IEC 62382:2012 describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. This standard is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). This second edition cancels and replaces the first edition published in 2006 and constitutes a technical revision. The main changes with respect to the previous edition are: The definition of the documents mentioned in the standards is in accordance with IEC 62708: Documents for Electrical and Instrumentation Projects in the Process Industry. Subclause 6.3 has been revised.

  • Standard
    42 pages
    English and French language
    sale 15% off

IEC 62381:2012 defines the procedures and specifications for the Factory Acceptance Test (FAT), the Site Acceptance Test (SAT), and the Site Integration Test (SIT). These tests are carried out to prove that the automation system is in accordance with the specification. The description of activities given in this standard can be taken as a guideline and adapted to the specific requirements of the process, plant or equipment. This second edition cancels and replaces the first edition published in 2006. This edition constitutes a technical revision. The main changes with respect to the previous edition are: The definition of the documents mentioned in this standard is in accordance with future IEC 62708.

  • Standard
    80 pages
    English and French language
    sale 15% off

IEC 62337:2012 defines specific phases and milestones in the commissioning of electrical, instrumentation and control systems in the process industry. By way of example, it describes activities following the "completion-of-erection" milestone of the project and prior to the "acceptance-of-the-plant" phase by the owner. Such activities need to be adapted for each type of process/plant concerned. This second edition cancels and replaces the first edition published in 2006. This edition constitutes a technical revision. The main changes with respect to the previous edition is: the definition of the documents mentioned in this standard is in accordance with future IEC 62708. The contents of the corrigendum of December 2012 have been included in this copy.

  • Standard
    70 pages
    English and French language
    sale 15% off