This document specifies processes, requirements and recommendations for the breakdown of project management structures, collectively called project breakdown structures, in terms of the various specification (i.e. requirements), functional, product, work, cost, business and organizational breakdown structures that are established and implemented to contribute to the success of a space programme, which is often composed of one or more projects. It specifies the various types of project breakdown structures and gives processes, requirements and guidance concerning the composition of these breakdown structures. This document is applicable to project breakdown structures for a project, including at the top level of a programme, i.e. level 0, as indicated in ISO 14300-1. It is intended to be used either by an independent developer as a partial basis for programme processes or as a basis for an agreement between a supplier and a customer. This document also provides descriptions of the kinds of project breakdown structures that are commonly useful in contributing to the success of a space project. Other project breakdown structures not described in this document also often contribute to the success of a space project.
Systèmes spatiaux — Management de programme — Éléments de structures de gestion de projet
General Information
Relations
Overview
ISO 27026:2023 - Space systems - Programme management - Breakdown of project management structures - defines processes, requirements and guidance for creating and managing project breakdown structures used in space programmes. The standard covers the composition and relationships of hierarchical breakdowns such as the specification tree, function tree, product tree, work breakdown structure (WBS), cost breakdown structure (CBS), business agreement breakdown structure, and organizational breakdown structure (OBS). It is applicable at the programme top level (level 0) and for individual projects, and can be used by independent developers or as the basis of supplier–customer agreements.
Key technical topics and requirements
- Types of breakdown structures: Describes the common trees (specification, function, product, WBS, CBS, business agreement, OBS) and how they contribute to project control and traceability.
- Hierarchical tree model: Requires a tree-like organizational framework for each breakdown structure so lower-level elements relate to higher-level nodes and interfaces are identified.
- Relationships and flow-down: Specifies how requirements at level 0 flow into level 1 specifications and cascade into function and product trees, and how WBS and CBS map to tasks and costs.
- Composition and tailoring: Provides requirements and recommendations for composing, tailoring and iterating breakdown structures across programme stages to manage scope, risk and resources.
- Contract and supplier context: Explains use for supplier–customer arrangements and subcontracting (level 1, level 2, etc.), including the use of a business agreement breakdown structure to represent subcontract relationships.
- Purpose and outcomes: Emphasizes traceability of requirements to products, identification of tasks and resources, cost relationships, and organizational accountability.
Practical applications
- Establishing a consistent WBS, CBS and OBS for budgeting, scheduling and resource planning in satellite and launch projects.
- Ensuring requirements traceability from top-level customer needs down through specifications, functions and product elements.
- Defining subcontract boundaries and responsibilities via a business agreement breakdown structure during procurement and supply-chain management.
- Tailoring project structure during phase transitions (design, integration, launch, operations) to control risk, costs and schedules.
- Improving cross-organizational communication and reducing programmatic risk by standardizing project breakdown practices.
Who should use ISO 27026:2023
- Space programme and project managers
- Systems and requirements engineers
- Cost and schedule planners (PMO, EVM analysts)
- Contracting officers, suppliers and prime contractors
- Risk and configuration managers involved in complex space systems
Related standards
- ISO 14300-1 - Structuring of a project (higher-tier standard referenced by ISO 27026)
- ISO 23462 - Guidelines to define the management framework for a space project
- ISO 10795 - Space systems programme management vocabulary
Keywords: ISO 27026, project breakdown structures, WBS, CBS, OBS, specification tree, function tree, space programme management, space systems standards.
