ETSI TS 136 523-2 V15.6.0 (2020-04)
LTE; Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Packet Core (EPC); User Equipment (UE) conformance specification; Part 2: Implementation Conformance Statement (ICS) proforma specification (3GPP TS 36.523-2 version 15.6.0 Release 15)
LTE; Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Packet Core (EPC); User Equipment (UE) conformance specification; Part 2: Implementation Conformance Statement (ICS) proforma specification (3GPP TS 36.523-2 version 15.6.0 Release 15)
RTS/TSGR-0536523-2vf60
General Information
Buy Standard
Standards Content (Sample)
ETSI TS 136 523-2 V15.6.0 (2020-04)
TECHNICAL SPECIFICATION
LTE;
Evolved Universal Terrestrial Radio Access (E-UTRA)
and Evolved Packet Core (EPC);
User Equipment (UE) conformance specification;
Part 2: Implementation Conformance Statement (ICS)
proforma specification
(3GPP TS 36.523-2 version 15.6.0 Release 15)
---------------------- Page: 1 ----------------------
3GPP TS 36.523-2 version 15.6.0 Release 15 1 ETSI TS 136 523-2 V15.6.0 (2020-04)
Reference
RTS/TSGR-0536523-2vf60
Keywords
LTE
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE
Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16
Siret N° 348 623 562 00017 - NAF 742 C
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° 7803/88
Important notice
The present document can be downloaded from:
http://www.etsi.org/standards-search
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the prevailing version of an ETSI
deliverable is the one made publicly available in PDF format at www.etsi.org/deliver.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at
https://portal.etsi.org/TB/ETSIDeliverableStatus.aspx
If you find errors in the present document, please send your comment to one of the following services:
https://portal.etsi.org/People/CommiteeSupportStaff.aspx
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying
and microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.
© ETSI 2020.
All rights reserved.
DECT™, PLUGTESTS™, UMTS™ and the ETSI logo are trademarks of ETSI registered for the benefit of its Members.
3GPP™ and LTE™ are trademarks of ETSI registered for the benefit of its Members and
of the 3GPP Organizational Partners.
oneM2M™ logo is a trademark of ETSI registered for the benefit of its Members and
of the oneM2M Partners.
®
GSM and the GSM logo are trademarks registered and owned by the GSM Association.
ETSI
---------------------- Page: 2 ----------------------
3GPP TS 36.523-2 version 15.6.0 Release 15 2 ETSI TS 136 523-2 V15.6.0 (2020-04)
Intellectual Property Rights
Essential patents
IPRs essential or potentially essential to normative deliverables may have been declared to ETSI. The information
pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found
in ETSI SR 000 314: "Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in
respect of ETSI standards", which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web
server (https://ipr.etsi.org/).
Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee
can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web
server) which are, or may be, or may become, essential to the present document.
Trademarks
The present document may include trademarks and/or tradenames which are asserted and/or registered by their owners.
ETSI claims no ownership of these except for any which are indicated as being the property of ETSI, and conveys no
right to use or reproduce any trademark and/or tradename. Mention of those trademarks in the present document does
not constitute an endorsement by ETSI of products, services or organizations associated with those trademarks.
Legal Notice
This Technical Specification (TS) has been produced by ETSI 3rd Generation Partnership Project (3GPP).
The present document may refer to technical specifications or reports using their 3GPP identities. These shall be
interpreted as being references to the corresponding ETSI deliverables.
The cross reference between 3GPP and ETSI identities can be found under http://webapp.etsi.org/key/queryform.asp.
Modal verbs terminology
In the present document "shall", "shall not", "should", "should not", "may", "need not", "will", "will not", "can" and
"cannot" are to be interpreted as described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of
provisions).
"must" and "must not" are NOT allowed in ETSI deliverables except when used in direct citation.
ETSI
---------------------- Page: 3 ----------------------
3GPP TS 36.523-2 version 15.6.0 Release 15 3 ETSI TS 136 523-2 V15.6.0 (2020-04)
Contents
Intellectual Property Rights . 2
Legal Notice . 2
Modal verbs terminology . 2
Foreword . 4
Introduction . 4
1 Scope . 5
2 References . 5
3 Definitions, symbols and abbreviations . 5
4 Recommended Test Case Applicability . 5
Annex A to B: Void . 6
Annex C (informative): Change history . 7
History . 29
ETSI
---------------------- Page: 4 ----------------------
3GPP TS 36.523-2 version 15.6.0 Release 15 4 ETSI TS 136 523-2 V15.6.0 (2020-04)
Foreword
rd
This Technical Specification has been produced by the 3 Generation Partnership Project (3GPP).
