CLC/TC 8X/WG 03 - Requirements for connection of generators to distribution networks
- connection criteria to public distribution networks; - protection criteria (control, switching and protection equipment) - safety criteria; - installation criteria
Requirements for connection of generators to distribution networks
- connection criteria to public distribution networks; - protection criteria (control, switching and protection equipment) - safety criteria; - installation criteria
General Information
This standard provides technical requirements for the connection of generating plants up to and including Type B which can be operated in parallel with a public MV distribution network. They are intended to be used as a technical reference for connection agreements between DSOs and electricity producers and to demonstrate compliance with COMMISSION REGULATION (EU) 2016/631 (Requirements for Generators).
- Standard80 pagesEnglish languagesale 10% offe-Library read for1 day
- Standard81 pagesEnglish languagesale 10% offe-Library read for1 day
- Draft68 pagesEnglish languagesale 10% offe-Library read for1 day
These standards provide technical requirements for the connection of generating plants up to and including Type A (-1-1)/ Type B (-1-2) which can be operated in parallel with a public LV distribution network. They are intended to be used as a technical reference for connection agreements between DNOs and electricity producers and to demonstrate compliance with COMMISSION REGULATION (EU) 2016/631 (Requirements for Generators).
- Standard71 pagesEnglish languagesale 10% offe-Library read for1 day
- Standard71 pagesEnglish languagesale 10% offe-Library read for1 day
- Standard – translation74 pagesSlovenian languagesale 10% offe-Library read for1 day
These standards provide technical requirements for the connection of generating plants up to and including Type A (-1-1)/ Type B (-1-2) which can be operated in parallel with a public LV distribution network. They are intended to be used as a technical reference for connection agreements between DNOs and electricity producers and to demonstrate compliance with COMMISSION REGULATION (EU) 2016/631 (Requirements for Generators).
- Corrigendum2 pagesEnglish languagesale 10% offe-Library read for1 day
- Corrigendum2 pagesEnglish languagesale 10% offe-Library read for1 day
- Corrigendum – translation2 pagesSlovenian languagesale 10% offe-Library read for1 day
2019-09-17: No XML available because of the template of CLC corrigendum
- Corrigendum6 pagesEnglish languagesale 10% offe-Library read for1 day