Industrial communication networks - Profiles - Part 5-19: Installation of fieldbuses - Installation profiles for CPF 19

Industrielle Kommunikationsnetze - Profile - Teil 5-19: Feldbusinstallation - Installationsprofile für die Kommunikationsprofilfamilie 19

Réseaux de communication industriels - Profils - Partie 5-19: Installation des bus de terrain - Profils d'installation pour CPF 19

Industrijska komunikacijska omrežja - Profili - 5-19. del: Inštalacija procesnih vodil - Inštalacijski profili za CPF 19

General Information

Status
Not Published
Public Enquiry End Date
12-Jun-2022
Current Stage
4020 - Public enquire (PE) (Adopted Project)
Start Date
05-Apr-2022
Due Date
23-Aug-2022
Completion Date
13-Jun-2022

Relations

Buy Standard

Draft
prEN IEC 61784-5-19:2022 - BARVE
English language
73 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

SLOVENSKI STANDARD
oSIST prEN IEC 61784-5-19:2022
01-junij-2022
Industrijska komunikacijska omrežja - Profili - 5-19. del: Inštalacija procesnih vodil
- Inštalacijski profili za CPF 19
Industrial communication networks - Profiles - Part 5-19: Installation of fieldbuses -
Installation profiles for CPF 19
Industrielle Kommunikationsnetze - Profile - Teil 5-19: Feldbusinstallation -
Installationsprofile für die Kommunikationsprofilfamilie 19
Réseaux de communication industriels - Profils - Partie 5-19: Installation des bus de
terrain - Profils d'installation pour CPF 19
Ta slovenski standard je istoveten z: prEN IEC 61784-5-19:2022
ICS:
25.040.40 Merjenje in krmiljenje Industrial process
industrijskih postopkov measurement and control
35.100.40 Transportni sloj Transport layer
oSIST prEN IEC 61784-5-19:2022 en,fr,de
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------
oSIST prEN IEC 61784-5-19:2022

---------------------- Page: 2 ----------------------
oSIST prEN IEC 61784-5-19:2022
65C/1159/CDV

COMMITTEE DRAFT FOR VOTE (CDV)
PROJECT NUMBER:
IEC 61784-5-19 ED2
DATE OF CIRCULATION: CLOSING DATE FOR VOTING:
2022-03-25 2022-06-17
SUPERSEDES DOCUMENTS:
65C/1115/CD, 65C/1136/CC

IEC SC 65C : INDUSTRIAL NETWORKS
SECRETARIAT: SECRETARY:
France Ms Valérie DEMASSIEUX
OF INTEREST TO THE FOLLOWING COMMITTEES: PROPOSED HORIZONTAL STANDARD:

SC 22G,TC 57,SC 121A
Other TC/SCs are requested to indicate their interest, if any,
in this CDV to the secretary.
FUNCTIONS CONCERNED:
EMC ENVIRONMENT QUALITY ASSURANCE SAFETY
SUBMITTED FOR CENELEC PARALLEL VOTING NOT SUBMITTED FOR CENELEC PARALLEL VOTING
Attention IEC-CENELEC parallel voting
The attention of IEC National Committees, members of
CENELEC, is drawn to the fact that this Committee Draft for
Vote (CDV) is submitted for parallel voting.
The CENELEC members are invited to vote through the
CENELEC online voting system.

This document is still under study and subject to change. It should not be used for reference purposes.
Recipients of this document are invited to submit, with their comments, notification of any relevant patent rights of which they
are aware and to provide supporting documentation.

TITLE:
Industrial communication networks - Profiles - Part 5-19: Installation of fieldbuses - Installation profiles
for CPF 19

PROPOSED STABILITY DATE: 2028

NOTE FROM TC/SC OFFICERS:


Copyright © 2022 International Electrotechnical Commission, IEC. All rights reserved. It is permitted to download this
electronic file, to make a copy and to print out the content for the sole purpose of preparing National Committee positions.
You may not copy or "mirror" the file or printed version of the document, or any part of it, for any other purpose without
permission in writing from IEC.

