Water quality — Sampling — Part 11: Guidance on sampling of groundwaters

ISO 5667-11:2009 provides guidance on the sampling of groundwaters. It informs the user of the necessary considerations when planning and undertaking groundwater sampling to survey the quality of groundwater supply, to detect and assess groundwater contamination and to assist in groundwater resource management, protection and remediation. ISO 5667-11:2009 does not apply to sampling related to the day-to-day operational control of groundwater abstractions for potable purposes. The guidance includes sampling of groundwater from both the saturated (below water table) zone and the unsaturated (above the water table) zone.

Qualité de l'eau — Échantillonnage — Partie 11: Lignes directrices pour l'échantillonnage des eaux souterraines

Kakovost vode - Vzorčenje - 11. del: Navodilo za vzorčenje podzemne vode

Ta del ISO 5667 določa navodilo za vzorčenje podzemne vode. Uporabnika informira o nujnih premislekih pri načrtovanju in izvajanju vzorčenja podzemne vode za pregledovanje kakovosti zaloge podzemne vode, za zaznavanje in ocenjevanje onesnaženja podzemne vode in za pomoč pri upravljanju virov podzemnih voda, njihovem varovanju in sanaciji. Navodilo vključuje vzorčenje podzemne vode iz nasičene cone (pod vodno ravnijo) in nenasičene cone (nad vodno ravnijo).

General Information

Status
Published
Publication Date
15-Apr-2009
Current Stage
9093 - International Standard confirmed
Completion Date
20-Jan-2020

Relations

Buy Standard

Standard
ISO 5667-11:2009
English language
26 pages
sale 15% off
Preview
sale 15% off
Preview
Standard
ISO 5667-11:2009 - Water quality -- Sampling
English language
26 pages
sale 15% off
Preview
sale 15% off
Preview
Standard
ISO 5667-11:2010
English language
33 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

МЕЖДУНАРОДНЫЙ ISO
СТАНДАРТ 5667-11
Второе издание
2009-04-15


Качество воды. Отбор проб.
Часть 11.
Руководство по отбору проб
грунтовых вод
Water quality — Sampling —
Part 11: Guidance on sampling of groundwaters




Ответственность за подготовку русской версии несёт GOST R
(Российская Федерация) в соответствии со статьёй 18.1 Устава
Ссылочный номер
ISO 5667-11:2009(R)
©
ISO 2009

---------------------- Page: 1 ----------------------
ISO 5667-11:2009(R)
Отказ от ответственности при работе в PDF
Настоящий файл PDF может содержать интегрированные шрифты. В соответствии с условиями лицензирования, принятыми
фирмой Adobe, этот файл можно распечатать или вывести на экран, но его нельзя изменить, пока не будет получена
лицензия на загрузку интегрированных шрифтов в компьютер, на котором ведется редактирование. В случае загрузки
настоящего файла заинтересованные стороны принимают на себя ответственность за соблюдение лицензионных условий
фирмы Adobe. Центральный секретариат ISO не несет никакой ответственности в этом отношении.
Adobe торговый знак фирмы Adobe Systems Incorporated.
Подробности, относящиеся к программным продуктам, использованным для создания настоящего файла PDF, можно найти в
рубрике General info файла; параметры создания PDF были оптимизированы для печати. Были приняты во внимание все
меры предосторожности с тем, чтобы обеспечить пригодность настоящего файла для использования комитетами-членами
ISO. В редких случаях возникновения проблемы, связанной со сказанным выше, просьба проинформировать Центральный
секретариат по адресу, приведенному ниже.


ДОКУМЕНТ ЗАЩИЩЕН АВТОРСКИМ ПРАВОМ


©  ISO 2009
Все права сохраняются. Если не указано иное, никакую часть настоящей публикации нельзя копировать или использовать в
какой-либо форме или каким-либо электронным или механическим способом, включая фотокопии и микрофильмы, без
предварительного письменного согласия ISO по соответствующему адресу, указанному ниже, или комитета-члена ISO в стране
заявителя.
ISO copyright office
Case postale 56 • CH-1211 Geneva 20
Tel. + 41 22 749 01 11
Fax + 41 22 749 09 47
E-mail copyright@iso.org
Web www.iso.org
Опубликовано в Швейцарии

ii © ISO 2009 – Все права сохраняются

---------------------- Page: 2 ----------------------
ISO 5667-11:2009(R)
Содержание Страница
Предисловие .iv
Введение .vi
1 Область применения .1
2 Нормативные ссылки .1
3 Термины и определения .1
4 Разработка стратегии и программы для отбора проб .4
4.1 Общие положения .4
4.2 Выбор мест отбора проб .5
4.3 Выбор параметров грунтовых вод.8
4.4 Частота отбора проб.8
5 Типы установок для мониторинга и метод отбора проб.9
5.1 Общие положения .9
5.2 Мониторинг ненасыщенной зоны .9
5.3 Насыщенная зона .13
6 Процедуры отбора проб .17
6.1 Очистка .17
6.2 Разведочные шурфы.22
6.3 Отбор проб на наличие загрязняющих веществ в свободной фазе (DNAPLs и LNAPLs).22
6.4 Материалы для пробоотборного оборудования .23
6.5 Предотвращение загрязнения.23
7 Меры безопасности.24
8 Идентификация пробы и отчеты.26
9 Гарантия качества/контроль качества .27
Приложение A (информативное) Расчет частоты отбора проб с использованием
номограммы .28
Приложение B (информативное) Пример отчета. Отбор проб из грунтовых вод.29
Библиография.30

© ISO 2009 – Все права сохраняются iii

---------------------- Page: 3 ----------------------
ISO 5667-11:2009(R)
Предисловие
Международная организация по стандартизации (ISO) является всемирной федерацией национальных
организаций по стандартизации (комитетов-членов ISO). Разработка международных стандартов
обычно осуществляется техническими комитетами ISO. Каждый комитет-член, заинтересованный в
деятельности, для которой был создан технический комитет, имеет право быть представленным в этом
комитете. Международные правительственные и неправительственные организации, имеющие связи с
ISO, также принимают участие в работах. ISO осуществляет тесное сотрудничество с международной
электротехнической комиссией (IEC) по всем вопросам стандартизации в области электротехники.
Проекты международных стандартов разрабатываются по правилам, указанным в Директивах ISO/IEC,
Часть 2.
Главная задача технических комитетов состоит в разработке международных стандартов. Проекты
международных стандартов, принятые техническими комитетами, рассылаются комитетам-членам на
голосование. Их опубликование в качестве международных стандартов требует одобрения, по
меньшей мере, 75 % комитетов-членов, принимающих участие в голосовании.
Обращается внимание на возможность патентования некоторых элементов данного международного
стандарта. ISO не несет ответственности за идентификацию какого-либо или всех таких патентных
прав.
ISO 5667-11 был подготовлен Техническим комитетом ISO/TC 147, Качество воды, Подкомитетом SC 6,
Отбор проб (общие методы).
Это второе издание отменяет и заменяет первое издание (ISO 5667-11:1993) и ISO 5667-18:2001,
которое технически пересмотрено
ISO 5667 состоит из следующих частей под общим заглавием Качество воды. Отбор проб:
⎯ Часть 1. Качество воды. Отбор проб. Часть 1. Руководство по составлению программ и
методикам отбора проб
⎯ Часть 3. Руководство по хранению и обращению с пробами воды
⎯ Часть 4. Руководство по отбору проб из естественных и искусственных озер
⎯ Часть 5. Руководство по отбору проб питьевой воды из очистных сооружений и
трубопроводных распределительных систем
⎯ Часть 6. Руководство по отбору проб из рек и потоков
⎯ Часть 7. Руководство по отбору проб воды и пара из котельных установок
⎯ Часть 8. Руководство по отбору проб влажных осаждений
⎯ Часть 9. Руководство по отбору проб морской воды
⎯ Часть 10. Руководство по отбору проб из сточных вод
⎯ Часть 11. Руководство по отбору проб грунтовых вод
⎯ Часть 12. Руководство по отбору проб из донных отложений
iv © ISO 2009 – Все права сохраняются

---------------------- Page: 4 ----------------------
ISO 5667-11:2009(R)
⎯ Часть 13. Рекомендации по отбору проб шлама сточных вод и на сооружениях водоочистки
⎯ Часть 14. Руководство по обеспечению качества при отборе проб природных вод и обращении
с ними
⎯ Часть 15. Руководство по консервированию и обработке проб осадка и отложений
⎯ Часть 16. Руководство по биотестированию проб
⎯ Часть 17. Руководство по отбору валовых проб взвешенных твердых частиц
⎯ Часть 18. Руководство по отбору проб подземных вод на загрязненных участках
⎯ Часть 19. Руководство по отбору проб в морских отложениях
⎯ Часть 20. Руководство по использованию данных об образцах для принятия решения.
Соответствие с пороговыми и классификационными системами
⎯ Часть 21. Руководство по отбору проб питьевой воды, распределяемой цистернами или
другими средствами, кроме водопроводных труб
⎯ Часть 22. Руководство по проектированию и размещению мест для отбора проб грунтовых
вод
⎯ Часть 23. Определение значительных загрязнений в поверхностных водах методом пассивного
отбора проб
Эту часть ISO 5667 следует использовать вместе с другими частями, в частности с ISO 5667-1 и
ISO 5667-3.
© ISO 2009 – Все права сохраняются v

