SIST ETS 300 374-3 E2:2005
(Main)Intelligent Network (IN); Intelligent Network Capability Set 1 (CS1); Core Intelligent Network Application Protocol (INAP); Part 3: Test Suite Structure and Test Purposes (TSS&TP) specification for Service Switching Function (SSF) and Specialized Resource Function (SRF)
Intelligent Network (IN); Intelligent Network Capability Set 1 (CS1); Core Intelligent Network Application Protocol (INAP); Part 3: Test Suite Structure and Test Purposes (TSS&TP) specification for Service Switching Function (SSF) and Specialized Resource Function (SRF)
To supply PIXIT & TTCN test suite for ETS 300 374-1 & 2.
Inteligentno omrežje (IN) - Nabor zmožnosti 1 (CS1) inteligentnega omrežja - Jedrni aplikacijski protokol inteligentnega omrežja (INAP) - 3. del: Specifikacija zgradbe preskušalnega niza in nameni preskušanja (TSS&TP) za funkcijo komutacije storitev (SSF) in funkcijo posebnih virov (SRF)
General Information
Standards Content (Sample)
SLOVENSKI STANDARD
SIST ETS 300 374-3 E2:2005
01-april-2005
Inteligentno omrežje (IN) - Nabor zmožnosti 1 (CS1) inteligentnega omrežja - Jedrni
aplikacijski protokol inteligentnega omrežja (INAP) - 3. del: Specifikacija zgradbe
preskušalnega niza in nameni preskušanja (TSS&TP) za funkcijo komutacije
storitev (SSF) in funkcijo posebnih virov (SRF)
Intelligent Network (IN); Intelligent Network Capability Set 1 (CS1); Core Intelligent
Network Application Protocol (INAP); Part 3: Test Suite Structure and Test Purposes
(TSS&TP) specification for Service Switching Function (SSF) and Specialized Resource
Function (SRF)
Ta slovenski standard je istoveten z: ETS 300 374-3 Edition 2
ICS:
33.040.35 Telefonska omrežja Telephone networks
SIST ETS 300 374-3 E2:2005 en
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
---------------------- Page: 1 ----------------------
SIST ETS 300 374-3 E2:2005
---------------------- Page: 2 ----------------------
SIST ETS 300 374-3 E2:2005
EUROPEAN ETS 300 374-3
TELECOMMUNICATION December 1997
STANDARD Second Edition
Source: SPS Reference: RE/SPS-03058
ICS: 33.020
Key words: IN, CS1, INAP, TSS&TP, testing
Intelligent Network (IN);
Intelligent Network Capability Set 1 (CS1);
Core Intelligent Network Application Protocol (INAP);
Part 3: Test Suite Structure and Test Purposes (TSS&TP)
specification for Service Switching Function (SSF) and
Specialized Resource Function (SRF)
ETSI
European Telecommunications Standards Institute
ETSI Secretariat
Postal address: F-06921 Sophia Antipolis CEDEX - FRANCE
Office address: 650 Route des Lucioles - Sophia Antipolis - Valbonne - FRANCE
X.400: c=fr, a=atlas, p=etsi, s=secretariat - Internet: secretariat@etsi.fr
Tel.: +33 4 92 94 42 00 - Fax: +33 4 93 65 47 16
Copyright Notification: No part may be reproduced except as authorized by written permission. The copyright and the
foregoing restriction extend to reproduction in all media.
© European Telecommunications Standards Institute 1997. All rights reserved.
---------------------- Page: 3 ----------------------
SIST ETS 300 374-3 E2:2005
Page 2
ETS 300 374-3: December 1997
Whilst every care has been taken in the preparation and publication of this document, errors in content,
typographical or otherwise, may occur. If you have comments concerning its accuracy, please write to
"ETSI Editing and Committee Support Dept." at the address shown on the title page.
