ETSI GS NFV-SOL 002 V3.5.1 (2021-07)
Network Functions Virtualisation (NFV) Release 3; Protocols and Data Models; RESTful protocols specification for the Ve-Vnfm Reference Point
Network Functions Virtualisation (NFV) Release 3; Protocols and Data Models; RESTful protocols specification for the Ve-Vnfm Reference Point
RGS/NFV-SOL002ed351
General Information
Standards Content (Sample)
ETSI GS NFV-SOL 002 V3.5.1 (2021-07)
GROUP SPECIFICATION
Network Functions Virtualisation (NFV) Release 3;
Protocols and Data Models;
RESTful protocols specification
for the Ve-Vnfm Reference Point
Disclaimer
The present document has been produced and approved by the Network Functions Virtualisation (NFV) ETSI Industry
Specification Group (ISG) and represents the views of those members who participated in this ISG.
It does not necessarily represent the views of the entire ETSI membership.
---------------------- Page: 1 ----------------------
2 ETSI GS NFV-SOL 002 V3.5.1 (2021-07)
Reference
RGS/NFV-SOL002ed351
Keywords
API, NFV, protocol
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE
Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16
Siret N° 348 623 562 00017 - APE 7112B
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° w061004871
Important notice
The present document can be downloaded from:
http://www.etsi.org/standards-search
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the prevailing version of an ETSI
deliverable is the one made publicly available in PDF format at www.etsi.org/deliver.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at
https://portal.etsi.org/TB/ETSIDeliverableStatus.aspx
If you find errors in the present document, please send your comment to one of the following services:
https://portal.etsi.org/People/CommiteeSupportStaff.aspx
Notice of disclaimer & limitation of liability
The information provided in the present deliverable is directed solely to professionals who have the appropriate degree of
experience to understand and interpret its content in accordance with generally accepted engineering or
other professional standard and applicable regulations.
No recommendation as to products and services or vendors is made or should be implied.
No representation or warranty is made that this deliverable is technically accurate or sufficient or conforms to any law
and/or governmental rule and/or regulation and further, no representation or warranty is made of merchantability or fitness
for any particular purpose or against infringement of intellectual property rights.
In no event shall ETSI be held liable for loss of profits or any other incidental or consequential damages.
Any software contained in this deliverable is provided "AS IS" with no warranties, express or implied, including but not
limited to, the warranties of merchantability, fitness for a particular purpose and non-infringement of intellectual property
rights and ETSI shall not be held liable in any event for any damages whatsoever (including, without limitation, damages
for loss of profits, business interruption, loss of information, or any other pecuniary loss) arising out of or related to the use
of or inability to use the software.
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and
microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.
© ETSI 2021.
All rights reserved.
ETSI
---------------------- Page: 2 ----------------------
3 ETSI GS NFV-SOL 002 V3.5.1 (2021-07)
Contents
Intellectual Property Rights . 16
Foreword . 16
Modal verbs terminology . 16
1 Scope . 17
2 References . 17
2.1 Normative references . 17
2.2 Informative references . 17
3 Definition of terms, symbols and abbreviations . 18
3.1 Terms . 18
3.2 Symbols . 18
3.3 Abbreviations . 18
4 General aspects . 19
4.1 Overview . 19
4.2 Void . 20
4.3 Void . 20
4.4 Common data types . 20
4.4.1 Structured data types . 20
4.4.1.1 Introduction . 20
4.4.1.2 Void. 20
4.4.1.3 Void. 20
4.4.1.3a Void. 20
4.4.1.4 Void. 20
4.4.1.5 Type: VnfInstanceSubscriptionFilter . 20
4.4.1.6 Void. 21
4.4.2 Simple data types and enumerations . 21
4.4.2.1 Introduction . 21
4.4.2.2 Simple data types . 21
4.4.2.3 Enumerations . 21
4.4.2.3.1 Introduction . 21
4.4.2.3.2 Enumeration: LcmCoordResultType . 21
4.5 Void . 22
4.6 Void . 22
4.7 Void . 22