---------------------- Page: 5 ----------------------
ISO 5667-11:2009(R)
Введение
Настоящая часть ISO 5667 является пересмотром ISO 5667-11:1993, Руководство по отбору проб
грунтовых вод, и ISO 5667-18:2001, Руководство по отбору проб грунтовых вод на загрязненных
участках.
Руководство в этой части ISO 5667 можно использовать параллельно с другим руководством по отбору
проб для контроля качества воды и/или исследования загрязненных либо потенциально загрязненных
участков, так как отбор проб любых грунтовых вод из таких участков может составить часть гораздо
более широкой исследовательской программы.
Разработка программы отбора проб грунтовых вод зависит от целей исследования. Определение цели
отбора проб грунтовых вод является существенной предпосылкой для установления принципов,
которые должны применяться для решения конкретных проблем отбора проб.
Принципы, установленные в этой части ISO 5667, распространяются также на следующие более
детализированные цели:
a) определить пригодность грунтовых вод как источника питьевой воды или
промышленной/сельскохозяйственной воды;
b) идентифицировать на ранней стадии загрязнения водоносных пластов, вызываемые потенциально
опасной поверхностной или подземной деятельностью (например, работы в местах сброса
сточных вод, загрязнение почвы, промышленная деятельность, разработка минеральных
месторождений, сельскохозяйственные работы, перемены в землепользовании), и определить
потенциал воздействия этих загрязнений на поверхностные воды и на другие возможные
приемники в окрестности этого участка;
c) установить, происходит ли миграция загрязняющих веществ, для того чтобы оценить их
воздействие на качество подземных вод и калибровать и валидировать подходящие модели
качества грунтовых вод;
d) способствовать пониманию изменений качества и течения грунтовых вод, включая изменения,
вызванные намеренными действиями (например, изменения режимов откачивания грунтовых вод,
искусственное пополнение, вызванное стоком, очистка поверхности на загрязненных участках),
для того чтобы обеспечить оптимальное управление природными ресурсами, получить данные
для проведения оценки рисков и обеспечить применение закона об охране окружающей среды;
e) способствовать выбору мер по устранению неисправностей и разработке процесса исправления и
отслеживать выполнение и эффективность этих мер или технического проектирования;
f) продемонстрировать соответствие лицензионным условиям или собрать доказательства для
целей регулирования;
g) идентифицировать и описать отдельные водоемы.
Примеры ситуаций, где может быть использовано это руководство, включают:
⎯ общие обследования качества грунтовых вод для химической и микробиологической оценок;
⎯ исследование настоящих или бывших промышленных участков с историей проведения
потенциально загрязняющих мероприятий;
⎯ исследование грунтовых вод и мониторинг участков удаления отходов (мусорные свалки);
vi © ISO 2009 – Все права сохраняются

---------------------- Page: 6 ----------------------
ISO 5667-11:2009(R)
⎯ исследование участков, где естественные и/или искусственные процессы привели к
потенциальному загрязнению земель и грунтовых вод;
⎯ исследование участков, где различные продукты были разлиты или выброшены в результате
несчастных случаев или непредвиденных обстоятельств, например аварии при транспортировке.
Руководящие указания, содержащиеся в этой части ISO 5667, распространяются на выбор мест отбора
проб, монтажа и оборудования для отбора проб, параметров грунтовых вод и частоты отбора проб.
Нормативное руководство на методы и их применение невозможно. Поэтому данное руководство
обеспечивает информацию о большинстве обычно применяемых и имеющихся методов и дает
перечни их преимуществ, недостатков и ограничений использования, где это известно. При анализе
разработки стратегий отбора проб необходимо рассматривать свойства системы грунтовых вод
(водоносных пластов), проектирование пунктов мониторинга, источник (и) загрязнений, пути миграции
и приемники.
© ISO 2009 – Все права сохраняются vii

---------------------- Page: 7 ----------------------
МЕЖДУНАРОДНЫЙ СТАНДАРТ ISO 5667-11:2009(R)

Качество воды. Отбор проб.
Часть 11.
Руководство по отбору проб грунтовых вод
1 Область применения
В настоящей части ISO 5667 даются руководящие указания по отбору проб грунтовых вод. Она
информирует пользователя о вопросах, необходимых для рассмотрения при планировании и
проведении отбора проб грунтовых вод для контроля качества эксплуатационных запасов грунтовых
вод, обнаружения и оценки загрязнения грунтовых вод и содействия в управлении ресурсами, защите
и восстановлении грунтовых вод. Эта часть ISO 5667 не распространяется на отбор проб, связанный с
повседневным оперативным контролем заборов грунтовых вод для питьевых нужд. Руководство
включает отбор проб грунтовых вод как из насыщенной зоны (ниже уровня грунтовых вод), так и из
ненасыщенной зоны (выше уровня грунтовых вод).
2 Нормативные ссылки
Следующие ссылочные нормативные документы являются обязательными при применении данного
документа. Для жестких ссылок применяется только цитированное издание документа. Для плавающих
ссылок необходимо использовать самое последнее издание нормативного ссылочного документа
(включая любые изменения).
ISO 772, Гидрометрия. Словарь и условные обозначения
ISO 5667-1:2006, Качество воды. Отбор проб. Часть 1. Руководство по составлению программ и
методикам отбора проб
ISO 5667-3, Качество воды. Отбор проб. Часть 3. Руководство по хранению и обращению с
пробами воды
ISO 5667-14, Качество воды. Отбор проб. Часть 14. Руководство по обеспечению качества при
отборе проб природных вод и обращении с ними
ISO 6107-2, Качество воды. Словарь. Часть 2
3 Термины и определения
Применительно к этому документу используются термины и определения, данные в ISO 6107-2,
ISO 772, и следующие.
3.1
пьезометр
piezometer
прибор, состоящий из трубы или нескольких трубок с пористым элементом или перфорированным
участком (окруженным фильтром) в нижней части (конец пьезометра), который устанавливают и
герметизируют в грунте на соответствующем уровне в пределах насыщенной зоны для измерения
уровня воды, измерения гидравлического давления и/или отбора проб грунтовых вод
© ISO 2009 – Все права сохраняются 1

---------------------- Page: 8 ----------------------
ISO 5667-11:2009(R)
ПРИМЕЧАНИЕ Адаптировано из ISO 6107-2:2006.
3.2
гнездовые (вложенные) пьезометры
nested piezometers
установка нескольких пьезометров
группа пьезометров, установленных на различных глубинах в пределах одной скважины большего
диаметра
ПРИМЕЧАНИЕ 1 В общем, конструкция каждого пьезометра должна позволять проводить отбор проб в заданном
интервале глубины в пределах водоносного пласта. Концы пьезометров изолируются друг от друга путем
создания между ними постоянного непроницаемого герметизирующего слоя.
ПРИМЕЧАНИЕ 2 Адаптировано из ISO 6107-2:2006.
3.3
кустовые скважины
multiple boreholes
группа отдельных скважин или пьезометров, установленных на различных глубинах, но близко друг к
другу, образуя сеть мониторинга, подходящую для целей исследования
ПРИМЕЧАНИЕ Адаптировано из ISO 6107-2:2006.
3.4
многоуровневый пробоотборник
multi-level sampler
единичная установка для отбора проб грунтовых вод с дискретных глубин или диапазона глубин
подземной зоны
ПРИМЕЧАНИЕ 1 Устройство может быть установлено непосредственно в землю или в уже существующую либо
специально пробуренную скважину. При установке в скважину используются интегральные пакеры (или
уплотнительные устройства) для изоляции индивидуальных горизонтов в пределах системы грунтовых вод, из
которых берется проба.
ПРИМЕЧАНИЕ Адаптировано из ISO 6107-2:2006.
3.5
водоносный пласт
aquifer
геологическое водоносное образование (пласт или слой) водопроницаемой породы или рыхлого
материала (например, песок или гравий), способное давать значительное количество воды
[4]
ПРИМЕЧАНИЕ Адаптировано из ISO 6107-3:1993 .
3.6
сцементированный водоносный пласт
consolidated aquifer
водоносный пласт, содержащий материал, который уплотнен за счет цементации или сжатия
3.7
насыщенная зона
saturated zone
часть водоносного пласта, в котором поровые пространства геологического образования целиком
заполнены водой
[ISO 6107-2:2006]
2 © ISO 2009 – Все права сохраняются

---------------------- Page: 9 ----------------------
ISO 5667-11:2009(R)
3.8
ненасыщенная зона
unsaturated zone
часть водоносного пласта, в котором поровые пространства образования не целиком заполнены водой
[ISO 6107-2:2006]
3.9
грунтовая вода
groundwater
вода в насыщенной и/или ненасыщенной зоне подземного геологического образования или
искусственного осаждения, такого как насыпной грунт, например заполняющий материал
3.10
верховодка
perched groundwater
изолированное скопление грунтовой воды, которое ограничено в горизонтальном и вертикальном
распространении, размещено в пределах ненасыщенной зоны, покрывая гораздо более обширное
скопление грунтовой воды, и изолировано сверху слабопроницаемой поверхностью (прерывистым
геологическим образованием, задерживающим воду – “aquitard”)
ПРИМЕЧАНИЕ Адаптировано из ISO 6107-2:2006, “уровень верховодки”.
3.11
рецептор
receptor
объект (социальные, животноводческие, водные, растениеводческие, строительные и другие службы),
восприимчивый к вредному(ым) воздействию(ям) вредных веществ или реактивов
ПРИМЕЧАНИЕ Адаптировано из ISO 6107-2:2006.
3.12
пакер
packer
устройство или материал, которые набухают или расширяются для временной изоляции
определенных вертикальных участков в скважинах, чтобы обеспечить отбор проб грунтовых вод из
отдельных зон или мест в пределах скважины либо водоносного слоя
ПРИМЕЧАНИЕ Адаптировано из ISO 6107-2:2006.
3.13
полевая емкость
field capacity
максимальное количество воды, которое почва или порода могут удерживать после удаления
гравитационной воды
ПРИМЕЧАНИЕ Адаптировано из ISO 6107-2:2006.
3.14
плотные безводные жидкие фазы
dense non-aqueous phase liquids
DNAPLs
органические вещества, которые имеют очень низкую водорастворимость и плотность которых больше
плотности воды
ПРИМЕР Хлорированные углеводороды, например трихлорэтан.
ПРИМЕЧАНИЕ 1 Адаптировано из ISO 6107-2:2006.
ПРИМЕЧАНИЕ 2 Когда DNAPLs присутствуют в недостаточном количестве, они образуют отдельную фазу от
воды.
© ISO 2009 – Все права сохраняются 3

