ETSI GS ENI 001 V3.2.1 (2023-05)
Experiential Networked Intelligence (ENI); ENI Use Cases
Experiential Networked Intelligence (ENI); ENI Use Cases
RGS/ENI-001v321_Use_cases
General Information
Standards Content (Sample)
ETSI GS ENI 001 V3.2.1 (2023-05)
GROUP SPECIFICATION
Experiential Networked Intelligence (ENI);
ENI Use Cases
Disclaimer
The present document has been produced and approved by the Experiential Networked Intelligence (ENI) ETSI Industry
Specification Group (ISG) and represents the views of those members who participated in this ISG.
It does not necessarily represent the views of the entire ETSI membership.
---------------------- Page: 1 ----------------------
2 ETSI GS ENI 001 V3.2.1 (2023-05)
Reference
RGS/ENI-001v321_Use_cases
Keywords
artificial intelligence, management, network,
use case
ETSI
650 Route des Lucioles
F-06921 Sophia Antipolis Cedex - FRANCE
Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16
Siret N° 348 623 562 00017 - APE 7112B
Association à but non lucratif enregistrée à la
Sous-Préfecture de Grasse (06) N° w061004871
Important notice
The present document can be downloaded from:
https://www.etsi.org/standards-search
The present document may be made available in electronic versions and/or in print. The content of any electronic and/or
print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any
existing or perceived difference in contents between such versions and/or in print, the prevailing version of an ETSI
deliverable is the one made publicly available in PDF format at www.etsi.org/deliver.
Users of the present document should be aware that the document may be subject to revision or change of status.
Information on the current status of this and other ETSI documents is available at
https://portal.etsi.org/TB/ETSIDeliverableStatus.aspx
If you find errors in the present document, please send your comment to one of the following services:
https://portal.etsi.org/People/CommiteeSupportStaff.aspx
If you find a security vulnerability in the present document, please report it through our
Coordinated Vulnerability Disclosure Program:
https://www.etsi.org/standards/coordinated-vulnerability-disclosure
Notice of disclaimer & limitation of liability
The information provided in the present deliverable is directed solely to professionals who have the appropriate degree of
experience to understand and interpret its content in accordance with generally accepted engineering or
other professional standard and applicable regulations.
No recommendation as to products and services or vendors is made or should be implied.
No representation or warranty is made that this deliverable is technically accurate or sufficient or conforms to any law
rule and/or regulation and further, no representation or warranty is made of merchantability or fitness
and/or governmental
for any particular purpose or against infringement of intellectual property rights.
In no event shall ETSI be held liable for loss of profits or any other incidental or consequential damages.
Any software contained in this deliverable is provided "AS IS" with no warranties, express or implied, including but not
limited to, the warranties of merchantability, fitness for a particular purpose and non-infringement of intellectual property
rights and ETSI shall not be held liable in any event for any damages whatsoever (including, without limitation, damages
for loss of profits, business interruption, loss of information, or any other pecuniary loss) arising out of or related to the use
of or inability to use the software.
Copyright Notification
No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and
microfilm except as authorized by written permission of ETSI.
The content of the PDF version shall not be modified without the written authorization of ETSI.
The copyright and the foregoing restriction extend to reproduction in all media.
© ETSI 2023.
All rights reserved.
