETSI ES 202 336-2 . 38
7.2 AC UPS power system ETSI ES 202 336-3 . 38
7.3 AC distribution switchboard ETSI ES 202 336-4 . 38
7.4 AC diesel back-up generator ETSI ES 202 336-5 . 38
7.5 Thermal environment and cooling system ETSI ES 202 336-6 . 38
7.6 Other utilities system ETSI ES 202 336-7 . 38
7.7 Remote power feeding system ETSI ES 202 336-8 . 38
ETSI
4 Final draft ETSI ES 202 336-1 V1.3.0 (2025-02)
7.8 Alternative power systems ETSI ES 202 336-9 . 38
7.9 AC inverter power system ETSI ES 202 336-10 . 38
7.10 Battery system with integrated control and monitoring information model ETSI ES 202 336-11 . 38
7.11 ICT equipment power, energy, and environmental parameters monitoring information model ETSI
ES 202 336-12 . 38
8 Principle of Power, Energy, Environmental parameters (PEE) measurement . 39
8.0 General . 39
8.1 Power and energy consumption measurement . 39
8.2 Voltage, current measurement . 40
8.3 Accuracy of PEE measurement . 40
8.3.1 Electrical measurement accuracy . 40
8.3.2 Compatibility with IEC standard . 41
8.4 Local acquisition record . 42
8.5 Accuracy verification . 42
8.6 Data transmission period . 43
8.7 Local record saving . 43
9 Supervisor functions and performance . 43
9.0 General . 43
10 Data structure format for exchange between CU or DGU and LMA or RMA by infrastructure
equipment monitoring & control agent . 44
10.0 General . 44
10.1 Standard elements of any equipment, system or subsystem . 45
10.1.1 Standard elements .
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.