ISO 22192:2021
(Main)Bunkering of marine fuel using the Coriolis mass flow meter (MFM) system
Bunkering of marine fuel using the Coriolis mass flow meter (MFM) system
This document specifies procedures and requirements for the transfer of bunkers to vessels by bunker tankers using the Coriolis mass flow meter (MFM) system. It encompasses the process leading to the approval of the MFM system as installed on bunker tankers and post-approval bunkering operation. It covers terminology, specifications, requirements and procedures on metrology, system integrity, metering system selection and installation, MFM system verification, bunker delivery and dispute handling. NOTE Local and international regulations, such as the International Convention for the Prevention of Pollution from Ships (MARPOL) can apply.
Soutage de fioul marin à l’aide d’un débitmètre massique (MFM) selon le principe de Coriolis
General Information
Buy Standard
Standards Content (Sample)
INTERNATIONAL ISO
STANDARD 22192
First edition
2021-01
Bunkering of marine fuel using the
Coriolis mass flow meter (MFM) system
Soutage de fioul marin à l’aide d’un débitmètre massique (MFM) selon
le principe de Coriolis
Reference number
©
ISO 2021
© ISO 2021
All rights reserved. Unless otherwise specified, or required in the context of its implementation, no part of this publication may
be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting
on the internet or an intranet, without prior written permission. Permission can be requested from either ISO at the address
below or ISO’s member body in the country of the requester.
ISO copyright office
CP 401 • Ch. de Blandonnet 8
CH-1214 Vernier, Geneva
Phone: +41 22 749 01 11
Email: copyright@iso.org
Website: www.iso.org
Published in Switzerland
ii © ISO 2021 – All rights reserved
Contents Page
Foreword .v
Introduction .vi
1 Scope . 1
2 Normative references . 1
3 Terms and definitions . 1
4 General requirements (safety, health and the environment) . 7
5 Metrological requirements . 7
5.1 General . 7
5.2 Mass flow meter requirement. 7
5.3 Mass flow meter system requirements . 8
5.4 Post approval maintenance . 9
5.4.1 Meter zero verification frequency . 9
5.4.2 Zero verification procedure . 9
5.4.3 Meter and ancillary devices verification and/or calibration frequency . 9
5.4.4 Software upgrade/ software update . 9
6 System integrity requirements .10
6.1 General .10
6.2 Metrological control .10
6.2.1 Documentation .10
6.2.2 Type approval and pattern evaluation .10
6.3 Security features .10
6.3.1 Equipment security .10
6.3.2 Software security .10
6.3.3 Data security . .11
6.3.4 Critical alarm .11
6.4 Installation and commissioning .11
6.4.1 Pre-installation and MFM system sealing plan .11
6.4.2 Installation and re-installation .11
6.4.3 Commissioning .11
6.4.4 Re-commissioning .12
6.5 Operational security .12
6.6 Maintenance and control of MFM system .12
6.6.1 Inspection and verification .12
6.6.2 Breaking of seals and re-sealing of MFM system .12
7 Meter selection and installation requirements.12
7.1 General .12
7.2 Site survey onboard tankers.13
7.3 Meter selection .13
7.4 Meter installation.13
7.5 Meter commissioning .14
8 MFM system verification requirements.14
9 Metering procedures .14
9.1 General .14
9.2 Documentation .14
9.2.1 General.14
9.2.2 Pre-delivery documentation .15
9.2.3 Post-delivery documentation .15
9.3 Additional documentation for bunker surveyor .15
9.4 Additional documentation for bunker tanker .16
9.4.1 Meter totalizer log .16
9.4.2 Documents carried onboard the bunker tanker .16
9.5 Planning f or bunkering operation .17
9.6 Pre-delivery procedures .17
9.6.1 Flow measurement conditions and checks on system integrity .17
9.6.2 Pre-delivery conference .17
9.6.3 Bunker requisition form (mass flow metering) .17
9.6.4 Mass flow metering system seals checklist .18
9.6.5 Meter reading record form (delivery) .18
9.7 Delivery procedures .19
9.7.1 General.19
9.7.2 Start of delivery .19
9.7.3 End of delivery .20
9.8 Post-delivery procedures and checks .21
9.8.1 Meter reading record form (delivery) .21
9.8.2 Mass flow metering system seals checklist .21
9.8.3 Bunker metering ticket.21
9.8.4 Bunker delivery note .21
9.8.5 Custody transfer quantity .22
9.9 Others .23
9.9.1 MFM system failure .23
9.9.2 Quantity dispute .23
10 Sampling .23
Annex A (informative) Safety, health and the environment .24
Annex B (informative) Uncertainty budget table .28
Annex C (informative) Metrological and system integrity requirements .29
Annex D (informative) Procedures for zero verification .30
Annex E (informative) Sealable bolts and nuts for blanks and ancillary device .31
Annex F (informative) Request for information checklist .