---------------------- Page: 10 ----------------------
ISO 5667-11:2009(R)
3.15
легкие безводные жидкие фазы
light non-aqueous phase liquids
LNAPLs
органические вещества, которые имеют очень низкую водорастворимость и плотность которых меньше
плотности воды
ПРИМЕР Нефтепродукты.
ПРИМЕЧАНИЕ 1 Адаптировано из ISO 6107-2:2006.
ПРИМЕЧАНИЕ 2 Когда LNAPLs присутствуют в недостаточном количестве, они образуют отдельную фазу от
воды.
3.16
колодец
скважина
well
borehole
〈отбор проб грунтовых вод〉 яма, сделанная в земле путем буровых или землеройных работ для
получения грунтовой воды или для наблюдения
[3]
ПРИМЕЧАНИЕ Это определение отличается от определения, данного и в ISO 772:— и ISO 6707-1:2004 .
3.17
источник
spring
грунтовая вода, выходящая через поверхность земли естественным путем
[4]
[ISO 6107-3:1993 ]
3.18
поровая вода
pore water
вода, заполняющая поры или пустоты породы или грунта
3.19
обсадная труба
casing
трубчатая удерживающая конструкция, которую устанавливают в пробуренной скважине или вырытом
колодце для крепления и поддержания ствола и устья скважины
[ISO 772:—]
ПРИМЕЧАНИЕ В контексте отбора проб грунтовых вод “поддержание ствола и устья скважины” означает
предотвращение попадания в скважину твердых материалов водоносного пласта или контроль поступления
грунтовой воды в скважину на установленных глубинах через (скважинный) фильтр. Конструкция может быть
временной или постоянной.
4 Разработка стратегии и программы для отбора проб
4.1 Общие положения
Отбор проб грунтовых вод может проводиться как отдельная операция или как часть больших
инженерно-геологических либо экологических исследований, или как часть
региональной/национальной программы. Независимо от цели должен быть рациональный подход, в
котором четко устанавливаются задачи, определяется уровень необходимой информации и
идентифицируются различные стадии исследования. Должны быть рассмотрены практические
4 © ISO 2009 – Все права сохраняются

---------------------- Page: 11 ----------------------
ISO 5667-11:2009(R)
ограничения, такие как доступ к участку, инфраструктура и расстояние от участка до аналитических
лабораторий.
Следует отметить, что обычно при отборе проб грунтовых вод только из насыщенной зоны не может
быть сделана полная оценка уровня загрязнения под земной поверхностью в ситуациях, когда
существует ненасыщенная зона значительной толщины. Игнорирование ненасыщенной зоны может
привести к тому, что система ненасыщенной зоны и грунтовых вод может быть уже сильно
загрязненной, прежде чем будет получено какое-либо ощутимое свидетельство просачивания или
загрязнения в пробах, собранных ниже уровня грунтовых вод.
4.2 Выбор мест отбора проб
4.2.1 Общие положения
При размещении установок для мониторинга, проектировании сети и выбора пунктов мониторинга для
исследования качества грунтовых вод следует учитывать:
a) гидрологические условия участка исследования;
b) прошлое и будущее использование участка;
c) цель работы;
d) прогнозируемое или известное качество грунтовых вод;
e) характер и степень любого вероятного загрязнения.
Все эти факторы должны быть рассмотрены на предварительных стадиях выполнения программы
мониторинга для обеспечения наиболее подходящей и эффективной стратегии отбора проб. Эта
информация может быть получена путем изучения всей информации, имеющейся у владельцев
участков (или других агентов), в местных, региональных и национальных агентствах регулирования и у
других держателей данных. В Таблице 1 представлен обзор этапов, включенных в разработку
стратегии исследования и для отбора проб грунтовых вод.
При использовании существующих пунктов мониторинга для получения доступа к грунтовым водам,
необходимо определить конструкционные детали и характеристики скважины для идентификации
слоев, из которых берется проба. Когда создаются новые скважины специально для отбора проб,
нужно выбрать конструкцию скважины (например, открытая площадь и протяженность) и метод
конструирования, не только отвечающие требованиям отбора проб, но также сводящие к минимуму
загрязнение или нарушение водоносного пласта.
4.2.2 Контроль качества грунтовых вод для питьевого водоснабжение
Когда проводится мониторинг качества грунтовых вод для питьевого водоснабжения, должны
проверяться скважины, колодцы и источники, из которых берут пробы, для контроля тех параметров,
которые имеют значение для использования воды. В соответствующих случаях следует обратиться к
национальным требованиям отбора проб сырой воды и мониторинга для более детальной
консультации. При выборе мест отбора проб для контроля водоснабжения рекомендуется также
провести мониторинг некоторых скважин, отдаленных от водозабора, для того чтобы исследовать
воздействие водозабора на динамические характеристики водоносного пласта (например, течение
грунтовых вод, изменения толщины насыщенной зоны).
4.2.3 Загрязнение грунтовых вод точечным источником
Чтобы установить степень загрязнения грунтовых вод и направление и скорость миграции
загрязняющих веществ, пункты мониторинга следует размещать внутри и вне любой загрязненной
зоны или зон. Пункты мониторинга вне зоны источника загрязнения следует размещать в местах по
восходящему и нисходящему градиентам участков относительно гидравлического градиента как
© ISO 2009 – Все права сохраняются 5

---------------------- Page: 12 ----------------------
ISO 5667-11:2009(R)
минимум. Дополнительные места отбора проб следует размещать по нисходящему градиенту, а также
внутри и вне любого шлейфа загрязнения.
Когда анализ показывает, что в основании участка лежит сложная геологическая структура или что
есть вероятность присутствия загрязняющих веществ с широким диапазоном физических и химических
свойств, количество пунктов мониторинга увеличивают для адекватного описания распределения
загрязняющих веществ в трех измерениях. Помимо исследования поперечных изменений,
обусловленных гетерогенностью, стратегия отбора проб должна также включать исследование
вертикальных изменений.
Для идентификации преобладающего режима течения требуется особая тщательность, так как
локализованная подпитка грунта может изменить гидравлический градиент. В результате направление
течения грунтовых вод и транспортировки загрязняющих веществ может стать противоположным
течению, обусловленному региональным градиентом. Плотные безводные жидкие фазы (DNAPLs)
могут также перемещаться в другом направлении и с другой скоростью по сравнению с грунтовыми
водами, потому что их химические и физические свойства отличаются от свойств воды (эффекты
плотности). На их миграцию также влияет геологическая структура слоя низкой проницаемости,
лежащего под насыщенным водоносным пластом.
Химические свойства легких безводных жидких фаз (LNAPLs) также отличаются от химических свойств
воды. На их миграцию и распределение влияют геологическая структура, химические взаимодействия
в пределах ненасыщенной зоны и зоны флуктуаций уровня грунтовых вод, а также граница между
водной и газовой фазами.
Когда целью отбора проб является предварительное оповещение о влиянии загрязняющих веществ на
рецепторы, пункты мониторинга следует размещать между источником загрязнения (и шлейфом) и
потенциальными рецепторами, а также в зоне загрязнения. Например, для мусорных свалок пункты
мониторинга должны быть установлены снаружи свалок, но поблизости от них, на соответствующих
глубинах.
Места отбора проб в зоне загрязнения и снаружи (по возрастающему и нисходящему гидравлическому
градиенту) следует устанавливать для измерения рабочих характеристик и эффективности устранения
неисправностей, для демонстрации соответствия лицензионным условиям и для определения
качества грунтовых вод, текущих в зону исследования.