5 VNF Lifecycle Management interface . 22
5.1 Description . 22
5.1a API version . 23
5.2 Resource structure and methods . 23
5.3 Sequence diagrams (informative) . 26
5.3.1 Flow of the creation of a VNF instance resource . 26
5.3.2 Flow of the deletion of a VNF instance resource . 26
5.3.3 Flow of VNF lifecycle management operations triggered by task resources . 27
5.3.4 Flow of automatic invocation of VNF scaling and VNF healing. 29
5.3.5 Flow of the Query VNF operation . 31
5.3.6 Flow of the Modify VNF Information operation . 32
5.3.7 Flow of the Get Operation Status operation . 33
5.3.8 Flow of managing subscriptions . 34
5.3.9 Flow of sending notifications. 36
5.3.10 Flow of retrying a VNF lifecycle management operation . 37
5.3.11 Flow of rolling back a VNF lifecycle management operation . 38
5.3.12 Flow of failing a VNF lifecycle management operation . 40
5.3.13 Flow of cancelling a VNF lifecycle management operation . 41
5.3.14 Flow of creation of a VNF snapshot resource . 43
5.3.15 Flow of the Query VNF Snapshot operation . 43
5.3.16 Flow of the deletion of a VNF snapshot resource . 44
ETSI
---------------------- Page: 3 ----------------------
4 ETSI GS NFV-SOL 002 V3.5.1 (2021-07)
5.4 Resources . 44
5.4.1 Introduction. 44
5.4.1.1 Overview . 44
5.4.1.2 Task resources that trigger VNF LCM operations . 45
5.4.1a Resource: API versions . 46
5.4.2 Resource: VNF instances . 46
5.4.2.1 Description . 46
5.4.2.2 Resource definition . 46
5.4.2.3 Resource methods . 47
5.4.2.3.1 POST . 47
5.4.2.3.2 GET . 48
5.4.2.3.3 PUT . 49
5.4.2.3.4 PATCH . 50
5.4.2.3.5 DELETE . 50
5.4.3 Resource: Individual VNF instance . 50
5.4.3.1 Description . 50
5.4.3.2 Resource definition . 50
5.4.3.3 Resource methods . 50
5.4.3.3.1 POST . 50
5.4.3.3.2 GET . 50
5.4.3.3.3 PUT . 51
5.4.3.3.4 PATCH . 51
5.4.3.3.5 DELETE . 52
5.4.4 Resource: Instantiate VNF task . 53
5.4.4.1 Description . 53
5.4.4.2 Resource definition . 53
5.4.4.3 Resource methods . 53
5.4.4.3.1 POST . 53
5.4.4.3.2 GET . 54
5.4.4.3.3 PUT . 54
5.4.4.3.4 PATCH . 55
5.4.4.3.5 DELETE . 55
5.4.5 Resource: Scale VNF task . 55
5.4.5.1 Description . 55
5.4.5.2 Resource definition . 55
5.4.5.3 Resource methods . 55
5.4.5.3.1 POST . 55
5.4.5.3.2 GET . 56
5.4.5.3.3 PUT . 56
5.4.5.3.4 PATCH . 56
5.4.5.3.5 DELETE . 57
5.4.6 Resource: Scale VNF to Level task . 57
5.4.6.1 Description . 57
5.4.6.2 Resource definition . 57
5.4.6.3 Resource methods . 57
5.4.6.3.1 POST . 57
5.4.6.3.2 GET . 58
5.4.6.3.3 PUT . 58
5.4.6.3.4 PATCH . 58
5.4.6.3.5 DELETE . 59
5.4.7 Resource: Change VNF Flavour task . 59
5.4.7.1 Description . 59
5.4.7.2 Resource definition . 59
5.4.7.3 Resource methods . 59
5.4.7.3.1 POST . 59
5.4.7.3.2 GET . 61
5.4.7.3.3 PUT . 61
5.4.7.3.4 PATCH . 61
5.4.7.3.5 DELETE . 61
5.4.8 Resource: Terminate VNF task . 61
5.4.8.1 Description . 61
5.4.8.2 Resource definition . 61
ETSI
---------------------- Page: 4 ----------------------
5 ETSI GS NFV-SOL 002 V3.5.1 (2021-07)
5.4.8.3 Resource methods . 62
5.4.8.3.1 POST . 62
5.4.8.3.2 GET . 63
5.4.8.3.3 PUT . 63
5.4.8.3.4 PATCH . 63
5.4.8.3.5 DELETE . 63
5.4.9 Resource: Heal VNF task . 63
5.4.9.1 Description . 63
5.4.9.2 Resource definition . 63
5.4.9.3 Resource methods . 63
5.4.9.3.1 POST . 63
5.4.9.3.2 GET . 64
5.4.9.3.3 PUT . 64
5.4.9.3.4 PATCH . 65
5.4.9.3.5 DELETE . 65
5.4.10 Resource: Operate VNF task . 65
5.4.10.1 Description . 65
5.4.10.2 Resource definition . 65
5.4.10.3 Resource methods . 66
5.4.10.3.1 POST . 66
5.4.10.3.2 GET . 67
5.4.10.3.3 PUT . 67
5.4.10.3.4 PATCH . 67
5.4.10.3.5 DELETE . 67
5.4.11 Resource: Change external VNF connectivity task . 67
5.4.11.1 Description . 67
5.4.11.2 Resource definition . 67
5.4.11.3 Resource methods . 68
5.4.11.3.1 POST . 68
5.4.11.3.2 GET . 68
5.4.11.3.3 PUT . 69
5.4.11.3.4 PATCH . 69
5.4.11.3.5 DELETE . 69
5.4.11a Resource: Change current VNF package task . 69
5.4.11a.1 Description . 69
5.4.11a.2 Resource definition . 70
5.4.11a.3 Resource methods . 70
5.4.11a.3.1 POST . 70
5.4.11a.3.2 GET . 72
5.4.11a.3.3 PUT . 72
5.4.11a.3.4 PATCH . 72
5.4.11a.3.5 DELETE . 72
5.4.12 Resource: VNF LCM operation occurrences . 73
5.4.12.1 Description . 73
5.4.12.2 Resource definition . 73
5.4.12.3 Resource methods .
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.