Requirements for the connection of micro-generators in parallel with public low-voltage distribution networks

This European Standard specifies technical requirements for the protection functions and the operational capabilities of micro-generating plants, designed for operation in parallel with public lowvoltage distribution networks. This European Standard applies irrespectively of the micro-generating plants’ primary source of energy, where micro-generation refers to equipment with nominal currents up to and including 16 A per phase, single or multi phase 230/400 V or multi phase 230 V (phase-to-phase nominal voltage). For practical reasons, this European Standard refers to the distribution system operator in case settings have to be defined and/or provided, even when these settings are to be defined and/or provided by another actor according to national and European legal framework.
NOTE 1 This includes European network codes and their national implementation, as well as further national regulations.
NOTE 2 Further national requirements especially for the connection to the grid and the operation of the micro-generator can apply as long as they are not in conflict with this EN. In some countries, this document may be applied to generators with higher nominal currents used mostly in domestic and small commercial installations. These countries are listed in Annex G. The provisions of this European Standard are not intended to ensure by themselves the safety of DSO personnel or their contracted parties. The following aspects are included in the scope:
• all micro-generation technologies are applicable.
The following aspects are excluded from the scope:
• multiple units that for one installation, in aggregate, exceed 16 A;
• issues of revenue rebalancing, metering or other commercial matters;
• requirements related to the primary energy source e.g. matters related to gas fired generator units;
• island operation of generating plants, both intentional and unintentional, where no part of the public distribution network is involved;
• active front ends of drives feeding energy back into the distribution network for short duration.

Anforderungen für den Anschluss von Klein-Generatoren an das öffentliche Niederspannungsnetz

Prescriptions pour le raccordement de micro-générateurs en parallèle avec les réseaux publics de distribution à basse tension

La présente Norme Européenne spécifie les exigences techniques pour les fonctions de protection et les possibilités d'exploitation des installations de micro-génération conçues pour fonctionner en parallèle avec les réseaux publics de distribution à basse tension. La présente Norme Européenne s'applique quelle que soit la source principale d'énergie des installations de micro-génération, où micro-génération fait référence à des équipements nominaux jusqu'à et incluant 16 A par phase, monophasés ou polyphasés 230/400 V ou polyphasés 230 V (tension nominale entre phases). Pour des raisons pratiques, la présente Norme Européenne fait référence au gestionnaire de système de distribution dans le cas où des paramètres doivent être définis et/ou fournis, même quand ils doivent l'être par un autre acteur conformément au cadre légal national et européen. NOTE 1 Cela inclut les codes réseau européens et leur mise en œuvre nationale, ainsi que les autres réglementations nationales. NOTE 2 D'autres exigences nationales, en particulier pour la connexion du réseau et l'exploitation du micro-générateur, peuvent s'appliquer, à condition qu'elles n'entrent pas en conflit avec la présente EN. Dans certains pays ce document peut s'appliquer aux générateurs avec les courants nominaux les plus hauts et qui sont généralement utilisés dans les installations domestiques et les petites installations commerciales. Ces pays sont énumérés à l'Annexe G. Les dispositions de cette Norme Européenne n'ont pas pour objet d'assurer la sécurité du personnel du GSD ou de ses sous-traitants. Les aspects suivants sont inclus dans le domaine d'application: - toutes les technologies de micro-génération sont applicables. Les aspects suivants sont exclus du domaine d'application: - cas de plusieurs générateurs pour une installation, excédant 16 A cumulés; - questions de rémunération, de comptage et autres questions commerciales; - exigences relatives à la source d'énergie primaire, par exemple les questions relatives aux générateurs alimentés en gaz; - exploitation de l'îlotage des centrales électriques, intentionnelle et non intentionnel, où aucune partie du réseau de distribution public n'est concerné; - frontaux actifs de conduit qui renvoient l'énergie dans le réseau de distribution pour une courte durée.

Zahteve za vzporedno vezavo mikro generatorjev z javnim nizkonapetostnim razdelilnim omrežjem

Ta evropski standard določa tehnične zahteve za zaščitne funkcije in operativno zmogljivost mikrogeneratorskih obratov, namenjenih vzporednemu delovanju z javnim nizkonapetostnim razdelilnim omrežjem. Ta evropski standard se uporablja ne glede na primarni vir energije mikrogeneratorskih obratov, pri čemer se mikro proizvodnja nanaša na opremo z nazivnimi toki do vključno 16 A na fazo, 230/400 V pri eni ali več fazah ali 230 V pri več fazah (medfazna nazivna napetost). Zaradi praktičnih razlogov se ta evropski standard nanaša na upravljavca razdelilnega omrežja, kadar je treba nastavitve opredeliti in/ali zagotoviti, tudi kadar mora te nastavitve opredeliti in/ali zagotoviti drug udeleženec v skladu z nacionalnim in evropskim pravnim okvirom.
OPOMBA 1: To zajema evropske omrežne kodekse in njihovo nacionalno izvajanje ter tudi dodatne nacionalne predpise.
OPOMBA 2: Uporabljajo se lahko dodatne nacionalne zahteve, zlasti za povezavo z omrežjem in delovanje mikro generatorja, če niso v nasprotju s tem standardom EN. V nekaterih državah se lahko ta dokument uporablja za generatorje z višjimi nazivnimi tokovi, ki se uporabljajo zlasti v gospodinjskih in manjših komercialnih obratih. Te države so navedene v dodatku G. Določbe tega evropskega standarda same po sebi niso namenjene zagotavljanju varnosti osebja upravljavca razdelilnega omrežja ali njihovih pogodbenih strank. Področje uporabe zajema naslednje vidike:
• uporabljajo se vse mikrogeneratorske tehnologije.
Področje uporabe ne zajema naslednjih vidikov:
• več enot, ki v enem obratu skupaj presegajo 16 A;
• vprašanj prerazporejanja dobička, merjenja ali drugih poslovnih zadev;
• zahtev v zvezi s primarnim virom energije, npr. zadeve, povezane z generatorskimi enotami na plin;
• ločenim delovanjem generatorskih obratov, namernim in nenamernim, kadar ni vključen noben del javnega razdelilnega omrežja;
• aktivnih sprednjih delov pogonov, ki energijo usmerjajo nazaj v razdelilno omrežje za kratek čas.