6 © ISO 2009 – Все права сохраняются

---------------------- Page: 13 ----------------------
ISO 5667-11:2009(R)
Таблица 1 — Процедурные этапы для отбора проб грунтовых вод (адаптировано из ссылки [13])
Этап (со ссылкой на другие части
Процедура Основные элементы Примечания
ISO 5667)
Сопоставление имеющихся данных

Стратегия исследования/мониторинга Теоретическое исследование Геологические, геохимические и
Идентификация источников данных
(ISO 5667-1) ↓ гидрогеологические характеристики
Разработка концептуальной модели

Рекогносцировочное исследование Проектирование сети скважин/мест отбора
см. 4.2, 4.3 и 4.4
↓ проб и программа отбора проб
Оценка/выбор существующих пунктов мониторинга См. Раздел 5

Проектирование скважины, выбор
Выбор/установка технических средств Установка пунктов мониторинга бурением
материала и метод установки

Очистка и разработка скважины/колодца См. 6.1
Гидрологические измерения Измерения уровня воды
Контроль скважины/колодца Гидрогеологическое описание
↓ Гидравлические испытания
Удаление или изоляция застойной воды
Репрезентативная грунтовая вода См. 6.1


Очистка скважины/колодцаl Определение параметров очистки
Верификация репрезентативной грунтовой См. 6.2
(например, EC, pH, температура, окислительно-восстановительный
воды
потенциал)
Сбор проб соответствующим механизмом

Полевое определение чувствительных См. 5.2 и 5.3
Полевая отфильтрованная
параметров parameters, pH, электрической
Нефильтрованная проба проба
проводимости, температуры,

Сбор проб окислительно-восстановительного
Органические вещества (все) Растворенные следы металлов
Фильтрация потенциала, растворенного кислорода при
Кислотность/pH для конкретной геохимической
Полевые определения необходимости
Растворенные газы информации
(ISO 5667-1, ISO 5667-3, настоящая часть Пробы, не имеющие сверху свободного См. 6.4 и 6.5
Восприимчивые нео
...

INTERNATIONAL ISO
STANDARD 5667-11
Second edition
2009-04-15


Water quality — Sampling —
Part 11:
Guidance on sampling of groundwaters
Qualité de l'eau — Échantillonnage —
Partie 11: Lignes directrices pour l'échantillonnage des eaux
souterraines





Reference number
ISO 5667-11:2009(E)
©
ISO 2009

---------------------- Page: 1 ----------------------
ISO 5667-11:2009(E)
PDF disclaimer
This PDF file may contain embedded typefaces. In accordance with Adobe's licensing policy, this file may be printed or viewed but
shall not be edited unless the typefaces which are embedded are licensed to and installed on the computer performing the editing. In
downloading this file, parties accept therein the responsibility of not infringing Adobe's licensing policy. The ISO Central Secretariat
accepts no liability in this area.
Adobe is a trademark of Adobe Systems Incorporated.
Details of the software products used to create this PDF file can be found in the General Info relative to the file; the PDF-creation
parameters were optimized for printing. Every care has been taken to ensure that the file is suitable for use by ISO member bodies. In
the unlikely event that a problem relating to it is found, please inform the Central Secretariat at the address given below.


COPYRIGHT PROTECTED DOCUMENT


©  ISO 2009
All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any form or by any means,
electronic or mechanical, including photocopying and microfilm, without permission in writing from either ISO at the address below or
ISO's member body in the country of the requester.
ISO copyright office
Case postale 56 • CH-1211 Geneva 20
Tel. + 41 22 749 01 11
Fax + 41 22 749 09 47
E-mail copyright@iso.org
Web www.iso.org
Published in Switzerland

ii © ISO 2009 – All rights reserved

---------------------- Page: 2 ----------------------
ISO 5667-11:2009(E)
Contents Page
Foreword. iv
Introduction . vi
1 Scope . 1
2 Normative references . 1
3 Terms and definitions. 1
4 Sampling strategy and programme design. 4
4.1 General. 4
4.2 Selection of sampling point location. 4
4.3 Groundwater parameter selection . 7
4.4 Sampling frequency. 7
5 Types of monitoring installation and sampling method. 8
5.1 General. 8
5.2 Unsaturated zone monitoring. 8
5.3 Saturated zone . 11
6 Sampling procedures . 15
6.1 Purging . 15
6.2 Trial pits . 19
6.3 Sampling of free-phase contaminants (DNAPLs and LNAPLs) . 19
6.4 Materials for sampling equipment . 19
6.5 Prevention of contamination . 20
7 Safety precautions. 21
8 Sample identification and records. 22
9 Quality assurance/quality control. 23
Annex A (informative) Calculation of sampling frequency using nomogram. 24
Annex B (informative) Example of a report — Sampling from groundwaters. 25
Bibliography . 26

© ISO 2009 – All rights reserved iii

---------------------- Page: 3 ----------------------
ISO 5667-11:2009(E)
Foreword
ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies
(ISO member bodies). The work of preparing International Standards is normally carried out through ISO
technical committees. Each member body interested in a subject for which a technical committee has been
established has the right to be represented on that committee. International organizations, governmental and
non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely with the
International Electrotechnical Commission (IEC) on all matters of electrotechnical standardization.
International Standards are drafted in accordance with the rules given in the ISO/IEC Directives, Part 2.
The main task of technical committees is to prepare International Standards. Draft International Standards
adopted by the technical committees are circulated to the member bodies for voting. Publication as an
International Standard requires approval by at least 75 % of the member bodies casting a vote.
Attention is drawn to the possibility that some of the elements of this document may be the subject of patent
rights. ISO shall not be held responsible for identifying any or all such patent rights.
ISO 5667-11 was prepared by Technical Committee ISO/TC 147, Water quality, Subcommittee SC 6,
Sampling (general methods).
This second edition cancels and replaces the first edition (ISO 5667-11:1993) and ISO 5667-18:2001, which
have been technically revised.
ISO 5667 consists of the following parts, under the general title Water quality — Sampling:
⎯ Part 1: Guidance on the design of sampling programmes and sampling techniques
⎯ Part 3: Guidance on the preservation and handling of water samples
⎯ Part 4: Guidance on sampling from lakes, natural and man-made
⎯ Part 5: Guidance on sampling of drinking water from treatment works and piped distribution systems
⎯ Part 6: Guidance on sampling of rivers and streams
⎯ Part 7: Guidance on sampling of water and steam in boiler plants
⎯ Part 8: Guidance on the sampling of wet deposition
⎯ Part 9: Guidance on sampling from marine waters
⎯ Part 10: Guidance on sampling of waste waters
⎯ Part 11: Guidance on sampling of groundwaters
⎯ Part 12: Guidance on sampling of bottom sediments
⎯ Part 13: Guidance on sampling of sludges from sewage and water treatment works
⎯ Part 14: Guidance on quality assurance of environmental water sampling and handling
⎯ Part 15: Guidance on preservation and handling of sludge and sediment samples
iv © ISO 2009 – All rights reserved

---------------------- Page: 4 ----------------------
ISO 5667-11:2009(E)
⎯ Part 16: Guidance on biotesting of samples
⎯ Part 17: Guidance on sampling of suspended sediments
⎯ Part 19: Guidance on sampling of marine sediments
⎯ Part 20: Guidance on the use of sampling data for decision making — Compliance with thresholds and
classification systems
⎯ Part 21: Guidance on sampling of drinking water distributed by tankers or means other than distribution
pipes
⎯ Part 22: Guidance on design and installation of groundwater sample points
⎯ Part 23: Determination of significant pollutants in surface waters using passive sampling
This part of ISO 5667 should be read in conjunction with other parts, in particular ISO 5667-1 and ISO 5667-3.
© ISO 2009 – All rights reserved v

---------------------- Page: 5 ----------------------
ISO 5667-11:2009(E)
Introduction
This part of ISO 5667 is a revision of both ISO 5667-11:1993, Guidance on sampling of groundwaters and
ISO 5667-18:2001, Guidance on sampling of groundwater at contaminated sites.
The guidance in this part of ISO 5667 can be used in parallel with other guidance on water quality sampling
and/or investigation of contaminated or potentially contaminated sites, as any groundwater sampling from
such sites is likely to form part of a much wider investigation programme.
Development of a groundwater sampling programme depends on the purposes of the investigation.
A definition of the purpose of groundwater sampling is an essential prerequisite for identifying the principles to
be applied to a particular sampling problem.
The principles set out in this part of ISO 5667 can be used to satisfy the following more detailed objectives:
a) to determine the suitability of groundwater as a source of drinking water or industrial/agricultural water;
b) to identify, at an early stage, contamination of aquifers caused by potentially hazardous surface or
sub-surface activities (e.g. the operation of waste disposal sites, land contamination, industrial
developments, mineral exploitation, agricultural practices, changes in land use) and its potential to impact
on surface waters and other potential receptors in the vicinity of the site;
c) to establish whether migration of contaminants is occurring in order to assess the impact on groundwater
quality and to calibrate and validate suitable groundwater quality models;
d) to develop an understanding of groundwater quality and flow variations, including those caused by
deliberate actions (e.g. variations in groundwater pumping regimes, groundwater recharge caused by
effluent, surface clean-up activities arising from contaminated sites), in order to achieve optimal resource
management, provide data for undertaking risk assessment and to enable enforcement of pollution-
control law;
e) to assist in the selection of remedial measures and remediation process design, and monitor the
performance and effectiveness of these measures or facility design;
f) to demonstrate compliance with licence conditions, or collect evidence for regulatory purposes;
g) to identify and characterise discrete aquifer water bodies.
Examples of situations where this guidance can be used include:
⎯ general surveys of groundwater quality for chemical and microbiological assessment;
⎯ investigation of present or former industrial sites with a history of potentially contaminatory activities;
⎯ groundwater investigation and monitoring of waste disposal (landfill) sites;
⎯ investigation of sites where natural and/or artificial processes have led to potential land and groundwater
contamination;
⎯ investigation of sites where products have been spilled or released as a result of accidents or other
unforeseen events, e.g. transportation accidents.
The guidance contained in this part of ISO 5667 covers selection of sampling points, selection of sampling
installations and devices, groundwater parameter selection and sampling frequency.
vi © ISO 2009 – All rights reserved

