Digital cellular telecommunications system (Phase 2) (GSM); Mobile Station (MS) conformance specification; Part 2: Protocol Implementation Conformance Statement (PICS) proforma specification (GSM 11.10-2)

DE/SMG-071110P-2

Digitalni celični telekomunikacijski sistem (faza 2) – Specifikacija skladnosti za mobilne postaje (MS) – 2. del: Izjava o skladnosti izvedbe protokola (PICS) – Proforma specifikacija (GSM 11.10-2)

General Information

Status
Published
Publication Date
06-Oct-1996
Current Stage
12 - Completion
Due Date
20-Sep-1996
Completion Date
07-Oct-1996
Mandate

Buy Standard

Standard
ETS 300 607-2 E1:2003
English language
40 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.Digital cellular telecommunications system (Phase 2) (GSM); Mobile Station (MS) conformance specification; Part 2: Protocol Implementation Conformance Statement (PICS) proforma specification (GSM 11.10-2)33.070.50Globalni sistem za mobilno telekomunikacijo (GSM)Global System for Mobile Communication (GSM)ICS:Ta slovenski standard je istoveten z:ETS 300 607-2 Edition 1SIST ETS 300 607-2 E1:2003en01-december-2003SIST ETS 300 607-2 E1:2003SLOVENSKI
STANDARD



SIST ETS 300 607-2 E1:2003



EUROPEANETS 300 607-2TELECOMMUNICATIONOctober 1996STANDARDSource: ETSI TC-SMGReference: DE/SMG-071110P-2ICS:33.060.50Key words:Digital cellular telecommunications system, Global System for Mobile communications (GSM),ICS, PICSGLOBAL SYSTEM
FOR MOBILE COMMUNICATIONSRDigital cellular telecommunications system (Phase 2);Mobile Station (MS) conformance specification;Part 2: Protocol Implementation Conformance Statement (PICS)proforma specification(GSM 11.10-2)ETSIEuropean Telecommunications Standards InstituteETSI SecretariatPostal address: F-06921 Sophia Antipolis CEDEX - FRANCEOffice address: 650 Route des Lucioles - Sophia Antipolis - Valbonne - FRANCEX.400: c=fr, a=atlas, p=etsi, s=secretariat - Internet: secretariat@etsi.frTel.: +33 4 92 94 42 00 - Fax: +33 4 93 65 47 16Copyright Notification: No part may be reproduced except as authorized by written permission. The copyright and theforegoing restriction extend to reproduction in all media.© European Telecommunications Standards Institute 1996. All rights reserved.SIST ETS 300 607-2 E1:2003



Page 2ETS 300 607-2: October 1996 (GSM 11.10-2 Version 4.15.0)Whilst every care has been taken in the preparation and publication of this document, errors in content,typographical or otherwise, may occur. If you have comments concerning its accuracy, please write to"ETSI Editing and Committee Support Dept." at the address shown on the title page.SIST ETS 300 607-2 E1:2003



Page 3ETS 300 607-2: October 1996 (GSM 11.10-2 Version 4.15.0)ContentsForeword.5Introduction.51Scope.72Normative references.73Definitions and abbreviations.103.1Definitions.103.2Abbreviations.104Conformance to this PICS proforma specification.11Annex A (normative):PICS proforma for GSM phase 2 mobile stations.12A.1Guidance for completing the PICS proforma.12A.1.1Purposes and structure.12A.1.2Abbreviations and conventions.12A.1.3Instructions for completing the PICS proforma.14A.2Identification of the implementation.15A.2.1Date of the statement.15A.2.2Implementation Under Test (IUT) identification.15A.2.3System Under Test (SUT) identification.15A.2.4Product supplier.16A.2.5Client.17A.2.6PICS contact person.17A.3Identification of the protocol.18A.4PICS proforma tables.18A.4.1Global statement of conformance.18A.4.2Types of Mobile Stations.18A.4.3Mobile Station Features.19A.4.4Teleservices.20A.4.5Bearer Services.21A.4.6Supplementary Services.22A.4.7Bearer Capability Information.23A.4.8Additional Information.37History.40SIST ETS 300 607-2 E1:2003



Page 4ETS 300 607-2: October 1996 (GSM 11.10-2 Version 4.15.0)Blank pageSIST ETS 300 607-2 E1:2003



