IEC 60143-2:2012 covers protective equipment for series capacitor banks, with a size larger than 10 Mvar per phase. Protective equipment is defined as the main circuit apparatus and ancillary equipment, which are part of a series capacitor installation, but which are external to the capacitor part itself. The recommendations for the capacitor part are given in IEC 60143-1:2004. The protective equipment is mentioned in Clause 3 and 10.6 of IEC 60143-1:2004. This second edition cancels and replaces the first edition published in 1994. It constitutes a technical revision. The main changes with respect to the previous edition are:
- updated with respect to new and revised component standards;
- updates with respect to technology changes. Outdated technologies have been removed, i.e. series capacitors with dual self-triggered gaps. New technologies have been added, i.e. current sensors instead of current transformers;
- the testing of spark gaps has been updated to more clearly specify requirements and testing procedures. A new bypass making current test replaces the old discharge current test;
- Clause 5, Guide, has been expanded with more information about different damping circuits and series capacitor protections. Keywords: protective equipment for series capacitor banks

  • Standard
    232 pages
    English and French language
    sale 15% off
  • Standard
    112 pages
    English and French language
    sale 15% off

IEC 60143-4:2010 specifies testing of thyristor controlled series capacitor (TCSC) installations used in series with transmission lines. This standard also addresses issues that consider ratings for TCSC thyristor valve assemblies, capacitors, and reactors as well as TCSC control characteristics, protective features, cooling system and system operation. This part of IEC 60143 is to be used in conjonction with the following standards: IEC 60143-1:2004, IEC 60143-2:1994 and IEC 60143-3:1998.

  • Standard
    109 pages
    English and French language
    sale 15% off