---------------------- Page: 6 ----------------------
ISO 5667-11:2009(E)
Prescriptive guidance on methods and applications is not possible. Therefore, this guidance provides
information on the most commonly applied, and available, techniques and lists their advantages,
disadvantages and limitations of use where these are known. When considering design of sampling strategies,
the properties of the groundwater (aquifer) system, monitoring point design, contaminant source(s), pathways
for migration and the receptors need to be considered.
© ISO 2009 – All rights reserved vii

---------------------- Page: 7 ----------------------
INTERNATIONAL STANDARD ISO 5667-11:2009(E)

Water quality — Sampling —
Part 11:
Guidance on sampling of groundwaters
1 Scope
This part of ISO 5667 provides guidance on the sampling of groundwaters. It informs the user of the
necessary considerations when planning and undertaking groundwater sampling to survey the quality of
groundwater supply, to detect and assess groundwater contamination and to assist in groundwater resource
management, protection and remediation. This part of ISO 5667 does not apply to sampling related to the
day-to-day operational control of groundwater abstractions for potable purposes. The guidance includes
sampling of groundwater from both the saturated (below water table) zone and the unsaturated (above the
water table) zone.
2 Normative references
The following referenced documents are indispensable for the application of this document. For dated
references, only the edition cited applies. For undated references, the latest edition of the referenced
document (including any amendments) applies.
ISO 772, Hydrometry — Vocabulary and symbols
ISO 5667-1:2006, Water quality — Sampling — Part 1: Guidance on the design of sampling programmes and
sampling techniques
ISO 5667-3, Water quality — Sampling — Part 3: Guidance on the preservation and handling of water
samples
ISO 5667-14, Water quality — Sampling — Part 14: Guidance on quality assurance of environmental water
sampling and handling
ISO 6107-2, Water quality — Vocabulary — Part 2
3 Terms and definitions
For the purposes of this document, the terms and definitions given in ISO 6107-2, ISO 772 and the following
apply.
3.1
piezometer
device consisting of a tube or pipe with a porous element or perforated section (surrounded by a filter) on the
lower part (piezometer tip), which is installed and sealed into the ground at an appropriate level within the
saturated zone for the purposes of water level measurement, hydraulic pressure measurement and/or
groundwater sampling
NOTE Adapted from ISO 6107-2:2006.
© ISO 2009 – All rights reserved 1

---------------------- Page: 8 ----------------------
ISO 5667-11:2009(E)
3.2
nested piezometers
bundled piezometer installation
group of piezometers installed to different depths within a single larger diameter borehole
NOTE 1 In general, each piezometer should be designed to allow sampling over a specific depth interval within the
aquifer. Piezometer tips are isolated from each other by installing a permanent impermeable seal between them.
NOTE 2 Adapted from ISO 6107-2:2006.
3.3
multiple boreholes
group of individual boreholes or piezometers installed to different depths separately, but in close proximity, to
form a monitoring network adequate for the purposes of an investigation
NOTE Adapted from ISO 6107-2:2006.
3.4
multi-level sampler
single installation for sampling groundwater from discrete depths or depth intervals within the sub-surface
NOTE 1 The device can be installed directly into the ground or into a pre-existing, or purpose-drilled, borehole. When
installed into a borehole, integral packers (or similar sealing devices) are used to isolate the individual horizons within the
groundwater system that are to be sampled.
NOTE 2 Adapted from ISO 6107-2:2006.
3.5
aquifer
geological water-bearing formation (bed or stratum) of permeable rock, or unconsolidated material (e.g. sand
and gravels) capable of yielding significant quantities of water
[4]
NOTE Adapted from ISO 6107-3:1993 .
3.6
consolidated aquifer
aquifer comprising material which is compact due to cementation or compression
3.7
saturated zone
part of an aquifer in which the pore spaces of the formation are completely filled with water
[ISO 6107-2:2006]
3.8
unsaturated zone
part of an aquifer in which the pore spaces of the formation are not totally filled with water
[ISO 6107-2:2006]
3.9
groundwater
water in the saturated zone and/or unsaturated zone of an underground geological formation or artificial
deposit such as made ground, e.g. fill material
2 © ISO 2009 – All rights reserved

---------------------- Page: 9 ----------------------
ISO 5667-11:2009(E)
3.10
perched groundwater
isolated body of groundwater, which is limited in lateral and vertical extent, located within the unsaturated
zone overlying a much more extensive groundwater body and isolated above by a discontinuous poorly
permeable surface (discontinuous aquitard)
NOTE Adapted from ISO 6107-2:2006, “perched water table”.
3.11
receptor
entity (human, animal, water, vegetation, building services, etc.) that is vulnerable to the adverse effect(s) of a
hazardous substance or agent
NOTE Adapted from ISO 6107-2:2006.
3.12
packer
device or material that inflates or expands for temporarily isolating specified vertical sections within boreholes
to allow groundwater sampling from discrete zones or locations within the borehole or aquifer
NOTE Adapted from ISO 6107-2:2006.
3.13
field capacity
maximum amount of water that a soil or rock can retain after gravitational water has drained away
NOTE Adapted from ISO 6107-2:2006.
3.14
dense non-aqueous phase liquids
DNAPLs
organic compounds that have very low water solubility and a density greater than that of water
EXAMPLE Chlorinated hydrocarbons such as trichloroethane.
NOTE 1 Adapted from ISO 6107-2:2006.
NOTE 2 When present in sufficient quantities, DNAPLs form a separate phase from the water.
3.15
light non-aqueous phase liquids
LNAPLs
organic compounds that have very low water solubility and a density less than that of water
EXAMPLE Petroleum products.
NOTE 1 Adapted from ISO 6107-2:2006.
NOTE 2 When present in sufficient quantities, LNAPLs form a separate phase from the water.
3.16
well
borehole
〈groundwater sampling〉 hole sunk into the ground, either by drilling (boring) or digging, to obtain groundwater
or for observation purposes
[3]
NOTE This definition differs from the one given in both ISO 772:— and ISO 6707-1:2004 .
© ISO 2009 – All rights reserved 3

---------------------- Page: 10 ----------------------
ISO 5667-11:2009(E)
3.17
spring
groundwater emerging naturally through the surface of the land
[4]
[ISO 6107-3:1993 ]
3.18
pore water
water that fills the pores or cavities within a body of rock or soil
3.19
casing
tubular retaining structure, which is installed in a drilled borehole or excavated well, to maintain the borehole
opening
[ISO 772:—]
NOTE In the context of groundwater sampling, “maintain the borehole opening” means the prevention of the ingress
of solid aquifer material into the borehole or control of groundwater entry to the borehole at specific depths via a (well)
screen. The structure can be temporary or permanent.
4 Sampling strategy and programme design
4.1 General
Groundwater sampling can be carried out as a single exercise, as part of a larger site or environmental
investigation, or as part of a regional/national programme. Regardless of the purpose, a rational approach
should be taken that clearly defines the objectives, determines the level of information needed, and identifies
the various stages of the investigation. Consideration should also be given to practical constraints such as site
access, infrastructure, and the distance between the site and analytical laboratories.
It should be noted that, normally, groundwater sampling from the saturated zone alone cannot fully assess the
level of contamination in the subsurface in situations where an unsaturated zone of considerable thickness
exists. The potential consequence of ignoring the unsaturated zone is that the unsaturated zone and
groundwater system could become extensively contaminated before any tangible evidence of leakage or
contamination is evident in samples collected from below the water table.
4.2 Selection of sampling point location
4.2.1 General
The location of monitoring installations, the design of the network, and the selection of monitoring points for
investigating groundwater quality should take account of:
a) the hydrogeological setting of the investigation site;
b) the past and future use(s) of the site;
c) the purpose of the exercise;
d) the anticipated or known groundwater quality;
e) the nature and extent of any likely contamination.
4 © ISO 2009 – All rights reserved

---------------------- Page: 11 ----------------------
ISO 5667-11:2009(E)
All of these factors should be considered during the preliminary stages of the monitoring programme to enable
the most appropriate and effective sampling strategy to be implemented. This information can be obtained by
examining all available information held by site owners (or their agents), local, regional and national regulatory
agencies and other data holders. Table 1 provides an overview of the steps involved in planning an
investigation strategy and for sampling groundwater.
When using existing monitoring points to obtain and gain access to groundwater, it is necessary to determine
borehole constructional details and characteristics to define from which strata the sample is being obtained.
When new boreholes are being constructed specifically for sampling, the design of the borehole (e.g. the open
area and length) and the method of construction need to be chosen, not only to meet the sampling
requirement, but also to minimise contamination or disturbance of the aquifer.
4.2.2 Surveillance of groundwater quality for potable supply
When monitoring the quality of groundwater for potable supply use, boreholes, wells and springs that are
sampled should be monitored for those parameters that are relevant to the use of the water. Where
appropriate, national raw water sampling and monitoring requirements should be referred to for more detailed
advice. When selecting sampling points for water supply surveillance, it is recommended that some boreholes
remote from the abstraction are also monitored, in order to examine the effect of the abstraction on the
dynamic characteristics of the aquifer (e.g. the natural groundwater flow, the variation in thickness of the
saturated zone).
4.2.3 Point source contamination of groundwater
To establish the extent of groundwater contamination and the direction and rate of contaminant migration,
monitoring points should be located inside and outside any contaminated area(s). Monitoring points outside
the contaminant source area should be located in positions up gradient and down gradient of the sites with
respect to the hydraulic gradient as a minimum. A greater number of sample points should be positioned down
gradient, both inside and outside of any contaminant plume.
Where analysis indicates that complex geology underlies the site or that contaminants with a broad range of
physical and chemical properties are likely to be present, increase the number of monitoring points to
adequately characterise the contaminant distribution in three dimensions. In addition to investigating the
lateral variation caused by heterogeneity, the sampling strategy should also be designed to investigate any
vertical variations.
Care should be taken when identifying the prevailing flow regime as localised recharge to the subsurface can
alter the regional hydraulic gradient. This can result in groundwater flow and contaminant transportation in a
direction that is contrary to flow imposed by the regional gradient. Dense non-aqueous phase liquids
(DNAPLs) can also move in a different direction and at a different rate to that of groundwater because their
chemical and physical properties are different to those of water (density effects). Their migration is also
affected by the geological structure of the low permeability layer underlying the saturated aquifer.
Light non-aqueous phase liquids (LNAPLs) also have different chemical properties to those of water. Their
migration and distribution are affected by the geological structure, chemical interactions within the unsaturated
zone and zone of water table fluctuation, as well as partitioning between aqueous and gaseous phases.
Where sampling is aimed at providing an early warning of the impact of contaminants on receptors, monitoring
points should be located between the contaminant source (and plume) and the potential receptors as well as
within the zone of contamination. For example, at landfill sites, monitoring points should be established around
the outside of, but close to, the landfill at appropriate depths.
Sample points within the zone of contamination and outside (both up and down hydraulic gradient) should be
installed to measure performance and effectiveness of remediation, for demonstrating compliance to licence
conditions and to determine the quality of groundwater flowing into the area of investigation.