The contents of the present document are subject to continuing work within the TSG and may change following formal
TSG approval. Should the TSG modify the contents of the present document, it will be re-released by the TSG with an
identifying change of release date and an increase in version number as follows:
Version x.y.z
where:
x the first digit:
1 presented to TSG for information;
2 presented to TSG for approval;
3 or greater indicates TSG approved document under change control.
y the second digit is incremented for all changes of substance, i.e. technical enhancements, corrections,
updates, etc.
z the third digit is incremented when editorial only changes have been incorporated in the document.
Introduction
To evaluate conformance of a particular implementation, it is necessary to have a statement of which capabilities and
options have been implemented for a telecommunication specification. Such a statement is called an Implementation
Conformance Statement (ICS).
The present document is part 2 of a multi-part conformance test specification for User Equipment (UE).
3GPP TS 36.523-1 [19]: "Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Packet Core
(EPC); User Equipment (UE) conformance specification; Part 1: Protocol conformance specification".
3GPP TS 36.523-2: "Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Packet Core (EPC);
User Equipment (UE) conformance specification; Part 2: Implementation Conformance Statement (ICS)
proforma specification". (the present document)
3GPP TS 36.523-3 [20]: "Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Packet Core
(EPC); User Equipment (UE) conformance specification; Part 3: Abstract Test Suite (ATS)".
ETSI
---------------------- Page: 5 ----------------------
3GPP TS 36.523-2 version 15.6.0 Release 15 5 ETSI TS 136 523-2 V15.6.0 (2020-04)
1 Scope
rd
The present document provides the Implementation Conformance Statement (ICS) proforma for 3 Generation User
Equipment (UE), in compliance with the relevant EPS (E-UTRA/EPC) requirements, and in accordance with the
relevant guidance given in ISO/IEC 9646-1 [24] and ISO/IEC 9646-7 [25].
The present document also specifies a recommended applicability statement for the test cases included in TS 36.523-1
[19]. These applicability statements are based on the features implemented in the UE.
Special conformance testing functions can be found in TS 36.509 [6] and the common test environments are included in
3GPP TS 36.508 [18].
The present document is valid for UE complying with EPS (E-UTRA/EPC) and implemented according to 3GPP
releases starting from Release 8 up to the Release indicated on the cover page of the present document.
2 References
The following documents contain provisions which, through reference in this text, constitute provisions of the present
document.
• References are either specific (identified by date of publication, edition number, version number, etc.) or
non-specific.
• For a specific reference, subsequent revisions do not apply.
• For a non-specific reference, the latest version applies. In the case of a reference to a 3GPP document (including
a GSM document), a non-specific reference implicitly refers to the latest version of that document in the same
Release as the present document.
[1] to [55] (void)
[56] 3GPP TS 36.523-2 Release 16: "Evolved Universal Terrestrial Radio Access (E-UTRA) and
Evolved Packet Core (EPC); User Equipment (UE) conformance specification; Part 2:
Implementation Conformance Statement (ICS) proforma specification"
3 Definitions, symbols and abbreviations
Void
4 Recommended Test Case Applicability
The requirements of the present document are provided in 3GPP TS 36.523-2 Release 16 [56].