General Information

Status
Published
Public Enquiry End Date
31-Dec-2012
Publication Date
19-Dec-2013
Current Stage
6060 - National Implementation/Publication (Adopted Project)
Start Date
12-Dec-2013
Due Date
16-Feb-2014
Completion Date
20-Dec-2013

RELATIONS

Buy Standard

Standard
SIST EN 50438:2014 (EN) - BARVE na PDF-strani 12,17,20,26.
English language
65 pages
sale 10% off
Preview
sale 10% off
Preview

e-Library read for
1 day
Standard
SIST EN 50438:2014 (DE) - BARVE na PDF-strani 15,19,25
German language
65 pages
sale 10% off
Preview
sale 10% off
Preview

e-Library read for
1 day

Standards Content (sample)

SLOVENSKI STANDARD
SIST EN 50438:2014
01-januar-2014
1DGRPHãþD
SIST EN 50438:2008
Zahteve za vzporedno vezavo mikro generatorjev z javnim nizkonapetostnim
razdelilnim omrežjem

Requirements for the connection of micro-generators in parallel with public low-voltage

distribution networks
Anforderungen für den Anschluss von Klein-Generatoren an das öffentliche
Niederspannungsnetz

Prescriptions pour le raccordement de micro-générateurs en parallèle avec les réseaux

publics de distribution à basse tension
Ta slovenski standard je istoveten z: EN 50438:2013
ICS:
29.160.20 Generatorji Generators
29.240.01 2PUHåMD]DSUHQRVLQ Power transmission and
GLVWULEXFLMRHOHNWULþQHHQHUJLMH distribution networks in
QDVSORãQR general
SIST EN 50438:2014 en,fr,de

2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------
SIST EN 50438:2014
---------------------- Page: 2 ----------------------
SIST EN 50438:2014
EUROPEAN STANDARD
EN 50438
NORME EUROPÉENNE
December 2013
EUROPÄISCHE NORM
ICS 29.160.20 Supersedes EN 50438:2007
English version
Requirements for micro-generating plants to be connected in parallel with
public low-voltage distribution networks
Exigences pour les installations de micro- Anforderungen für den Anschluss von
génération destinées à être raccordées en Klein-Generatoren an das öffentliche
parallèle avec les réseaux publics de Niederspannungsnetz
distribution à basse tension

This European Standard was approved by CENELEC on 2013-11-04. CENELEC members are bound to comply

with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard

the status of a national standard without any alteration.

Up-to-date lists and bibliographical references concerning such national standards may be obtained on

application to the CEN-CENELEC Management Centre or to any CENELEC member.

This European Standard exists in three official versions (English, French, German). A version in any other

language made by translation under the responsibility of a CENELEC member into its own language and notified

to the CEN-CENELEC Management Centre has the same status as the official versions.

CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus,

the Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany,

Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland,

Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom.

CENELEC
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung
CEN-CENELEC Management Centre: Avenue Marnix 17, B - 1000 Brussels

© 2013 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members.

Ref. No. EN 50438:2013 E
---------------------- Page: 3 ----------------------
SIST EN 50438:2014
EN 50438:2013 - 2 -
Contents

Foreword ................................................................................................................................................ 6

1 Scope ............................................................................................................................................... 7

2 Normative references ..................................................................................................................... 7

3 Terms and definitions .................................................................................................................... 8

4 Technical requirements ...............................................................................................................13

4.1 Electrical installation ..........................................................................................................13

4.1.1 General....................................................................................................................13

4.1.2 Over-current protection ........................................................................................13

4.1.3 Earthing ..................................................................................................................13

4.2 Normal operating range .....................................................................................................13

4.2.1 General....................................................................................................................13

4.2.2 Continuous voltage operation range ...................................................................14

4.2.3 Continuous frequency operation range ..............................................................14

4.2.4 Response to under-frequencies ...........................................................................14

4.2.5 Power response to over-frequency .....................................................................15

4.3 Reactive power capability..................................................................................................16

4.3.1 Inverter based micro-generator ...........................................................................16

4.3.2 Directly coupled micro-generator with no inverter ............................................17

4.4 Reactive power control modes .........................................................................................17

4.4.1 General....................................................................................................................17

4.4.2 Fix control mode cos φ fix ....................................................................................17

4.4.3 Voltage related control mode Q(U) ......................................................................18

4.4.4 Power related control mode cos φ (P) .................................................................18

4.5 Voltage control by active power .......................................................................................18

4.6 Interface protection ............................................................................................................18

4.6.1 General....................................................................................................................18

4.6.2 Interface protection settings ................................................................................20

4.6.3 Requirements regarding single fault tolerance of interface protection system20

4.7 Connection and starting to generate electrical power ...................................................21

4.7.1 General....................................................................................................................21

4.7.2 Automatic reconnection after tripping ................................................................21

4.7.3 Starting to generate electrical power ..................................................................21

4.7.4 Synchronisation .....................................................................................................21

4.8 Power quality ......................................................................................................................21

4.8.1 General....................................................................................................................21

4.8.2 DC injection ............................................................................................................22

5 Operation and safety of the micro-generator ............................................................................22

5.1 General ................................................................................................................................22

5.2 Safety ...................................................................................................................................23

5.3 Information plate ................................................................................................................23

5.4 Labelling ..............................................................................................................................23

5.5 Maintenance and routine testing ......................................................................................24

6 Commissioning .............................................................................................................................24

Annex A (informative) National settings and requirements .............................................................25

A.1 General ................................................................................................................................25

---------------------- Page: 4 ----------------------
SIST EN 50438:2014
- 3 - EN 50438:2013

A.2 AT – Austria ......................................................................................................................25

A.3 BE – Belgium ....................................................................................................................26

A.4 CY – Cyprus ......................................................................................................................27

A.5 CZ – Czech Republic ........................................................................................................27

A.6 DE – Germany ...................................................................................................................28

A.7 DK – Denmark ...................................................................................................................28

A.8 EE – Estonia ......................................................................................................................28

A.9 ES – Spain .........................................................................................................................29

A.10 FI – Finland ........................................................................................................................30

A.11 FR – France .......................................................................................................................30

A.12 GB – United Kingdom ......................................................................................................31

A.13 IE – Ireland ........................................................................................................................32

A.14 IT – Italy .............................................................................................................................33

A.15 LV – Latvia .........................................................................................................................35

A.16 NL – The Netherlands .......................................................................................................36

A.17 NO – Norway .....................................................................................................................36

A.18 PL – Poland .......................................................................................................................36

A.19 SI – Slovenia .....................................................................................................................37

A.20 SE – Sweden .....................................................................................................................38

Annex B (informative) Loss of Mains and overall system security .................................................39

Annex C (informative) Example notification sheets ..........................................................................40

C.1 General ................................................................................................................................40

C.2 Application for connection of micro-generators .............................................................40

C.3 Notification of micro-generator decommissioning .........................................................43

Annex D (informative) Compliance type testing ................................................................................44

D.1 General ................................................................................................................................44

D.2 Type testing of the interface protection ...........................................................................44

D.2.1 Introduction ............................................................................................................44

D.2.2 General....................................................................................................................44

D.2.3 Over-/under-voltage ...............................................................................................44

D.2.4 Over- /under-frequency .........................................................................................45

D.2.5 Loss of Mains (LoM) detection .............................................................................46

D.3 Type testing of a micro-generator ....................................................................................47

D.3.1 Operating range .....................................................................................................47

D.3.2 Active power feed-in at under-frequency ............................................................48

D.3.3 Power response to over-frequency .....................................................................48

D.3.4 Reactive power capability .....................................................................................50