Page 5ETS 300 607-2: October 1996 (GSM 11.10-2 Version 4.15.0)ForewordThis European Telecommunication Standard (ETS) has been produced by the Special Mobile Group(SMG), Technical Committee of the European Telecommunications Standards Institute (ETSI).This ETS provides the Protocol Implementation Conformance Statement (PICS) proforma for MobileStations (MSs), operating in the 900 MHz and 1 800 MHz frequency band (GSM 900 and DCS 1 800)within the digital cellular telecommunications system (Phase 2).This ETS corresponds to GSM technical specification GSM 11.10-2 version 4.15.0.ETS 300 607 consists of three parts, which have the following ETS numbers and titles:ETS 300 607-1Digital cellular telecommunications system (Phase 2);Mobile Station (MS) conformance specification;Part 1: Conformance specificationReference: GSM 11.10-1.ETS 300 607-2Digital cellular telecommunications system (Phase 2);Mobile Station (MS) conformance specification;Part 2: Protocol Implementation Conformance Statement (PICS) proformaspecificationReference: GSM 11.10-2.ETS 300 607-3Digital cellular telecommunications system (Phase 1);Mobile Station (MS) conformance specification;Part 3: Layer 3 (L3) Abstract Test Suite (ATS)Reference: GSM 11.10-3.Transposition datesDate of adoption of this ETS:30 August 1996Date of latest announcement of this ETS (doa):31 January 1997Date of latest publication of new National Standardor endorsement of this ETS (dop/e):31 July 1997Date of withdrawal of any conflicting National Standard (dow):31 July 1997IntroductionTo evaluate conformance of a particular implementation, it is necessary to have a statement of whichcapabilities and options have been implemented for a telecommunication specification. Such a statementis called an Implementation Conformance Statement (ICS).SIST ETS 300 607-2 E1:2003



Page 6ETS 300 607-2: October 1996 (GSM 11.10-2 Version 4.15.0)Blank pageSIST ETS 300 607-2 E1:2003



Page 7ETS 300 607-2: October 1996 (GSM 11.10-2 Version 4.15.0)1ScopeThis European Telecommunication Standard (ETS) provides the Protocol Implementation ConformanceStatement (PICS) proforma for Global System for Mobile Stations (MSs), operating in the 900 MHz and1 800 MHz frequency band (GSM 900 and DCS 1 800) within the European digital cellulartelecommunications system (Phase 2), in compliance with the relevant requirements, and in accordancewith the relevant guidance given in ISO/IEC 9646-7 [3] and ETS 300 406 [1].2Normative referencesThis ETS incorporates by dated and undated reference, provisions from other publications. Thesenormative references are cited at the appropriate places in the text and the publications are listedhereafter. For dated references, subsequent amendments to or revisions of any of these publicationsapply to this ETS only when incorporated in it by amendment or revision. For undated references the latestedition of the publication referred to applies.[1]ETS 300 406 (January 1995): "Methods for testing and Specification (MTS);Protocol and profile conformance testing specifications; Standardizationmethodology".[2]ISO/IEC 9646-1 (1995): "Information technology - Open systems interconnection- Conformance testing methodology and framework - Part 1: General concepts".[3]ISO/IEC 9646-7 (1995): "Information technology - Open systems interconnection- Conformance testing methodology and framework - Part 7: ImplementationConformance Statements".[4]ETS 300 500 (GSM 02.01): "European digital cellular telecommunication system(Phase 2); Principles of telecommunication services supported by a GSM PublicLand Mobile Network (PLMN)".[5]ETS 300 501 (GSM 02.02 Version 4.2.2): "Digital cellular telecommunicationsystem (Phase 2); Bearer Services (BS) supported by a GSM Public LandMobile Network (PLMN)".[6]ETS 300 502 (GSM 02.03 Version 4.3.1): "Digital cellular telecommunicationsystem (Phase 2); Teleservices supported by a GSM Public Land MobileNetwork (PLMN)".[7]ETS 300 503 Edition 3 (GSM 02.04 Version 4.9.1): "Digital cellulartelecommunication system (Phase 2); General on supplementary services".[8]ETS 300 504 Edition 3 (GSM 02.06 Version 4.4.0): "Digital cellulartelecommunication system (Phase 2); Types of Mobile Stations (MS)".[9]ETS 300 505 Edition 2 (GSM 02.07 Version 4.7.0): "Digital cellulartelecommunication system (Phase 2); Mobile Station (MS) features".[10]ETS 300 506 (GSM 02.09 Version 4.3.0): "Digital cellular telecommunicationsystem (Phase 2); Security aspects".[11]ETS 300 507 Edition 4 (GSM 02.11 Version 4.9.0): "Digital cellulartelecommunication system (Phase 2);
Service accessibility".[12]ETS 300 508 Edition 2 (GSM 02.16 Version 4.5.0): "Digital cellulartelecommunication system (Phase 2);
International Mobile station EquipmentIdentities (IMEI)".[13]ETS 300 509 (GSM 02.17 Version 4.3.3): "Digital cellular telecommunicationsystem (Phase 2); Subscriber identity modules
Functional characteristics".SIST ETS 300 607-2 E1:2003