ETSI
---------------------- Page: 6 ----------------------
3GPP TS 36.523-2 version 15.6.0 Release 15 6 ETSI TS 136 523-2 V15.6.0 (2020-04)
Annex A to B: Void
ETSI
---------------------- Page: 7 ----------------------
3GPP TS 36.523-2 version 15.6.0 Release 15 7 ETSI TS 136 523-2 V15.6.0 (2020-04)
Annex C (informative):
Change history
ETSI
---------------------- Page: 8 ----------------------
3GPP TS 36.523-2 version 15.6.0 Release 15 8 ETSI TS 136 523-2 V15.6.0 (2020-04)
Date TSG # TSG Doc. CR R Subject/Comment Old New
e
v
2007-11 - - - - Initial version 0.0.1
2008-02 - - - - Addition applicability 6 new LTE RRC test cases. 0.0.1 0.1.0
2008-04 - - - - Editorial corrections 0.1.0 0.1.1
2008-05 - - - - Extend the Applicability table scope with additional information for 0.1.1 0.2.0
testing which may include:
- relevant per TC Specific PICS statements
- relevant per TC Specific PIXIT statements
Updated TC applicability with contributions to RAN5#39
2008-06 - - - - - Added TCs agreed at RAN5#39bis 0.2.0 0.3.0
- Updating TCs names, numbers, removed TCs deleted from the
TC list
- Editorial update
2008-09 RP-41 RP-080595 - - Submitted for information. 0.3.0 1.0.0
Update in accordance with RAN5#40 (Editorial update and input
from R5-083453, R5-083517, R5-083654)
2008-09 post - - - Update to reflect the agreed during the RAN5#40 extended e-mail 1.0.0 1.0.1
RAN5#40 agreement input:
- All agreed new TCs added
- One modified TCs title reflected
2008-10 post - - - - Added new agreed at RAN5#40bis TCs 1.0.1 1.1.0
RAN5#40 - Removed TCs that are removed from the LTE/SAE WP (R5-
bis 084008)
- Added TCs that exist as 80% completed in the LTE/SAE WP (R5-
084008) but do not exist in 36.523-2
- Modified agreed RAN5#40bis new TC numbers
- Updated TCs titles to match those in the LTE/SAE WP (R5-
084008)
2008-11 Post - - - R5-085361: 1.1.0 2.0.0
RAN5#41 - New TCs added to applicability table
- TCs titles updated
- TC 9.2.2.1.2 removed from applicability table
- Table for provision of test loops added
- Editorial changes
2008-12 RAN#42 RP-080860 Approval of version 2.0.0 at RAN#42, then put to version 8.0.0. 2.0.0 8.0.0
2008-01 Editorial corrections. 8.0.0 8.0.1
2009-03 RAN#43 R5-090101 0001 - Removal of reference to 11-bit Length Indicator in E-UTRA RLC 8.0.1 8.1.0
test cases
2009-03 RAN#43 R5-090292 0002 1 Applicability of new E-UTRA PDCP test case - 7.3.5.4 8.0.1 8.1.0
2009-03 RAN#43 R5-090569 0003 - Updating applicability table with input relevant to agreed at 8.0.1 8.1.0
RAN5#41bis 36.523-1 CRs
2009-03 RAN#43 R5-090668 0004 - Batch 1B - Applicability of new E-UTRA PDCP test cases 8.0.1 8.1.0
2009-03 RAN#43 R5-090737 0005 - Update of Applicability table for EPS mobility management test 8.0.1 8.1.0
cases
2009-03 RAN#43 R5-090738 0006 - Batch 1: Applicability for new MAC test cases 7.1.3.9 & 7.1.4.12 8.0.1 8.1.0
2009-03 RAN#43 R5-090751 0007 - Addition of Applicability new LTE test cases 8.0.1 8.1.0
2009-05 RAN#44 R5-092056 0008 GCF Priority 2 - Adding TC 9.1.2.5 to applicability 8.1.0 8.2.0
2009-05 RAN#44 R5-092091 0009 GCF Priority 2 - Addition of applicability statement for E-UTRAN 8.1.0 8.2.0