D.3.5 Voltage control by active power ..........................................................................52

D.3.6 Connection and starting to generate electrical power ......................................52

D.3.7 Short-circuit current contribution ........................................................................53

D.3.8 Harmonic current emission ..................................................................................54

D.3.9 Voltage fluctuations and flicker ...........................................................................54

D.3.10 DC injection ............................................................................................................54

Annex E (informative) Example test results sheet ............................................................................55

E.1 General details ....................................................................................................................55

E.1.1 Micro-generator details .........................................................................................55

E.1.2 Test house details .................................................................................................55

E.1.3 Test details .............................................................................................................55

---------------------- Page: 5 ----------------------
SIST EN 50438:2014
EN 50438:2013 - 4 -

E.2 Type testing of the interface protection ...........................................................................56

E.2.1 General....................................................................................................................56

E.2.2 Over-/under-frequency tests ................................................................................56

E.2.3 Over-/under-voltage tests (single stage protection) ..........................................56

E.2.4 LoM test ..................................................................................................................56

E.3 Type testing of a micro-generator ....................................................................................57

E.3.1 Operating Range ....................................................................................................57

E.3.2 Active power at under-frequency .........................................................................57

E.3.3 Power response to over-frequency .....................................................................57

E.3.4 Reactive power ......................................................................................................58

E.3.5 Connection and starting to generate electrical power ......................................59

E.3.6 Short-circuit current contribution ........................................................................59

E.3.7 Power quality .........................................................................................................60

E.4 Comments ...........................................................................................................................60

Annex F (informative) Commissioning ...............................................................................................61

F.1 Installation ...........................................................................................................................61

F.2 Notification procedure .......................................................................................................61

F.2.1 Ordinary procedure ...............................................................................................61

F.2.2 Inform and Fit for a single installation ................................................................61

Annex G (normative) Countries allowing extension of the scope > 16 A .......................................62

G.1 General ................................................................................................................................62

G.2 CY – Cyprus ........................................................................................................................62

G.3 FI – Finland ..........................................................................................................................62

G.4 IE – Ireland ..........................................................................................................................62

Annex H (informative) Abbreviations ..................................................................................................63

Annex I (informative) A-deviations ......................................................................................................64

Bibliography ......................................................................................................................................... 65

Figure 1  Main times defining interface protection performance ................................................10

Figure 2  Maximum allowable power reduction in case of under-frequency ..............................15

Figure 3  Reactive power capability in load reference frame .......................................................17

Figure 4  Reactive power control characteristic ............................................................................18

Figure 5  Example of a warning label both for size and content .................................................24

Figure A.1 ..............................................................................................................................................34

Figure D.1  LoM test arrangement ...................................................................................................47

Figure D.2  Example of testing the active power feed-in at over-frequency with f = 50,2 Hz ..49

Figure D.3  Power factor test arrangement ....................................................................................50

Table 1  Minimum time periods for operation in under-frequency situation ..............................14

Table 2  Minimum time periods for operation in over-frequency situation ................................15

---------------------- Page: 6 ----------------------
SIST EN 50438:2014
- 5 - EN 50438:2013

Table 3  Standard settings for power response to over-frequency .............................................16

Table 4  Default interface protection performance ........................................................................20

Table 5  Harmonics and flicker emission standards .....................................................................22

---------------------- Page: 7 ----------------------
SIST EN 50438:2014
EN 50438:2013 - 6 -
Foreword

This document (EN 50438:2013) has been prepared by CLC/TC 8X "System aspects of electrical

energy supply".
The following dates are fixed:
• latest date by which this document has
(dop) 2014-11-04
to be implemented at national level by
publication of an identical national
standard or by endorsement
• latest date by which the national
(dow) 2016-11-04
standards conflicting with this
document have to be withdrawn
This document supersedes EN 50438.2007.

EN 50438:2013 includes the following significant technical changes with respect to EN 50438:2007:

– introduction of a power reduction capability in case of over-frequency;
– introduction of reactive power capability
– update of national protection parameters settings in Annex A;

– modification of tests for the verification of interface protections (voltage and frequency);

– modification of the test for islanding detection;
– addition of a test for direct current injection.

Attention is drawn to the possibility that some of the elements of this document may be the subject of

patent rights. CENELEC [and/or CEN] shall not be held responsible for identifying any or all such

patent rights.

This document has been prepared under a mandate given to CENELEC by the European Commission

and the European Free Trade Association.

This European Standard relates to both future European Network Codes and current technical market

needs. Its purpose is to give detailed description of functions to be implemented in products and

methods to verify the compliance of the products.

This European Standard is also intended to serve as a technical reference for the definition of national

requirements where European Network Codes requirements allow flexible implementation,

e.g. settings for power response to over frequency.

CLC/TC 8X plans to review the Standard periodically, in order to ensure its compatibility with the

evolution of the legal framework.
__________
---------------------- Page: 8 ----------------------
SIST EN 50438:2014
- 7 - EN 50438:2013
1 Scope

This European Standard specifies technical requirements for the protection functions and the

operational capabilities of micro-generating plants, designed for operation in parallel with public low-

voltage distribution networks.

This European Standard applies irrespectively of the micro-generating plants’ primary source of

energy, where micro-generation refers to equipment with nominal currents up to and including 16 A

per phase, single or multi phase 230/400 V or multi phase 230 V (phase-to-phase nominal voltage).

For practical reasons, this European Standard refers to the distribution system operator in case

settings have to be defined and/or provided, even when these settings are to be defined and/or

provided by another actor according to national and European legal framework.

NOTE 1 This includes European network codes and their national implementation, as well as further national regulations.

NOTE 2 Further national requirements especially for the connection to the grid and the operation of the micro-generator can

apply as long as they are not in conflict with this EN.

In some countries, this document may be applied to generators with higher nominal currents used

mostly in domestic and small commercial installations. These countries are listed in Annex G.

The provisions of this European Standard are not intended to ensure by themselves the safety of DSO

personnel or their contracted parties.
The following aspects are included in the scope:
• all micro-generation technologies are applicable.
The following aspects are excluded from the scope:
• multiple units that for one installation, in aggregate, exceed 16 A;
• issues of revenue rebalancing, metering or other commercial matters;

• requirements related to the primary energy source e.g. matters related to gas fired generator

units;

• island operation of generating plants, both intentional and unintentional, where no part of the

public distribution network is involved;

• active front ends of drives feeding energy back into the distribution network for short duration.

2 Normative references

The following documents, in whole or in part, are normatively referenced in this document and are

indispensable for its application. For dated references, only the edition cited applies. For undated

references, the latest edition of the referenced document (including any amendments) applies.