---------------------- Page: 4 ----------------------
SIST ETS 300 374-3 E2:2005
Page 3
ETS 300 374-3: December 1997
Contents
Foreword .7
1 Scope .9
2 Normative references.9
3 Definitions and abbreviations .9
3.1 Definitions .9
3.2 Abbreviations .10
4 Test Suite Structure (TSS) .11
4.1 Overview .11
4.2 Physical scenarios .13
4.3 Test groups.16
4.3.1 Interface groups .16
4.3.1.1 Basic SSF - bS .16
4.3.1.2 SSF relay - rS .16
4.3.1.3 Initiating SSF - iS .16
4.3.1.4 Assisting SSF - aS.17
4.3.1.5 IP with direct path to SCP - cI.17
4.3.2 Main test groups.17
4.3.2.1 Capability tests (CA) .17
4.3.2.2 Valid Behaviour tests (BV).17
4.3.2.3 Invalid Behaviour tests (BI).17
4.3.2.4 Inopportune Behaviour tests (BO) .17
4.4 Test step structure.17
4.4.1 Preambles .17
4.4.2 Postambles.17
4.5 Timers of the Abstract Test Suite (ATS).18
5 Test Purposes (TP).20
5.1 Introduction .20
5.1.1 Test purpose naming convention .20
5.1.2 Source of test purpose definition.21
5.1.3 Initial state .21
5.1.4 Untested procedures.21
5.2 Service Switching Point (SSP).21
5.2.1 Basic SSF - bS .21
5.2.1.1 Capability tests (CA) .21
5.2.1.1.1 SSF-FSM state "Idle".21
5.2.1.1.2 SSF-FSM state "Waiting For
Instructions" .22
5.2.1.1.3 SSF-FSM state "Monitoring".22
5.2.1.1.4 SSME-FSM state "Idle".22
5.2.1.2 Valid Behaviour tests (BV).23
5.2.1.2.1 SSF-FSM state "Idle".23
5.2.1.2.2 SSF-FSM state "Waiting For
Instructions" .27
5.2.1.2.3 SSF-FSM state "Monitoring".37
5.2.1.2.4 SSME-FSM state "Idle".48
5.2.1.2.5 SSME-FSM state "Non Call
Associated Treatment" .49
5.2.1.3 Invalid Behaviour tests (BI).50
5.2.1.3.1 SSF-FSM state "Idle".50
5.2.1.3.2 SSF-FSM state "Waiting For
Instructions" .51
5.2.1.3.3 SSF-FSM state "Monitoring".52
---------------------- Page: 5 ----------------------
SIST ETS 300 374-3 E2:2005
Page 4
ETS 300 374-3: December 1997
5.2.1.3.4 SSME-FSM state "Idle" . 53
5.2.1.4 Inopportune Behaviour tests (BO) . 53
5.2.1.4.1 SSF-FSM state "Idle" . 53
5.2.1.4.2 SSF-FSM state "Waiting For
Instructions". 54
5.2.1.4.3 SSF-FSM state "Monitoring" . 55
5.2.2 SSF relay - rS . 56
5.2.2.1 Valid Behaviour tests (BV) . 56
5.2.2.1.1 SSF-FSM state "Waiting For
Instructions". 56
5.2.2.1.2 SSF-FSM state "Waiting For End Of
User Interaction". 57
5.2.2.2 Invalid Behaviour tests (BI) . 62
5.2.2.2.1 SSF-FSM state "Waiting For
Instructions". 62
5.2.2.2.2 SSF-FSM state "Waiting For End Of
User Interaction". 63
5.2.2.3 Inopportune Behaviour tests (BO) . 63
5.2.2.3.1 SSF-FSM state "Idle" . 63
5.2.2.3.2 SSF-FSM state "Waiting For
Instructions". 64
5.2.2.3.3 SSF-FSM state "Waiting for End of
User Interaction". 64
5.2.2.3.4 SSF-FSM state "Monitoring" . 65
5.2.3 Initiating SSF - iS . 65
5.2.3.1 Valid Behaviour tests (BV) . 65
5.2.3.1.1 SSF-FSM state "Waiting For
Instructions". 65
5.2.3.1.2 SSF-FSM state "Waiting For End Of
Temporary Connection" . 67
5.2.3.2 Invalid Behaviour tests (BI) . 68
5.2.3.2.1 SSF-FSM state "Waiting For
Instructions". 68
5.2.3.2.2 SSF-FSM state "Waiting For End Of
Temporary Connection" . 68
5.2.3.3 Inopportune Behaviour tests (BO) . 68
5.2.3.3.1 SSF-FSM state "Idle" . 68
5.2.3.3.2 SSF-FSM state "Waiting For
Instructions". 69
5.2.3.3.3 SSF-FSM state "Waiting for End of
Temporary Connection" . 70
5.2.3.3.4 SSF-FSM state "Monitoring" . 70
5.2.4 Assisting SSF - aS. 71
