Diesel engines -- Clamp-mounted fuel injectors, types 7 and 28

ISO 2698:2016 specifies dimensions necessary for the mounting of fuel injectors in diesel (compression-ignition) engines. The location of the fuel inlet and leak-off connections, and the dimensions of the clamp are not defined since they vary according to the particular application. ISO 2698:2016 applies to clamp-mounted injectors of types 7 and 28 made of an integral nozzle and nozzle holder design with a 9,5 mm (nominal) injector shank diameter.

Moteurs à allumage par compression -- Porte-injecteurs de combustible complets à fixation par patte, types 7 et 28

General Information

Status
Published
Publication Date
20-Nov-2016
Current Stage
9020 - International Standard under periodical review
Start Date
15-Oct-2021
Ref Project

RELATIONS

Buy Standard

Standard
ISO 2698:2016 - Diesel engines -- Clamp-mounted fuel injectors, types 7 and 28
English language
5 pages
sale 15% off
Preview
sale 15% off
Preview

Standards Content (sample)

INTERNATIONAL ISO
STANDARD 2698
Fourth edition
2016-11-15
Diesel engines — Clamp-mounted fuel
injectors, types 7 and 28
Moteurs à allumage par compression — Porte-injecteurs de
combustible complets à fixation par patte, types 7 et 28
Reference number
ISO 2698:2016(E)
ISO 2016
---------------------- Page: 1 ----------------------
ISO 2698:2016(E)
COPYRIGHT PROTECTED DOCUMENT
© ISO 2016, Published in Switzerland

All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized otherwise in any form

or by any means, electronic or mechanical, including photocopying, or posting on the internet or an intranet, without prior

written permission. Permission can be requested from either ISO at the address below or ISO’s member body in the country of

the requester.
ISO copyright office
Ch. de Blandonnet 8 • CP 401
CH-1214 Vernier, Geneva, Switzerland
Tel. +41 22 749 01 11
Fax +41 22 749 09 47
copyright@iso.org
www.iso.org
ii © ISO 2016 – All rights reserved
---------------------- Page: 2 ----------------------
ISO 2698:2016(E)
Contents Page

Foreword ........................................................................................................................................................................................................................................iv

1 Scope ................................................................................................................................................................................................................................. 1

2 Normative references ...................................................................................................................................................................................... 1

3 Terms and definitions ..................................................................................................................................................................................... 1

4 Dimensions and tolerances ....................................................................................................................................................................... 1

4.1 Injectors, types 7 and 28 ................................................................................................................................................................ 1

4.2 Clamp location ......................................................................................................................................................................................... 3

4.3 Preferred length, L ................................................................................................................................................................................4

5 Other specifications .......................................................................................................................................................................................... 4

Bibliography ................................................................................................................................................................................................................................ 5

© ISO 2016 – All rights reserved iii
---------------------- Page: 3 ----------------------
ISO 2698:2016(E)
Foreword

ISO (the International Organization for Standardization) is a worldwide federation of national standards

bodies (ISO member bodies). The work of preparing International Standards is normally carried out

through ISO technical committees. Each member body interested in a subject for which a technical

committee has been established has the right to be represented on that committee. International

organizations, governmental and non-governmental, in liaison with ISO, also take part in the work.

ISO collaborates closely with the International Electrotechnical Commission (IEC) on all matters of

electrotechnical standardization.

The procedures used to develop this document and those intended for its further maintenance are

described in the ISO/IEC Directives, Part 1. In particular the different approval criteria needed for the

different types of ISO documents should be noted. This document was drafted in accordance with the

editorial rules of the ISO/IEC Directives, Part 2 (see www.iso.org/directives).

Attention is drawn to the possibility that some of the elements of this document may be the subject of

patent rights. ISO shall not be held responsible for identifying any or all such patent rights. Details of

any patent rights identified during the development of the document will be in the Introduction and/or

on the ISO list of patent declarations received (see www.iso.org/patents).

Any trade name used in this document is information given for the convenience of users and does not

constitute an endorsement.

For an explanation on the meaning of ISO specific terms and expressions related to conformity assessment,

as well as information about ISO’s adherence to the World Trade Organization (WTO) principles in the

Technical Barriers to Trade (TBT) see the following U
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.