Digital cellular telecommunications system (Phase 2+) (GSM); Mobile radio interface; Layer 3 specification (GSM 04.08 version 5.9.1)

SUBJECT (from SMG#23) Protocol error handling in the network Descriptive group or broadcast call reference Editorial Correction BA Range IE Handling MS handling of cipher mode setting Coding of the IEI of the priority level Handling of mandatory information error in release Wrong reference Handling of ASCI information by non-supporting MS Clarification of use of L2 Pseudo Length in SYSTEM INFORMATION messages. Clarification of use of L2 Pseudo Length in SYSTEM INFORMATION messages. Deletion of codepoint for V.32bis. SUBJECT (from SMG #24) System information type 10 Network Alerting in the MS: Consequential CR - A new Information Element is introduced in setup message (N>MS) to provide an indication for alerting. Inconsistency of user rate in IE bearer capability Frequency redefinition procedure for multislot configuration Clarification to SACCH procedures for multislot configuration Clarification on audio connection Mobile assisted frequency allocation Multiple allocation of IEs within on protocol Alignment of the compact notation with the way it is used SUBJECT (SMG#25) Uplink access procedures Uplink free message coding Indication of ASCI network options to the mobiles Group Receive / Group Transmit mode definitions Deletion of NOTIFICATION/SACCH SI6 rest octets Deletion of NCH position IE Introduction of message type table for messages using  short L2 header  Clarification on channel request coding for dual rate mobiles

Digitalni celični telekomunikacijski sistem (faza 2+) - Vmesnik za mobilni radio - Specifikacija tretje plasti (GSM 04.08, različica 5.9.1)

General Information

Status
Published
Publication Date
31-Jan-2005
Current Stage
6060 - National Implementation/Publication (Adopted Project)
Start Date
01-Feb-2005
Due Date
01-Feb-2005
Completion Date
01-Feb-2005

Buy Standard

Standard
ETS 300 940 E3:2005
English language
513 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

SLOVENSKI STANDARD
SIST ETS 300 940 E3:2005
01-februar-2005
'LJLWDOQLFHOLþQLWHOHNRPXQLNDFLMVNLVLVWHP ID]D 9PHVQLN]DPRELOQLUDGLR
6SHFLILNDFLMDWUHWMHSODVWL *60UD]OLþLFD
Digital cellular telecommunications system (Phase 2+) (GSM); Mobile radio interface;
Layer 3 specification (GSM 04.08 version 5.9.1)
Ta slovenski standard je istoveten z: ETS 300 940 Edition 3
ICS:
33.070.01 Mobilni servisi na splošno Mobile services in general
SIST ETS 300 940 E3:2005 en
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------

SIST ETS 300 940 E3:2005

---------------------- Page: 2 ----------------------

SIST ETS 300 940 E3:2005
EUROPEAN ETS 300 940
TELECOMMUNICATION October 1998
STANDARD Third Edition
Source: SMG Reference: RE/SMG-030408QR5
ICS: 33.020
Key words: Digital cellular telecommunications system, Global System for Mobile communications (GSM)
R
GLOBAL SYSTEM FOR
MOBILE COMMUNICATIONS
Digital cellular telecommunications system (Phase 2+);
Mobile radio interface;
Layer 3 specification
(GSM 04.08 version 5.9.1)
ETSI
European Telecommunications Standards Institute
ETSI Secretariat
Postal address: F-06921 Sophia Antipolis CEDEX - FRANCE
Office address: 650 Route des Lucioles - Sophia Antipolis - Valbonne - FRANCE
Internet: secretariat@etsi.fr - http://www.etsi.org
Tel.: +33 4 92 94 42 00 - Fax: +33 4 93 65 47 16
Copyright Notification: No part may be reproduced except as authorized by written permission. The copyright and the
foregoing restriction extend to reproduction in all media.
© European Telecommunications Standards Institute 1998. All rights reserved.

---------------------- Page: 3 ----------------------

SIST ETS 300 940 E3:2005
Page 2
ETS 300 940 (GSM 04.08 version 5.9.1): October 1998
Whilst every care has been taken in the preparation and publication of this document, errors in content,
typographical or otherwise, may occur. If you have comments concerning its accuracy, please write to
"ETSI Standards Making Support Dept." at the address shown on the title page.