5.2.4.1 Valid Behaviour tests (BV) . 71
5.2.4.1.1 SSF-FSM state "Idle" . 71
5.2.4.1.2 SSF-FSM state "Waiting For
Instructions". 72
5.2.4.1.3 SSF-FSM state "Waiting For End Of
User Interaction". 74
5.2.4.2 Invalid Behaviour tests (BI) . 76
5.2.4.2.1 SSF-FSM state "Waiting For
Instructions". 76
5.2.4.2.2 SSF-FSM state "Waiting for End of
User Interaction". 76
5.2.4.3 Inopportune Behaviour tests (BO) . 77
5.2.4.3.1 SSF-FSM state "Waiting For
Instructions". 77
5.3 Intelligent Peripheral (IP). 78
5.3.1 Valid Behaviour tests (BV). 78
5.3.1.1 SRSM-FSM state "Idle". 78
5.3.1.2 SRSM-FSM state "Connected" . 78
5.3.1.2.1 Network events . 78
5.3.1.2.2 Operations. 79
---------------------- Page: 6 ----------------------
SIST ETS 300 374-3 E2:2005
Page 5
ETS 300 374-3: December 1997
5.3.1.2.3 Operation errors.83
5.3.1.3 SRSM-FSM state "User Interaction".84
5.3.1.3.1 Network events .84
5.3.1.3.2 Operations .84
5.3.2 Invalid Behaviour tests (BI) .85
5.3.2.1 SRSM-FSM state "Connected".85
5.3.2.2 SRSM-FSM state "User Interaction".85
5.3.3 Inopportune Behaviour tests (BO).86
5.3.3.1 SRSM-FSM state "Idle" .86
5.3.3.2 SRSM-FSM state "Connected".86
6 Compliance .86
Annex A (informative): TP coverage .87
History.88
---------------------- Page: 7 ----------------------
SIST ETS 300 374-3 E2:2005
Page 6
ETS 300 374-3: December 1997
Blank page
---------------------- Page: 8 ----------------------
SIST ETS 300 374-3 E2:2005
Page 7
ETS 300 374-3: December 1997
Foreword
This second edition European Telecommunication Standard (ETS) has been produced by the Signalling
Protocols and Switching (SPS) Technical Committee of the European Telecommunications Standards
Institute (ETSI).
This ETS is part 3 of a multi-part standard covering the Capability Set 1 (CS1) core Intelligent Network
Protocol (INAP) as described below:
Part 1: "Protocol specification";
Part 2: "Protocol Implementation Conformance Statement (PICS) proforma specification";
Part 3: "Test Suite Structure and Test Purposes (TSS&TP) specification for Service Switching
Function (SSF) and Specialized Resource Function (SRF)";
Part 4: "Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing
(PIXIT) proforma specification for SSF and SRF";
Part 5: "Protocol specification for the Service Control Function (SCF) - Service Data Function (SDF)
interface";
Part 6: "PICS proforma specification for the SCF-SDF interface".
Transposition dates
Date of adoption: 5 December 1997
Date of latest announcement of this ETS (doa): 31 March 1998
Date of latest publication of new National Standard
or endorsement of this ETS (dop/e): 30 September 1998
Date of withdrawal of any conflicting National Standard (dow): 30 September 1998
---------------------- Page: 9 ----------------------
SIST ETS 300 374-3 E2:2005
Page 8
ETS 300 374-3: December 1997
Blank page
---------------------- Page: 10 ----------------------
SIST ETS 300 374-3 E2:2005
Page 9
ETS 300 374-3: December 1997
1 Scope
This third part of ETS 300 374 provides the Test Suite Structure and Test Purposes (TSS&TP) for
conformance testing of the Service Switching Function (SSF) and the Specialized Resource Function
(SRF) of the core Intelligent Network Application Protocol (INAP) of Intelligent Network (IN) Capability
Set 1 (CS1) according to ETS 300 374-1 [1].
