CEN/CLC/TC 2 - CEN/CENELEC Joint Technical Group Power Engineering
Joint CEN/CENELEC steering coordination and programming group entrusted: a) with the task to manage the different project teams to develop guides for procurement and submit them through the secretariat to the common CEN/CENELEC procedures. b) and with the task to make a survey of supporting standards needed, identifying the existing and missing standards as well as the responsible CEN or CENELEC technical committee for their drafting or redrafting.
CEN/CENELEC Joint Technical Group Power Engineering
Joint CEN/CENELEC steering coordination and programming group entrusted: a) with the task to manage the different project teams to develop guides for procurement and submit them through the secretariat to the common CEN/CENELEC procedures. b) and with the task to make a survey of supporting standards needed, identifying the existing and missing standards as well as the responsible CEN or CENELEC technical committee for their drafting or redrafting.
General Information
This standard gives guidance on writing the technical specification for the procurement of equipment for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide on cabling systems deals with a wide range of activities and may be used for any or all of these activities by selection of the relevant parts e.g.: - provision of support for cable; - laying of cable; - completion of cable ends; The Guide covers the installation of power cable up to and including 20,8/36 (42) kV and the supply and installation of control and instrumentation cable. The supply of power cable is covered by EN 45510-2-8. The Guide includes the installation of protective conductor cable for earthing and equipotential bonding up to the main earthing busbar(s), but not the below ground earth-electrode network. The equipment covered by this Guide is defined by its function rather than design type. Therefore, the guidance to the specification is stated in performance terms rather than being specified by a detailed description of the equipment to be supplied. This Guide indicates to potential purchasers how their specification should be prepared so that - the equipment type and capacity interfaces correctly with other elements of the systems, - predicted performance is achieved, - ancillary equipment is properly sized, - reliability, availability and safety requirements are achieved, - proper consideration is given to the evaluation process and the quality measures to be applied. This Guide does not determine the type of specification (e.g. detailed, performance, functional) or the extent of supply for any given contract which is normally decided on the basis of the purchaser's project strategy. It does not cover - any commercial, contractual or legal issues which are normally in separate parts of an enquiry, - any allocation of responsibilities which are determined by the contract. This Guide does not prescribe the arrangement of the documents in the enquiry. NOTE As a comprehensive European environmental policy is still under preparation, this Guide does not address the environmental implications of the equipment.
- Standard51 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of low voltage (LV) and medium voltage (MV) power cables for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers power cables only for voltages up to and including Um = 41,5 kV. This Guide does not cover cables for public distribution systems, control and instrumentation systems or communications systems. For guidance on the technical specification of cables, including their installation and termination, refer to EN 45510-2-6 The equipment covered by this Guide is defined by its function rather than design type. Therefore, the guidance to the specification is stated in performance terms rather than being specified by a detailed description of the equipment to be supplied. This Guide indicates to potential purchasers how their specification should be prepared so that: - the equipment type and capacity interfaces correctly with other elements of the systems; - predicted performance is achieved; - ancillary equipment is properly sized; - reliability, availability and safety requirements are achieved; - proper consideration is given to the evaluation process and the quality measures to be applied. This Guide does not determine the type of specification (e.g. detailed, performance, functional) or the extent of supply for any given contract which is normally decided on the basis of the purchaser’s project strategy. It does not cover: - any commercial, contractual or legal issues which are normally in separate parts of an enquiry; - any allocation of responsibilities which are determined by the contract. This Guide does not prescribe the arrangement of the documents in the enquiry.
- Standard20 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of switchgear and controlgear for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers switchgear and controlgear within installations primarily concerned with the generation of electrical power and, where appropriate, their interconnection with the transmission and/or distribution system. It also includes main connections (busbars) associated with generator circuits and the ancillary plant forming part of switchboards and/or switching circuits. The equipment covered by this Guide is defined by its function rather than design type. Therefore, the guidance to the specification is stated in performance terms rather than being specified by a detailed description of the equipment to be supplied. This Guide indicates to potential purchasers how their specification should be prepared so that: - the equipment type and capacity interfaces correctly with other elements of the systems; - predicted performance is achieved; - ancillary equipment is properly sized; - reliability, availability and safety requirements are achieved; - proper consideration is given to the evaluation process and the quality measures to be applied. This Guide does not determine the type of specification (e.g. detailed, performance, functional) or the extent of supply for any given contract which is normally decided on the basis of the purchaser’s project strategy. It does not cover: - any commercial, contractual or legal issues which are normally in separate parts of an enquiry; - any allocation of responsibilities which are determined by the contract. This Guide does not prescribe the arrangement of the documents in the enquiry.