test case 6.1.2.7 for Cell reselection: Equivalent PLMN
2009-05 RAN#44 R5-092116 0010 GCF Priority 1 - Applicability of new E-UTRA MAC test cases 8.1.0 8.2.0
2009-05 RAN#44 R5-092117 0011 GCF Priority 1 - Proposal to remove E-UTRA RLC test case 8.1.0 8.2.0
7.2.3.19 (Part 2)
2009-05 RAN#44 R5-092207 0012 GCF Priority 2 - Addition of applicability for new EMM test case 8.1.0 8.2.0
2009-05 RAN#44 R5-092215 0013 GCF Priority 2 - Addition of applicability for new idle mode and 8.1.0 8.2.0
RRC test cases
2009-05 RAN#44 R5-092254 0014 Update of Applicability table for agreed EMM test cases in 8.1.0 8.2.0
RAN5#42bis
2009-05 RAN#44 R5-092255 0015 GCF Priority 2 - Applicability for new idle mode test cases 8.1.0 8.2.0
2009-05 RAN#44 R5-092279 0016 Addition of Applicability New LTE Test cases 8.1.0 8.2.0
2009-05 RAN#44 R5-092404 0017 GCF priority 2: Applicability statements for the new MAC DRX test 8.1.0 8.2.0
cases
2009-05 RAN#44 R5-092407 0018 GCF Priority 2 - Addition of applicability for UM RLC test case 8.1.0 8.2.0
7.2.2.11
2009-05 RAN#44 R5-092415 0019 GCF Priority 2: Applicability of new EMM test cases 8.1.0 8.2.0
2009-05 RAN#44 R5-092416 0020 GCF Priority 2: Applicability of new Cell Selection test cases 8.1.0 8.2.0
2009-05 RAN#44 R5-092424 0021 Addition of LTE Operating Band Capabilities for FDD Mode Test 8.1.0 8.2.0
frequencies
2009-05 RAN#44 R5-092432 0022 GCF Priority 2 - Addition of Applicability statement for MAC test 8.1.0 8.2.0
case 7.1.4.14
2009-05 RAN#44 R5-092433 0023 GCF Priority 2: Applicability of new Cell Reselection test cases 8.1.0 8.2.0
2009-05 RAN#44 R5-092448 0024 Update of Applicability for Feature Group Indicators 8.1.0 8.2.0
ETSI
---------------------- Page: 9 ----------------------
3GPP TS 36.523-2 version 15.6.0 Release 15 9 ETSI TS 136 523-2 V15.6.0 (2020-04)
Date TSG # TSG Doc. CR R Subject/Comment Old New
e
v
2009-05 RAN#44 R5-092450 0025 GCF Priority 1 - Update of applicability for RRC part 3 test cases 8.1.0 8.2.0
based on Feature Group Indicators
2009-05 RAN#44 R5-092508 0026 Missing applicability of EMM/ESM test cases 8.1.0 8.2.0
2009-05 RAN#44 R5-092509 0027 Applicability of new EMM & ESM test cases 8.1.0 8.2.0
2009-05 RAN#44 R5-092586 0028 GCF Priority 1 - Update of applicability for RLC test cases 8.1.0 8.2.0
2009-05 RAN#44 R5-092769 0029 GCF Priority 2 - Applicability of new RRC test case 8.3.2.6 8.1.0 8.2.0
2009-05 RAN#44 R5-092770 0030 GCF Priority 2 - Update of applicability for MAC test cases based 8.1.0 8.2.0
on Feature Group Indicators
2009-05 RAN#44 R5-092783 0031 Addition of applicability for new idle mode CSG test cases 8.1.0 8.2.0
2009-09 RAN#45 R5-094183 0032 - Missing TCs applicability in 36-523-2 8.2.0 8.3.0
2009-09 RAN#45 R5-094206 0033 - GCF Priority 3 - Remove RRC test case 8.1.3.3 applicability 8.2.0 8.3.0
2009-09 RAN#45 R5-094302 0034 1 Update of Feature Group Indicators 8.2.0 8.3.0
2009-09 RAN#45 R5-094404 0035 - GCF Priority 2 - Applicability Statement for 8.3.2.1 8.2.0 8.3.0
2009-09 RAN#45 R5-094535 0036 - Update of Applicability for PDCP tc based on FGI 8.2.0 8.3.0