ISO/IEC 9646-1 [3] and ISO/IEC 9646-2 [4] are used as the basis for the test methodology.
2 Normative references
This ETS incorporates by dated and undated reference, provisions from other publications. These
normative references are cited at the appropriate places in the text and the publications are listed
hereafter. For dated references, subsequent amendments to or revisions of any of these publications
apply to this ETS only when incorporated in it by amendment or revision. For undated references the latest
edition of the publication referred to applies.
[1] ETS 300 374-1 (1994): "Intelligent Network (IN); Intelligent Network Capability
Set 1 (CS1); Core Intelligent Network Application Protocol (INAP); Part 1:
Protocol specification".
[2] ETS 300 374-2 (1996): "Intelligent Network (IN); Intelligent Network Capability
Set 1 (CS1); Core Intelligent Network Application Protocol (INAP); Part 2:
Protocol Implementation Conformance Statement (PICS) proforma specification
for Service Switching Function (SSF), Specialized Resource Function (SRF) and
Service Control Function (SCF)".
[3] ISO/IEC 9646-1: "Information technology - Open systems interconnection -
Conformance testing methodology and framework - Part 1: General concepts".
[4] ISO/IEC 9646-2: "Information technology - Open systems interconnection -
Conformance testing methodology and framework - Part 2: Abstract test suite
specification".
3 Definitions and abbreviations
3.1 Definitions
For the purposes of this ETS, the following definitions apply:
- terms defined in ETS 300 374-1 [1];
- terms defined in ISO/IEC 9646-1 [3] and in ISO/IEC 9646-2 [4].
In particular, the following terms defined in ISO/IEC 9646-1 [3] apply:
- Abstract Test Suite (ATS);
- Implementation Under Test (IUT);
- System Under Test (SUT);
- Protocol Implementation Conformance Statement (PICS).
---------------------- Page: 11 ----------------------
SIST ETS 300 374-3 E2:2005
Page 10
ETS 300 374-3: December 1997
3.2 Abbreviations
For the purposes of this ETS, the following abbreviations apply:
aS assisting SSF
aSSP assisting SSP
ATS Abstract Test Suite
BI Invalid Behaviour tests
BO Inopportune Behaviour tests
bS tests for SSP basic functions
BV Valid Behaviour tests
CA Capability tests
cI IP with direct path to SCP
EDP-N Event Detection Point - Notification
EDP-R Event Detection Point - Request
FE Functional Entity
FSM Finite State Machine
IN Intelligent Network
INAP Intelligent Network Application Protocol
IP Intelligent Peripheral
iS initiating SSF
iSSP initiating SSP
IUT Implementation Under Test
PICS Protocol Implementation Conformance Statement
PDU Protocol Data Unit
rS SSF relay
SCF Service Control Function
SCP Service Control Point
SDF Service Data Function
SDP Service Data Point
SRF Specialized Resource Function
SRSM SRF call State Model
SSF Service Switching Function
SSME SSF Management Entity
SSP Service Switching Point
SUT System Under Test
TCAP Transaction Capabilities Application Part
TDP Trigger Detection Point
TP Test Purpose
TSS Test Suite Structure
---------------------- Page: 12 ----------------------
SIST ETS 300 374-3 E2:2005
Page 11
ETS 300 374-3: December 1997
4 Test Suite Structure (TSS)
4.1 Overview
Tables 1 and 2 show the structure of the test suites for SSF and SRF.