Frequently Asked Questions
ISO 27026:2023 is a standard published by the International Organization for Standardization (ISO). Its full title is "Space systems - Programme management - Breakdown of project management structures". This standard covers: This document specifies processes, requirements and recommendations for the breakdown of project management structures, collectively called project breakdown structures, in terms of the various specification (i.e. requirements), functional, product, work, cost, business and organizational breakdown structures that are established and implemented to contribute to the success of a space programme, which is often composed of one or more projects. It specifies the various types of project breakdown structures and gives processes, requirements and guidance concerning the composition of these breakdown structures. This document is applicable to project breakdown structures for a project, including at the top level of a programme, i.e. level 0, as indicated in ISO 14300-1. It is intended to be used either by an independent developer as a partial basis for programme processes or as a basis for an agreement between a supplier and a customer. This document also provides descriptions of the kinds of project breakdown structures that are commonly useful in contributing to the success of a space project. Other project breakdown structures not described in this document also often contribute to the success of a space project.
This document specifies processes, requirements and recommendations for the breakdown of project management structures, collectively called project breakdown structures, in terms of the various specification (i.e. requirements), functional, product, work, cost, business and organizational breakdown structures that are established and implemented to contribute to the success of a space programme, which is often composed of one or more projects. It specifies the various types of project breakdown structures and gives processes, requirements and guidance concerning the composition of these breakdown structures. This document is applicable to project breakdown structures for a project, including at the top level of a programme, i.e. level 0, as indicated in ISO 14300-1. It is intended to be used either by an independent developer as a partial basis for programme processes or as a basis for an agreement between a supplier and a customer. This document also provides descriptions of the kinds of project breakdown structures that are commonly useful in contributing to the success of a space project. Other project breakdown structures not described in this document also often contribute to the success of a space project.
ISO 27026:2023 is classified under the following ICS (International Classification for Standards) categories: 49.140 - Space systems and operations. The ICS classification helps identify the subject area and facilitates finding related standards.
ISO 27026:2023 has the following relationships with other standards: It is inter standard links to ISO 27026:2011. Understanding these relationships helps ensure you are using the most current and applicable version of the standard.
You can purchase ISO 27026:2023 directly from iTeh Standards. The document is available in PDF format and is delivered instantly after payment. Add the standard to your cart and complete the secure checkout process. iTeh Standards is an authorized distributor of ISO standards.
Standards Content (Sample)
INTERNATIONAL ISO
STANDARD 27026
Second edition
2023-08
Space systems — Programme
management — Breakdown of project
management structures
Systèmes spatiaux — Management de programme — Éléments de
structures de gestion de projet
Reference number
© ISO 2023
All rights reserved. Unless otherwise specified, or required in the context of its implementation, no part of this publication may
be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting on
the internet or an intranet, without prior written permission. Permission can be requested from either ISO at the address below
or ISO’s member body in the country of the requester.
ISO copyright office
CP 401 • Ch. de Blandonnet 8
CH-1214 Vernier, Geneva
Phone: +41 22 749 01 11
Email: copyright@iso.org
Website: www.iso.org
Published in Switzerland
ii
Contents Page
Foreword .iv
Introduction .v
1 Scopes . 1
2 Normative references . 1
3 Terms, definitions and abbreviated terms . 1
3.1 Terms and definitions . 1
3.2 Abbreviated terms . 2
4 Overview of project breakdown structures . 2
4.1 General . 2
4.2 Relationship of project breakdown structures . 2
4.3 Purpose of project breakdown structures . 3
4.4 Tailoring . 4
5 Processes and requirements of project breakdown structures . 4
5.1 General . 4
5.2 Specification tree . 4
5.3 Function tree . 5
5.4 Product tree . 5
5.5 Work breakdown structure . 6
5.6 Cost breakdown structure . 7
5.7 Business agreement breakdown structure . 7
5.8 Organizational breakdown structure . 8
Annex A (informative) Specification tree . 9
Annex B (informative) Function tree .10
Annex C (informative) Product tree .11
Annex D (informative) Work breakdown structure .12
Annex E (informative) Cost breakdown structure .13
iii
Foreword
ISO (the International Organization for Standardization) is a worldwide federation of national standards
bodies (ISO member bodies). The work of preparing International Standards is normally carried out
through ISO technical committees. Each member body interested in a subject for which a technical
committee has been established has the right to be represented on that committee. International
organizations, governmental and non-governmental, in liaison with ISO, also take part in the work.