---------------------- Page: 4 ----------------------

SIST ETS 300 940 E3:2005
Page 3
ETS 300 940 (GSM 04.08 version 5.9.1): October 1998
Contents
Foreword .21
Introduction.21
0 Scope .23
0.1 Scope of the Technical Specification.23
0.2 Application to the interface structures.23
0.3 Structure of layer 3 procedures.23
0.4 Test procedures.23
0.5 Use of logical channels.23
0.6 Overview of control procedures .24
0.6.1 List of procedures.24
0.7 Applicability of implementations.25
1 Normative references.26
2 Definitions and abbreviations .30
2.1 Random values.30
2.2 Vocabulary .30
3 Radio Resource management procedures .32
3.1 Overview/General .32
3.1.1 General.32
3.1.2 Services provided to upper layers .32
3.1.2.1 Idle mode.32
3.1.2.2 Dedicated mode .32
3.1.2.3 Group receive mode .33
3.1.2.4 Group transmit mode.33
3.1.3 Services required from data link and physical layers .33
3.1.4 Change of dedicated channels.33
3.1.4.1 Change of dedicated channels using SAPI = 0 .33
3.1.4.2 Change of dedicated channels using other SAPIs than 0 .34
3.1.4.3 Sequenced message transfer operation.34
3.1.4.3.1 Variables and sequence numbers .34
3.1.4.3.1.2 Send sequence number N(SD).34
3.1.4.3.2 Procedures for the initiation, transfer
execution and termination of the
sequenced message transfer
operation.35
3.1.4.3.2.2 Transfer Execution.35
3.1.5 Procedure for Service Request and Contention Resolution.35
3.2 Idle mode procedures .36
3.2.1 Mobile Station side .36
3.2.2 Network side.36
3.2.2.1 System information broadcasting .36
3.2.2.2 Paging.37
3.3 RR connection establishment .37
3.3.1 RR connection establishment initiated by the mobile station .37
3.3.1.1 Entering the dedicated mode : immediate assignment
procedure.37
3.3.1.1.1 Permission to access the network .37
3.3.1.1.2 Initiation of the immediate assignment
procedure.38
3.3.1.1.3 Answer from the network.39
3.3.1.1.3.1 On receipt of a CHANNEL REQUEST
message .39
3.3.1.1.3.2 Assignment rejection .40

---------------------- Page: 5 ----------------------

SIST ETS 300 940 E3:2005
Page 4
ETS 300 940 (GSM 04.08 version 5.9.1): October 1998
3.3.1.1.4 Assignment completion. 40
3.3.1.1.5 Abnormal cases . 41
3.3.1.2 Entering the group transmit mode: uplink access
procedure. 41
3.3.1.2.1 Mobile station side. 41
3.3.1.2.1.1 Uplink investigation procedure . 41
3.3.1.2.1.2 Uplink access procedure. 42
3.3.1.2.2 Network side . 42
3.3.1.2.3 Abnormal cases . 43
3.3.2 Paging procedure . 43
3.3.2.1 Paging initiation by the network. 43
3.3.2.2 Paging response . 44
3.3.2.3 Abnormal cases . 44
3.3.3 Notification procedure. 45
3.3.3.1 Notification of a call. 45
3.3.3.2 Joining a VGCS or VBS call. 45
3.3.3.3 Reduced NCH monitoring mechanism . 46
3.4 Procedures in dedicated mode and in group transmit mode . 47
3.4.1 SACCH procedures . 47
3.4.1.1 General . 47
3.4.1.2 Measurement report. 48
3.4.1.3 Extended measurement report $(MAFA)$. 48
3.4.2 Transfer of messages and link layer service provision. 48
3.4.3 Channel assignment procedure. 48
3.4.3.1 Channel assignment initiation . 49
3.4.3.2 Assignment completion. 51
3.4.3.3 Abnormal cases . 51
3.4.4 Handover procedure. 52
3.4.4.1 Handover initiation . 52
3.4.4.2 Physical channel establishment. 54
3.4.4.2.1 Finely synchronized cell case. 54
3.4.4.2.2 Non synchronized cell case. 54
3.4.4.2.3 Pseudo-synchronized cell case. 55
3.4.4.2.4 Pre-synchronized cell case . 55
3.4.4.3 Handover completion . 55
3.4.4.4 Abnormal cases . 56
3.4.5 Frequency redefinition procedure . 57
3.4.5.1 Abnormal cases . 57
3.4.6 Channel mode modify procedure. 57
3.4.6.1 Normal channel mode modify procedure. 58
3.4.6.1.1 Initiation of the channel mode modify
procedure . 58
3.4.6.1.2 Completion of channel mode modify
procedure . 58
3.4.6.1.3 Abnormal cases . 58
3.4.6.2 Channel mode modify procedure for a voice group call
talker . 58
3.4.6.2.1 Initiation of the channel mode modify
procedure . 58
3.4.6.2.2 Completion of mode change
procedure . 59
3.4.6.2.3 Abnormal cases . 59
3.4.7 Ciphering mode setting procedure. 59
3.4.7.1 Ciphering mode setting initiation. 59
3.4.7.2 Ciphering mode setting completion. 59
3.4.8 Additional channel assignment procedure. 60
3.4.8.1 Additional assignment procedure initiation. 60
3.4.8.2 Additional assignment procedure completion . 60
3.4.8.3 Abnormal cases . 60
3.4.9 Partial channel release procedure. 61
3.4.9.1 Partial release procedure initiation. 61
3.4.9.2 Abnormal cases . 61
3.4.10 Classmark change procedure. 61