© ISO 2009 – All rights reserved 5

---------------------- Page: 12 ----------------------
ISO 5667-11:2009(E)
6 © ISO 2009 – All rights reserved
Table 1 — Procedural steps for sampling groundwater (adapted from Reference [13])
Step (with reference to other
Procedure Essential elements Notes
parts of ISO 5667)
Collation of available data

Desk study
Investigation/monitoring strategy Geological, geochemical and
Identify data sources
(ISO 5667-1) hydrogeological characterisation

Develop conceptual model

Reconnaissance survey
Design borehole/sampling point
See 4.2, 4.3 and 4.4
network and sampling programme

Assessment/selection of existing monitoring points
See Clause 5

Borehole design, material selection
Facility installation/selection Installation of monitoring points by drilling
and installation technique


Borehole/well cleaning and development See 6.1
Hydrologic measurements
Water level measurements
Borehole/well inspection Hydrogeological characterisation
↓ Hydraulic testing
Removal or isolation of stagnant water
Representative groundwater See 6.1

Borehole/well purging
Determination of purging parameters
Verification of representative See 6.2
groundwater
(e.g. EC, pH, temperature, redox potential)


Sample collection by appropriate
See 5.2 and 5.3

mechanism

Unfiltered sample
Field filtered sample
Field determination of sensitive


parameters, pH, electrical

Sample collection

conductivity, temperature,
Organics (all)
Dissolved trace metals for
Filtration

redox potential, dissolved oxygen
specific geochemical
Alkalinity/pH
Field determinations
as appropriate
information
Dissolved gases
(ISO 5667-1, ISO 5667-3, this part
See 6.4 and 6.5
Head-space free samples
Sulfide and other sensitive
Sensitive inorganic species,
of ISO 5667)
Minimal aeration or
inorganics, e.g. iron(II)
e.g. nitrite, ammonium
de-pressurisation

Major ions
Tracer metals for mobile
Minimal air contact
Blanks and spiked samples should
(colloidal) loads
be prepared in accordance with
Sample preservation
Microbiological agents
ISO 5667-14
Storage and transport of samples
Minimal loss of sample integrity
 See Clauses 7, 8 and 9
prior to analysis
(ISO 5667-3)

---------------------- Page: 13 ----------------------
ISO 5667-11:2009(E)
4.2.4 Diffuse contamination of groundwater
When designing monitoring networks to identify extensive diffuse-source pollution of aquifers, the use of
existing sampling points in the form of large capacity production boreholes is recommended, as they can
provide integrated samples from a large volume of the aquifer. However, in some cases of localised or
low-intensity pollution, the use of this type of borehole can dilute the contamination to levels below the
analytical detection limit: in these cases, smaller capacity pumped boreholes are recommended. The part of
the aquifer which is most sensitive to pollution is that nearest the boundary between the saturated and
unsaturated zones. At least one of the sampling boreholes should therefore have a screen near to the surface
of the saturated zone. Other purpose-drilled boreholes should be completed and screened over different depth
intervals of the aquifer. Sampling boreholes should be located throughout the area of interest. It is
recommended that sites be chosen to represent the different hydrogeological and land-use conditions and
areas considered to be particularly vulnerable to diffuse pollution.
4.3 Groundwater parameter selection
The parameters selected for analysis should reflect the nature of the investigation and/or the former, current,
and proposed future use of the site. In some cases, certain parameters and/or contaminants will be the
subject of national regulations. Focusing only on these, however, could be inadequate for providing the
complete picture of groundwater quality under
...

SLOVENSKI STANDARD
SIST ISO 5667-11:2010
01-julij-2010
1DGRPHãþD
SIST ISO 5667-11:1996
SIST ISO 5667-18:2001
SIST ISO 5667-18:2001/Cor 1:2009
.DNRYRVWYRGH9]RUþHQMHGHO1DYRGLOR]DY]RUþHQMHSRG]HPQHYRGH
Water quality - Sampling - Part 11: Guidance on sampling of groundwaters
Qualité de l'eau - Échantillonnage - Partie 11: Lignes directrices pour l'échantillonnage
des eaux souterraines
Ta slovenski standard je istoveten z: ISO 5667-11:2009
ICS:
13.060.10 Voda iz naravnih virov Water of natural resources
13.060.45 Preiskava vode na splošno Examination of water in
general
SIST ISO 5667-11:2010 en
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------

SIST ISO 5667-11:2010

---------------------- Page: 2 ----------------------

SIST ISO 5667-11:2010

INTERNATIONAL ISO
STANDARD 5667-11
Second edition
2009-04-15


Water quality — Sampling —
Part 11:
Guidance on sampling of groundwaters
Qualité de l'eau — Échantillonnage —
Partie 11: Lignes directrices pour l'échantillonnage des eaux
souterraines





Reference number
ISO 5667-11:2009(E)
©
ISO 2009

---------------------- Page: 3 ----------------------

SIST ISO 5667-11:2010
ISO 5667-11:2009(E)
PDF disclaimer
This PDF file may contain embedded typefaces. In accordance with Adobe's licensing policy, this file may be printed or viewed but
shall not be edited unless the typefaces which are embedded are licensed to and installed on the computer performing the editing. In
downloading this file, parties accept therein the responsibility of not infringing Adobe's licensing policy. The ISO Central Secretariat
accepts no liability in this area.
Adobe is a trademark of Adobe Systems Incorporated.
Details of the software products used to create this PDF file can be found in the General Info relative to the file; the PDF-creation
parameters were optimized for printing. Every care has been taken to ensure that the file is suitable for use by ISO member bodies. In
the unlikely event that a problem relating to it is found, please inform the Central Secretariat at the address given below.


COPYRIGHT PROTECTED DOCUMENT


©  ISO 2009
All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any form or by any means,
electronic or mechanical, including photocopying and microfilm, without permission in writing from either ISO at the address below or
ISO's member body in the country of the requester.
ISO copyright office
Case postale 56 • CH-1211 Geneva 20
Tel. + 41 22 749 01 11
Fax + 41 22 749 09 47
E-mail copyright@iso.org
Web www.iso.org
Published in Switzerland

ii © ISO 2009 – All rights reserved

---------------------- Page: 4 ----------------------

SIST ISO 5667-11:2010
ISO 5667-11:2009(E)
Contents Page
Foreword. iv
Introduction . vi
1 Scope . 1
2 Normative references . 1
3 Terms and definitions. 1
4 Sampling strategy and programme design. 4
4.1 General. 4
4.2 Selection of sampling point location. 4
4.3 Groundwater parameter selection . 7
4.4 Sampling frequency. 7
5 Types of monitoring installation and sampling method. 8
5.1 General. 8
5.2 Unsaturated zone monitoring. 8
5.3 Saturated zone . 11
6 Sampling procedures . 15
6.1 Purging . 15
6.2 Trial pits . 19
6.3 Sampling of free-phase contaminants (DNAPLs and LNAPLs) . 19
6.4 Materials for sampling equipment . 19
6.5 Prevention of contamination . 20
7 Safety precautions. 21
8 Sample identification and records. 22
9 Quality assurance/quality control. 23
Annex A (informative) Calculation of sampling frequency using nomogram. 24
Annex B (informative) Example of a report — Sampling from groundwaters. 25
Bibliography . 26