2009-09 RAN#45 R5-094683 0037 - GCF Priority 2 - Update of applicability for RLC test case 7.2.2.11 8.2.0 8.3.0
2009-09 RAN#45 R5-094722 0038 - Correction of TC titles on RRC part 2 (8.2 RRC Connection 8.2.0 8.3.0
Reconfiguration)
2009-09 RAN#45 R5-094727 0039 1 Update of test case applicability for feature group indicators for 8.2.0 8.3.0
RRC part 2 (8.2 RRC Connection Reconfiguration)
2009-09 RAN#45 R5-095033 0040 - GCF Priority 2 - Addition of applicability for new SMS over SGs test 8.2.0 8.3.0
cases
2009-09 RAN#45 R5-095224 0041 1 GCF Priority 2 - Update of applicability for LTE-C2k interworking 8.2.0 8.3.0
test cases
2009-09 RAN#45 R5-095225 0042 1 Corrections to PICS for PS and CS registration and applicability of 8.2.0 8.3.0
EMM test cases
2009-09 RAN#45 R5-095226 0043 1 merge of 36.523-2 EMM CRs from RAN5#44 8.2.0 8.3.0
2009-09 RAN#45 R5-095229 0044 - Applicability for Idle Mode test cases 8.2.0 8.3.0
2009-11 GERAN GP-092406 0045 - Addition of new Test Case 6.2.3.21 8.3.0 8.4.0
#44
2009-12 RAN#46 R5-095479 0046 - Applicability of new TC 6.2.3.6 8.3.0 8.4.0
2009-12 RAN#46 R5-095480 0047 - Applicability of new/removed RRC Part 2 test cases 8.3.0 8.4.0
2009-12 RAN#46 R5-095483 0048 - Applicability of new ESM test cases 8.3.0 8.4.0
2009-12 RAN#46 R5-095526 0049 - GCF Priority 1 - Update of RLC test case applicability 8.3.0 8.4.0
2009-12 RAN#46 R5-095673 0050 - Applicability for new IDLE MODE test case 6.1.2.13 8.3.0 8.4.0
2009-12 RAN#46 R5-095797 0051 - Addition of applicability for new DSMIPv6 test cases 8.3.0 8.4.0
2009-12 RAN#46 R5-095989 0052 - Wrong reference in TC applicability condition C01 8.3.0 8.4.0
2009-12 RAN#46 R5-096064 0053 - GCF Priority 1 - Corrections to MAC test case applicability 8.3.0 8.4.0
2009-12 RAN#46 R5-096119 0054 2 Applicability for section 8.4 RRC Inter-RAT test cases NTT 8.3.0 8.4.0
DOCOMO
2009-12 RAN#46 R5-096134 0055 - GCF Priority 3 - Correction to E-UTRA DRB test case 12.3 8.3.0 8.4.0
2009-12 RAN#46 R5-096136 0056 - GCF Priority 3 - Applicability of new E-UTRA DRB test case 12.3 8.3.0 8.4.0
2009-12 RAN#46 R5-096659 0057 - GCF Priority 2 - Addition of applicability for new test case 11.1.4 8.3.0 8.4.0
2009-12 RAN#46 R5-096702 0058 - Add applicabilities for test case 8.1.3.7 and 8.5.2.1 8.3.0 8.4.0
2009-12 RAN#46 R5-096703 0059 - GCF Priority 3 - Add applicabilities for new test case 8.3.1.11 8.3.0 8.4.0
2009-12 RAN#46 R5-096704 0060 - Update of Applicability table for Multi-layer Procedure test cases 8.3.0 8.4.0
2009-12 RAN#46 R5-096705 0062 - EMM CRs from RAN5#45 8.3.0 8.4.0
2009-12 RAN#46 R5-096710 0061 - GCF Priority 3 - Addition of applicability for new LTE-C2k 8.3.0 8.4.0
interworking test cases
2010-03 RAN#47 R5-100080 0063 - Addition of applicability for new multi-layer test case 8.4.0 8.5.0
2010-03 RAN#47 R5-100179 0064 - Applicability for new EMM test case 9.2.1.2.14 8.4.0 8.5.0
2010-03 RAN#47 R5-100286 0065 - Update of Applicability table of TC 8.4.2.4 8.4.0 8.5.0
2010-03 RAN#47 R5-100333 0066 - Addition of TDD RF Baseline Implementation Capabilities 8.4.0 8.5.0
2010-03 RAN#47 R5-100479 0067 - Addition of applicability for new DSMIPv6 test cases 8.4.0 8.5.0
