(Main)Petroleum and natural gas industries — Specific requirements for offshore structures — Part 6: Marine operations
Petroleum and natural gas industries — Specific requirements for offshore structures — Part 6: Marine operations
ISO 19901-6:2009 provides requirements and guidance for the planning and engineering of marine operations, encompassing the design and analysis of the components, systems, equipment and procedures required to perform marine operations, as well as the methods or procedures developed to carry them out safely. This part of ISO 19901 is applicable to marine operations for offshore structures, including steel and concrete gravity-base structures (GBS); piled steel structures and compliant towers; tension leg platforms (TLP); deep-draught floaters (DDF), including spars or deep-draught caisson vessels (DDCV); floating production semi-submersibles (FPSS); floating production, storage and offloading vessels (FPSO); other types of floating production systems (FPS); mobile offshore units (MOU); topsides and components of any of the above; subsea templates and similar structures; gravity, piled, drag-embedded and suction or other anchors; tendon foundations; and associated mooring systems. This document is also applicable to modifications of existing structures, e.g. installation of additional topsides modules. This part of ISO 19901 is not applicable to the following marine operations: — construction activities, e.g. in a fabrication yard onshore, where there is no exposure to the marine — environment; — drilling, processing and petrochemical activities; — routine marine activities during the service life of the structure; — drilling from mobile offshore drilling units (MODU); — installation of pipelines, flowlines, risers and umbilicals; — diving.
Industries du pétrole et du gaz naturel — Exigences spécifiques relatives aux structures en mer — Partie 6: Opérations marines
L'ISO 19901-6:2009 fournit des exigences et des lignes directrices pour la planification et l'ingénierie des opérations maritimes, englobant la conception et l'analyse des composants, systèmes, équipements et modes opératoires requis pour les opérations maritimes, ainsi que les méthodes et modes opératoires développés pour les exécuter en toute sécurité. L'ISO 19901-6:2009 est applicable aux opératoires maritimes sur les structures en mer incluant les structures gravitaires (GBS) en acier et en béton, les structures en béton sur pieux et les tours flexibles, les plates-formes à ancrage tendu (TLP), les flotteurs à tirant d'eau profond (DDF), y compris les spars ou les structures en caisson à tirant d'eau profond (DDCV), les unités semi-submersibles flottantes de production (FPSS), les unités flottantes de production, de stockage et de déchargement (FPSO), les autres types de systèmes de production flottants (FPS), les unités mobiles en mer (MOU), les superstructures et les composants des unités et systèmes susmentionnés, les châssis de guidage immergés et les structures similaires, les ancres gravitaires, à pieux, flottantes, à succion et autres, les fondations à lignes d'ancrage et les systèmes d'ancrage associés. Ce document est également applicable aux modifications apportées aux structures existantes (installation de modules de superstructure supplémentaires, par exemple). L'ISO 19901-6:2009 n'est pas applicable aux opérations maritimes suivantes: les activités de construction (dans un chantier à terre, par exemple) au cours desquelles il n'y a aucune exposition à l'environnement marin; les activités de forage, de traitement et pétrochimiques; les activités maritimes de routine pendant la durée de vie en service de la structure; les forages réalisés à partir d'unités mobiles de forage en mer (MODU); l'installation de pipelines, de lignes de production, de tubes prolongateurs et d'ombilicaux; la plongée.
General Information
Buy Standard
Standards Content (Sample)
INTERNATIONAL ISO
STANDARD 19901-6
First edition
2009-12-15
Petroleum and natural gas industries —
Specific requirements for offshore
structures —
Part 6:
Marine operations
Industries du pétrole et du gaz naturel — Exigences spécifiques
relatives aux structures en mer —
Partie 6: Opérations marines
Reference number
ISO 19901-6:2009(E)
©
ISO 2009
---------------------- Page: 1 ----------------------
ISO 19901-6:2009(E)
PDF disclaimer
This PDF file may contain embedded typefaces. In accordance with Adobe's licensing policy, this file may be printed or viewed but
shall not be edited unless the typefaces which are embedded are licensed to and installed on the computer performing the editing. In
downloading this file, parties accept therein the responsibility of not infringing Adobe's licensing policy. The ISO Central Secretariat
accepts no liability in this area.