Page 8ETS 300 607-2: October 1996 (GSM 11.10-2 Version 4.15.0)[14]ETS 300 510 Edition 2 (GSM 02.24 Version 4.5.0): "Digital cellulartelecommunication system (Phase 2);
Description of Charge Advice Information(CAI)".[15]ETS 300 511 Edition 2 (GSM 02.30 Version 4.13.0): "Digital cellulartelecommunication system (Phase 2); Man-Machine Interface (MMI) of theMobile Station (MS)".[16]ETS 300 512 Edition 2 (GSM 02.40 Version 4.5.0): "Digital cellulartelecommunication system (Phase 2); Procedures for call progress indications".[17]ETS 300 513 (GSM 02.41 Version 4.5.2): "Digital cellular telecommunicationsystem (Phase 2);
Operator determined barring".[18]ETS 300 514 Edition 2 (GSM 02.81 Version 4.5.1): "Digital cellulartelecommunication system (Phase 2); Line identification supplementary services- Stage 1".[19]ETS 300 515 Edition 2 (GSM 02.82 Version 4.5.2): "Digital cellulartelecommunication system (Phase 2); Call Forwarding (CF) supplementaryservices - Stage 1".[20]ETS 300 516 Edition 2 (GSM 02.83 Version 4.6.7): "Digital cellulartelecommunication system (Phase 2); Call Waiting (CW) and Call Hold (HOLD)supplementary services - Stage 1".[21]ETS 300 517 Edition 2 (GSM 02.84 Version 4.4.7): "Digital cellulartelecommunication system (Phase 2); MultiParty (MPTY) supplementaryservices - Stage 1".[22]ETS 300 518 Edition 2 (GSM 02.85 Version 4.2.6): "Digital cellulartelecommunication system (Phase 2); Closed User Group (CUG) supplementaryservices - Stage 1".[23]ETS 300 519 Edition 2 (GSM 02.86 Version 4.1.5): "Digital cellulartelecommunication system (Phase 2); Advice of charge (AoC) supplementaryservices - Stage 1".[24]ETS 300 536 Edition 4 (GSM 03.40 Version 4.13.0): "Digital cellulartelecommunication system (Phase 2); Technical realization of the ShortMessage Service (SMS) Point to Point (PP)".[25]ETS 300 537 Edition 2 (GSM 03.41 Version 4.11.0): "Digital cellulartelecommunication system (Phase 2); Technical realization of Short MessageService Cell Broadcast (SMSCB)".[26]ETS 300 538 Edition 2 (GSM 03.45 Version 4.5.0): "Digital cellulartelecommunication system (Phase 2); Technical realization of facsimile group 3transparent".[27]ETS 300 539 (GSM 03.46 Version 4.1.2): "Digital cellular telecommunicationsystem (Phase 2); Technical realization of facsimile group 3 non-transparent".[28]ETS 300 551 (GSM 04.02 Version 4.0.4): "Digital cellular telecommunicationsystem (Phase 2); GSM Public Land Mobile Network (PLMN) access referenceconfiguration".[29]ETS 300 553 (GSM 04.04 Version 4.0.4): "Digital cellular telecommunicationsystem (Phase 2); layer 1
General requirements".[30]ETS 300 554 (GSM 04.05 Version 4.0.3): "Digital cellular telecommunicationsystem (Phase 2); Data Link (DL) layer
General aspects".SIST ETS 300 607-2 E1:2003