---------------------- Page: 3 ----------------------
oSIST prEN IEC 61784-5-19:2022
– 2 – IEC CDV 61784-5-19 © IEC 2022
1 CONTENTS
2
3 FOREWORD . 7
4 INTRODUCTION . 9
5 1 Scope . 10
6 2 Normative references . 10
7 3 Terms, definitions and abbreviated terms . 10
8 4 CPF19: Overview of installation profiles . 11
9 5 Installation profile conventions . 11
10 6 Conformance to installation profiles . 12
11 Annex A (normative) CP 19/1 (MECHATROLINK-II) specific installation profile . 13
12 A.1 Installation profile scope . 13
13 A.2 Normative references . 13
14 A.3 Installation profile terms, definitions, and abbreviated terms . 13
15 A.3.1 Terms and definitions . 13
16 A.3.2 Abbreviated terms . 13
17 A.3.3 Conventions for installation profiles . 14
18 A.4 Installation planning . 14
19 A.4.1 General . 14
20 A.4.2 Planning requirements . 14
21 A.4.3 Network capabilities. 14
22 A.4.4 Selection and use of cabling components . 16
23 A.4.5 Cabling planning documentation . 23
24 A.4.6 Verification of cabling planning specification . 24
25 A.5 Installation implementation . 24
26 A.5.1 General requirements . 24
27 A.5.2 Cable installation . 24
28 A.5.3 Connector installation . 25
29 A.5.4 Terminator installation . 26
30 A.5.5 Device installation . 26
31 A.5.6 Coding and labelling . 26
32 A.5.7 Earthing and bonding of equipment and devices and shield cabling . 26
33 A.5.8 As-implemented cabling documentation . 27
34 A.6 Installation verification and installation acceptance test . 27
35 A.6.1 General . 27
36 A.6.2 Installation verification . 27
37 A.6.3 Installation acceptance test . 28
38 A.7 Installation administration . 29
39 A.8 Installation maintenance and installation troubleshooting . 29
40 Annex B (normative) CP 19/2 (MECHATROLINK-III) specific installation profile . 31
41 B.1 Installation profile scope . 31
42 B.2 Normative references . 31
43 B.3 Installation profile terms, definitions, and abbreviated terms . 31
44 B.3.1 Terms and definitions . 31
45 B.3.2 Abbreviated terms . 31
46 B.3.3 Conventions for installation profiles . 31

---------------------- Page: 4 ----------------------
oSIST prEN IEC 61784-5-19:2022
IEC CDV 61784-5-19 © IEC 2022 – 3 –
47 B.4 Installation planning . 31
48 B.4.1 General . 31
49 B.4.2 Planning requirements . 31
50 B.4.3 Network capabilities. 32
51 B.4.4 Selection and use of cabling components . 33
52 B.4.5 Cabling planning documentation . 37
53 B.4.6 Verification of cabling planning specification . 38
54 B.5 Installation implementation . 38
55 B.5.1 General requirements . 38
56 B.5.2 Cable installation . 38
57 B.5.3 Connector installation . 39
58 B.5.4 Terminator installation . 40
59 B.5.5 Device installation . 40
60 B.5.6 Coding and labelling . 40
61 B.5.7 Earthing and bonding of equipment and devices and shield cabling . 40
62 B.5.8 As-implemented cabling documentation . 40
63 B.6 Installation verification and installation acceptance test . 40
64 B.6.1 General . 40
65 B.6.2 Installation verification . 40
66 B.6.3 Installation acceptance test . 41
67 B.7 Installation administration . 42
68 B.8 Installation maintenance and installation troubleshooting . 42
69 Annex C (normative) CP19/3 (Σ-LINK II) specific installation profile . 43
70 C.1 Installation profile scope . 43
71 C.2 Normative references . 43
72 C.3 Installation profile terms, definitions, and abbreviated terms . 43
73 C.3.1 Terms and definitions . 43
74 C.3.2 Abbreviated terms . 43
75 C.3.3 Conventions for installation profiles . 43
76 C.4 Installation planning . 43
77 C.4.1 Introduction . 43
78 C.4.2 Planning requirements . 43
79 C.4.3 Network capabilities. 44
80 C.4.4 Selection and use of cabling components . 45
81 C.4.5 Cabling planning documentation . 56
82 C.4.6 Verification of cabling planning specification . 56
83 C.5 Installation implementation . 56
84 C.5.1 General requirements . 56
85 C.5.2 Cable installation . 56
86 C.5.3 Connector installation . 57
87 C.5.4 Terminator installation . 58
88 C.5.5 Device installation . 58
89 C.5.6 Coding and labelling . 58
90 C.5.7 Earthing and bonding of equipment and devices and shield cabling . 58
91 C.5.8 As-implemented cabling documentation . 58
92 C.6 Installation verification and installation acceptance test . 58
93 C.6.1 Introduction . 58
94 C.6.2 Installation verification . 58
95 C.6.3 Installation acceptance test . 60