Adobe is a trademark of Adobe Systems Incorporated.
Details of the software products used to create this PDF file can be found in the General Info relative to the file; the PDF-creation
parameters were optimized for printing. Every care has been taken to ensure that the file is suitable for use by ISO member bodies. In
the unlikely event that a problem relating to it is found, please inform the Central Secretariat at the address given below.
COPYRIGHT PROTECTED DOCUMENT
© ISO 2009
All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any form or by any means,
electronic or mechanical, including photocopying and microfilm, without permission in writing from either ISO at the address below or
ISO's member body in the country of the requester.
ISO copyright office
Case postale 56 • CH-1211 Geneva 20
Tel. + 41 22 749 01 11
Fax + 41 22 749 09 47
E-mail copyright@iso.org
Web www.iso.org
Published in Switzerland
ii © ISO 2009 – All rights reserved
---------------------- Page: 2 ----------------------
ISO 19901-6:2009(E)
Contents Page
Foreword .vii
Introduction.ix
1 Scope.1
2 Normative references.2
3 Terms and definitions .2
4 Symbols and abbreviated terms .15
4.1 Symbols.15
4.2 Abbreviated terms .18
5 General considerations.20
5.1 Introduction.20
5.2 Jurisdiction .21
5.3 HSE plan.22
5.4 Risk management.22
5.5 Job safety analysis.23
5.6 Environmental impact study .23
5.7 Manning, qualifications, job and safety training.23
5.8 Incident reporting .24
5.9 Personnel tracking .24
5.10 Approval by national authorities .24
6 Organization, documentation and planning .24
6.1 Introduction.24
6.2 Organization and communication .24
6.3 Quality assurance and administrative procedures.26
6.4 Technical procedures .26
6.5 Technical documentation .26
6.6 Certification and documentation .29
6.7 Systems and equipment .30
7 Metocean and earthquake requirements .32
7.1 Introduction.32
7.2 Weather-restricted/weather-unrestricted operations .33
7.3 Metocean conditions.33
7.4 Metocean criteria .35
7.5 Weather windows .36
7.6 Operational duration .37
7.7 Metocean forecast .37
7.8 Earthquake .38
8 Weight control .38
8.1 Introduction.38
8.2 Weight control classes .38
8.3 Contingencies for class A .39
8.4 Weight and CoG constraints .39
8.5 Weight control audits.39
8.6 Dimensional control .39
9 Stability.39
9.1 Introduction.39
9.2 General requirements .39
9.3 Stability calculations.40
© ISO 2009 – All rights reserved iii
---------------------- Page: 3 ----------------------
ISO 19901-6:2009(E)
9.4 Intact stability.40
9.5 Damage stability .42
9.6 Single-barge transports .45
9.7 Multi-barge transports.45
9.8 Classed vessels .45
9.9 Self-floating structures .45
9.10 Loadout operations .47
9.11 Watertight integrity and temporary closures.48
9.12 Inclining tests.48
10 Ballasting operations .49
10.1 Introduction.49
10.2 Ballast system.50
10.3 Protection against damage and deterioration .51
10.4 Prevention of progressive flooding in damage condition.52
10.5 Control and indicating systems .52
10.6 Pumps .53
10.7 Valve arrangements.53
10.8 Vent systems.53
10.9 Air cushion system capacity .54
10.10 System testing .54
11 Loadout.54
11.1 Introduction.54
11.2 Categories of loadout.55
11.3 Structure being loaded.55
11.4 Site and quay.56
11.5 Barge.56
11.6 Link beams, skidways and skidshoes.56
11.7 Moorings.57
11.8 Grounded loadouts.57
11.9 Pumping and ballasting .58
11.10 Loadouts by trailers, SPMTs or hydraulic skidshoes.60
11.11 Propulsion system design, redundancy and back-up .60
11.12 Float-on onto submersible barges or vessels .62
11.13 Barge reinstatement and sea fastenings .63
11.14 Tugs .63
11.15 Management and organization.64
11.16 Loadout manual .64
12 Transportation.64
12.1 Introduction.64
12.2 General considerations.64