EN 50110 (all parts), Operation of electrical installations

EN 50160, Voltage characteristics of electricity supplied by public electricity networks

HD 60364 (all parts), Low-voltage electrical installations (IEC 60364 series)

EN 61000-3-2:2006, Electromagnetic compatibility (EMC) — Part 3-2: Limits — Limits for harmonic

current emissions (equipment input current <= 16 A per phase) (IEC 61000-3-2:2005)

EN 61000-3-3, Electromagnetic compatibility (EMC) — Part 3-3: Limits — Limitation of voltage

changes, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with

rated current <= 16 A per phase and not subject to conditional connection (IEC 61000-3-3)

EN 61000-4-30, Electromagnetic compatibility (EMC) — Part 4-30: Testing and measurement

techniques — Power quality measurement methods (IEC 61000-4-30)
---------------------- Page: 9 ----------------------
SIST EN 50438:2014
EN 50438:2013 - 8 -

EN 61000-6-1, Electromagnetic compatibility (EMC) — Part 6-1: Generic standards — Immunity for

residential, commercial and light-industrial environments (IEC 61000-6-1)

EN 61000-6-3, Electromagnetic compatibility (EMC) — Part 6-3: Generic standards — Emission

standard for residential, commercial and light-industrial environments (IEC 61000-6-3)

HD 60364-5-551, Low-voltage electrical installations — Part 5-55: Selection and erection of electrical

equipment — Other equipment — Clause 551: Low-voltage generating sets (IEC 60364-5-

55:2001/A2:2008 (CLAUSE 551))

IEC 60255-127, Measuring relays and protection equipment — Part 127: Functional requirements for

over/under voltage protection
3 Terms and definitions
For the purposes of this document, the following terms and definitions apply.
3.1
active factor

ratio of the active power to the apparent power, for a two-terminal element or a two-terminal circuit

under sinusoidal conditions

Note 1 to entry: In a three phase system this is referring to the positive sequence.

Note 2 to entry: The active factor is equal to the cosine of the displacement angle.

3.2
cogeneration
combined heat and power
CHP

combined generation of electricity and heat by an energy conversion system and the concurrent use of

the electric and thermal energy from the conversion system

Note 1 to entry: In the context of small-scale generation this concept is sometimes referred to as “micro-CHP”.

3.3
commissioning

process of putting into operation a micro-generator, apparatus, equipment, building, or facility

3.4
decommissioning

process of removing a micro-generator, apparatus, equipment, building, or facility from operation

3.5
disconnection

separation of the active parts of the micro-generator from the network with mechanical contacts

providing at least the equivalent of basic insulation

Note 1 to entry: Passive components like filters, auxiliary power supply to the micro-generator and sense lines can remain

connected.

Note 2 to entry: For the design of basic insulation all voltage sources will be considered.

3.6
displacement angle

phase difference angle under sinusoidal conditions, phase difference between the voltage applied to a

linear two-terminal element or two-terminal circuit and the electric current in the element or circuit

Note 1 to entry: In a three phase system this is referring to the positive sequence.

Note 2 to entry: The cosine of the displacement angle is the active factor.
3.7
LV distribution network

low voltage part of the electric power system used for the transfer of electricity within an area of

consumption to consumers
---------------------- Page: 10 ----------------------
SIST EN 50438:2014
- 9 - EN 50438:2013
3.8
distribution system operator
DSO

natural or legal person responsible for operating, ensuring the maintenance of and, if necessary,

developing the distribution network in a given area and, when applicable, its interconnections with

other systems and for ensuring the long term ability of the system to meet reasonable demands for the

distribution of electricity
3.9
droop

ratio of the per-unit change in frequency (Δf)/f (where f is the nominal frequency) to the per-unit

n n

change in power (ΔP)/ P (where P is the actual active power at the instance when the frequency

M M
reaches the frequency threshold used to activate the droop control):
s= - (Δf/f ) / (ΔP/ P )
n M
[SOURCE: IEV 603-04-08, modified — the full definition has been altered.]
3.10
electrical installation

assembly of wiring and electrical equipment that is used within the domestic premises for the

distribution and/or use of electric energ
...

SLOVENSKI STANDARD
SIST EN 50438:2014
01-januar-2014
1DGRPHãþD
SIST EN 50438:2008
Zahteve za vzporedno vezavo mikro generatorjev z javnim nizkonapetostnim
razdelilnim omrežjem

Requirements for the connection of micro-generators in parallel with public low-voltage

distribution networks
Anforderungen für den Anschluss von Klein-Generatoren an das öffentliche
Niederspannungsnetz

Prescriptions pour le raccordement de micro-générateurs en parallèle avec les réseaux

publics de distribution à basse tension
Ta slovenski standard je istoveten z: EN 50438:2013
ICS:
29.160.20 Generatorji Generators
29.240.01 2PUHåMD]DSUHQRVLQ Power transmission and
GLVWULEXFLMRHOHNWULþQHHQHUJLMH distribution networks in
QDVSORãQR general
SIST EN 50438:2014 en,fr,de

2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------
SIST EN 50438:2014
---------------------- Page: 2 ----------------------
SIST EN 50438:2014
EUROPÄISCHE NORM
EN 50438
EUROPEAN STANDARD
Dezember 2013
NORME EUROPÉENNE
ICS 29.160.20 Ersatz für EN 50438:2007
Deutsche Fassung
Anforderungen für den Anschluss von Klein-Generatoren an das
öffentliche Niederspannungsnetz

Requirements for micro-generating plants Exigences pour les installations de micro-

to be connected in parallel with public low- génération destinées à être raccordées en

voltage distribution networks parallèle avec les réseaux publics de
distribution à basse tension

Diese Europäische Norm wurde von CENELEC am 2013-11-04 angenommen. CENELEC-Mitglieder sind

gehalten, die CEN/CENELEC-Geschäftsordnung zu erfüllen, in der die Bedingungen festgelegt sind, unter denen

dieser Europäischen Norm ohne jede Änderung der Status einer nationalen Norm zu geben ist.

Auf dem letzten Stand befindliche Listen dieser nationalen Normen mit ihren bibliographischen Angaben sind

beim CEN-CENELEC Management Centre oder bei jedem CENELEC-Mitglied auf Anfrage erhältlich.

Diese Europäische Norm besteht in drei offiziellen Fassungen (Deutsch, Englisch, Französisch). Eine Fassung in

einer anderen Sprache, die von einem CENELEC-Mitglied in eigener Verantwortung durch Übersetzung in seine

Landessprache gemacht und dem CEN-CENELEC Management Centre mitgeteilt worden ist, hat den gleichen

Status wie die offiziellen Fassungen.

CENELEC-Mitglieder sind die nationalen elektrotechnischen Komitees von Belgien, Bulgarien, Dänemark,

Deutschland, der ehemaligen jugoslawischen Republik Mazedonien, Estland, Finnland, Frankreich,

Griechenland, Irland, Island, Italien, Kroatien, Lettland, Litauen, Luxemburg, Malta, den Niederlanden,

Norwegen, Österreich, Polen, Portugal, Rumänien, Schweden, der Schweiz, der Slowakei, Slowenien, Spanien,

der Tschechischen Republik, der Türkei, Ungarn, dem Vereinigten Königreich und Zypern.