---------------------- Page: 5 ----------------------
oSIST prEN IEC 61784-5-19:2022
– 4 – IEC CDV 61784-5-19 © IEC 2022
96 C.7 Installation administration . 60
97 C.8 Installation maintenance and installation troubleshooting . 60
98 Annex D (normative) CP 19/4 (MECHATROLINK-4) specific installation profile . 61
99 D.1 Installation profile scope . 61
100 D.2 Normative references . 61
101 D.3 Installation profile terms, definitions, and abbreviated terms . 61
102 D.3.1 Terms and definitions . 61
103 D.3.2 Abbreviated terms . 61
104 D.3.3 Conventions for installation profiles . 61
105 D.4 Installation planning . 61
106 D.4.1 Introduction . 61
107 D.4.2 Planning requirements . 61
108 D.4.3 Network capabilities. 62
109 D.4.4 Selection and use of cabling components . 63
110 D.4.5 Cabling planning documentation . 68
111 D.4.6 Verification of cabling planning specification . 68
112 D.5 Installation implementation . 68
113 D.5.1 General requirements . 68
114 D.5.2 Cable installation . 68
115 D.5.3 Connector installation . 69
116 D.5.4 Terminator installation . 70
117 D.5.5 Device installation . 70
118 D.5.6 Coding and labelling . 70
119 D.5.7 Earthing and bonding of equipment and devices and shield cabling . 71
120 D.5.8 As-implemented cabling documentation . 71
121 D.6 Installation verification and installation acceptance test . 71
122 D.6.1 Introduction . 71
123 D.6.2 Installation verification . 71
124 D.6.3 Installation acceptance test . 72
125 D.7 Installation administration . 72
126 D.8 Installation maintenance and installation troubleshooting . 72
127 Bibliography . 73
128
129 Figure 1 – Standards relationships . 9
130 Figure A.1 – Topology of CP 19/1 network . 15
131 Figure A.2 – Network expansion using repeater . 15
132 Figure A.3 – Structure of cable . 17
133 Figure A.4 – Dimensions of single port device connector . 19
134 Figure A.5 – Dimensions of dual ports device connector . 19
135 Figure A.6 – Dimensions of cable connector . 20
136 Figure A.7 – Cable connector with inductors . 20
137 Figure A.8 – Terminator connection in cable connector housing . 21
138 Figure A.9 – Wiring example . 25
139 Figure A.10 – Terminator installed in M-II cable connector . 26
140 Figure A.11 – Division of network segment by changing terminator location . 30
141 Figure C.1 – Topology of CP 19/3 combination of linear and T-branch network . 44
142 Figure C.2 – Topology of CP 19/3 network example with Power adaptor . 45

---------------------- Page: 6 ----------------------
oSIST prEN IEC 61784-5-19:2022
IEC CDV 61784-5-19 © IEC 2022 – 5 –
143 Figure C.3 – Structure of 6-conductor cable . 47
144 Figure C.4 – Structure of 8-conductor cable . 48
145 Figure C.5 – Connection for linear network . 48
146 Figure C.6 – Dimensions of device 6 pin connector . 49
147 Figure C.7 – Dimensions of device 6 pin connector . 50
148 Figure C.8 – Dimensions of device 6 pin connector . 50
149 Figure C.9 – Dimensions of device 8 pin male connector . 50
150 Figure C.10 – Dimensions of ejector for device 8 pin male connector . 51
151 Figure C.11 – Dimensions of device 8 pin female connector . 51
152 Figure C.12 – Dimensions of cable 6 pin male connector . 52
153 Figure C.13 – Dimensions of cable 6 pin female connector . 52
154 Figure C.14 – Dimensions of cable 8 pin male connector . 52
155 Figure C.15 – Dimensions of cable 8 pin female connector . 52
156
157 Table A.1 – Basic network characteristics for balanced cabling not based on Ethernet . 15
158 Table A.2 – Number of devices and maximum segment length . 16
159 Table A.3 – Information relevant to copper cable: fixed cables . 17
160 Table A.4 – Additional cable specifications . 17
161 Table A.5 – Connectors for copper cabling CPs not based on Ethernet . 18
162 Table A.6 – Parameters for balanced cables . 24
163 Table A.7 – Pin assignment and wire colour coding for CP 19/1 connector . 26
164 Table A.8 – Typical problems in a network with balanced cabling . 29
165 Table B.1 – Network characteristics for balanced cabling based on Ethernet . 33
166 Table B.2 – Information relevant to copper cable: fixed cables . 33
167 Table B.3 – Information relevant to copper cable: cords . 34
168 Table B.4 – Connectors for balanced cabling CPs based on Ethernet . 35
169 Table B.5 – Parameters for balanced cables . 38
170 Table B.6 – Pin assignment and wire colour coding for CP 19/2 modular and IMI
171 connector . 39
172 Table B.7 – Pin assignment and wire colour coding for CP 19/2 M12 connector . 39
173 Table C.1 – Basic network characteristics for balanced cabling not based on Ethernet . 45
174 Table C.2 – Information relevant to 6-conductor copper cable . 46
175 Table C.3 – Information relevant to 8-conductor copper cable . 46
176 Table C.4 – Additional cable specifications . 47
177 Table C.5 – Connectors for copper cabling CPs not based on Ethernet . 49
178 Table C.6 – Electric characteristics of 6pin connector . 53
179 Table C.7 – Electric characteristics of 8pin connector . 53
180 Table C.8 – Parameters for balanced cables . 56
181 Table C.9 – Pin assignment and wire colour coding for CP 19/3 6 pin connector . 57
182 Table C.10 – Pin assignment and wire colour coding for CP 19/3 8 pin connector . 58
183 Table D.1 – Network characteristics for balanced cabling based on Ethernet . 63
184 Table D.2 – Information relevant to copper cable: CP 19/4 type A fixed cables . 63
185 Table D.3 – Information relevant to copper cable: CP 19/4 type B fixed cables . 64