Page 9ETS 300 607-2: October 1996 (GSM 11.10-2 Version 4.15.0)[31]ETS 300 555 (GSM 04.06 Version 4.4.0): "Digital cellular telecommunicationsystem (Phase 2); Mobile Station - Base Station System (MS - BSS) interfaceData Link (DL) layer specification".[32]ETS 300 556 (GSM 04.07 Version 4.3.1): "Digital cellular telecommunicationsystem (Phase 2); Mobile radio interface signalling layer 3
General aspects".[33]ETS 300 557 Edition 6 (GSM 04.08 Version 4.15.0): "Digital cellulartelecommunication system (Phase 2); Mobile radio interface layer 3specification".[34]ETS 300 558 Edition 2 (GSM 04.10 Version 4.10.0): "Digital cellulartelecommunication system (Phase 2); Mobile radio interface layer 3Supplementary services specification
General aspects".[35]ETS 300 559 Edition 4 (GSM 04.11 Version 4.10.0): "Digital cellulartelecommunication system (Phase 2); Point-to-Point (PP) Short MessageService (SMS) support on mobile radio interface".[36]ETS 300 560 Edition 3 (GSM 04.12 Version 4.6.0): "Digital cellulartelecommunication system (Phase 2); Short Message Service Cell Broadcast(SMSCB) support on the mobile radio interface".[37]ETS 300 561 Edition 3 (GSM 04.13 Version 4.2.0): "Digital cellulartelecommunication system (Phase 2); Performance requirements on mobileradio interface".[38]ETS 300 562 Edition 3 (GSM 04.21 Version 4.6.0): "Digital cellulartelecommunication system (Phase 2); Rate adaption on the Mobile Station -Base Station System (MS - BSS) interface".[39]ETS 300 563 (GSM 04.22 Version 4.4.0): "Digital cellular telecommunicationsystem (Phase 2); Radio Link Protocol (RLP) for data and telematic services onthe Mobile Station - Base Station System (MS - BSS) interface and the BaseStation System - Mobile-services Switching Centre (BSS - MSC) interface".[40]ETS 300 564 Edition 3 (GSM 04.80 Version 4.11.0): "Digital cellulartelecommunication system (Phase 2); Mobile radio interface layer 3supplementary services specification
Formats and coding".[41]ETS 300 565 (GSM 04.81 Version 4.4.1): "Digital cellular telecommunicationsystem (Phase 2); Line identification supplementary services - Stage 3".[42]ETS 300 566 Edition 2 (GSM 04.82 Version 4.9.0): "Digital cellulartelecommunication system (Phase 2); Call Forwarding (CF) supplementaryservices - Stage 3".[43]ETS 300 567 Edition 2 (GSM 04.83 Version 4.6.0): "Digital cellulartelecommunication system (Phase 2); Call Waiting (CW) and Call Hold (HOLD)supplementary services - Stage 3".[44]ETS 300 568 (GSM 04.84 Version 4.3.2): "Digital cellular telecommunicationsystem (Phase 2); MultiParty (MPTY) supplementary services - Stage 3".[45]ETS 300 569 Edition 2 (GSM 04.85 Version 4.1.0): "Digital cellulartelecommunication system (Phase 2); Closed User Group (CUG) supplementaryservices - Stage 3".[46]ETS 300 570 (GSM 04.86 Version 4.5.2): "Digital cellular telecommunicationsystem (Phase 2); Advice of Charge (AoC) supplementary services - Stage 3".SIST ETS 300 607-2 E1:2003