...
INTERNATIONAL ISO
STANDARD 22192
First edition
2021-01
Bunkering of marine fuel using the
Coriolis mass flow meter (MFM) system
Soutage de fioul marin à l’aide d’un débitmètre massique (MFM) selon
le principe de Coriolis
Reference number
©
ISO 2021
© ISO 2021
All rights reserved. Unless otherwise specified, or required in the context of its implementation, no part of this publication may
be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting
on the internet or an intranet, without prior written permission. Permission can be requested from either ISO at the address
below or ISO’s member body in the country of the requester.
ISO copyright office
CP 401 • Ch. de Blandonnet 8
CH-1214 Vernier, Geneva
Phone: +41 22 749 01 11
Email: copyright@iso.org
Website: www.iso.org
Published in Switzerland
ii © ISO 2021 – All rights reserved
Contents Page
Foreword .v
Introduction .vi
1 Scope . 1
2 Normative references . 1
3 Terms and definitions . 1
4 General requirements (safety, health and the environment) . 7
5 Metrological requirements . 7
5.1 General . 7
5.2 Mass flow meter requirement. 7
5.3 Mass flow meter system requirements . 8
5.4 Post approval maintenance . 9
5.4.1 Meter zero verification frequency . 9
5.4.2 Zero verification procedure . 9
5.4.3 Meter and ancillary devices verification and/or calibration frequency . 9
5.4.4 Software upgrade/ software update . 9
6 System integrity requirements .10
6.1 General .10
6.2 Metrological control .10
6.2.1 Documentation .10
6.2.2 Type approval and pattern evaluation .10
6.3 Security features .10
6.3.1 Equipment security .10
6.3.2 Software security .10
6.3.3 Data security . .11
6.3.4 Critical alarm .11
6.4 Installation and commissioning .11
6.4.1 Pre-installation and MFM system sealing plan .11
6.4.2 Installation and re-installation .11
6.4.3 Commissioning .11
6.4.4 Re-commissioning .12
6.5 Operational security .12
6.6 Maintenance and control of MFM system .12
6.6.1 Inspection and verification .12
6.6.2 Breaking of seals and re-sealing of MFM system .12
7 Meter selection and installation requirements.12
7.1 General .12
7.2 Site survey onboard tankers.13
7.3 Meter selection .13
7.4 Meter installation.13
7.5 Meter commissioning .14
8 MFM system verification requirements.14
9 Metering procedures .14
9.1 General .14
9.2 Documentation .14
9.2.1 General.14
9.2.2 Pre-delivery documentation .15
9.2.3 Post-delivery documentation .15
9.3 Additional documentation for bunker surveyor .15
9.4 Additional documentation for bunker tanker .16
9.4.1 Meter totalizer log .16
9.4.2 Documents carried onboard the bunker tanker .16
9.5 Planning f or bunkering operation .17
9.6 Pre-delivery procedures .17
9.6.1 Flow measurement conditions and checks on system integrity .17
9.6.2 Pre-delivery conference .17
9.6.3 Bunker requisition form (mass flow metering) .17
9.6.4 Mass flow metering system seals checklist .18
9.6.5 Meter reading record form (delivery) .18
9.7 Delivery procedures .19
9.7.1 General.19
9.7.2 Start of delivery .19
9.7.3 End of delivery .20
9.8 Post-delivery procedures and checks .21
9.8.1 Meter reading record form (delivery) .21
9.8.2 Mass flow metering system seals checklist .21
9.8.3 Bunker metering ticket.21
9.8.4 Bunker delivery note .21
9.8.5 Custody transfer quantity .22
9.9 Others .23
9.9.1 MFM system failure .23
9.9.2 Quantity dispute .23
10 Sampling .23
Annex A (informative) Safety, health and the environment .24
Annex B (informative) Uncertainty budget table .28
Annex C (informative) Metrological and system integrity requirements .29
Annex D (informative) Procedures for zero verification .30
Annex E (informative) Sealable bolts and nuts for blanks and ancillary device .31
Annex F (informative) Request for information checklist .
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.