© ISO 2009 – All rights reserved iii

---------------------- Page: 5 ----------------------

SIST ISO 5667-11:2010
ISO 5667-11:2009(E)
Foreword
ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies
(ISO member bodies). The work of preparing International Standards is normally carried out through ISO
technical committees. Each member body interested in a subject for which a technical committee has been
established has the right to be represented on that committee. International organizations, governmental and
non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely with the
International Electrotechnical Commission (IEC) on all matters of electrotechnical standardization.
International Standards are drafted in accordance with the rules given in the ISO/IEC Directives, Part 2.
The main task of technical committees is to prepare International Standards. Draft International Standards
adopted by the technical committees are circulated to the member bodies for voting. Publication as an
International Standard requires approval by at least 75 % of the member bodies casting a vote.
Attention is drawn to the possibility that some of the elements of this document may be the subject of patent
rights. ISO shall not be held responsible for identifying any or all such patent rights.
ISO 5667-11 was prepared by Technical Committee ISO/TC 147, Water quality, Subcommittee SC 6,
Sampling (general methods).
This second edition cancels and replaces the first edition (ISO 5667-11:1993) and ISO 5667-18:2001, which
have been technically revised.
ISO 5667 consists of the following parts, under the general title Water quality — Sampling:
⎯ Part 1: Guidance on the design of sampling programmes and sampling techniques
⎯ Part 3: Guidance on the preservation and handling of water samples
⎯ Part 4: Guidance on sampling from lakes, natural and man-made
⎯ Part 5: Guidance on sampling of drinking water from treatment works and piped distribution systems
⎯ Part 6: Guidance on sampling of rivers and streams
⎯ Part 7: Guidance on sampling of water and steam in boiler plants
⎯ Part 8: Guidance on the sampling of wet deposition
⎯ Part 9: Guidance on sampling from marine waters
⎯ Part 10: Guidance on sampling of waste waters
⎯ Part 11: Guidance on sampling of groundwaters
⎯ Part 12: Guidance on sampling of bottom sediments
⎯ Part 13: Guidance on sampling of sludges from sewage and water treatment works
⎯ Part 14: Guidance on quality assurance of environmental water sampling and handling
⎯ Part 15: Guidance on preservation and handling of sludge and sediment samples
iv © ISO 2009 – All rights reserved

---------------------- Page: 6 ----------------------

SIST ISO 5667-11:2010
ISO 5667-11:2009(E)
⎯ Part 16: Guidance on biotesting of samples
⎯ Part 17: Guidance on sampling of suspended sediments
⎯ Part 19: Guidance on sampling of marine sediments
⎯ Part 20: Guidance on the use of sampling data for decision making — Compliance with thresholds and
classification systems
⎯ Part 21: Guidance on sampling of drinking water distributed by tankers or means other than distribution
pipes
⎯ Part 22: Guidance on design and installation of groundwater sample points
⎯ Part 23: Determination of significant pollutants in surface waters using passive sampling
This part of ISO 5667 should be read in conjunction with other parts, in particular ISO 5667-1 and ISO 5667-3.
© ISO 2009 – All rights reserved v

---------------------- Page: 7 ----------------------

SIST ISO 5667-11:2010
ISO 5667-11:2009(E)
Introduction
This part of ISO 5667 is a revision of both ISO 5667-11:1993, Guidance on sampling of groundwaters and
ISO 5667-18:2001, Guidance on sampling of groundwater at contaminated sites.
The guidance in this part of ISO 5667 can be used in parallel with other guidance on water quality sampling
and/or investigation of contaminated or potentially contaminated sites, as any groundwater sampling from
such sites is likely to form part of a much wider investigation programme.
Development of a groundwater sampling programme depends on the purposes of the investigation.
A definition of the purpose of groundwater sampling is an essential prerequisite for identifying the principles to
be applied to a particular sampling problem.
The principles set out in this part of ISO 5667 can be used to satisfy the following more detailed objectives:
a) to determine the suitability of groundwater as a source of drinking water or industrial/agricultural water;
b) to identify, at an early stage, contamination of aquifers caused by potentially hazardous surface or
sub-surface activities (e.g. the operation of waste disposal sites, land contamination, industrial
developments, mineral exploitation, agricultural practices, changes in land use) and its potential to impact
on surface waters and other potential receptors in the vicinity of the site;
c) to establish whether migration of contaminants is occurring in order to assess the impact on groundwater
quality and to calibrate and validate suitable groundwater quality models;
d) to develop an understanding of groundwater quality and flow variations, including those caused by
deliberate actions (e.g. variations in groundwater pumping regimes, groundwater recharge caused by
effluent, surface clean-up activities arising from contaminated sites), in order to achieve optimal resource
management, provide data for undertaking risk assessment and to enable enforcement of pollution-
control law;
e) to assist in the selection of remedial measures and remediation process design, and monitor the
performance and effectiveness of these measures or facility design;
f) to demonstrate compliance with licence conditions, or collect evidence for regulatory purposes;
g) to identify and characterise discrete aquifer water bodies.
Examples of situations where this guidance can be used include:
⎯ general surveys of groundwater quality for chemical and microbiological assessment;
⎯ investigation of present or former industrial sites with a history of potentially contaminatory activities;
⎯ groundwater investigation and monitoring of waste disposal (landfill) sites;
⎯ investigation of sites where natural and/or artificial processes have led to potential land and groundwater
contamination;
⎯ investigation of sites where products have been spilled or released as a result of accidents or other
unforeseen events, e.g. transportation accidents.
The guidance contained in this part of ISO 5667 covers selection of sampling points, selection of sampling
installations and devices, groundwater parameter selection and sampling frequency.
vi © ISO 2009 – All rights reserved

---------------------- Page: 8 ----------------------

SIST ISO 5667-11:2010
ISO 5667-11:2009(E)
Prescriptive guidance on methods and applications is not possible. Therefore, this guidance provides
information on the most commonly applied, and available, techniques and lists their advantages,
disadvantages and limitations of use where these are known. When considering design of sampling strategies,
the properties of the groundwater (aquifer) system, monitoring point design, contaminant source(s), pathways
for migration and the receptors need to be considered.
© ISO 2009 – All rights reserved vii

---------------------- Page: 9 ----------------------

SIST ISO 5667-11:2010

---------------------- Page: 10 ----------------------

SIST ISO 5667-11:2010
INTERNATIONAL STANDARD ISO 5667-11:2009(E)

Water quality — Sampling —
Part 11:
Guidance on sampling of groundwaters
1 Scope
This part of ISO 5667 provides guidance on the sampling of groundwaters. It informs the user of the
necessary considerations when planning and undertaking groundwater sampling to survey the quality of
groundwater supply, to detect and assess groundwater contamination and to assist in groundwater resource
management, protection and remediation. This part of ISO 5667 does not apply to sampling related to the
day-to-day operational control of groundwater abstractions for potable purposes. The guidance includes
sampling of groundwater from both the saturated (below water table) zone and the unsaturated (above the
water table) zone.
2 Normative references
The following referenced documents are indispensable for the application of this document. For dated
references, only the edition cited applies. For undated references, the latest edition of the referenced
document (including any amendments) applies.
ISO 772, Hydrometry — Vocabulary and symbols
ISO 5667-1:2006, Water quality — Sampling — Part 1: Guidance on the design of sampling programmes and
sampling techniques
ISO 5667-3, Water quality — Sampling — Part 3: Guidance on the preservation and handling of water
samples
ISO 5667-14, Water quality — Sampling — Part 14: Guidance on quality assurance of environmental water
sampling and handling
ISO 6107-2, Water quality — Vocabulary — Part 2
3 Terms and definitions
For the purposes of this document, the terms and definitions given in ISO 6107-2, ISO 772 and the following
apply.
3.1
piezometer
device consisting of a tube or pipe with a porous element or perforated section (surrounded by a filter) on the
lower part (piezometer tip), which is installed and sealed into the ground at an appropriate level within the
saturated zone for the purposes of water level measurement, hydraulic pressure measurement and/or
groundwater sampling
NOTE Adapted from ISO 6107-2:2006.
© ISO 2009 – All rights reserved 1

---------------------- Page: 11 ----------------------

SIST ISO 5667-11:2010
ISO 5667-11:2009(E)
3.2
nested piezometers
bundled piezometer installation
group of piezometers installed to different depths within a single larger diameter borehole
NOTE 1 In general, each piezometer should be designed to allow sampling over a specific depth interval within the
aquifer. Piezometer tips are isolated from each other by installing a permanent impermeable seal between them.
NOTE 2 Adapted from ISO 6107-2:2006.
3.3
multiple boreholes
group of individual boreholes or piezometers installed to different depths separately, but in close proximity, to
form a monitoring network adequate for the purposes of an investigation
NOTE Adapted from ISO 6107-2:2006.
3.4
multi-level sampler
single installation for sampling groundwater from discrete depths or depth intervals within the sub-surface
NOTE 1 The device can be installed directly into the ground or into a pre-existing, or purpose-drilled, borehole. When
installed into a borehole, integral packers (or similar sealing devices) are used to isolate the individual horizons within the
groundwater system that are to be sampled.
NOTE 2 Adapted from ISO 6107-2:2006.
3.5
aquifer
geological water-bearing formation (bed or stratum) of permeable rock, or unconsolidated material (e.g. sand
and gravels) capable of yielding significant quantities of water
[4]
NOTE Adapted from ISO 6107-3:1993 .
3.6
consolidated aquifer
aquifer comprising material which is compact due to cementation or compression
3.7
saturated zone
part of an aquifer in which the pore spaces of the formation are completely filled with water
[ISO 6107-2:2006]
3.8
unsaturated zone
part of an aquifer in which the pore spaces of the formation are not totally filled with water
[ISO 6107-2:2006]
3.9
groundwater
water in the saturated zone and/or unsaturated zone of an underground geological formation or artificial
deposit such as made ground, e.g. fill material
2 © ISO 2009 – All rights reserved