12.3 Towline pull required, fleet composition and towing arrangement.66
12.4 Tow out from dry dock .68
12.5 Inshore tow.70
12.6 Offshore tow.70
12.7 Transport by dry tow or onboard a heavy transport vessel.71
12.8 Transport manual.73
13 Temporary mooring and stationkeeping for marine operations.73
13.1 Introduction.73
13.2 Environmental criteria.74
13.3 Determination of mooring response.75
13.4 Sizing of mooring lines .76
13.5 Sizing of anchors.77
13.6 Sizing of attachments.77
13.7 Sizing of mooring line components.77
13.8 Clearances under extreme conditions .78
13.9 Tensioning of moorings.78
13.10 Other stationkeeping means .79
iv © ISO 2009 – All rights reserved
---------------------- Page: 4 ----------------------
ISO 19901-6:2009(E)
14 Construction and outfitting afloat .79
14.1 Introduction.79
14.2 Structural strength and stresses .80
14.3 Construction spread .81
14.4 Welding.82
15 Float-over topsides installation .82
15.1 Introduction.82
15.2 Environmental considerations.82
15.3 Structural considerations.82
15.4 Clearances .83
15.5 Guidance systems for topsides set-down .84
15.6 Operational aspects .85
15.7 Float-over manual.87
16 Pre-laid mooring including foundation .87
16.1 Introduction.87
16.2 Installation planning.88
16.3 Fluke anchor installation .90
16.4 Plate anchor installation.91
16.5 Suction anchor installation .91
16.6 Anchor pile installation.93
16.7 Gravity anchor installation .94
16.8 Mooring system connectors .95
16.9 Chain.95
16.10 Steel wire rope .96
16.11 Synthetic fibre rope.97
16.12 TLP tendons.98
16.13 Mooring installation manual.99
17 Offshore installation operations .99
17.1 Introduction.99
17.2 Installation site .99
17.3 Actions on and motions of floating units .99
17.4 Systems and equipment .100
17.5 Launching.100
17.6 Float-off .102
17.7 Upending .103
17.8 Ballasting.104
17.9 Lifting and lowering by external means.104
17.10 Lowering by ballasting.105
17.11 Precise positioning on the sea floor by active and passive means.106
17.12 Skirt penetration .107
17.13 Underbase grouting .108
17.14 Piling.109
17.15 Attachment to pre-laid mooring system .111
17.16 Connection to a tendon system.112
17.17 Offshore completion .113
17.18 Installation manual .114
18 Lifting operations .114
18.1 Introduction.114
18.2 Rigging geometry .115
18.3 Actions and action effects.115
18.4 Strengths of slings, grommets and shackles.124
18.5 Design verifications .132
18.6 Lift point design.136
18.7 Clearances .137
18.8 Bumpers and guides .139
18.9 Heave compensated lifts .141
18.10 Lifts using DP .141
18.11 Practical considerations.141
© ISO 2009 – All rights reserved v
---------------------- Page: 5 ----------------------
ISO 19901-6:2009(E)
18.12 Lifting operation manual.142
19 Decommissioning and removal.143
19.1 Introduction.143
19.2 Removal planning.143
19.3 Preparation for removal .146
19.4 Removal .147
19.5 Transportation and disposal .149
19.6 Site clearance.149
Annex A (informative) Additional information and guidance .150
A.1 General.150
A.2 Guidance for 6.6.2: Required or recommended documentation .150
A.3 Guidance for 11.16: Loadout manual .152
A.4 Guidance for 12.8: Transport manual.154
A.5 Guidance for 17.18: Installation manual.155
A.6 Guidance for 18.8.4: Bumper and guide loads .156
Annex B (informative) Regional information .160
B.1 Introduction.160
B.2 Canada .160
Bibliography .164
vi © ISO 2009 – All rights reserved
---------------------- Page: 6 ----------------------
ISO 19901-6:2009(E)
Foreword
ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies
(ISO member bodies). The work of preparing International Standards is normally carried out through ISO
technical committees. Each member body interested in a subject for which a technical committee has been
established has the right to be re
...