ISO collaborates closely with the International Electrotechnical Commission (IEC) on all matters of
electrotechnical standardization.
The procedures used to develop this document and those intended for its further maintenance are
described in the ISO/IEC Directives, Part 1. In particular, the different approval criteria needed for the
different types of ISO document should be noted. This document was drafted in accordance with the
editorial rules of the ISO/IEC Directives, Part 2 (see www.iso.org/directives).
ISO draws attention to the possibility that the implementation of this document may involve the use
of (a) patent(s). ISO takes no position concerning the evidence, validity or applicability of any claimed
patent rights in respect thereof. As of the date of publication of this document, ISO had not received
notice of (a) patent(s) which may be required to implement this document. However, implementers are
cautioned that this may not represent the latest information, which may be obtained from the patent
database available at www.iso.org/patents. ISO shall not be held responsible for identifying any or all
such patent rights.
Any trade name used in this document is information given for the convenience of users and does not
constitute an endorsement.
For an explanation of the voluntary nature of standards, the meaning of ISO specific terms and
expressions related to conformity assessment, as well as information about ISO's adherence to
the World Trade Organization (WTO) principles in the Technical Barriers to Trade (TBT), see
www.iso.org/iso/foreword.html.
This document was prepared by Technical Committee ISO/TC 20, Aircraft and space vehicles,
Subcommittee SC 14, Space systems and operations.
This second edition cancels and replaces the first edition (ISO 27026:2011), which has been technically
revised.
The main changes are as follows:
— updated the normative references in Clause 2;
— updated the terms and definitions references in Clause 3.
Any feedback or questions on this document should be directed to the user’s national standards body. A
complete listing of these bodies can be found at www.iso.org/members.html.
iv
Introduction
Space programmes, and the space systems developed by them, are complex, incorporate many different
technologies, and can last for many years progressing through several different stages from conception
to disposal or other disposition. When a space programme advances from one stage to another,
substantial changes in the breakdown of project management structures, hereinafter collectively
called project breakdown structures, of the programme and the type and amount of resources required
can occur; a programme is often composed of one or more projects. In addition, there can be attendant
risks to either the success of the project or to the well-being of project equipment or to personnel. Well-
regulated project breakdown structures can be an important factor in ensuring that all factors are
ready for these changes through controlled changes to the project breakdown structures that form a
framework for the project in each of the several different stages, and assist in ensuring that the risks
are well understood and accepted. Use of this document as a basis for the framework of activities
comprising the project, the necessary resources, controls, inputs, outputs, and results is intended to
enhance communications between different organizations that participate in a project, and can assist
in reducing costs and schedule of performing the project in each stage.
This document is intended to complement and supplement similar project breakdown structure
processes, requirements and recommendations contained within ISO 14300-1, which serves as a
higher-tier International Standard for this document and for such other space systems and operations
International Standards that require formal project breakdown structures.
v
INTERNATIONAL STANDARD ISO 27026:2023(E)
Space systems — Programme management — Breakdown
of project management structures
1 Scopes
This document specifies processes, requirements and recommendations for the breakdown of
project management structures, collectively called project breakdown structures, in terms of the
various specification (i.e. requirements), functional, product, work, cost, business and organizational
breakdown structures that are established and implemented to contribute to the success of a space
programme, which is often composed of one or more projects. It specifies the various types of project
breakdown structures and gives processes, requirements and guidance concerning the composition of
these breakdown structures.
This document is applicable to project breakdown structures for a project, including at the top level of
a programme, i.e. level 0, as indicated in ISO 14300-1. It is intended to be used either by an independent
developer as a partial basis for programme processes or as a basis for an agreement between a supplier
and a customer.
This document also provides descriptions of the kinds of project breakdown structures that are
commonly useful in contributing to the success of a space project. Other project breakdown structures
not described in this document also often contribute to the success of a space project.