2010-03 RAN#47 R5-100498 0068 - GCF priority 3 - Applicability Statements for new PUSCH Hopping 8.4.0 8.5.0
test cases
2010-03 RAN#47 R5-100747 0069 - Adding PICS for UE UTRAN and GERAN types 8.4.0 8.5.0
2010-03 RAN#47 R5-101030 0070 - GCF Priority 3 - Adding TC 9-1-5-1 EMM Information Procedure 8.4.0 8.5.0
applicability
2010-03 RAN#47 R5-101143 0071 - Addition of applicability for new LTE-C2k interworking test cases 8.4.0 8.5.0
2010-03 RAN#47 R5-101193 0072 - GCF Priority 3 - Addition of applicability statement for E-UTRAN 8.4.0 8.5.0
test case 13.4.1.2
2010-03 RAN#47 R5-101194 0073 - Applicability of new RRC part 1 test case 8.4.0 8.5.0
2010-03 RAN#47 R5-101195 0074 - Correcting applicability and PICS for EMM test cases 8.4.0 8.5.0
2010-03 RAN#47 R5-101196 0075 - Removal of LTE test cases 9.3.1.2 and 10.5.2 8.4.0 8.5.0
2010-03 RAN#47 R5-101197 0076 - Corrections to applicability table to align to TS 36.523-1 8.4.0 8.5.0
2010-03 RAN#47 R5-101198 0077 - Correction of the Applicability of GCF Priority 2 NAS test case 8.4.0 8.5.0
9.2.2.1.1
2010-03 RAN#47 R5-101199 0078 - Update of applicability of ESM test cases 8.4.0 8.5.0
2010-03 RAN#47 RP-100116 0079 - Test Case titles alignment 8.4.0 8.5.0
ETSI
---------------------- Page: 10 ----------------------
3GPP TS 36.523-2 version 15.6.0 Release 15 10 ETSI TS 136 523-2 V15.6.0 (2020-04)
Date TSG # TSG Doc. CR R Subject/Comment Old New
e
v
2010-03 RAN#47 GP-100099 0064 - Addition of new Test Case 6.2.3.22 8.4.0 8.5.0
2010-03 RAN#47 - - - Moved to v9.0.0 with no change 8.5.0 9.0.0
2010-06 RAN#48 GP-100627 0080 Addition of new GELTE test cases 6.2.3.28 and 6.2.3.30 9.0.0 9.1.0
2010-06 RAN#48 GP-100674 0081 New test cases for GERAN to LTE added Part 2 9.0.0 9.1.0
2010-06 RAN#48 R5-103122 0082 - Adding band 20 and 21 to TS36.523-2 9.0.0 9.1.0
2010-06 RAN#48 R5-103146 0083 - GCF Priority 4 - Addition of applicability statement for E-UTRAN 9.0.0 9.1.0
test case 14.1 and 14.2
2010-06 RAN#48 R5-103246 0094 - Applicability of new TC 13.1.5 9.0.0 9.1.0
Note: This CR is wrongly identified on its cover page and in
RP-100510 as CR0802.
2010-06 RAN#48 R5-103270 0084 - Modification of applicability condition for UTRAN in 36.523-2 9.0.0 9.1.0
2010-06 RAN#48 R5-103314 0085 - GCF Priority 2 - Correction to applicability of test case 7.1.4.3 9.0.0 9.1.0
Note: This CR is wrongly identified on its cover page and in
RP-100510 as being to 34.123-2
2010-06 RAN#48 R5-103369 0086 - GCF Priority 1: Update of TC titles and formatting in applicability 9.0.0 9.1.0
table
2010-06 RAN#48 R5-103370 0087 - GCF Priority 3: New TC 9.3.1.6 applicability 9.0.0 9.1.0
2010-06 RAN#48 R5-103621 0088 - Correction for feature group indicators in Annex A.4.5 9.0.0 9.1.0
2010-06 RAN#48 R5-103874 0089 - GCF Priority 2: Update of EMM test case applicability using new 9.0.0 9.1.0
UE implementation capabilities to control UE attach type
2010-06 RAN#48 R5-103878 0090 - GCF Priority 3: Applicability statements for new P3&P4 TCs 9.0.0 9.1.0
2010-06 RAN#48 R5-103879 0091 - Applicability for GCF Priority test cases 9.2.1.1.4, 9.3.1.18, 13.1.8 9.0.0 9.1.0