Table 1: Test suite structure of the SSF tests
SUT Interface Category State Group
SSP SCF-SSF CA State 1 Network event
bS: SSP basic functions
Operation
State 3 Operation
State 6 Network event
State 7 Operation
BV State 1 Network event
Operation
State 3 Network event
Operation
Operation error
State 6 Network event
Operation
Operation error
State 7 Operation
State 8 Network event
BI State 1 Operation
State 3 Operation
Operation error
State 6 Operation
State 7 Operation
BO State 1 Operation
State 3 Operation
State 6 Operation
SCF-SSF-SRF BV State 3 Operation
rS: add. for SSP with
State 4 Network event
relay functions
Operation
Operation error
BI State 3 Operation
State 4 Operation
BO State 1 Operation
State 3 Operation
State 4 Operation
State 6 Operation
(continued)
---------------------- Page: 13 ----------------------
SIST ETS 300 374-3 E2:2005
Page 12
ETS 300 374-3: December 1997
Table 1 (concluded): Test suite structure of the SSF tests
SUT Interface Category State Group
SSP SCF-SSF BV State 3 Operation
iS: add. for SSP acting
State 5 Network event
as initiating SSP
Operation
Operation error
BI State 3 Operation
State 5 Operation
BO State 1 Operation
State 3 Operation
State 5 Operation
State 6 Operation
SCF-SSF BV Network event
State 1
aS: add. for SSP acting
State 3 Network event
as assisting SSP
Operation
Operation error
State 4 Network event
Operation
Operation error
BI State 3 Operation
State 4 Operation
BO State 3 Operation
State 4 Operation
Table 2: Test suite structure of the SRF tests
SUT Interface Category State Group
IP SCF-SRF BV State 1 Network event
cI (IP direct path to SCP)
State 2
Network event
Operation
Operation error
State 3 Network event
Operation
BI State 2 Operation
State 3 Operation
BO State 1 Operation
State 2 Operation
---------------------- Page: 14 ----------------------
SIST ETS 300 374-3 E2:2005
Page 13
ETS 300 374-3: December 1997
4.2 Physical scenarios
The test suites given in subclause 4.1 are based on the mapping of Functional Entities (FE) to Physical
Entities (PE) as shown in table 3.
Table 3: Mapping of functional entities to physical entities
FE
PE SRF SSF SCF SDF
SSP o m n/a n/a
SCP n/a n/a m o
n/a n/a n/a m
SDP
IP m n/a n/a n/a
The application of the test suites according to subclause 4.1 is given in figures 1 to 5 for a number of
different example physical scenarios.
The following figures illustrate mainly the SRF configurations. The SDP is included for better
understanding of the whole IN configuration. Nevertheless, it possible to support an SCP with an
integrated SDF.
SCP
SDF
SCF
Non-integrated SRF
Integrated SRF
SSP
IP
SSF
CCF
SRF
applied test suite groups for SSP testing: bS + rS
Figure 1: Example for SCP with single SSP Non-integrated or Integrated SRF
---------------------- Page: 15 ----------------------
SIST ETS 300 374-3 E2:2005
Page 14
ETS 300 374-3: December 1997
SCP
SDF
SCF
SSP
IP
SSF
CCF
SRF
applied test suite groups for iSSP testing: bS + iS
applied test suite groups for IP testing: cI
Figure 2: Example for direct path SCP - IP
SCP
SDF
SCF
Non-integrated SRF
Integrated SRF
initiating SSP assisting SSP
IP
SSF
SSF
CCF SRF
CCF
applied test suite groups for iSSP testing: bS + iS
applied test suite groups for aSSP testing: aS + rS
Figure 3: Example for SSP Assist/Hand-off (assisting SSP with relay)
---------------------- Page: 16 ----------------------
SIST ETS 300 374-3 E2:2005
Page 15
ETS 300 374-3: December 1997
SCP
SDF
SCF
Non-integrated SRF
Integrated SRF
initiating SSP
IP
IP
SSF
CCF
SRF SRF
applied test suite groups for iSSP testing: bS + iS + rS
applied test suite groups for IP testing: cI
Figure 4: Example for SSP Assist/Hand-off (initiating SSP with relay)
SCP
SDF
SCF
Non-integrated SRF
Non-integrated SRF
Integrated SRF
Integrated SRF
assisting SSP
initiating SSP
IP IP
SSF
SSF
CCF SRF
SRF CCF
applied test suite groups for iSSP testing: bS + iS + rS
applied test suite groups for aSSP testing: aS + rS
Figure 5: Example for SSP Assist/Hand-off (initiating and assisting SSP with relay)
---------------------- Page: 17 ----------------------
SIST ETS 300 374-3 E2:2005
Page 16
ETS 300 374-3: December 1997
4.3 Test groups
4.3.1 Interface groups
4.3.1.1 Basic SSF - bS
The defined test purposes cover the INAP procedures at the SSP for the basic functions as described in