ETSI
---------------------- Page: 2 ----------------------
3 ETSI GS ENI 001 V3.2.1 (2023-05)
Contents
Intellectual Property Rights . 9
Foreword . 9
Modal verbs terminology . 9
1 Scope . 10
2 References . 10
2.1 Normative references . 10
2.2 Informative references . 10
3 Definition of terms, symbols and abbreviations . 11
3.1 Terms . 11
3.2 Symbols . 11
3.3 Abbreviations . 11
4 Overview . 14
4.1 Background . 14
4.2 Overview of the ENI System . 14
4.2.1 Brief Description . 14
4.2.2 Expected Benefits . 15
5 Use cases . 16
5.1 Introduction . 16
5.2 Infrastructure Management . 17
5.2.1 Use Case #1-1: Policy-driven IDC Traffic Steering . 17
5.2.1.1 Use case context . 17
5.2.1.2 Description of the use case . 17
5.2.1.2.1 Overview . 17
5.2.1.2.2 Motivation . 18
5.2.1.2.3 Actors and Roles. 18
5.2.1.2.4 Initial context configuration . 19
5.2.1.2.5 Trigger conditions . 19
5.2.1.2.6 Operational Flow of the actions . 19
5.2.1.2.7 Post-conditions . 20
5.2.2 Use Case #1-2: Handling of Peak Planned Occurrences. 20
5.2.2.1 Use case context . 20
5.2.2.2 Description of the use case . 20
5.2.2.2.1 Overview . 20
5.2.2.2.2 Motivation . 21
5.2.2.2.3 Actors and Roles. 21
5.2.2.2.4 Initial context configuration . 21
5.2.2.2.5 Triggering conditions . 21
5.2.2.2.6 Operational flow of actions . 21
5.2.2.2.7 Post-conditions . 22
5.2.3 Use Case #1-3: Energy optimization using AI . 22
5.2.3.1 Use case context . 22
5.2.3.2 Description of the use case . 23
5.2.3.2.1 Overview . 23
5.2.3.2.2 Motivation . 23
5.2.3.2.3 Actors and Roles. 24
5.2.3.2.4 Initial context configuration . 24
5.2.3.2.5 Triggering conditions . 24
5.2.3.2.6 Operational flow of actions . 24
5.2.3.2.7 Post-conditions . 25
5.2.3.3 Mapping to ENI reference architecture . 25
5.2.3.3.1 Functional blocks. 25
5.2.3.3.2 Interfaces . 26
5.2.3.3.3 Flow of information . 26
5.2.4 Use Case #1-4: Intelligent Optimization for Transmission Network . 27
ETSI
---------------------- Page: 3 ----------------------
4 ETSI GS ENI 001 V3.2.1 (2023-05)
5.2.4.1 Use case context . 27
5.2.4.2 Description of the use case . 28
5.2.4.2.1 Overview . 28
5.2.4.2.2 Motivation . 28
5.2.4.2.3 Actors and Roles. 29
5.2.4.2.4 Initial context configuration . 29
5.2.4.2.5 Trigger conditions . 29
5.2.4.2.6 Operational Flow of the actions . 30
5.2.4.2.7 Post-conditions . 30
5.2.5 Use Case #1-5: Energy saving in radio network . 30
5.2.5.1 Use case context . 30
5.2.5.2 Description of the use case . 30
5.2.5.2.1 Overview . 30
5.2.5.2.2 Motivation . 31
5.2.5.2.3 Actors and Roles. 31
5.2.5.2.4 Initial context configuration . 31
5.2.5.2.5 Triggering conditions . 31
5.2.5.2.6 Operational flow of actions . 32
5.2.5.2.7 Post-conditions . 32
5.3 Network Operations . 32
5.3.1 Use Case #2-1: Policy-driven IP managed networks . 32
5.3.1.1 Use case context . 32
5.3.1.2 Description of the use case . 32
5.3.1.2.1 Overview . 32
5.3.1.2.2 Motivation . 32
5.3.1.2.3 Actors and Roles. 33
5.3.1.2.4 Initial context configuration . 33
5.3.1.2.5 Triggering conditions . 33
5.3.1.2.6 Operational flow of actions . 34
5.3.1.2.7 Post-conditions . 34
5.3.2 Use Case #2-2: Radio Coverage and capacity optimization . 34