Page 10ETS 300 607-2: October 1996 (GSM 11.10-2 Version 4.15.0)[47]ETS 300 571 Edition 2 (GSM 04.88 Version 4.7.0): "Digital cellulartelecommunication system (Phase 2); Call Barring (CB) supplementary services- Stage 3".[48]ETS 300 572 (GSM 04.90 Version 4.1.1): "Digital cellular telecommunicationsystem (Phase 2); Unstructured supplementary services operation - Stage 3".[49]ETS 300 573 Edition 4 (GSM 05.01 Version 4.6.0): "Digital cellulartelecommunication system (Phase 2); Physical layer on the radio path
Generaldescription".[50]ETS 300 574 Edition 4 (GSM 05.02 Version 4.7.0): "Digital cellulartelecommunication system (Phase 2); Multiplexing and multiple access on theradio path".[51]ETS 300 575 Edition 2 and Am1 (GSM 05.03 Version 4.3.0): "Digital cellulartelecommunication system (Phase 2); Channel coding".[52]ETS 300 576 (GSM 05.04 Version 4.0.3): "Digital cellular telecommunicationsystem (Phase 2); Modulation".[53]ETS 300 577 Edition 7 (GSM 05.05 Version 4.15.0): "Digital cellulartelecommunication system (Phase 2); Radio transmission and reception".[54]ETS 300 578 Edition 7 (GSM 05.08 Version 4.17.0): "Digital cellulartelecommunication system (Phase 2); Radio subsystem link control".[55]ETS 300 579 Edition 6 (GSM 05.10 Version 4.9.0): "Digital cellulartelecommunication system (Phase 2); Radio subsystem synchronisation".[56]ETS 300 582 Edition 4 (GSM 07.01 Version 4.10.0): "Digital cellulartelecommunication system (Phase 2); General on Terminal AdaptationFunctions (TAF) for Mobile Stations (MS)".3Definitions and abbreviations3.1DefinitionsFor the purposes of this ETS, the following definitions apply:-terms defined in the relevant GSM specifications (see normative references);-terms defined in ISO/IEC 9646-1 [2] and in ISO/IEC 9646-7 [3].In particular, the following terms defined in ISO/IEC 9646-1 [2] apply:Implementation Conformance Statement (ICS): A statement made by the supplier of an implementationor system claimed to conform to a given specification, stating which capabilities have been implemented.The ICS can take several forms: protocol ICS, profile ICS, profile specific ICS, information object ICS, etc.ICS proforma: A document, in the form of a questionnaire, which when completed for an implementationor system becomes an ICS.Protocol ICS (PICS): An ICS for an implementation or system claimed to conform to a given protocolspecification.3.2AbbreviationsFor the purposes of this ETS, the following abbreviations apply:ICSImplementation Conformance StatementIUTImplementation Under TestPICSProtocol Implementation Conformance StatementSIST ETS 300 607-2 E1:2003



Page 11ETS 300 607-2: October 1996 (GSM 11.10-2 Version 4.15.0)SCSSystem Conformance StatementSUTSystem Under Test4Conformance to this PICS proforma specificationIf it claims to conform to this ETS, the actual PICS proforma to be filled in by a supplier shall be technicallyequivalent to the text of the PICS proforma given in annex A, and shall preserve the numbering/namingand ordering of the proforma items.An PICS which conforms to this ETS shall be a conforming PICS proforma completed in accordance withthe instructions for completion given in clause A.1.SIST ETS 300 607-2 E1:2003



Page 12ETS 300 607-2: October 1996 (GSM 11.10-2 Version 4.15.0)Annex A (normative):PICS proforma for GSM phase 2 mobile stationsNotwithstanding the provisions of the copyright clause related to the text of this ETS, ETSI grants thatusers of this ETS may freely reproduce the PICS proforma in this annex so that it can be used for itsintended purposes and may further publish the completed PICS.A.1Guidance for completing the PICS proformaA.1.1Purposes and structureThe purpose of this PICS proforma is to provide a mechanism whereby a supplier of an implementation ofthe requirements defined in relevant specifications may provide information about the implementation in astandardized manner.The PICS proforma is subdivided into subclauses for the following categories of information:-instructions for completing the PICS proforma;-identification of the implementation;-identification of the protocol;-PICS proforma tables;-global statement of conformance;-types of mobile stations;-support of basic services;-support of supplementary services;-mobile station features;-additional information;A.1.2Abbreviations and conventionsThe PICS proforma contained in this annex is comprised of information in tabular form in accordance withthe guidelines presented in ISO/IEC 9646-7 [3].Item columnThe item column contains a number which identifies the item in the table.Item description columnThe item description column describes in free text each respective item (e.g. parameters, timers, etc.). Itimplicitly means "is supported by the implementation?".Status columnThe following notations, defined in ISO/IEC 9646-7 [3], are used for the status column:Mmandatory - the capability is required to be supported.Ooptional - the capability may be supported or not.N/Anot applicable - in the given context, it is impossible to use the capability.Xprohibited (excluded) - there is a requirement not to use this capability in thegiven context.O.iqualified optional - for mutually exclusive or selectable options from a set. "i" isan integer which identifies an unique group of related optional items and thelogic of their selection which is defined immediately following the table.SIST ETS 300 607-2 E1:2003