---------------------- Page: 6 ----------------------

SIST ETS 300 940 E3:2005
Page 5
ETS 300 940 (GSM 04.08 version 5.9.1): October 1998
3.4.11 Classmark interrogation procedure.61
3.4.11.1 Classmark interrogation initiation .61
3.4.11.2 Classmark interrogation completion .62
3.4.12 Indication of notifications and paging informations .62
3.4.13 RR connection release procedure.63
3.4.13.1 Normal release procedure.63
3.4.13.1.1 Channel release procedure initiation in
dedicated mode and in group transmit
mode.63
3.4.13.1.2 Abnormal cases.64
3.4.13.2 Radio link failure in dedicated mode.64
3.4.13.2.1 Mobile side.64
3.4.13.2.2 Network side .64
3.4.13.3 RR connection abortion in dedicated mode.64
3.4.13.4 Uplink release procedure in group transmit mode.65
3.4.14 Receiving a RR STATUS message by a RR entity. .65
3.4.15 Group receive mode procedures.65
3.4.15.1 Mobile station side.65
3.4.15.1.1 Reception of the VGCS or VBS
channel .65
3.4.15.1.2 Monitoring of downlink messages and
related procedures.65
3.4.15.1.2.1 Channel assignment procedure.65
3.4.15.1.2.2 Frequency redefinition procedure .65
3.4.15.1.2.3 Channel mode modify procedure.66
3.4.15.1.2.4 Notification and paging information .66
3.4.15.1.2.4.1 Use of Reduced NCH monitoring .66
3.4.15.1.2.5 Uplink status messages.66
3.4.15.1.2.6 Channel release message.66
3.4.15.1.2.7 Information on paging channel
restructuring.67
3.4.15.1.3 Uplink reply procedure.67
3.4.15.1.4 Leaving the group receive mode .67
3.4.15.1.4.1 Returning to idle mode.67
3.4.15.1.4.2 Going to group transmit mode .67
3.4.15.2 Network side.68
3.4.15.2.1 Provision of messages on the VGCS
or VBS channel downlink.68
3.4.15.2.1.1 General .68
3.4.15.2.1.2 Provision of general information
messages .68
3.4.15.2.1.3 Provision of messages related to the
voice group call uplink channel.68
3.4.15.2.2 Release of the VGCS or VBS
Channels.69
3.4.15.3 Failure cases .69
3.4.16 Configuration change procedure.69
3.4.16.1 Configuration change initiation .69
3.4.16.2 Configuration change completion .69
3.4.16.3 Abnormal cases.69
3.4.17 Mapping of user data substreams onto timeslots in a multislot
configuration.70
3.4.18 Handling of classmark information at band change .70
4 Elementary procedures for Mobility Management.71
4.1 General .71
4.1.1 Type of MM procedures .71
4.1.2 MM sublayer states .71
4.1.2.1 MM sublayer states in the mobile station.72
4.1.2.1.1 Main states.72
4.1.2.1.2 Substates of the MM IDLE state .75
4.1.2.2 The update Status .76
4.1.2.3 MM sublayer states on the network side .77