NORME ISO
INTERNATIONALE 19901-6
Première édition
2009-12-15
Industries du pétrole et du gaz naturel —
Exigences spécifiques relatives aux
structures en mer —
Partie 6:
Opérations marines
Petroleum and natural gas industries — Specific requirements for
offshore structures —
Part 6: Marine operations
Numéro de référence
ISO 19901-6:2009(F)
©
ISO 2009
---------------------- Page: 1 ----------------------
ISO 19901-6:2009(F)
DOCUMENT PROTÉGÉ PAR COPYRIGHT
© ISO 2009
Droits de reproduction réservés. Sauf prescription différente, aucune partie de cette publication ne peut être reproduite ni utilisée sous
quelque forme que ce soit et par aucun procédé, électronique ou mécanique, y compris la photocopie et les microfilms, sans l'accord écrit
de l'ISO à l'adresse ci-après ou du comité membre de l'ISO dans le pays du demandeur.
ISO copyright office
Case postale 56 CH-1211 Geneva 20
Tel. + 41 22 749 01 11
Fax + 41 22 749 09 47
E-mail copyright@iso.org
Web www.iso.org
Version française parue en 2012
Publié en Suisse
ii © ISO 2009 – Tous droits réservés
---------------------- Page: 2 ----------------------
ISO 19901-6:2009(F)
Sommaire Page
Avant-propos . vii
Introduction . ix
1 Domaine d'application . 1
2 Références normatives . 2
3 Termes et définitions . 2
4 Symboles et abréviations . 15
4.1 Symboles . 15
4.2 Abréviations . 19
5 Considérations générales . 21
5.1 Introduction . 21
5.2 Juridiction . 22
5.3 Plan de santé, de sécurité et d'environnement (HSE) . 23
5.4 Gestion des risques . 23
5.5 Analyse de la sécurité des tâches . 24
5.6 Étude d'impact environnemental . 24
5.7 Personnel, qualifications, tâches et formation à la sécurité . 24
5.8 Rapports d'incidents . 25
5.9 Suivi du personnel . 25
5.10 Approbation des autorités nationales . 25
6 Organisation, documentation et planification . 26
6.1 Introduction . 26
6.2 Organisation et communication . 26
6.3 Assurance qualité et procédures administratives . 27
6.4 Procédures techniques . 27
6.5 Documentation technique . 28
6.6 Certification et documentation . 31
6.7 Systèmes et équipements . 32
7 Exigences météo-océaniques et sismiques . 34
7.1 Introduction . 34
7.2 Opérations restreintes et/ou non restreintes en cas d'intempérie . 35
7.3 Conditions météo-océaniques . 35
7.4 Critères météo-océaniques . 37
7.5 Fenêtres météorologiques . 38
7.6 Durée opérationnelle . 39
7.7 Prévisions météo-océaniques . 40
7.8 Séismes . 40
8 Contrôle des poids . 41
8.1 Introduction . 41
8.2 Classes de contrôle de poids . 41
8.3 Contingences de poids pour la classe A . 41
8.4 Contraintes de poids et de centre de gravité . 41
8.5 Audits de contrôle de poids . 42
8.6 Contrôle dimensionnel . 42
9 Stabilité . 42
9.1 Introduction . 42
9.2 Exigences générales . 42
9.3 Calculs de stabilité . 42
© ISO 2009 – Tous droits réservés iii
---------------------- Page: 3 ----------------------
ISO 19901-6:2009(F)
9.4 Stabilité intacte .43
9.5 Stabilité après avarie .45
9.6 Transports sur barges simples .48
9.7 Transports sur barges multiples .48
9.8 Navires classés .48
9.9 Structures auto-flottantes .48
9.10 Opérations de chargement .50
9.11 Fermetures temporaires et fermetures d'intégrité étanches à l'eau .51
9.12 Essais d'inclinaison .51
10 Opérations de ballastage .52
10.1 Introduction .52
10.2 Système de ballast .53