- Standard30 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of motors for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers motors within installations primarily concerned with the generation of electrical power. However, as a complete electrical drive system is not defined in this Guide, attention is drawn to the possible additional electrical and mechanical stresses to which the motor may be subjected e.g. by a static AC converter/inverter. Reference should be made to IEC 60034-17. The equipment covered by this Guide is defined by its function rather than design type. Therefore, the guidance to the specification is stated in performance terms rather than being specified by a detailed description of the equipment to be supplied. This Guide indicates to potential purchasers how their specification should be prepared so that: - the equipment type and capacity interfaces correctly with other elements of the systems; - predicted performance is achieved; - ancillary equipment is properly sized; - reliability, availability and safety requirements are achieved; - proper consideration is given to the evaluation process and the quality measures to be applied. This Guide does not determine the type of specification (e.g. detailed, performance, functional) or the extent of supply for any given contract which is normally decided on the basis of the purchaser’s project strategy. It does not cover: - any commercial, contractual or legal issues which are normally in separate parts of an enquiry; - any allocation of responsibilities which are determined by the contract. This Guide does not prescribe the arrangement of the documents in the enquiry.
- Standard31 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of coal handling and bulk storage plant, associated with steam generating plant in the electrical power supply industry. This includes: wagon unloaders or wagon tipplers; barges or ship unloaders; coal stackers and coal reclaimers (bucket wheels, scrapers) of the coal yard; hoppers; silos for coal mixing, buffer silos, bunkers (boiler house silos); transfer towers between belt conveyors; belt conveyors, bucket elevators; metal structures (towers, conveyor tunnels)...
- Standard42 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of fuel preparation plant for solid, liquid and gaseous fuels associated with steam generating plant and flue gas treatment plant in the electrical power supply industry. This includes: feeders; pulverizers/mills, crushers; classifiers, pipework; pumps; heaters; filters; dampers; valves.
- Standard26 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of stationary batteries and chargers for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers stationary lead-acid and nickel-cadmium batteries, chargers, battery accommodation battery main connections and battery accessories. This equipment usually forms part of either a centralised or unit d.c. supplies system for duties such as switchgear closing/tripping, protection, control, alarm, instrumentation and telecommunication supplies, emergency lighting and emergency drives. The equipment covered by this Guide is defined by its function rather than design type. Therefore, the guidance to the specification is stated in performance terms rather than being specified by a detailed description of the equipment to be supplied. This Guide indicates to potential purchasers how their specification should be prepared so that: - the equipment type and capacity interfaces correctly with other elements of the systems; - predicted performance is achieved; - ancillary equipment is properly sized; - reliability, availability and safety requirements are achieved; - proper consideration is given to the evaluation process and the quality measures to be applied. This Guide does not determine the type of specification (e.g. detailed, performance, functional) or the extent of supply for any given contract which is normally decided on the basis of the purchaser’s project strategy. It does not cover: - any commercial, contractual or legal issues which are normally in separate parts of an enquiry; - any allocation of responsibilities which are determined by the contract. This Guide does not prescribe the arrangement of the documents in the enquiry.
- Standard32 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of turbine-driven generators and their auxiliaries for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. The generators may be air, hydrogen, or liquid-cooled. The excitation system may be of the static or rotating rectifier type fed by a static or rotating power supply. The equipment covered by this Guide is defined by its function rather than design type. Therefore, the guidance to the specification is stated in performance terms rather than being specified by a detailed description of the equipment to be supplied. This Guide indicates to potential purchasers how their specification should be prepared so that: - the equipment type and capacity interfaces correctly with other elements of the systems; - predicted performance is achieved; - ancillary equipment is properly sized; - reliability, availability and safety requirements are achieved; - proper consideration is given to the evaluation process and the quality measures to be applied. This Guide does not determine the type of specification (e.g. detailed, performance, functional) or the extent of supply for any given contract which is normally decided on the basis of the purchaser’s project strategy. It does not cover: - any commercial, contractual or legal issues which are normally in separate parts of an enquiry; - any allocation of responsibilities which are determined by the contract. This Guide does not prescribe the arrangement of the documents in the enquiry. NOTE: As a comprehensive European environmental policy is still under preparation, this Guide does not address the environmental implications of the equipment.