---------------------- Page: 12 ----------------------

SIST ISO 5667-11:2010
ISO 5667-11:2009(E)
3.10
perched groundwater
isolated body of groundwater, which is limited in lateral and vertical extent, located within the unsaturated
zone overlying a much more extensive groundwater body and isolated above by a discontinuous poorly
permeable surface (discontinuous aquitard)
NOTE Adapted from ISO 6107-2:2006, “perched water table”.
3.11
receptor
entity (human, animal, water, vegetation, building services, etc.) that is vulnerable to the adverse effect(s) of a
hazardous substance or agent
NOTE Adapted from ISO 6107-2:2006.
3.12
packer
device or material that inflates or expands for temporarily isolating specified vertical sections within boreholes
to allow groundwater sampling from discrete zones or locations within the borehole or aquifer
NOTE Adapted from ISO 6107-2:2006.
3.13
field capacity
maximum amount of water that a soil or rock can retain after gravitational water has drained away
NOTE Adapted from ISO 6107-2:2006.
3.14
dense non-aqueous phase liquids
DNAPLs
organic compounds that have very low water solubility and a density greater than that of water
EXAMPLE Chlorinated hydrocarbons such as trichloroethane.
NOTE 1 Adapted from ISO 6107-2:2006.
NOTE 2 When present in sufficient quantities, DNAPLs form a separate phase from the water.
3.15
light non-aqueous phase liquids
LNAPLs
organic compounds that have very low water solubility and a density less than that of water
EXAMPLE Petroleum products.
NOTE 1 Adapted from ISO 6107-2:2006.
NOTE 2 When present in sufficient quantities, LNAPLs form a separate phase from the water.
3.16
well
borehole
〈groundwater sampling〉 hole sunk into the ground, either by drilling (boring) or digging, to obtain groundwater
or for observation purposes
[3]
NOTE This definition differs from the one given in both ISO 772:— and ISO 6707-1:2004 .
© ISO 2009 – All rights reserved 3

---------------------- Page: 13 ----------------------

SIST ISO 5667-11:2010
ISO 5667-11:2009(E)
3.17
spring
groundwater emerging naturally through the surface of the land
[4]
[ISO 6107-3:1993 ]
3.18
pore water
water that fills the pores or cavities within a body of rock or soil
3.19
casing
tubular retaining structure, which is installed in a drilled borehole or excavated well, to maintain the borehole
opening
[ISO 772:—]
NOTE In the context of groundwater sampling, “maintain the borehole opening” means the prevention of the ingress
of solid aquifer material into the borehole or control of groundwater entry to the borehole at specific depths via a (well)
screen. The structure can be temporary or permanent.
4 Sampling strategy and programme design
4.1 General
Groundwater sampling can be carried out as a single exercise, as part of a larger site or environmental
investigation, or as part of a regional/national programme. Regardless of the purpose, a rational approach
should be taken that clearly defines the objectives, determines the level of information needed, and identifies
the various stages of the investigation. Consideration should also be given to practical constraints such as site
access, infrastructure, and the distance between the site and analytical laboratories.
It should be noted that, normally, groundwater sampling from the saturated zone alone cannot fully assess the
level of contamination in the subsurface in situations where an unsaturated zone of considerable thickness
exists. The potential consequence of ignoring the unsaturated zone is that the unsaturated zone and
groundwater system could become extensively contaminated before any tangible evidence of leakage or
contamination is evident in samples collected from below the water table.
4.2 Selection of sampling point location
4.2.1 General
The location of monitoring installations, the design of the network, and the selection of monitoring points for
investigating groundwater quality should take account of:
a) the hydrogeological setting of the investigation site;
b) the past and future use(s) of the site;
c) the purpose of the exercise;
d) the anticipated or known groundwater quality;
e) the nature and extent of any likely contamination.
4 © ISO 2009 – All rights reserved

---------------------- Page: 14 ----------------------

SIST ISO 5667-11:2010
ISO 5667-11:2009(E)
All of these factors should be considered during the preliminary stages of the monitoring programme to enable
the most appropriate and effective sampling strategy to be implemented. This information can be obtained by
examining all available information held by site owners (or their agents), local, regional and national regulatory
agencies and other data holders. Table 1 provides an overview of the steps involved in planning an
investigation strategy and for sampling groundwater.
When using existing monitoring points to obtain and gain access to groundwater, it is necessary to determine
borehole constructional details and characteristics to define from which strata the sample is being obtained.
When new boreholes are being constructed specifically for sampling, the design of the borehole (e.g. the open
area and length) and the method of construction need to be chosen, not only to meet the sampling
requirement, but also to minimise contamination or disturbance of the aquifer.
4.2.2 Surveillance of groundwater quality for potable supply
When monitoring the quality of groundwater for potable supply use, boreholes, wells and springs that are
sampled should be monitored for those parameters that are relevant to the use of the water. Where
appropriate, national raw water sampling and monitoring requirements should be referred to for more detailed
advice. When selecting sampling points for water supply surveillance, it is recommended that some boreholes
remote from the abstraction are also monitored, in order to examine the effect of the abstraction on the
dynamic characteristics of the aquifer (e.g. the natural groundwater flow, the variation in thickness of the
saturated zone).
4.2.3 Point source contamination of groundwater
To establish the extent of groundwater contamination and the direction and rate of contaminant migration,
monitoring points should be located inside and outside any contaminated area(s). Monitoring points outside
the contaminant source area should be located in positions up gradient and down gradient of the sites with
respect to the hydraulic gradient as a minimum. A greater number of sample points should be positioned down
gradient, both inside and outside of any contaminant plume.
Where analysis indicates that complex geology underlies the site or that contaminants with a broad range of
physical and chemical properties are likely to be present, increase the number of monitoring points to
adequately characterise the contaminant distribution in three dimensions. In addition to investigating the
lateral variation caused by heterogeneity, the sampling strategy should also be designed to investigate any
vertical variations.
Care should be taken when identifying the prevailing flow regime as localised recharge to the subsurface can
alter the regional hydraulic gradient. This can result in groundwater flow and contaminant transportation in a
direction that is contrary to flow imposed by the regional gradient. Dense non-aqueous phase liquids
(DNAPLs) can also move in a different direction and at a different rate to that of groundwater because their
chemical and physical properties are different to those of water (density effects). Their migration is also
affected by the geological structure of the low permeability layer underlying the saturated aquifer.
Light non-aqueous phase liquids (LNAPLs) also have different chemical properties to those of water. Their
migration and distribution are affected by the geological structure, chemical interactions within the unsaturated
zone and zone of water table fluctuation, as well as partitioning between aqueous and gaseous phases.
Where sampling is aimed at providing an early warning of the impact of contaminants on receptors, monitoring
points should be located between the contaminant source (and plume) and the potential receptors as well as
within the zone of contamination. For example, at landfill sites, monitoring points should be established around
the outside of, but close to, the landfill at appropriate depths.
Sample points within the zone of contamination and outside (both up and down hydraulic gradient) should be
installed to measure performance and effectiveness of remediation, for demonstrating compliance to licence
conditions and to determine the quality of groundwater flowing into the area of investigation.

© ISO 2009 – All rights reserved 5

---------------------- Page: 15 ----------------------

SIST ISO 5667-11:2010
ISO 5667-11:2009(E)
6 © ISO 2009 – All rights reserved
Table 1 — Procedural steps for sampling groundwater (adapted from Reference [13])
Step (with reference to other
Procedure Essential elements Notes
parts of ISO 5667)
Collation of available data

Desk study
Investigation/monitoring strategy Geological, geochemical and
Identify data sources
(ISO 5667-1) hydrogeological characterisation

Develop conceptual model

Reconnaissance survey
Design borehole/sampling point
See 4.2, 4.3 and 4.4
network and sampling programme

Assessment/selection of existing monitoring points
See Clause 5

Borehole design, material selection
Facility installation/selection Installation of monitoring points by drilling
and installation technique


Borehole/well cleaning and development See 6.1
Hydrologic measurements
Water level measurements
Borehole/well inspection Hydrogeological characterisation
↓ Hydraulic testing
Removal or isolation of stagnant water
Representative groundwater See 6.1

Borehole/well purging
Determination of purging parameters
Verification of representative See 6.2
groundwater
(e.g. EC, pH, temperature, redox potential)


Sample collection by appropriate
See 5.2 and 5.3

mechanism

Unfiltered sample
Field filtered sample
Field determination of sensitive


parameters, pH, electrical

Sample collection

conductivity, temperature,
Organics (all)
Dissolved trace metals for
Filtration

redox potential, dissolved oxygen
specific geochemical
Alkalinity/pH
Field determinations
as appropriate
information
Dissolved gases
(ISO 5667-1, ISO 5667-3, this part
See 6.4 and 6.5
Head-space free samples
Sulfide and other sensitive
Sensitive inorganic species,
of ISO 5667)
Minimal aeration or
inorganics, e.g. iron(II)
e.g. nitrite, ammonium
de-pressurisation

Major ions
Tracer metals for mobile
Minimal air contact
Blanks and spiked samples should
(colloidal) loads
be prepared in accordance with
Sample preservation
Microbiological agents
ISO 5667-14
Storage and transport of samples
Minimal loss of sample integrity
 See Clauses 7, 8 and 9
prior to analysis
(ISO 5667-3)

---------------------- Page: 16 ----------------------

SIST ISO 5667-11:2010
ISO 5667-11:2009(E)
4.2.4 Diffuse contamination of groundwater
When designing monitoring networks to identify extensive diffuse-source pollution of aquifers, the use of
existing sampling points in the form of large capacity production boreholes is recommended, as they can
provide integrated samples from a large
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.