10.3 Protection contre les avaries et les détériorations .55
10.4 Prévention de l'envahissement progressif en condition d'avarie .55
10.5 Systèmes de commande et d'indication .55
10.6 Pompes .56
10.7 Disposition des vannes .57
10.8 Systèmes d'évent .57
10.9 Capacité du système de coussin d'air .57
10.10 Essais de systèmes .58
11 Chargement .58
11.1 Introduction .58
11.2 Catégories de chargement .59
11.3 Structure en cours de chargement .59
11.4 Site et quai .59
11.5 Barge .60
11.6 Poutres de liaison, voies et patins de berceau .60
11.7 Ancrages .61
11.8 Chargements par échouage .61
11.9 Pompage et ballastage .62
11.10 Chargement par remorques, SPMT ou patins hydrauliques .64
11.11 Conception, redondance et secours du système de propulsion .64
11.12 Chargement par flottaison sur des barges submersibles ou des navires .66
11.13 Renouvellement de la certification des barges et saisines .68
11.14 Remorqueurs .68
11.15 Gestion et organisation .68
11.16 Manuel de chargement .69
12 Transport .69
12.1 Introduction .69
12.2 Considérations générales .69
12.3 Traction requise du câble de remorque, composition de la flotte et installation de
remorquage .71
12.4 Remorque à partir d'une cale sèche .74
12.5 Remorquage côtier .75
12.6 Remorquage en mer .76
12.7 Transport par remorquage à sec ou à bord d'un navire de transport .77
12.8 Manuel de transport .79
13 Ancrage temporaire et maintien en position pendant les opérations maritimes .79
13.1 Introduction .79
13.2 Critères environnementaux .80
13.3 Détermination de la réponse des ancrages .81
13.4 Dimensionnement des lignes d'ancrage .82
13.5 Dimensionnement des ancres .83
13.6 Dimensionnement des attaches .83
13.7 Dimensionnement des composants des lignes d'ancrage .84
13.8 Dégagements en conditions extrêmes .84
13.9 Mise sous tension des ancrages .85
13.10 Autres moyens de maintien en position .85
iv © ISO 2009 – Tous droits réservés
---------------------- Page: 4 ----------------------
ISO 19901-6:2009(F)
14 Construction et armement à flot . 86
14.1 Introduction . 86
14.2 Résistance et contraintes structurelles . 87
14.3 Tronçon de construction . 88
14.4 Soudage . 89
15 Installation des superstructures à flot . 89
15.1 Introduction . 89
15.2 Aspects environnementaux . 89
15.3 Considérations structurelles . 89
15.4 Dégagements . 90
15.5 Systèmes de guidage pour la dépose des superstructures . 91
15.6 Aspects opérationnels . 92
15.7 Manuel de transfert par flottaison . 94
16 Ancrage pré-posé incluant les fondations . 94
16.1 Introduction . 94
16.2 Planification de l'installation . 95
16.3 Installation des ancres à pattes . 98
16.4 Installation des plaques d'ancrage . 98
16.5 Installation des ancres à succion . 99
16.6 Installation des pieux d'ancrage . 100
16.7 Installation des ancres gravitaires . 102
16.8 Connecteurs du système d'ancrage . 102
16.9 Chaîne . 103
16.10 Câbles en acier . 104
16.11 Câbles en fibres synthétiques . 105
16.12 Tendons de TLP . 106
16.13 Manuel d'installation des ancrages . 107
17 Opération d'installation en mer . 107
17.1 Introduction . 107
17.2 Site d'installation . 107
17.3 Actions sur les unités flottantes et mouvements . 108
17.4 Systèmes et équipements . 108
17.5 Lancement . 109
17.6 Déchargement par flottaison . 110
17.7 Redressement . 111
17.8 Ballastage . 112
