EN 50090-7-1:2004
(Main)Home and Building Electronic Systems (HBES) - Part 7-1: System management - Management procedures
Home and Building Electronic Systems (HBES) - Part 7-1: System management - Management procedures
This international standard establishes general principles for network- and device-management shared by and independent of the installation mode. The goal is to standardize the interaction, between a management client and a management server, that shall lead to the successful configuration of the devices. In this way, these management procedures thus specify the highest level communication requirements between a management client and a management server. These requirements specify: a) the sequence of messages that shall be exchanged between a management client and a management server, and b) the contents and interpretation of the transported data, and c) the action to take based on these data (setting internal resources, state machines, physical actions, …), and d) the error and exception handling. The management procedures base on the application layer services. Some management procedures solely base on the use of one or a sequence of dedicated application layer services to achieve the required goal. For these, the documents EN 50090-4-1 and EN 50090-4-2 provide sufficient information for the underlying mechanisms. Other management procedures additionally use the application layer services to access internal data in the management server to achieve the required goal. These data are laid down as objects as specified in EN 50090 3 2.
Elektrische Systemtechnik für Heim und Gebäude (ESHG) - Teil 7-1: Systemmanagement - Managementverfahren
Systèmes électroniques pour les foyers domestiques et les bâtiments (HBES) - Partie 7-1: Management système - Procédures de management
Stanovanjski in stavbni elektronski sistemi (HBES) – 7-1. del: Upravljanje sistema – Upravljalni proces
General Information
Standards Content (Sample)
SLOVENSKI SIST EN 50090-7-1:2005
STANDARD
september 2005
Stanovanjski in stavbni elektronski sistemi (HBES) – 7-1. del: Upravljanje
sistema – Upravljalni proces
Home and Building Electronic Systems (HBES) – Part 7-1: System management –
Management procedures
ICS 97.120 Referenčna številka
© Standard je založil in izdal Slovenski inštitut za standardizacijo. Razmnoževanje ali kopiranje celote ali delov tega dokumenta ni dovoljeno
EUROPEAN STANDARD EN 50090-7-1
NORME EUROPÉENNE
EUROPÄISCHE NORM February 2004
ICS 97.120 Supersedes R205-011:1996
English version
Home and Building Electronic Systems (HBES)
Part 7-1: System management -
Management procedures
Systèmes électroniques pour les foyers Elektrische Systemtechnik für Heim
domestiques et les bâtiments (HBES) und Gebäude (ESHG)
Partie 7-1: Management système - Teil 7-1: Systemmanagement -
Procédures de management Managementverfahren
This European Standard was approved by CENELEC on 2003-12-02. CENELEC members are bound to
comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European
Standard the status of a national standard without any alteration.
Up-to-date lists and bibliographical references concerning such national standards may be obtained on
application to the Central Secretariat or to any CENELEC member.
This European Standard exists in one official version (English). A version in any other language made by
translation under the responsibility of a CENELEC member into its own language and notified to the Central
Secretariat has the same status as the official version.
CENELEC members are the national electrotechnical committees of Austria, Belgium, Cyprus, Czech
Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia,
Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Slovakia, Slovenia, Spain, Sweden,
Switzerland and United Kingdom.
CENELEC
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung
Central Secretariat: rue de Stassart 35, B - 1050 Brussels
© 2004 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members.
Ref. No. EN 50090-7-1:2004 E
Contents
Foreword .7
Introduction.8
1 Scope.8
2 Normative references.9
3 Terms and definitions and abbreviations.9
3.1 Terms and definitions .9
3.2 Abbreviations.11
4 Network management procedures .11
4.1 General.11
4.2 NM_IndividualAddress_Read.12
4.2.1 Description.12
4.2.2 Used management service .12
4.2.3 Sequence.12
4.2.4 Exception handling .12
4.3 NM_IndividualAddress_Write.12
4.3.1 Description.12
4.3.2 Used management services.13
4.3.3 Sequence.13
4.3.4 Exception handling .14
4.4 NM_SerialNumberDefaultIA_Scan.15
4.4.1 Description.15
4.4.2 Used management service .15
4.4.3 Sequence.15
4.4.4 Exception Handling.15
4.5 NM_IndividualAddress_SerialNumber_Read.15
4.5.1 Description.15
4.5.2 Used management service .15
4.5.3 Sequence.16
4.5.4 Exception handling .16
4.6 NM_IndividualAddress_SerialNumber_Write.16
4.6.1 Description.16
4.6.2 Used management services.16
4.6.3 Sequence.17
4.6.4 Exception handling .17
4.7 NM_DomainAddress_Read.17
4.7.1 Description.17
4.7.2 Used management service .17
4.7.3 Sequence.18
4.7.4 Exception handling .18
4.8 NM_DomainAddress_Write.18
4.8.1 Description.18
4.8.2 Used management services.18
4.8.3 Sequence.19
4.8.4 Exception handling .20
4.9 NM_DomainAddress_Scan.20
4.9.1 Description.20
– 3 – EN 50090-7-1:2004
4.9.2 Used management service .20
4.9.3 Sequence.21
4.9.4 Exception handling .21
4.10 NM_Router_Scan.21
4.10.1 Description.21
4.10.2 Used management service .21
4.10.3 Sequence.22
4.11 NM_SubnetworkDevices_Scan.22
4.11.1 Description.22
4.11.2 Used management service .22
4.11.3 Sequence.23
4.12 NM_SubnetworkAddress_Read.23
4.12.1 Description.23
4.12.2 Used management service .23
4.12.3 Sequence.23
4.12.4 Exception handling .23
4.13 NM_IndividualAddress_Reset.24
4.13.1 Description.24
4.13.2 Used management services.24
4.13.3 Sequence.24
4.14 NM_IndividualAddress_Scan.25
4.14.1 Description.25
4.14.2 Used management services.25
4.14.3 Sequence.25
4.14.4 Possible Reactions.25
4.15 NM_IndividualAddress_Check.25
4.15.1 Description.25
4.15.2 Used management services.26
4.15.3 Sequence.26
4.16 NM_IndividualAddress_Check_LocalSubnetwork.27
4.16.1 Description.27
4.16.2 Used management service .27
4.16.3 Sequence.27
4.17 NM_GroupAddress_Check.27
4.17.1 Description.27
4.17.2 Used management service .27
4.17.3 Sequence.28
4.17.4 Exception handling .28
4.18 NM_FunctionalBlock_Scan.28
4.18.1 Description.28
4.18.2 Used management service .28
4.18.3 Sequence.29
4.18.4 Exception handling .29
5 Device management procedures.30
5.1 General.30
5.2 General exception handling.30
5.3 DM_Connect.30
5.3.1 General Description.30
5.3.2 Procedure: DMP_Connect_RCo.30
5.3.3 Procedure: DMP_Connect_RCl.31
5.4 DM_Disconnect .32
5.4.1 General Description.32
5.4.2 Procedure: DMP_Disconnect_RCo .32
5.4.3 Procedure: DMP_Disconnect_RCl .33
5.5 DM_Authorize.33
5.5.1 General Description.33
5.5.2 Procedure: DMP_Authorize_RCo.33
5.6 DM_SetKey.34
5.6.1 General description.34
5.6.2 Procedure: DM_SetKey_RCo.34
5.7 DM_Restart.35
5.7.1 General descrip
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.