2010-06 RAN#48 R5-103880 0092 - GCF priority 3 - Adding new 6.2.1 test cases to the applicability 9.0.0 9.1.0
table
2010-06 - - - - Adds note to the entry for CR0094 above. 9.1.0 9.1.1
2010-06 - - - - Adds note to the entry for CR0085 above. 9.1.1 9.1.2
2010-09 GERAN# GP-101176 0095 - CR 36.523-2-0095 6.2.3.19 : Redirection to E-UTRA upon the 9.1.2 9.2.0
47 release of the CS connection
2010-09 GERAN# GP-101178 0096 - CR 36.523-2-0096 6.2.3.20: Redirection to E-UTRA upon the 9.1.2 9.2.0
47 release of the CS connection and no suitable cell available
2010-09 GERAN# GP-101564 0097 - CR 36.523-2-0097 Addition of new GELTE test cases- 6.2.3.27 and 9.1.2 9.2.0
47 6.2.3.29
2010-09 GERAN# GP-101565 0098 - CR 36.523-2-0098 Adding TC 6.2.3.14 and 6.2.3.15 9.1.2 9.2.0
47
2010-09 RAN#49 R5-104068 0099 - Correction to test case applicability C41 9.1.2 9.2.0
2010-09 RAN#49 R5-104116 0100 - Addition of applicability for new EMM test case 9.1.2 9.2.0
2010-09 RAN#49 R5-104117 0101 - Update of applicability for EMM test case 9.2.1.1.4 9.1.2 9.2.0
2010-09 RAN#49 R5-104290 0102 - GCF Priority 4 - Addition of applicability statement for E-UTRAN 9.1.2 9.2.0
test case 14.3
2010-09 RAN#49 R5-104315 0103 - Add pics for IMS 9.1.2 9.2.0
2010-09 RAN#49 R5-104337 0104 - Applicability of new EMM TCs 9.1.2 9.2.0
2010-09 RAN#49 R5-104338 0105 - Applicability of new IDLE mode TCs 9.1.2 9.2.0
2010-09 RAN#49 R5-104339 0106 - Applicability of new RRC part 1 TCs 9.1.2 9.2.0
2010-09 RAN#49 R5-104391 0107 - Removal of applicability for DSMIPv6 test case 15.3 9.1.2 9.2.0
2010-09 RAN#49 R5-104540 0108 - Clarification of UE behaviour when a UTRAN or GERAN capable 9.1.2 9.2.0
UE is configured to initiate EPS attach
2010-09 RAN#49 R5-104636 0109 - Addition of applicability for new multi-layer test case 13.1.2 9.1.2 9.2.0
2010-09 RAN#49 R5-104638 0110 - Applicability for new test case 8.2.4.12 9.1.2 9.2.0
2010-09 RAN#49 R5-104641 0111 - Applicability for new emergency call TC 9.1.2 9.2.0
2010-09 RAN#49 R5-104642 0112 - Add capability for IMS emergency call 9.1.2 9.2.0
2010-09 RAN#49 R5-105029 0113 - Clarification to release column in tables A.4.3.1-1 and A.4.3.1-2 9.1.2 9.2.0
2010-09 RAN#49 R5-105036 0114 - Correction to test case applicability condition C59 9.1.2 9.2.0
2010-09 RAN#49 R5-105037 0115 - Correction to test case applicability condition for test case 9.3.1.16 9.1.2 9.2.0
2010-09 RAN#49 R5-105038 0116 - Correction to test case applicability for test cases 12.3.3 & 12.3.4 9.1.2 9.2.0
2010-09 RAN#49 R5-105042 0117 - Addition of some EMM TCs applicability to 36.523-2 9.1.2 9.2.0
2010-09 RAN#49 R5-105043 0118 - Corrections to applicability conditions C58 and C65 9.1.2 9.2.0
2010-09 RAN#49 R5-105044 0119 - GCF Priority X: Adding applicability of new ESM test case 10.9.1 9.1.2 9.2.0
for UE routing of uplinks packets
2010-09 RAN#49 R5-105045 0120 - Addition of applicability statement of new TC 6.3.3 9.1.2 9.2.0
2010-09 RAN#49 R5-105048 0121 - GCF Priority 2 - Addition of applicability statement for E-UTRAN 9.1.2 9.2.0
test case 6.2.3.4
2010-09 RAN#49 R5-105049 0122 - GCF Priority 2 - Correction of applicability statement for E-UTRAN 9.1.2 9.2.0