- Standard38 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on the writing the technical specification for the procurement of Boiler and High Pressure Piping Valves including Safety valves for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers valves (including safety valves) for installation in - Boiler plants (water tube boilers, shell boilers, boilers with fluidized bed firing);...
- Standard24 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of equipment for dust handling associated with coal fired steam generating plant for use in the electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers the devices for pneumatic, mechanical and hydraulic conveying of different design.
- Standard25 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of water tube boilers for the use in electricity generating stations(power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of the nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers water tube boilers: - using solid, liquid or gaseous fuels and for heat recovery; - with pulverised fuel, stoker or cyclone firing, gas or oil firing;...
- Standard30 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of any lifting equipment used in the electricity generating stations (power stations). This Guide for procurement is not applicable to equipment used in the nuclear reactor plant area of the nuclear power station. Other possibleapplications of such equipment have been considered in the preparation of this Guide. This Guide covers: - Travelling cranes; - Portal or semi-portal bridge cranes; - Fixed or articulated jigs; - Hoist monorails; - Mobile cranes.
- Standard27 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of processes and equipment for the removal of nitrogen oxides from the flue gas of steam generating plant for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard25 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of main and auxiliary cooling water systems for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers: - pump intake screening plant (coarse and fine screens) and associated cleaning systems; - pressure filters; - pipework and valves; - penstock gates; - priming and venting equipment;...
- Standard25 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of natural draught and mechanical draught dry cooling towers, aircooled condensers and their internals for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers: - water distribution system; - heat exchangers; - supporting frame and footbrigdes;...
- Standard23 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of boiler (with fluidized bed firing) for use in electricity generating stations (power stations). This Guide for Procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard30 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of natural draught and mechanical draught wet and wet/dry (hybrid) cooling tower and cooling towers internals for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers: - water distribution system; - spray assembly; - filling (film packing, splash grids or laths, etc.);...
- Standard23 pagesEnglish languagesale 10% offe-Library read for1 day
This Standard gives guidance on writing the technical specification for the procurement of high pressure piping systems, for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers: - Live steam lines; - Hot reheat lines; - Cold reheat lines; - Feedwater lines; - Spray water lines for HP and RH-attemperators and steam-bypass-systems; - Pump minimum flow and balancing leak off lines;...
- Standard26 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of the pump units for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers: - Feedwater pumps (including the start-up and booster pumps); Condensate pumps and condensate booster pumps; - Condenser cooling water pumps; - Boiler recirculation pumps;...
- Standard31 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of fired and unfired shell boilers for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide. This Guide covers shell boilers: - using solid, liquid or gaseous or derived fuels, waste heat utilisation;...
- Standard29 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of sootblower equipment associated with steam generating plant for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard23 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of dust emission reduction equipment for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard24 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of air heating equipment associated with steam generating plant and gas reheating equipment associated with flue gas treatment plant for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard25 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of equipment for ash handling associated with coal fired steam generating plant for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard24 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of processes and equipment for the removal of sulphur oxides from the flue gas of steam generating plant for use in electricity generations stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard24 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of fans, ducts and dampers associated with steam generating plant and flue gas treatment plant for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard24 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of static a.c. uninterruptible power supplies (UPS's) for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard31 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of steam turbines driving generators for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard38 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of deaerators associated with steam generating plants and steam turbine plant for use in electricity generating stations (power stations). This guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this guide.
- Standard23 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of gas turbines, including gas turbines for combined-cycle systems, and their auxiliairies for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear pouwer stations. Other possible applications of such equipment have not been considered in the preparation of this guide.
- Standard28 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of feedwater heaters for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard25 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of moisture separator reheaters for usein electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this guide.
- Standard24 pagesEnglish languagesale 10% offe-Library read for1 day
This standard gives guidance on writing the technical specification for the procurement of condenser plants for use in electricity generating stations (power stations). This Guide for procurement is not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Other possible applications of such equipment have not been considered in the preparation of this Guide.
- Standard25 pagesEnglish languagesale 10% offe-Library read for1 day