2 Normative references
The following documents are referred to in the text in such a way that some or all of their content
constitutes requirements of this document. For dated references, only the edition cited applies. For
undated references, the latest edition of the referenced document (including any amendments) applies.
ISO 10795, Space systems — Programme management and quality — Vocabulary
ISO 14300-1, Space systems — Programme management — Part 1: Structuring of a project
ISO 23462, Space systems — Guidelines to define the management framework for a space project
3 Terms, definitions and abbreviated terms
3.1 Terms and definitions
For the purposes of this document, the terms and definitions given in ISO 10795 and the following apply.
ISO and IEC maintain terminology databases for use in standardization at the following addresses:
— ISO Online browsing platform: available at https:// www .iso .org/ obp
— IEC Electropedia: available at https:// www .electropedia .org/
3.1.1
breakdown structure
framework for efficiently controlling some aspect of the activities of a programme (3.1.2) or project
(3.1.3)
3.1.2
programme
group of projects (3.1.3) managed in a coordinated way to obtain benefits not available from managing
them individually
3.1.3
project
unique process consisting of a set of coordinated and controlled activities with start and finish dates,
undertaken to achieve an objective conforming to specific requirements, including the constraints of
time, cost and resources
[SOURCE: ISO 9000:2015, 3.4.2, modified — The notes to entry have been removed.]
3.2 Abbreviated terms
CBS cost breakdown structure
OBS organizational breakdown structure
WBS work breakdown structure
WP work package
4 Overview of project breakdown structures
4.1 General
4.1.1 There are generally several types of project breakdown structures that are generated to
provide a framework for efficiently controlling the programme, or its projects, and producing the
product agreed to between the customer and the supplier. The project breakdown structures shall have
the organizational framework of a tree in accordance with ISO 23462.
4.1.2 A project breakdown structures tree as used in this document is an arrangement of related
items or elements characterized by having a top-level node, or summit, that is broken down into lower-
level elements or nodes until the lowest-level elements are determined; the lowest level is usually
based upon some degree of reasonableness or of diminishing returns of further breakdown. A tree is
generally constructed for project breakdown structures because the lower-level elements are more
easily managed. In a project breakdown structures tree, a hierarchical relationship exists between
elements at the same level of breakdown to the next higher related node element above; in addition,
elements at the same level of breakdown often have interfaces with other items at the same level.
4.1.3 The project breakdown structures described in this clause and in Clause 5 are expressed in terms
of a business agreement or contract between a supplier and a customer, where the project breakdown
structures are based upon the supplier's workshare. However, the same principles, processes and
requirements for project breakdown structures can be used by an independent developer, in which case
the project breakdown structures are for the complete system product that can be developed entirely
by the independent developer, or by the independent developer and subcontracted suppliers.
4.2 Relationship of project breakdown structures
4.2.1 In the context of ISO 14300-1, the various project breakdown structures within a programme or
project originate with the level 0 customer's set of requirements. Based upon the business agreement
and from the customer's requirements, a level 1 supplier develops a set of specifications, each containing
requirements, that satisfies the level 0 customer's requirements. The specifications are organized in a
hierarchical specification tree, with lower-level specifications containing requirements that flow down
from higher-level specifications.
4.2.2 From the requirements contained in the specification tree, a function tree shall be generally
generated. The functions determine what shall be performed by the level 1 supplier's workshare portion
of the system, which can be the complete system; the functional requirements in the specification tree
specify how well the requirements shall be performed. The specification and functional trees shall
be used to generate the design elements of the system product, which is arranged as a product tree.
The development of the specification, and hence requirements, tree, is an iterative process with the
development of the function tree and the product tree to develop lower levels of each of the trees.
Depending upon the situation, the requirements within the specification tree may often contain the
functions expressed as functional requirements in sufficient manner that a function tree may not need
to be separately generated, in which case only a specification tree may be generated.
