WG 4 (temporary) - Wheeled, tracked or legged robots - Outdoor Wheeled Inspection Robot System for Substation. (To be formally established after the approval of the 129/67/NP)
- Abstract
To study and prepare the draft for Part 3-11: Outdoor Wheeled Inspection Robot System for Substation — General requirement, test methods and acceptance criteria
This document specifies the system composition, operating environment, functional requirement, performance requirements, test requirements, marking, packaging, transportation, and storage of outdoor wheeled inspection robot system for substations.
(To be formally established after the approval of the NP)- Slovenian
Wheeled, tracked or legged robots - Outdoor Wheeled Inspection Robot System for Substation. (To be formally established after the approval of the 129/67/NP)
To study and prepare the draft for Part 3-11: Outdoor Wheeled Inspection Robot System for Substation — General requirement, test methods and acceptance criteria
This document specifies the system composition, operating environment, functional requirement, performance requirements, test requirements, marking, packaging, transportation, and storage of outdoor wheeled inspection robot system for substations.
(To be formally established after the approval of the NP)
There are no results that match your search criteria
Frequently Asked Questions
WG 4 (temporary) is a Technical Committee within the International Electrotechnical Commission (IEC). It is named "Wheeled, tracked or legged robots - Outdoor Wheeled Inspection Robot System for Substation. (To be formally established after the approval of the 129/67/NP)" and is responsible for: To study and prepare the draft for Part 3-11: Outdoor Wheeled Inspection Robot System for Substation — General requirement, test methods and acceptance criteria This document specifies the system composition, operating environment, functional requirement, performance requirements, test requirements, marking, packaging, transportation, and storage of outdoor wheeled inspection robot system for substations. (To be formally established after the approval of the NP) This committee has published 0 standards.
WG 4 (temporary) develops IEC standards in the area of Information technology. The scope of work includes: To study and prepare the draft for Part 3-11: Outdoor Wheeled Inspection Robot System for Substation — General requirement, test methods and acceptance criteria This document specifies the system composition, operating environment, functional requirement, performance requirements, test requirements, marking, packaging, transportation, and storage of outdoor wheeled inspection robot system for substations. (To be formally established after the approval of the NP) Currently, there are 0 published standards from this technical committee.
The International Electrotechnical Commission (IEC) is the world's leading organization for the preparation and publication of international standards for electrical, electronic, and related technologies. Founded in 1906, the IEC provides a global platform for companies, industries, and governments to meet, discuss, and develop the international standards they require.
A Technical Committee (TC) in IEC is a group of experts responsible for developing international standards in a specific technical area. TCs are composed of national member body delegates and work through consensus to create standards that meet global industry needs. Each TC may have subcommittees (SCs) and working groups (WGs) for specialized topics.