Page 13ETS 300 607-2: October 1996 (GSM 11.10-2 Version 4.15.0)Ciconditional - the requirement on the capability ("M", "O", "X" or "N/A") dependson the support of other optional or conditional items. "i" is an integer identifyingan unique conditional status expression which is defined immediately followingthe table. For nested conditional expressions, the syntax "IF . THEN (IF .THEN . ELSE.) ELSE ." shall be used to avoid ambiguities.Reference columnThe reference column gives reference to the relevant GSM specifications.Support columnThe support column shall be filled in by the supplier of the implementation. The following commonnotations, defined in ISO/IEC 9646-7 [3], are used for the support column:Y or ysupported by the implementationN or nnot supported by the implementationN/A, n/a or - no answer required (allowed only if the status is N/A, directly or after evaluationof a conditional status)It is also possible to provide a comment to an answer in the space provided at the bottom of the table.NOTE:As stated in ISO/IEC 9646-7 [3], support for a PDU requires the ability to parse all validparameters of that PDU. Supporting a PDU while having no ability to parse a validparameter is non-conformant. Support for a parameter on a PDU means that thesemantics of that parameter are supported.Values allowed columnThe values allowed column contains the values or the ranges of values allowed.Values supported columnThe values supported column shall be filled in by the supplier of the implementation. In this column, thevalues or the ranges of values supported by the implementation shall be indicated.Mnemonic columnThe Mnemonic column contains mnemonic identifiers for each item.References to itemsFor each possible item answer (answer in the support column) within the PICS proforma there exists aunique reference, used, for example, in the conditional expressions. It is defined as the table identifier,followed by a solidus character "/", followed by the item number in the table. If there is more than onesupport column in a table, the columns shall be discriminated by letters (a, b, etc.), respectively.EXAMPLE 1:A.5/4 is the reference to the answer of item 4 in table A.5.EXAMPLE 2:A.6/3b is the reference to the second answer (i.e. in the second support column)of item 3 in table A.6.Prerequisite lineA prerequisite line takes the form: Prerequisite: .A prerequisite line after a clause or table title indicates that the whole clause or the whole table is notrequired to be completed if the predicate is FALSE.SIST ETS 300 607-2 E1:2003



Page 14ETS 300 607-2: October 1996 (GSM 11.10-2 Version 4.15.0)A.1.3Instructions for completing the PICS proformaThe supplier of the implementation shall complete the PICS proforma in each of the spaces provided.More detailed instructions are given at the beginning of the different subclauses of the PICS proforma.SIST ETS 300 607-2 E1:2003



Page 15ETS 300 607-2: October 1996 (GSM 11.10-2 Version 4.15.0)A.2Identification of the implementationIdentification of the Implementation Under Test (IUT) and the system in which it resides (the SystemUnder Test (SUT)) should be filled in so as to provide as much detail as possible regarding versionnumbers and configuration options.The product supplier information and client information should both be filled in if they are different.A person who can answer queries regarding information supplied in the PICS should be named as thecontact person.A.2.1Date of the statement.A.2.2Implementation Under Test (IUT) identificationIUT name:.IUT version:.A.2.3System Under Test (SUT) identificationSUT name:.Hardware configuration:.SIST ETS 300 607-2 E1:2003



Page 16ETS 300 607-2: October 1996 (GSM 11.10-2 Version 4.15.0)A.2.4Product supplierName:.Address:.Telephone number:.Facsimile number:.E-mail address:.Additional information:.SIST ETS 300 607-2 E1:2003



Page 17ETS 300 607-2: October 1996 (GSM 11.10-2 Version 4.15.0)A.2.5ClientName:.Address:.
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.