5.3.2.1 Use case context . 34
5.3.2.2 Description of the use case . 35
5.3.2.2.1 Overview . 35
5.3.2.2.2 Motivation . 35
5.3.2.2.3 Actors and Roles. 35
5.3.2.2.4 Initial context configuration . 36
5.3.2.2.5 Triggering conditions . 36
5.3.2.2.6 Operational flow of actions . 36
5.3.2.2.7 Post-conditions . 36
5.3.2.3 Mapping to ENI reference architecture . 36
5.3.2.3.1 Functional blocks. 36
5.3.2.3.2 Interfaces . 37
5.3.2.3.3 Flow of information . 38
5.3.3 Use Case #2-3: Intelligent Software Rollouts . 39
5.3.3.1 Use Case context . 39
5.3.3.2 Description of the use case . 40
5.3.3.2.1 Overview . 40
5.3.3.2.2 Motivation . 40
5.3.3.2.3 Actors and Roles. 40
5.3.3.2.4 Initial context configuration . 41
5.3.3.2.5 Triggering conditions . 41
5.3.3.2.6 Operational flow of actions . 41
5.3.3.2.7 Post-conditions . 41
5.3.4 Use Case #2-4: Intelligent Fronthaul Management and Orchestration . 42
5.3.4.1 Use Case context . 42
5.3.4.2 Description of the use case . 42
5.3.4.2.1 Overview . 42
5.3.4.2.2 Motivation . 42
5.3.4.2.3 Actors and Roles. 43
5.3.4.2.4 Initial context configuration . 43
5.3.4.2.5 Triggering conditions . 43
ETSI
---------------------- Page: 4 ----------------------
5 ETSI GS ENI 001 V3.2.1 (2023-05)
5.3.4.2.6 Operational flow of actions . 43
5.3.4.2.7 Post-conditions . 44
5.3.5 Use Case #2-5: Elastic Resource Management and Orchestration . 44
5.3.5.1 Use case context . 44
5.3.5.2 Description of the use case . 44
5.3.5.2.1 Overview . 44
5.3.5.2.2 Motivation . 45
5.3.5.2.3 Actors and Roles. 45
5.3.5.2.4 Initial context configuration . 46
5.3.5.2.5 Triggering conditions . 46
5.3.5.2.6 Operational flow of actions . 46
5.3.5.2.7 Post-conditions . 47
5.3.5.3 Mapping to ENI reference architecture . 47
5.3.5.3.1 Functional blocks. 47
5.3.5.3.2 Interfaces . 48
5.3.5.3.3 Flow of information . 49
5.3.6 Use Case #2-6: Application Characteristic based Network Operation . 50
5.3.6.1 Use case context . 50
5.3.6.2 Description of the use case . 50
5.3.6.2.1 Overview . 50
5.3.6.2.2 Motivation . 51
5.3.6.2.3 Actors and Roles. 51
5.3.6.2.4 Initial context configuration . 51
5.3.6.2.5 Triggering conditions . 51
5.3.6.2.6 Operational flow of actions . 52
5.3.6.2.7 Post-conditions . 52
5.3.6.3 Mapping to ENI reference architecture . 53
5.3.6.3.1 Functional blocks. 53
5.3.6.3.2 Reference Point . 54
5.3.6.3.3 Flow of information . 55
5.3.7 Use Case #2-7: AI enabled network traffic classification . 56
5.3.7.1 Use case context . 56
5.3.7.2 Description of the use case . 57
5.3.7.2.1 Overview . 57
5.3.7.2.2 Motivation . 57
5.3.7.2.3 Actors and Roles. 58
5.3.7.2.4 Initial context configuration . 58
5.3.7.2.5 Triggering conditions . 58
5.3.7.2.6 Operational flow of actions . 58
5.3.7.2.7 Post-conditions . 59
5.3.7.3 Mapping to ENI reference architecture . 59
5.3.7.3.1 Functional blocks. 59
5.3.7.3.2 Interfaces . 61
5.3.7.3.3 Flow of information . 63
5.3.8 Use Case #2-8: Automatic service and resource design framework for cloud service . 66
5.3.8.1 Use case context . 66
5.3.8.2 Description of the use case . 67
5.3.8.2.1 Overview . 67
5.3.8.2.2 Motivation .
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.