ETS 300 374-1 [1], clauses 7 to 10. The basic functions are the INAP procedures at the SSP for the
following operations:
ActivateServiceFiltering
ActivityTest
ApplyCharging
ApplyChargingReport
CallInformationRequest
CallInformationReport
Cancel (CCF events)
CollectInformation
Connect
Continue
EventNotificationCharging
EventReportBCSM
FurnishChargingInformation
InitialDP
InitiateCallAttempt
ReleaseCall
RequestNotificationChargingEvent
RequestReportBCSMEvent
ResetTimer
SendChargingInformation
ServiceFilteringResponse
4.3.1.2 SSF relay - rS
The defined test purposes cover the INAP procedures at the SSP needed in addition to the basic
functions for the user interaction with relay as described in ETS 300 374-1 [1], clauses 7 to 10. These are
the procedures for the following operations:
Cancel (PA, PC)
ConnectToResource
DisconnectForwardConnection
PlayAnnouncement
PromptAndCollectUserInformation
SpecializedResourceReport
4.3.1.3 Initiating SSF - iS
The defined test purposes cover the INAP procedures at the initiating SSP needed in addition to the basic
functions as described in ETS 300 374-1 [1], clauses 7 to 10. These are the procedures for the following
operations:
Connect (hand-off)
DisconnectForwardConnection
EstablishTemporaryConnection
---------------------- Page: 18 ----------------------
SIST ETS 300 374-3 E2:2005
Page 17
ETS 300 374-3: December 1997
4.3.1.4 Assisting SSF - aS
The defined test purposes cover the INAP procedures at the assisting SSP needed in addition to the basic
and relay functions as described in ETS 300 374-1 [1], clauses 7 to 10. These are the procedures for the
following operations:
AssistRequestInstructions
4.3.1.5 IP with direct path to SCP - cI
The defined test purposes cover the INAP procedures at the IP related to the SRF-SCF interface in case
of a direct path between SCP and IP as described in ETS 300 374-1 [1], clauses 7 to 10. These are the
procedures for the following operations:
AssistRequestInstructions
Cancel
PlayAnnouncement
PromptAndCollectUserInformation
SpecializedResourceReport
4.3.2 Main test groups
4.3.2.1 Capability tests (CA)
Capability testing provides a limited testing to ascertain the capabilities stated in the PICS can be
observed.
4.3.2.2 Valid Behaviour tests (BV)
Predefined state transitions are considered as valid. The test purposes in the valid behaviour test sub
group cover as far as reasonable the verification of the normal and exceptional procedures of the various
Finite State Machines (FSMs), i.e. a valid behaviour test is a test where the message sequence and the
message contents is considered as valid.
4.3.2.3 Invalid Behaviour tests (BI)
This test sub group is intended to verify that the IUT is able to react properly having received an invalid
Protocol Data Unit (PDU). An invalid PDU is defined as a syntactically incorrect message.
4.3.2.4 Inopportune Behaviour tests (BO)
This test group is intended to verify that the IUT is able to react properly in the case an inopportune
protocol event occurring. Such an event is syntactically correct but occurs when it is not expected, e.g. a
correctly coded operation is received in a wrong state (the IUT may respond by sending error
UnexpectedComponentSequence).
4.4 Test step structure
4.4.1 Preambles
The preamble test group contains the preamble test steps needed for initialization of the IUT before
testing the particular test purpose. Each preamble shall start from the IUT initial state as defined in
subclause 5.1.4.
4.4.2 Postambles
After each test case the IUT shall be brought back to the initial state as defined in subclause 5.1.4.
---------------------- Page: 19 ----------------------
SIST ETS 300 374-3 E2:2005
Page 18
ETS 300 374-3: December 1997
4.5 Timers of the Abstract Test Suite (ATS)
This subclause describes the timers and counters used in the ATS. The "min" and "max" indications
define if the timer value represents the minimum or maximum limit of a timer. The timer values contain
some additional tolerances for delays caused by test simulators. Therefore, a bigger timer tolerance is
given than defined in ETS 300 374-1 [1]:
Minimum value of ATS timer = minimum ETS timer;
Maximum value of ATS timer = maximum ETS timer × 1,2.