CENELEC
Europäisches Komitee für Elektrotechnische Normung
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
CEN-CENELEC Management Centre: Avenue Marnix 17, B - 1000 Brüssel

© 2013 CENELEC - Alle Rechte der Verwertung, gleich in welcher Form und in welchem Verfahren, sind weltweit den Mitgliedern von

CENELEC vorbehalten.
Ref. Nr. EN 50438:2013 D
---------------------- Page: 3 ----------------------
SIST EN 50438:2014
EN 50438:2013 2
Inhalt

Vorwort ..............................................................................................................................................................4

1 Anwendungsbereich ............................................................................................................................5

2 Normative Verweisungen.....................................................................................................................5

3 Begriffe ..................................................................................................................................................6

4 Technische Anforderungen .............................................................................................................. 11

4.1 Elektrische Anlage ............................................................................................................................ 11

4.1.1 Allgemeines .................................................................................................................................... 11

4.1.2 Überstromschutz ............................................................................................................................ 11

4.1.3 Erdung ............................................................................................................................................. 11

4.2 Normaler Betriebsbereich................................................................................................................. 12

4.2.1 Allgemeines .................................................................................................................................... 12

4.2.2 Bereich der Dauer-Betriebsspannung ......................................................................................... 12

4.2.3 Bereich der Dauer-Betriebsfrequenz ............................................................................................ 12

4.2.4 Verhalten bei Unterfrequenz ......................................................................................................... 12

4.2.5 Verhalten bei Überfrequenz ........................................................................................................... 13

4.3 Blindleistung ...................................................................................................................................... 15

4.3.1 Umrichter-basierte Kleinerzeuger................................................................................................. 15

4.3.2 Direkt gekoppelte Kleinerzeuger ohne Umrichter....................................................................... 16

4.4 Blindleistungsregelung ..................................................................................................................... 16

4.4.1 Allgemeines .................................................................................................................................... 16

4.4.2 Festwertregelung cos φ fest ......................................................................................................... 16

4.4.3 Spannungsbezogene Regelfunktion Q(U) ................................................................................... 16

4.4.4 Leistungsbezogene Regelfunktion cos φ (P) .............................................................................. 17

4.5 Spannungsregelung durch Wirkleistung ........................................................................................ 17

4.6 Schnittstellenschutz .......................................................................................................................... 17

4.6.1 Allgemeines .................................................................................................................................... 17

4.6.2 Einstellwerte des Schnittstellenschutzes .................................................................................... 19

4.6.3 Anforderungen hinsichtlich der Einfehler-Toleranz des Schnittstellenschutzsystems ......... 19

4.7 Einschalten und Beginn der Stromerzeugung ............................................................................... 20

4.7.1 Allgemeines .................................................................................................................................... 20

4.7.2 Automatische Wiedereinschaltung nach einer Auslösung des

Schnittstellenschutzes .................................................................................................................. 20

4.7.3 Beginn der Stromerzeugung ......................................................................................................... 21

4.7.4 Synchronisation ............................................................................................................................. 21

4.8 Versorgungsqualität .......................................................................................................................... 21

4.8.1 Allgemeines .................................................................................................................................... 21

4.8.2 Gleichstromeinspeisung ............................................................................................................... 22

5 Betrieb und Sicherheit des Kleinerzeugers .................................................................................... 22

5.1 Allgemeines ....................................................................................................................................... 22

---------------------- Page: 4 ----------------------
SIST EN 50438:2014
3 EN 50438:2013

5.2 Sicherheit ............................................................................................................................................ 22

5.3 Typschild ............................................................................................................................................. 22

5.4 Kennzeichnung ................................................................................................................................... 23

5.5 Instandhaltung und wiederkehrende Prüfung ................................................................................ 24

6 Inbetriebnahme................................................................................................................................... 24

Anhang A (informativ) Nationale Einstellwerte und Anforderungen ......................................................... 25

Anhang B (informativ) Netzausfallschutz und Gesamtsystemstabilität .................................................... 38

Anhang C (informativ) Beispiel für Meldeformulare .................................................................................... 39

Anhang D (informativ) Konformitäts-Typprüfung ........................................................................................ 43

Anhang E (informativ) Beispiel für ein Prüfbericht ..................................................................................... 55

Anhang F (normativ) Inbetriebnahme ........................................................................................................... 61

Anhang G (normativ) Länder mit Erweiterung des Anwendungsbereichs auf Werte > 16 A .................. 62

Anhang H (informativ) Abkürzungen ............................................................................................................ 63

Anhang I (informativ) A-Abweichungen ........................................................................................................ 64

Literaturhinweise ............................................................................................................................................ 65

---------------------- Page: 5 ----------------------
SIST EN 50438:2014
EN 50438:2013 4
Vorwort

Dieses Dokument (EN 50438:2013) wurde vom CLC/TC 8X „System aspects for electrical energy supply“

erarbeitet.

Der Text des Entwurfs wurde der formellen Abstimmung unterworfen und von CENELEC am 20xx-xx-xx als

EN 50438 angenommen.
Nachstehende Daten wurden festgelegt:
– spätestes Datum, zu dem die EN auf nationaler
Ebene durch Veröffentlichung einer identischen
nationalen Norm oder durch Anerkennung
übernommen werden muss (dop): 2014-11-04
– spätestes Datum, zu dem nationale Normen, die
der EN entgegenstehen, zurückgezogen werden
müssen (dow): 2016-11-04
Dieses Dokument ersetzt EN 50438:2007.

EN 50438:2013 umfasst die folgenden wesentlichen technischen Änderungen gegenüber EN 50438:2007:

– Einführung der Leistungsreduzierung im Falle einer Überfrequenz;
– Einführung der Blindleistungsfähigkeit;
– Aktualisierung der nationalen Schutz-Parameter-Einstellungen in Anhang A;

– Modifikation der Prüfung zur Überprüfung des Schnittstellenschutzes (Spannung und Frequenz);

– Modifikation der Prüfung für die Inselerkennung;
– Ergänzung einer Prüfung zur direkten Stromeinspeisung.

Es wird auf die Möglichkeit hingewiesen, dass einige Elemente dieses Dokuments Patentrechte berühren

können. CEN und CENELEC sind nicht dafür verantwortlich, einige oder alle diesbezüglichen Patentrechte zu

identifizieren.

Dieses Dokument wurde unter dem Mandat erstellt, das die Europäische Kommission und die Europäische

Freihandelszone von CENELEC erhalten hat.

Diese Europäische Norm bezieht sich sowohl auf die künftigen europäischen Netzwerk-Codes als auch auf

die aktuellen technischen Anforderungen des Marktes. Ihr Zweck ist es, eine detaillierte Funktionsbeschrei-

bung in Produkten und Verfahren umzusetzen, um die Übereinstimmung der Produkte zu überprüfen.