---------------------- Page: 7 ----------------------

SIST ETS 300 940 E3:2005
Page 6
ETS 300 940 (GSM 04.08 version 5.9.1): October 1998
4.2 Behaviour in MM IDLE State . 78
4.2.1 Primary Service State selection. 78
4.2.1.1 Selection of the Service State after Power On. 78
4.2.1.2 Other Cases. 79
4.2.2 Detailed Description of the MS behaviour in MM IDLE State. . 79
4.2.2.1 Service State, NORMAL SERVICE. 79
4.2.2.2 Service State, ATTEMPTING TO UPDATE. 79
4.2.2.3 Service State, LIMITED SERVICE. 80
4.2.2.4 Service State, NO IMSI. 80
4.2.2.5 Service State, SEARCH FOR PLMN, NORMAL SERVICE 81
4.2.2.6 Service State, SEARCH FOR PLMN . 81
4.2.2.7 Service State, RECEIVING GROUP CALL (NORMAL
SERVICE) . 81
4.2.2.8 Service State, RECEIVING GROUP CALL (LIMITED
SERVICE) . 81
4.2.3 Service state when back to state MM IDLE from another state. 82
4.3 MM common procedures . 82
4.3.1 TMSI reallocation procedure. 82
4.3.1.1 TMSI reallocation initiation by the network. 83
4.3.1.2 TMSI reallocation completion by the mobile station. 83
4.3.1.3 TMSI reallocation completion in the network. . 83
4.3.1.4 Abnormal cases . 83
4.3.2 Authentication procedure. 85
4.3.2.1 Authentication request by the network. 85
4.3.2.2 Authentication response by the mobile station. 85
4.3.2.3 Authentication processing in the network . 85
4.3.2.4 Ciphering key sequence number . 85
4.3.2.5 Unsuccessful authentication . 86
4.3.2.6 Abnormal cases . 86
4.3.3 Identification procedure . 87
4.3.3.1 Identity request by the network . 87
4.3.3.2 Identification response by the mobile station . 87
4.3.3.3 Abnormal cases . 87
4.3.4 IMSI detach procedure . 87
4.3.4.1 IMSI detach initiation by the mobile station. 87
4.3.4.2 IMSI detach procedure in the network . 88
4.3.4.3 IMSI detach completion by the mobile station. 88
4.3.4.4 Abnormal cases . 88
4.3.5 Abort procedure. 88
4.3.5.1 Abort procedure initiation by the network. 88
4.3.5.2 Abort procedure in the mobile station . 89
4.3.6 MM information procedure. 89
4.3.6.1 MM information procedure initiation by the network. 89
4.3.6.2 MM information procedure in the mobile station. 89
4.4 MM specific procedures . 90
4.4.1 Location updating procedure . 90
4.4.2 Periodic updating . 91
4.4.3 IMSI attach procedure . 91
4.4.4 Generic Location Updating procedure. 92
4.4.4.1 Location updating initiation by the mobile station. 92
4.4.4.1a Network Request for Additional mobile station Capability
Information . 92
4.4.4.2 Identification request from the network. 92
4.4.4.3 Authentication by the network . 92
4.4.4.4 Ciphering mode setting by the network. 92
4.4.4.5 Attempt Counter. 92
4.4.4.6 Location updating accepted by the network. 93
4.4.4.7 Location updating not accepted by the network. 93
4.4.4.8 Release of RR connection after location updating. 94
4.4.4.9 Abnormal cases on the mobile station side . 94
4.4.4.10 Abnormal cases on the network side. 95
4.5 Connection management sublayer service provision. 96
4.5.1 MM connection establishment . 96

