Smart Cards; Test specification for the Host Controller Interface (HCI); Part 3: Host Controller features (Release 13)

RTS/SCP-00HCIHvd00

General Information

Status
Published
Publication Date
25-Apr-2019
Technical Committee
Current Stage
12 - Completion
Due Date
23-Apr-2019
Completion Date
26-Apr-2019
Ref Project

Buy Standard

Standard
ETSI TS 102 695-3 V13.0.0 (2019-04) - Smart Cards; Test specification for the Host Controller Interface (HCI); Part 3: Host Controller features (Release 13)
English language
71 pages
sale 15% off
Preview
sale 15% off
Preview

Standards Content (Sample)

ETSI TS 102 695-3 V13.0.0 (2019-04)






TECHNICAL SPECIFICATION
Smart Cards;
Test specification for the Host Controller Interface (HCI);
Part 3: Host Controller features
(Release 13)

---------------------- Page: 1 ----------------------
Release 13 2 ETSI TS 102 695-3 V13.0.0 (2019-04)



Reference
RTS/SCP-00HCIHvd00
Keywords
smart card, terminal
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE

Tel.: +33 4 92 94 42 00  Fax: +33 4 93 65 47 16

Siret N° 348 623 562 00017 - NAF 742 C
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° 7803/88

Important notice
The present document can be downloaded from:
http://www.etsi.org/standards-search
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the prevailing version of an ETSI
deliverable is the one made publicly available in PDF format at www.etsi.org/deliver.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at
https://portal.etsi.org/TB/ETSIDeliverableStatus.aspx
If you find errors in the present document, please send your comment to one of the following services:
https://portal.etsi.org/People/CommiteeSupportStaff.aspx
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying
and microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.

© ETSI 2019.
All rights reserved.

TM TM TM
DECT , PLUGTESTS , UMTS and the ETSI logo are trademarks of ETSI registered for the benefit of its Members.
TM TM
3GPP and LTE are trademarks of ETSI registered for the benefit of its Members and
of the 3GPP Organizational Partners.
oneM2M™ logo is a trademark of ETSI registered for the benefit of its Members and
of the oneM2M Partners.
®
GSM and the GSM logo are trademarks registered and owned by the GSM Association.
ETSI

---------------------- Page: 2 ----------------------
Release 13 3 ETSI TS 102 695-3 V13.0.0 (2019-04)
Contents
Intellectual Property Rights . 8
Foreword . 8
Modal verbs terminology . 9
Introduction . 9
1 Scope . 10
2 References . 10
2.1 Normative references . 10
2.2 Informative references . 11
3 Definition of terms, symbols, abbreviations and formats . 11
3.1 Terms . 11
3.2 Symbols . 11
3.3 Abbreviations . 11
3.4 Formats . 12
3.4.1 Format of the table of optional features . 12
3.4.2 Format of the applicability table . 12
3.4.3 Status and Notations . 12
3.4.4 Format of the conformance requirements tables . 13
4 Test environment . 14
4.1 Table of optional features . 14
4.2 Applicability table . 15
4.3 Information to be provided by the device supplier . 17
4.4 Test equipment . 17
4.4.0 Base Requirements . 17
4.4.1 Measurement / setting uncertaintie s . 18
4.4.2 Default conditions for DUT operation . 18
4.4.2.1 General . 18
4.4.2.2 Status of UICC interfaces . 18
4.4.3 Minimum/maximum conditions for DUT operation . 18
4.4.4 Conventions . 18
4.5 Test execution . 18
4.5.1 Parameter variations . 18
4.5.2 Execution requirements . 18
4.6 Pass criterion . 19
4.6.0 Principle . 19
4.6.1 Unanticipated behaviour from the DUT . 19
5 Test cases . 19
5.1 HCI architecture . 19
5.1.1 Overview . 19
5.1.2 Hosts . 20
5.1.3 Gates . 20
5.1.3.1 Conformance requirements . 20
5.1.4 Pipes. 20
5.1.4.1 Conformance requirements . 20
5.1.5 Registries . 21
5.1.5.1 Conformance requirements . 21
5.2 HCP . 21
5.2.1 HCP packets. 21
5.2.1.1 Conformance requirements . 21
5.2.2 HCP message structure . 22
5.2.2.1 Conformance requirements . 22
5.2.3 Message fragmentation . 22
5.2.3.1 Conformance requirements . 22
5.3 Instructions . 22
ETSI