Diese Europäische Norm soll auch als technische Referenz für die Festlegung der nationalen Anforderungen

dienen, wo Anforderungen für Europäische Netzwerk-Codes eine flexible Umsetzung ermöglichen, z. B.

Einstellungen für das Verhalten bei Überfrequenz.

CLC/TC8X plant, die Norm in regelmäßigen Abständen überprüfen, um die Kompatibilität mit der Entwicklung

der rechtlichen Rahmenbedingungen sicherzustellen.
–––––––––––
---------------------- Page: 6 ----------------------
SIST EN 50438:2014
5 EN 50438:2013
1 Anwendungsbereich

Diese Europäische Norm legt die technischen Anforderungen an die Schutzfunktionen und die

Betriebseigenschaften von Kleinerzeugungsanlagen fest, die für den Parallelbetrieb mit öffentlichen

Niederspannungs-Verteilungsnetzen vorgesehen sind.

Diese Europäische Norm gilt für Kleinerzeugungsanlagen, unabhängig von der verwendeten Primärenergie-

quelle, wobei Kleinerzeugungsgeräte mit Nennströmen bis maximal 16 A je Phase und Spannungen ein- oder

mehrphasig 230 V/400 V oder mehrphasig 230 V (Phase-Phase-Nennspannung) umfasst.

Aus praktischen Gründen verweist diese Europäische Norm auf den Verteilungsnetzbetreiber für den Fall

dass Einstellwerte definiert und/oder vorgegeben werden müssen, selbst wenn diese Einstellwerte entspre-

chend der nationalen oder europäischen Gesetzgebung von einer anderen Organisation definiert und/oder

vorgegeben werden sollten.

ANMERKUNG 1 Dies schließt europäische Netzwerk-Codes und deren nationale Umsetzung als auch weitere

nationale Rechts- und Verwaltungsvorschriften ein.

ANMERKUNG 2 Weitere nationale Anforderungen, insbesondere bezüglich des Netzanschlusses und des Betriebs der

Kleinerzeugungsanlage, können zur Anwendung kommen, sofern sie nicht im Widerspruch zu dieser EN stehen.

In einigen Ländern kann der Anwendungsbereich dieser Norm auf Erzeuger mit höheren Nennströmen aus-

gedehnt werden, die überwiegend in häuslichen und kleinen gewerblichen Anlagen zum Einsatz kommen.

Diese Länder sind in Anhang G aufgelistet.

Die Anforderungen dieser Europäischen Norm sind nicht dazu bestimmt, für sich allein die

Personensicherheit von Personal des VNB oder von mit diesem vertraglich verbundenen Dritten

sicherzustellen.
Folgende Aspekte werden durch den Anwendungsbereich abgedeckt:
• alle Technologien für Kleinerzeuger.
Folgende Anwendungen werden aus dem Anwendungsbereich ausgeschlossen:
• mehrere Einheiten, die zusammen für eine Anlage 16 A übersteigen;
• Verteilung der Einkünfte, Zählung oder andere wirtschaftliche Fragen;

• Anforderungen im Zusammenhang mit der Primärenergiequelle, z. B. Fragen hinsichtlich gasbetriebener

Erzeugungsanlagen;

• Inselnetzbetrieb von Erzeugungsanlagen, sowohl beabsichtigt als auch unbeabsichtigt, bei welchem kein

Teil des öffentlichen Verteilungsnetzes betroffen ist;

• aktive Anschlüsse von Antrieben, die für eine kurze Dauer Energie in das Verteilungsnetz zurückspeisen

können.
2 Normative Verweisungen

Die folgenden Dokumente, die in diesem Dokument teilweise oder als Ganzes zitiert werden, sind für die

Anwendung dieses Dokuments erforderlich. Bei datierten Verweisungen gilt nur die in Bezug genommene

Ausgabe. Bei undatierten Verweisungen gilt die letzte Ausgabe des in Bezug genommenen Dokuments

(einschließlich aller Änderungen).
EN 50110 (alle Teile), Betrieb von elektrischen Anlagen
EN 50160, Merkmale der Spannung in öffentlichen Elektrizitätsversorgungsnetzen
HD 60364 (alle Teile), Errichten von Niederspannungsanlagen (Reihe IEC 60364)
---------------------- Page: 7 ----------------------
SIST EN 50438:2014
EN 50438:2013 6

EN 61000-3-2:2006, Elektromagnetische Verträglichkeit (EMV) – Teil 3-2: Grenzwerte – Grenzwerte für

Oberschwingungsströme (Geräte-Eingangsstrom ≤ 16 A je Leiter) (IEC 61000-3-2:2005)

EN 61000-3-3, Elektromagnetische Verträglichkeit (EMV) – Teil 3-3: Grenzwerte – Begrenzung von Span-

nungsänderungen, Spannungsschwankungen und Flicker in öffentlichen Niederspannungs-Versorgungs-

netzen für Geräte mit einem Bemessungsstrom ≤ 16 A je Leiter, die keiner Sonderanschlussbedingung unter-

liegen (IEC 61000-3-3)

EN 61000-4-30, Elektromagnetische Verträglichkeit (EMV) – Teil 4-30: Prüfen und Messtechnik – Methoden

zur Spannungsqualitätsmessung (IEC 61000-4-30)

EN 61000-6-1, Elektromagnetische Verträglichkeit (EMV) – Teil 6-1: Fachgrundnormen – Störfestigkeit für

Wohnbereich, Geschäfts- und Gewerbebereiche sowie Kleinbetriebe (IEC 61000-6-1)

EN 61000-6-3, Elektromagnetische Verträglichkeit (EMV) – Teil 6-3: Fachgrundnormen – Störaussendung für

Wohnbereich, Geschäfts- und Gewerbebereiche sowie Kleinbetriebe /IEC 61000-6-3)

IEC 60255-127, Measuring relays and protection equipment – Part 127: Functional requirements for over/

under voltage protection

HD 60364-5-551, Errichten von Niederspannungsanlagen – Teil 5-55: Auswahl und Errichten von elektri-

schen Betriebsmitteln – Andere Betriebsmittel – Abschnitt 551: Niederspannungs-Erzeugungsanlagen (IEC

60364-5-55:/A2:2008 (Abschnitt 551))
3 Begriffe
Für die Anwendung dieses Dokuments gelten die folgenden Begriffe.
3.1
Wirkfaktor

Verhältnis von Wirkleistung zu Scheinleistung bei einem zweipoligen Element oder einem zweipoligen Strom-

kreis unter sinusförmigen Bedingungen

Anmerkung 1 zum Begriff: In einem Drehstromsystem bezieht sich dies auf das Mitsystem.

Anmerkung 2 zum Begriff: Der Wirkfaktor entspricht dem Kosinus des Phasenverschiebungswinkels.