---------------------- Page: 8 ----------------------

SIST ETS 300 940 E3:2005
Page 7
ETS 300 940 (GSM 04.08 version 5.9.1): October 1998
4.5.1.1 MM connection establishment initiated by the mobile
station .96
4.5.1.2 Abnormal cases.99
4.5.1.3 MM connection establishment initiated by the network .100
4.5.1.3.1 Mobile Terminating CM Activity .100
4.5.1.3.2 Mobile Originating CM Activity
$(CCBS)$.100
4.5.1.4 Abnormal cases.101
4.5.1.5 MM connection establishment for emergency calls.101
4.5.1.6 Call re-establishment.102
4.5.1.6.1 Call re-establishment, initiation by the
mobile station.103
4.5.1.6.2 Abnormal cases.104
4.5.1.7 Forced release during MO MM connection establishment 105
4.5.2 MM connection information transfer phase.105
4.5.2.1 Sending CM messages .105
4.5.2.2 Receiving CM messages.106
4.5.2.3 Abnormal cases.106
4.5.3 MM connection release .106
4.5.3.1 Release of associated RR connection.106
4.5.3.2 Uplink release in a voice group call .107
4.6 Receiving a MM STATUS message by a MM entity.107
5 Elementary procedures for circuit-switched Call Control .108
5.1 Overview .108
5.1.1 General.108
5.1.2 Call Control States .113
5.1.2.1 Call states at the mobile station side of the interface .113
5.1.2.1.1 Null (State U0) .113
5.1.2.1.2 MM Connection pending (U0.1).113
5.1.2.1.2a CC prompt present (U0.2) $(CCBS)$.113
5.1.2.1.2b Wait for network information (U0.3)
$(CCBS)$.113
5.1.2.1.2c CC-Establishmentpresent (U0.4)
$(CCBS)$.113
5.1.2.1.2d CC-Establishment confirmed (U0.5)
$(CCBS)$.113
5.1.2.1.2e Recall present (U0.6) $(CCBS)$ .113
5.1.2.1.3 Call initiated (U1) .113
5.1.2.1.4 Mobile originating call proceeding (U3)113
5.1.2.1.5 Call delivered (U4) .114
5.1.2.1.6 Call present (U6).114
5.1.2.1.7 Call received (U7) .114
5.1.2.1.8 Connect Request (U8) .114
5.1.2.1.9 Mobile terminating call confirmed (U9)114
5.1.2.1.10 Active (U10) .114
5.1.2.1.11 Disconnect request (U11).114
5.1.2.1.12 Disconnect indication (U12).114
5.1.2.1.13 Release request (U19).114
5.1.2.1.14 Mobile originating modify (U26) .114
5.1.2.1.15 Mobile terminating modify (U27).114
5.1.2.2 Network call states .114
5.1.2.2.1 Null (State N0) .115
5.1.2.2.2 MM connection pending (N0.1).115
5.1.2.2.2a CC connection pending (N0.2)
$(CCBS)$.115
5.1.2.2.2b Network answer pending (N0.3)
$(CCBS)$.115
5.1.2.2.2c CC-Establishment present (N0.4)
$(CCBS)$.115
5.1.2.2.2d CC-Establishment confirmed (N0.5)
$(CCBS)$.115

---------------------- Page: 9 ----------------------

SIST ETS 300 940 E3:2005
Page 8
ETS 300 940 (GSM 04.08 version 5.9.1): October 1998
This state exists for a mobile originating
call when the network has received
acknowledgement that the mobile
station has received all call
information necessary to effect call
establishment.5.1.2.2.2e Recall
present (N0.6) $(CCBS)$. 115
5.1.2.2.3 Call initiated (N1). 115
5.1.2.2.4 Mobile originating call proceeding (N3)115
5.1.2.2.5 Call delivered (N4). 115
5.1.2.2.6 Call present (N6) . 115
5.1.2.2.7 Call received (N7). 115
5.1.2.2.8 Connect request (N8). 116
5.1.2.2.9 Mobile terminating call confirmed (N9)116
5.1.2.2.10 Active (N10). 116
5.1.2.2.11 {Not used} . 116
5.1.2.2.12 Disconnect indication (N12) . 116
5.1.2.2.13 Release request (N19) . 116
5.1.2.2.14 Mobile originating modify (N26). 116
5.1.2.2.15 Mobile terminating modify (N27) . 116
5.1.2.2.16 Connect Indication (N28) . 116
5.2 Call establishment procedures. 116
5.2.1 Mobile originating call establishment . 117
5.2.1.1 Call initiation. 117
5.2.1.2 Receipt of a setup message . 118
5.2.1.3 Receipt of a CALL PROCEEDING message. 119
5.2.1.4 Notification of progressing mobile originated call. 119
5.2.1.4.1 Notification of interworking in
connection with mobile originated call
establishment . 119
5.2.1.4.2 Call progress in the PLMN/ISDN
environment . 120
5.2.1.5 Alerting. 120
5.2.1.6 Call connected . 121
5.2.1.7 Call rejection . 121
5.2.1.8 Transit network selection . 121
5.2.1.9 Traffic channel assignment at mobile originating call
establishment. 121
5.
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.