---------------------- Page: 3 ----------------------
Release 13 4 ETSI TS 102 695-3 V13.0.0 (2019-04)
5.3.1 Commands . 22
5.3.1.1 Overview . 22
5.3.1.1.1 Conformance requirements . 22
5.3.1.2 Generic commands . 23
5.3.1.2.1 ANY_SET_PARAMETER . 23
5.3.1.2.2 ANY_GET_PARAMETER. 24
5.3.1.2.3 ANY_OPEN_PIPE . 25
5.3.1.2.4 ANY_ CLOSE_P IP E . 26
5.3.1.3 Administration commands . 26
5.3.1.3.1 ADM_CREATE_PIPE . 26
5.3.1.3.2 ADM_NOTIFY_PIPE_CREATED . 27
5.3.1.3.3 ADM_DELETE_PIPE . 27
5.3.1.3.4 ADM_NOTIFY_PIPE_DELETED . 27
5.3.1.3.5 ADM_CLEAR_ALL_PIPE . 27
5.3.1.3.6 ADM_NOTIFY_ALL_PIPE_CLEARED . 28
5.3.2 Responses . 28
5.3.2.1 Conformance requirements . 28
5.3.2.2 Test case 1: responses received out of order, previous commands sent by host . 28
5.3.2.2.1 Test execution . 28
5.3.2.2.2 Initial conditions . 28
5.3.2.2.3 Test procedure . 28
5.3.2.3 Test case 2: responses received out of order, previous commands sent by host controller . 29
5.3.2.3.1 Test execution . 29
5.3.2.3.2 Initial conditions . 29
5.3.2.3.3 Test procedure . 29
5.3.3 Events . 29
5.3.3.1 Conformance requirements . 29
5.4 GATES and subclauses . 30
5.4.1 GATES . 30
5.4.1.1 Conformance requirements . 30
5.4.2 Management gates . 30
5.4.2.1 Administration gates . 30
5.4.2.1.1 Host controller administration gate . 30
5.4.2.1.2 Host administration gate . 31
5.4.2.2 Link management gate . 31
5.4.2.2.1 Host controller link management gate . 31
5.4.2.2.2 Host link management gate . 32
5.4.2.3 Identity management gate . 33
5.4.2.3.1 Local registry . 33
5.4.2.3.2 Remote registry . 34
5.4.2.4 Loop back gate . 35
5.4.2.4.1 Conformance requirements . 35
5.4.3 Generic gates . 35
5.5 HCI procedures . 35
5.5.1 Pipe management . 35
5.5.1.1 Pipe creation . 35
5.5.1.1.1 Conformance requirements . 35
5.5.1.1.2 Test case 1: valid pipe creation from host simulator to another host . 36
5.5.1.1.3 Test case 2: pipe creation from host simulator to another host, host simulator not in other
host's WHITELIST . 36
5.5.1.1.4 Test case 3: pipe creation from host simulator to another host, other host rejects pipe creation . 37
5.5.1.1.5 Test case 4: valid pipe creation from host controller to host simulator . 37
5.5.1.1.6 Test case 5: pipe creation from host simulator to host controller, pipe not supported by host
controller . 38
5.5.1.2 Pipe deletion . 38
5.5.1.2.1 Conformance requirements . 38
5.5.1.2.2 Test case 1: valid pipe deletion from host simulator to another host . 39
5.5.1.3 Clear all Pipes . 39
5.5.1.3.1 Conformance requirements . 39
5.5.1.3.2 Test case 1: clear all pipes from host controller - static pipes, dynamic pipes to host . 39
5.5.2 Registry access . 40
5.5.3 Host and Gate discovery . 40
ETSI

---------------------- Page: 4 ----------------------
Release 13 5 ETSI TS 102 695-3 V13.0.0 (2019-04)
5.5.4 Session initialization . 40
5.5.4.1 Conformance requirements . 40
5.5.5 Loop back testing . 41
5.5.5.1 Conformance requirements . 41
5.5.5.2 Test case 1: pipe creation . 41
5.5.5.2.1 Test execution . 41
5.5.5.2.2 Initial conditions . 41
5.5.5.2.3 Test procedure . 41
5.6 Contactless card emulation . 41
5.6.1 Overview . 41
5.6.1.1 Conformance requirements . 41
5.6.2 Void . 42
5.6.3 Gates . 42
5.6.3.1 Void. 42
5.6.3.2 Identity management gate . 42
5.6.3.2.1 Conformance requirements . 42
5.6.3.3 Card RF gates . 42
5.6.3.3.1 Overview . 42
5.6.3.3.2 Commands . 42
5.6.3.3.3 Events and subclauses . 42
5.6.3.3.4 Registry and subclauses . 43
5.6.3.4 Card application gates . 49
5.6.3.4.1 Overview . 49
5.6.3.4.2 Commands . 49
5.6.3.4.3 Events and subclauses . 49
5.6.3.4.4 Registry . 50
5.6.4 Procedures. 51
5.6.4.1 Use of contactless card application . 51
5.6.4.1.1 Conformance requirements . 51
5.6.4.2 Non ISO/IEC 14443-4 type A applications . 51
5.6.4.2.1 Conformance requirements . 51
5.6.4.3 Type B' RF technology . 52
5.6.4.3.1 Conformance requirements . 52
5.6.4.4 Type F RF technology . 52
5.6.4.4.1 Conformance requirements . 52
5.6.4.4.2 Test case 1: NFCIP-1 command is not forwarded to UICC . 53
5.6.4.5 Update RF technology settings . 54
5.6.4.5.1 Conformance requirements . 54
5.6.4.6 Identity check . 54
5.6.4.6.1 Conformance requirements . 54
5.7 Contactless reader. 54
5.7.1 Overview . 54
5.7.1.1 Conformance requirements . 54
5.7.2 Reader RF gates . 55
5.7.2.1 Overview . 55
5.7.2.2 Command . 55
5.7.2.2.1 WR_XCHG_DATA . 55
5.7.2.3 Registries . 56
5.7.2.3.1 Type A reader RF gate . 56
5.7.2.3.2 Type B reader RF gate . 57
5.7.2.4 Events and subclauses . 57
5.7.2.4.1 Events . 57
5.7.2.4.2 EVT_READER_REQUESTED . 58
5.7.2.4.3 EVT_END_OPERATION. 58
5.7.2.4.4 EVT_READER_STATUS . 58
5.7.2.5 Responses . 58
5.7.2.5.1 Conformance requirements . 58
5.7.3 Reader application gates . 59
5.7.3.1 Overview . 59
5.7.3.
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.