4.2.3 The tasks needed to develop the trees resulting in the system product are arranged in a work
breakdown structure (WBS), which is a hierarchical tree with lower-level tasks providing more detail
related to the node task above. The WBS serves as a reference for the identification of cost elements
arranged into a cost breakdown structure (CBS), which is a hierarchical tree of lower cost elements
related to the next higher node cost element above.
4.2.4 The WBS and CBS, along with the overall management organization of the level 1 supplier,
result in a programme or project organizational breakdown structure (OBS) for the level 1 supplier's
workshare, which is arranged as a hierarchical tree of lower organizational elements reporting, or
related, to the next higher-level node organization.
4.2.5 In the context of ISO 14300-1, when the level 1 supplier subcontracts part of the product
development to one or more level 2 suppliers, each level 2 supplier develops a similar set of lower-
level project breakdown structures based upon the requirements contained in the sub-contractua
...
記事のタイトル:ISO 27026:2023 - 宇宙システム――プログラム管理――プロジェクト管理構造の分解 記事の内容:この文書は、宇宙プログラムの成功に貢献するために設定し実施される、さまざまな仕様(要件)、機能、製品、作業、コスト、ビジネス、組織の分解構造(プロジェクトの分解構造と総称される)のためのプロセス、要件、および推奨事項を指定しています。この文書は、ISO 14300-1で示されるように、プログラムのトップレベルであるプロジェクトの分解構造(レベル0)を含む、プロジェクトの分解構造に適用されます。これは、独立した開発者がプログラムのプロセスの一部の基礎として使用するか、またはサプライヤーと顧客の間の合意の基礎として使用することを意図しています。この文書はまた、宇宙プロジェクトの成功に一般的に有用なプロジェクト分解構造の種類についての説明も提供します。この文書には記載されていない他のプロジェクト分解構造も、宇宙プロジェクトの成功に貢献することがあります。
ISO 27026:2023 is a document that outlines processes, requirements, and recommendations for the breakdown of project management structures in space systems. It refers to various types of breakdown structures such as specification, functional, product, work, cost, business, and organizational structures. The document provides guidance on establishing and implementing these structures to ensure the success of a space program, which may consist of multiple projects. It is meant to be used by independent developers or as a basis for agreements between suppliers and customers. The document also describes commonly useful project breakdown structures for space projects, although there are other structures not mentioned that can also contribute to success.
기사 제목: ISO 27026: 2023 - 우주 시스템 - 프로그램 관리 - 프로젝트 관리 구조 분해 기사 내용: 이 문서는 공개 명세 (즉, 요구 사항), 기능, 제품, 작업, 비용, 비즈니스 및 조직 분해 구조로서 프로젝트 관리 구조를 분해하는 프로세스, 요구 사항 및 권장 사항을 명시합니다. 이는 종종 하나 이상의 프로젝트로 구성된 우주 프로그램의 성공에 기여하기 위해 설정하고 실행되는 프로젝트 분해 구조를 일컫는 것입니다. 프로젝트 분해 구조의 다양한 유형을 명시하고 이러한 분해 구조의 구성에 대한 프로세스, 요구 사항 및 지침에 대해 제공합니다. 이 문서는 ISO 14300-1에서 지정한 것과 같이 프로그램의 최상위 수준인 프로젝트 분해 구조, 즉 레벨 0에서부터 프로젝트의 프로젝트 분해 구조에 적용됩니다. 이는 독립 개발자가 프로그램 프로세스의 일부 기초로 사용하거나 공급 업체와 고객 사이의 협정의 기초로 사용하기 위해 설계되었습니다. 이 문서는 또한 우주 프로젝트의 성공에 기여하는데 일반적으로 유용한 프로젝트 분해 구조의 종류에 대한 설명을 제공합니다. 이 문서에 기술되지 않은 다른 프로젝트 분해 구조도 종종 우주 프로젝트의 성공에 기여합니다.








Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.
Loading comments...