3.2
Kraft-Wärme-Kopplung
KWK-Anlagen
KWK

kombinierte Erzeugung von Strom und Wärme in einem Energieumwandlungssystem bei gleichzeitiger

Nutzung der elektrischen und thermischen Energie aus dem Energieumwandlungssystem

Anmerkung 1 zum Begriff: Bei Kleinerzeugern wird dieses Konzept gelegentlich auch als Mikro-KWK-Anlage

bezeichnet.
3.3
Inbetriebnahme

Prozess der Inbetriebsetzens eines Kleinerzeugers, eines Gerätes, einer Ausrüstung, eines Gebäudes oder

einer Anlage
3.4
Außerbetriebnahme

Prozess des Entfernens eines Kleinerzeugers, eines Gerätes, einer Ausrüstung, eines Gebäudes oder einer

Anlage
---------------------- Page: 8 ----------------------
SIST EN 50438:2014
7 EN 50438:2013
3.5
Ausschalten

Abtrennung vom Netz der aktiven Teile einer Kleinerzeugers mit mechanischen Kontakten, so dass

zumindest ein Äquivalent zur Basisisolierung erreicht wird

Anmerkung 1 zum Begriff: Passive Komponenten wie Filter, Hilfsstromversorgung für den Kleinerzeuger und

Messleitungen können verbunden bleiben.

Anmerkung 2 zum Begriff: Für die Auslegung der Basisisolierung werden alle Spannungsquellen berücksichtigt.

3.6
Phasenverschiebungswinkel

Phasenunterschied unter sinusförmigen Bedingungen zwischen der Spannung, die bei einem linearen

zweipoligen Element oder einem zweipoligen Stromkreis angelegt wird, und dem Strom in dem Element oder

Stromkreis

Anmerkung 1 zum Begriff: In einem Dreiphasensystem bezieht sich dies auf das Mitsystem.

Anmerkung 2 zum Begriff: Der Kosinus des Phasenverschiebungswinkels ist der Wirkfaktor.

3.7
NS-Verteilungsnetz

Niederspannungsteil eines elektrischen Netzes, der dazu dient, den Strom innerhalb eines Verbrauchsge-

biets an die Kunden zu verteilen
3.8
Verteilungsnetzbetreiber
VNB

natürliche oder juristische Person, verantwortlich für den Betrieb, die Sicherstellung der Wartung und falls

erforderlich die Erweiterung eines Verteilungsnetzes in einem bestimmten Gebiet und, falls zutreffend,

verantwortlich für die Verbindungen zu anderen Netzen und die langfristige Sicherstellung der Verteilung

elektrischer Energie im Rahmen einer angemessenen Bedarfsentwicklung
3.9
Statik

Verhältnis der bezogenen Frequenzänderung (Δf) / f (wobei f die Nennfrequenz ist) zu der bezogenen

n n

Leistungsänderung (ΔP) / P (wobei P die Wirkleistung zu dem Zeitpunkt ist, zu dem die Frequenz den

M M
Grenzwert erreicht, der für die Aktivierung der Statikregelung verwendet wird):
s = –(Δf / f ) / (ΔP / P )
n M

[Quelle: IEV 603-04-08, modifiziert – die vollständige Definition wurde geändert.]

3.10
elektrische Anlage

Gesamtheit der Verdrahtung und elektrischen Betriebsmittel, die innerhalb eines Wohnanwesens für die Ver-

teilung und/oder die Nutzung elektrischer Energie verwendet wird
3.11
Mitteilen und Anschließen
(en: inform and fit)

Prozess des Einbaus und der Inbetriebnahme eines Kleinerzeugers mit vorhergehender Information des

VNB, gefolgt von einer Aufnahme des Betriebs ohne vorhergehende formelle Genehmigung durch den VNB

3.12
Errichter

ausgebildete Person mit ausreichend Ausbildung, um mit sicheren Arbeitsmethoden einen Kleinerzeuger

nach dieser Norm errichten zu können

Entsprechend nationaler Rechts- und Verwaltungsvorschriften können andere Begriffe zur Anwendung kommen.

---------------------- Page: 9 ----------------------
SIST EN 50438:2014
EN 50438:2013 8
3.13
Schnittstellenschutz

elektrische Schutzfunktion, die erforderlich ist, um sicherzustellen, dass der Kleinerzeuger bei allen Vor-

gängen, bei denen das Verteilungsnetz in seiner Funktion oder seiner Sicherheit beeinträchtigt werden

könnte, vom Netz abgeschaltet wird
3.14
Zeitablauf des Schnittstellenschutzsystems

Bild 1 – Wichtige Zeiten, die das Verhalten des Schnittstellenschutzes beschreiben

3.14.1
Erregungsgröße

Erregungsgröße, durch die die Schutzfunktion aktiviert wird, wenn festgelegte Bedingungen auftreten

Anmerkung 1 zum Begriff: Siehe auch Bild 1.

[Quelle: IEV 442-05-58, modifiziert – die vollständige Definition wurde geändert.]

3.14.2
eingestellte Zeitverzögerung
beabsichtigte Zeitverzögerung, die vom Nutzer eingestellt werden kann
Anmerkung 1 zum Begriff: Siehe auch Bild 1.
3.14.3
Ansprechzeit

Zeitintervall zwischen dem Zeitpunkt, an dem die charakteristische Größe des Messrelais in Ruhestellung

unter festgelegten Bedingungen verändert wird, und dem Zeitpunkt, an dem das Anregesignal gesetzt wird

---------------------- Page: 10 ----------------------
SIST EN 50438:2014
9 EN 50438:2013
Anmerkung 1 zum Begriff: Siehe auch Bild 1.
[Quelle: EN 60255-151:2009, 3.5]
3.14.4
Auslösezeit

Dauer des Zeitintervalls zwischen dem Zeitpunkt, an dem die charakteristische Größe eines Messrelais in

Ruhestellung unter festgelegten Bedingungen geändert wird, und dem Zeitpunkt, an dem das Relais an-

spricht
Anmerkung 1 zum Begriff: Siehe auch Bild 1.

Anmerkung 2 zum Begriff: Die Auslösezeit ist die Summe aus Ansprechzeit und eingestellter Zeitverzögerung.

[Quelle: IEV 447-05-05, modifiziert – Anmerkung 2 zum Begriff wurde hinzugefügt.]