test case 8.1.3.7, 8.4.2.2 & 8.4.2.4
2010-09 RAN#49 R5-104766 0124 - GCF Priority 2 - Correction to EUTRA RRC Test Case 8.3.1.9 9.1.2 9.2.0
2010-09 RAN#49 R5-104775 0125 - Addition of applicabilities for new test cases 9.1.2 9.2.0
2010-09 RAN#49 R5-105039 0126 - GCF Priority 3 - Add Applicability for Multi-layer test case 13.1.4 9.1.2 9.2.0
2010-09 RAN#49 R5-105040 0127 - GCF Priority 3 - Add Applicability for EMM test case 9.2.2.1.3 9.1.2 9.2.0
2010-12 RAN#50 R5-106141 0132 - Applicability for RRC connection establishment of emergency call / 9.2.0 9.3.0
Limited Service
2010-12 RAN#50 R5-106142 0133 - Correct TC number emergency call 9.2.0 9.3.0
ETSI
---------------------- Page: 11 ----------------------
3GPP TS 36.523-2 version 15.6.0 Release 15 11 ETSI TS 136 523-2 V15.6.0 (2020-04)
Date TSG # TSG Doc. CR R Subject/Comment Old New
e
v
2010-12 RAN#50 R5-106184 0134 - GCF Priority 3 - Correction of applicability statement for E-UTRAN 9.2.0 9.3.0
test case 6.1.2.13
2010-12 RAN#50 R5-106185 0135 - Addition of applicability statement for E-UTRAN test case 6.2.3.31 9.2.0 9.3.0
2010-12 RAN#50 R5-106191 0136 - GCF Priority 1, P3 and P4 : Addition of new PICS to table A.4.4-1 9.2.0 9.3.0
2010-12 RAN#50 R5-106258 0137 - Applicability of new RRC part 1 TC 9.2.0 9.3.0
2010-12 RAN#50 R5-106259 0138 - Applicability of new Multilayer Procedures TC 9.2.0 9.3.0
2010-12 RAN#50 R5-106299 0139 - Addition of applicability for new idle mode test case on inter-freq 9.2.0 9.3.0
cell reselection based on CSG autonomous search
2010-12 RAN#50 R5-106359 0140 - Applicability for New TCs of cell reselection when 1xRTT is 9.2.0 9.3.0
higher/lower priority
2010-12 RAN#50 R5-106389 0141 - GCF Priority 4 - Add Applicability for PLMN selection test case 9.2.0 9.3.0
6.1.1.2
2010-12 RAN#50 R5-106467 0142 - Correction to applicability condition for test case 13.1.5 9.2.0 9.3.0
2010-12 RAN#50 R5-106554 0143 - CR to 36.523-2: Update Table A.4.3.1-2 for band 41 TDD LTE 9.2.0 9.3.0
2600MHz to RF baseline implementation capabilities.
2010-12 RAN#50 R5-106562 0144 - GCF Priority 2 – Addition of PICS statement related with UTRA 9.2.0 9.3.0
compressed mode
2010-12 RAN#50 R5-106639 0151 - GCF Priority 4 - Applicability of Section 6.3 TCs 9.2.0 9.3.0
2010-12 RAN#50 R5-106646 0145 - GCF priority x: Applicability for new test cases 9.2.1.2.1c and 9.2.0 9.3.0
9.2.3.2.1c
2010-12 RAN#50 R5-106663 0146 - Update of Applicability table for EMM test cases 9.2.0 9.3.0
2010-12 RAN#50 R5-106664 0147 - GCF Priority 3 - Correction to applicability condition C48 9.2.0 9.3.0
2010-12 RAN#50 R5-106668 0148 - GCF Priority 4 - Correction to the applicability for test case 8.1.7.3 9.2.0 9.3.0
2010-12 RAN#50 R5-106677 0149 - GCF Priority 3 - Add Applicability for EMM test case 9.2.3.2.13 9.2.0 9.3.0
2010-12 RAN#50 R5-106683 0150 - GCF Priority 3 - Addition of test case selection expression for test 9.2.0 9.3.0
case 9.2.3.3.4
2011-03 GERAN# GP-110022 0152 - CR 36.523-2-0152 New test cases 6.2.3.17 and 6.2.3.18 added 9.3.0 9.4.0
49 Part 2
2011-03 GERAN# GP-110045 0153 - CR 36.523-2-0153
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.