Table 4 shows the identified timers used in the ATS and the references to ETS 300 374-1 [1].
Table 4: ATS timer values
ATS timer name ATS timer value ETS timer name Reference to
[s] ETS 300 374-1 [1]
T (see note) T not defined
SSFmin SSF
T (see note)
SSFmax
T (see note) T not defined
SRFmin SRF
T (see note)
SRFmax
T (see note) T not defined
SCF-SSFmin SCF-SSF
T (see note)
SCF-SSFmax
T (see note) T not defined
ActTestmin ActTest
T (see note)
ActTestmax
T (see note) T not defined
ASSIST/HAND-OFFmin ASSIST/HAND-OFF
T (see note)
ASSIST/HAND-OFFmax
T 1T 6.1
asfmin asf
T 12
asfmax
T 1T 6.1
atmin at
T 12
atmax
T 1T 6.1
acmin ac
T 12
acmax
T 1T 6.1
acrmin acr
T 12
acrmax
T 1T 6.1
arimin ari
T 12
arimax
T 1T 6.1
cgmin cg
T 12
cgmax
T 1T 6.1
cirpmin cirp
T 12
cirpmax
T 1T 6.1
cirqmin cirq
T 12
cirqmax
T 1T 6.1
canmin can
T 12
canmax
T 1T 6.1
cimin ci
T 72
cimax
(continued)
---------------------- Page: 20 ----------------------
SIST ETS 300 374-3 E2:2005
Page 19
ETS 300 374-3: December 1997
Table 4 (concluded): ATS timer values
ATS timer name ATS timer value ETS timer name Reference to
[s] ETS 300 374-1 [1]
T 1T 6.1
conmin con
T 12
conmax
T 1T 6.1
ctrmin ctr
T 12
ctrmax
T 1T 6.1
cuemin cue
T 12
cuemax
T 1T 6.1
dfcmin dfc
T 12
dfcmax
T 1T 6.1
etcmin etc
T 72
etcmax
T 1T 6.1
encmin enc
T 12
encmax
T 1T 6.1
erbmin erb
T 12
erbmax
T 1T 6.1
fcimin fci
T 12
fcimax
T 1T 6.1
idpmin idp
T 12
idpmax
T 1T 6.1
icamin ica
T 12
icamax
T 1T 6.1
rcmin rc
T 12
rcmax
T 1T 6.1
rncmin rnc
T 12
rncmax
T 1T 6.1
rrbmin rrb
T 12
rrbmax
T 1T 6.1
rtmin rt
T 12
rtmax
T 1T 6.1
scimin sci
T 12
scimax
T 1T 6.1
sfrmin sfr
T 12
sfrmax
T 1T 6.1
pamin pa
T 1 800
pamax
T 1T 6.1
pcmin pc
T 1 800
pcmax
T 1T 6.1
srrmin srr
T 12
srrmax
NOTE: The value of this timer is given in ETS 300 374-2 [2].
---------------------- Page: 21 ----------------------
SIST ETS 300 374-3 E2:2005
Page 20
ETS 300 374-3: December 1997
5 Test Purposes (TP)
5.1 Introduction
For each test requirement a TP is defined.
At the start of each test sub group the preambles and the postambles are listed.
5.1.1 Test purpose naming convention
The identifier of the TP is built according to the scheme in table 5.
Table 5: TP identifier naming convention scheme
Identifier: IN
= interface: (1) SCP: Basic SCF (bC) (not used)
(2) SCP: SCF-SSF relay handling (rC) (not used)
(3) SCP: SCF Assist with relay handling (aC) (not used)
(4) SCP: SCF direct path IP handling (pC) (not used)
(5) SCP: SCF-SDF handling (dC) (not used)
6 SSP: Basic SSF (bS)
7 SSP: SSF relay (rS)
8 SSP: Initiating SSF (iS)
9 SSP: Assisting SSF (aS)
A IP: SCF-SRF direct path to SCP (cI)
(B) SDP: SCF-SDF direct path to SCP (cD) (not used)
= category: 1 BIT, Basic Interconnection tests (not used)
2 CA, Capability tests
3 BV, Valid Behaviour t
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.