3.14.5
Rücksetzzeit

Dauer des Zeitintervalls zwischen dem Zeitpunkt, an dem die charakteristische Größe eines Messrelais in

Arbeitsstellung unter festgelegten Bedingungen geändert wird, und dem Zeitpunkt, an dem das Relais zu-

rücksetzt
Anmerkung 1 zum Begriff: Siehe auch Bild 1.
[Quelle: IEV 447-05-06]
3.14.6
Fehlerklärungszeit

Summe aus Auslösezeit des Schutzsystems und der Ausschaltzeit (Ausschaltzeit des Leistungsschalters

nach Bild 1) des Schnittstellenschalters
3.15
Inselnetzbildung

Situation, in der ein Teil des Netzes, das Erzeugung enthält, vom öffentlichen Verteilungsnetz oder vom Netz

des Kunden physikalisch getrennt wird und eine oder mehrere Erzeugungseinheit(en) die Versorgung des

abgeschalteten Netzes aufrechterhalten
3.16
trennen

sicherheitsbedingte Abtrennung der gesamten elektrischen Anlage oder von Teilen davon, von jeglicher

elektrischen Energiequelle
3.17
Inselnetzerkennung
(en: Loss of Mains) LoM
Funktion die erkennt, wenn sich der Kleinerzeuger im Inselnetzzustand befindet
3.18
Niederspannung
Spannung, bei welcher der Effektivwert der Nennspannung U ≤ 1 kV ist
3.19
Kleinerzeuger

Quelle elektrischer Energie mit allen zugehörigen Schnittstellen und mit Nennströmen bis maximal 16 A je

Phase, die mit einen regulären Stromkreis in einer Niederspanungsanlage verbunden werden kann und so

ausgelegt ist, dass sie parallel zu einem öffentlichen Niederspannungsnetz betrieben werden kann

[Quelle: IEV 442617-04-10, modifiziert – Der Inhalt einer Anmerkung zum Begriff wird am Ende der

vorliegenden Definition aufgenommen.]
---------------------- Page: 11 ----------------------
SIST EN 50438:2014
EN 50438:2013 10
3.20
Kleinerzeugungsanlage

elektrische Anlage mit einem oder mehreren Kleinerzeugern, mit Nennströmen, die in Summe 16 A je Phase

nicht überschreiten
3.21
Nennspannung

Spannungswert, mit dem ein Versorgungsnetz gekennzeichnet oder identifiziert wird und auf den gewisse

Betriebseigenschaften bezogen werden
3.22
Mitteilung

Vorgang der Benachrichtigung des VNB über die Inbetriebnahme oder Außerbetriebnahme einer Kleiner-

zeugers
3.23
Arbeitswert

Wert der Eingangserregungsgröße (oder der charakteristischen Größe), bei dem ein Messrelais arbeitet

Anmerkung 1 zum Begriff: Siehe auch Bild 1.

[Quelle: IEV 447-02-10, modifiziert – Anmerkung 1 zum Begriff mit dem Querverweis zu Bild 1 wurde

hinzugefügt.]
3.24
Netzanschlusspunkt
POC

Stelle, an der die Erzeugungsanlage an ein öffentliche Verteilungsnetz angeschlossen ist

3.25
Gütefaktor
Maß für die Resonanzstärke der Last für die Inselnetz-Prüfung

Anmerkung 1 zum Begriff: In einem Parallelschwingkreis, wie die Last in einem Stromversorgungssystem, gilt:

QR=
Dabei Q ist der Gütefaktor;
R ist der Wirkwiderstand der Last;
C ist die Kapazität der Last (einschließlich Shunt-Kondensatoren);
L ist die Induktivität der Last.

Wenn L und C auf die Grundfrequenz des Netzes abgestimmt sind, der Resonanzkreis die Wirkleistung P, die

Blindleistungen Q für die induktive Last und Q für die kapazitive Last aufnimmt, kann Q bestimmt werden:

L c f
 
Q = Q  Q
 
fCL
 
Dabei P ist die Wirkleistung in W;
Q ist die induktive Last in VAr ;
L L
Q ist die kapazitive Last in VAr .
C C
3.26
Leistungsfaktor

bei periodischen Bedingungen Verhältnis des Betrags der Wirkleistung P zur Scheinleistung S

---------------------- Page: 12 ----------------------
SIST EN 50438:2014
11 EN 50438:2013
λ =

Anmerkung 1 zum Begriff: Unter sinusförmigen Bedingungen ist der Leistungsfaktor der Betrag des Wirkfaktors.

[Quelle: IEV 131-11-46]
3.27
einfache elektrische Trennung

Trennung zwischen elektrischen Stromkreisen oder zwischen einem elektrischen Stromkreis und örtlicher

Erde durch Basisisolierung
[Quelle: IEV 826-12-28]
3.28
stationäres Brennstoffzellen-Energiesystem

Energiewandlungsssystem, das ein Brennstoffzellenmodul verwendet, um elektrische Arbeit und Wärme zu

erzeugen und das fest an einem Ort fixiert ist

[Quelle: IEC/TS 62282-1:2010, 3.49 und 3.49.3, modifiziert – die beiden ursprünglichen Definitionen wurden

zusammengefasst.]
3.29
Lasttrennschalter

Lastschalter, der in der offenen Stellung die für einen Trennschalter festgelegten Anforderungen erfüllt

[Quelle: IEV 441-14-12]
3.30
Anwender

Person, die für die Gebäude, in denen der Kleinerzeuger errichtet ist, verantwortlich ist; an anderer Stelle

auch als Kunde, Verbraucher oder Netznutzer bezeichnet
4 Technische Anforderungen
4.1 Elektrische Anlage
4.1.1 Allgemeines

Elektrische Niederspannungsanlagen müssen nationalen und örtlichen Rechts- und Verwaltungsvorschriften

entsprechen.
Bei jeglicher Fehlfunktion der Geräte ist eine Netzabschaltung erforderlich.

ANMERKUNG Nur solche Hardware-Fehlfunktion sind zu berücksichtigen, die für die Einhaltung der

Kleinerzeugeranlagen mit dieser Norm relevant sind.
4.1.2 Überstromschutz

Die Kleinerzeugungsanlage muss nach der Reihe HD 60364 gegen Überströme geschützt sein. Bei der Aus-

wahl des Überstromschutzes innerhalb einer Hausinstallation ist es notwendig, dass die korrekte Selektivität

mit den Schutzeinrichtungen des VNB sichergestellt ist.
4.1.3 Erdung

Die Erdung muss nach HD 60364-5-551 und den relevanten nationalen Normen erfolgen.

Wenn ein Kleinerzeuger parallel mit dem Verteilungsnetz arbeitet, darf keine direkte Verbindung zwischen

der Generatorwicklung (oder Pol der Primärenergiequelle im Falle eines gleichstromgespeisten Kleinerzeu-

---------------------- Page: 13 ----------------------
SIST EN 50438:2014
EN 50438:2013 12

gers) und dem Erdungsanschlusspunkt des VNB existieren. Bei Anlagen, bei denen der Kunde seinen Er-

dungsanschlusspunkt selbst bereitstellt, z. B. bei Anschluss an ein TT-System, ist es ebenfalls ratsam, eine

Verbindung zwischen der Generatorwicklung und diesem Erdungsanschlusspunkt zu vermeiden.

ANMERKUNG Durch diese Vorsichtsmaßnahme sollen Schäden am Generator bei einem Fehler im Verteilungsnetz

verhindert und eine korrekte Funktion der Schutzeinrichtungen sichergestellt werden.

Bei einem Kleinerzeuger, der für den Parallelbetrieb mit einem Verteilungsnetz ausgelegt ist und der über

einen Wechselrichter ange
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.