17.9 Levage et descente par des moyens externes . 113
17.10 Descente par ballastage . 114
17.11 Positionnement précis sur le fond marin par des moyens actifs et passifs . 115
17.12 Pénétration des jupes . 116
17.13 Cimentage au-dessous de la base . 117
17.14 Réalisation des pieux . 118
17.15 Attache au système d'ancrage pré-posé . 120
17.16 Connexion à un système de tendons . 121
17.17 Achèvement de l'installation en mer . 122
17.18 Manuel d’installation . 123
18 Opérations de levage . 123
18.1 Introduction . 123
18.2 Géométrie du gréement . 125
18.3 Actions et effets des actions . 125
18.4 Résistances des élingues, estropes et manilles . 134
18.5 Vérifications de la conception . 144
18.6 Conception des points de levage . 147
18.7 Dégagements . 149
18.8 Butoirs et guides . 151
18.9 Levages compensés par le pilonnement . 153
18.10 Levage utilisant le positionnement dynamique . 154
18.11 Considérations d’ordre pratique . 154
© ISO 2009 – Tous droits réservés v
---------------------- Page: 5 ----------------------
ISO 19901-6:2009(F)
18.12 Manuel de l'opération de levage. 155
19 Mise hors service et enlèvement . 155
19.1 Introduction . 155
19.2 Planification de l'enlèvement . 156
19.3 Préparation à l'enlèvement . 159
19.4 Enlèvement . 160
19.5 Transport et évacuation . 162
19.6 Dégagement du site . 162
Annex A (informative) Additional information and guidance . 163
A.1 General . 163
A.2 Guidance for 6.6.2: Required or recommended documentation . 163
A.3 Guidance for 11.16: Loadout manual. 165
A.4 Guidance for 12.8: Transport manual . 167
A.5 Guidance for 17.18: Installation manual . 168
A.6 Guidance for 18.8.4: Bumper and guide loads . 169
Annex B (informative) Regional information . 173
B.1 Introduction . 173
B.2 Canada . 173
Bibliographie . 177
vi © ISO 2009 – Tous droits réservés
---------------------- Page: 6 ----------------------
ISO 19901-6:2009(F)
Avant-propos
L'ISO (Organisation internationale de normalisation) est une fédération mondiale d'organismes nationaux de
normalisation (comités membres de l'ISO). L'élaboration des Normes internationales est en général confiée
aux comités techniques de l'ISO. Chaque comité membre intéressé par une étude a le droit de faire partie du
comité technique créé à cet effet. Les organisations internationales, gouvernementales et non
gouvernementales, en liaison avec l'ISO participent également aux travaux. L'ISO collabore étroitement avec
la Commission électrotechnique internationale (CEI) en ce qui concerne la normalisation électrotechnique.
Les Normes internationales sont rédigées conformément aux règles données dans les Directives ISO/CEI,
Partie 2.
La tâche principale des comités techniques est d'élaborer les Normes internationales. Les projets de Normes
internationales adoptés par les comités techniques sont soumis aux comités membres pour vote. Leur
publication comme Normes internationales requiert l'approbation de 75 % au moins des comités membres
votants.
L'attention est appelée sur le fait que certains des éléments du présent document peuvent faire l'objet de
droits de propriété intellectuelle ou de droits analogues. L'ISO ne saurait être tenue pour responsable de ne
pas avoir identifié de tels droits de propriété et averti de leur existence.
L'ISO 19901-6 a été élaborée p
...