---------------------- Page: 7 ----------------------
oSIST prEN IEC 61784-5-19:2022
– 6 – IEC CDV 61784-5-19 © IEC 2022
186 Table D.4 – Information relevant to copper cable: CP 19/4 type A fixed cords . 64
187 Table D.5 – Information relevant to copper cable: CP 19/4 type B fixed cords . 64
188 Table D.6 – Connectors for balanced cabling CPs based on Ethernet . 65
189 Table D.7 – Parameters for balanced cables . 68
190 Table D.8 – Pin assignment and wire colour coding for CP 19/4 modular and IMI
191 connector . 70
192 Table D.9 – Pin assignment and wire colour coding for CP 19/4 M12-4 connector . 70
193 Table D.10 – Pin assignment and wire colour coding for CP 19/4 M12-8 connector . 70
194
195

---------------------- Page: 8 ----------------------
oSIST prEN IEC 61784-5-19:2022
IEC CDV 61784-5-19 © IEC 2022 – 7 –
196 INTERNATIONAL ELECTROTECHNICAL COMMISSION
197 ____________
198
199 INDUSTRIAL COMMUNICATION NETWORKS – PROFILES –
200
201 Part 5-19: Installation of fieldbuses – Installation profiles for CPF 19
202
203
204 FOREWORD
205 1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising
206 all national electrotechnical committees (IEC National Committees). The object of IEC is to promote
207 international co-operation on all questions concerning standardization in the electrical and electronic fields. To
208 this end and in addition to other activities, IEC publishes International Standards, Technical Specifications,
209 Technical Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC
210 Publication(s)”). Their preparation is entrusted to technical committees; any IEC National Committee interested
211 in the subject dealt with may participate in this preparatory work. International, governmental and non-
212 governmental organizations liaising with the IEC also participate in this preparation. IEC collaborates closely
213 with the International Organization for Standardization (ISO) in accordance with conditions determined by
214 agreement between the two organizations.
215 2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international
216 consensus of opinion on the relevant subjects since each technical committee has representation from all
217 interested IEC National Committees.
218 3) IEC Publications have the form of recommendations for international use and are accepted by IEC National
219 Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC
220 Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any
221 misinterpretation by any end user.
222 4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications
223 transparently to the maximum extent possible in their national and regional publications. Any divergence
224 between any IEC Publication and the corresponding national or regional publication shall be clearly indicated in
225 the latter.
226 5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity
227 assessment services and, in some areas, access to IEC marks of conformity. IEC is not responsible for any
228 services carried out by independent certification bodies.
229 6) All users should ensure that they have the latest edition of this publication.
230 7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and
231 members of its technical committees and IEC National Committees for any personal injury, property damage or
232 other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and
233 expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC
234 Publications.
235 8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is
236 indispensable for the correct application of this publication.
237 9) Attention is drawn to the possibility that some of the elements of this IEC Publication may be the subject of
238 patent rights. IEC shall not be held responsible for identifying any or all such patent rights.
239 IEC 61784-5-19 has been prepared by subcommittee 65C: Industrial networks, of IEC
240 technical committee 65: Industrial-process measurement, control and automation. It is an
241 International Standard.
242 This document is to be used in conjunction with IEC 61918:2018 and
243 IEC 61918:2018/AMD1:—.
244 This second edition cancels and replaces the first edition pub
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.