Control systems in the process industry - Electrical and instrumentation loop check

Leittechnische Systeme in der verfahrenstechnischen Industrie - PLT-Stellenprüfung

Systèmes de commande dans l’industrie de transformation - Contrôle de boucle des circuits électriques et des appareillages

Krmilni sistemi v procesni industriji - Preverjanje električnih in merilnih zank

General Information

Status
Not Published
Publication Date
02-Mar-2025
Current Stage
4060 - Enquiry results established and sent to TC, SR, BTTF - Enquiry
Start Date
03-Nov-2023
Completion Date
03-Nov-2023

Relations

Buy Standard

Draft
prEN IEC 62382:2023
English language
25 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

SLOVENSKI STANDARD
oSIST prEN IEC 62382:2023
01-oktober-2023
Nadzorni sistemi v procesni industriji - Preverjanje električnih in merilnih zank
Control systems in the process industry - Electrical and instrumentation loop check
Leittechnische Systeme in der verfahrenstechnischen Industrie - PLT-Stellenprüfung
Systèmes de commande pour les procédés industriels - Contrôle de boucle des circuits
électriques et des appareillages
Ta slovenski standard je istoveten z: prEN IEC 62382:2023
ICS:
25.040.40 Merjenje in krmiljenje Industrial process
industrijskih postopkov measurement and control
oSIST prEN IEC 62382:2023 en,fr,de
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------
oSIST prEN IEC 62382:2023

---------------------- Page: 2 ----------------------
oSIST prEN IEC 62382:2023

65E/1024/CDV

COMMITTEE DRAFT FOR VOTE (CDV)
PROJECT NUMBER:
IEC 62382 ED3
DATE OF CIRCULATION: CLOSING DATE FOR VOTING:
2023-08-11 2023-11-03
SUPERSEDES DOCUMENTS:
65E/930/CD, 65E/998/CC

IEC SC 65E : DEVICES AND INTEGRATION IN ENTERPRISE SYSTEMS
SECRETARIAT: SECRETARY:
United States of America Mr Donald (Bob) Lattimer
OF INTEREST TO THE FOLLOWING COMMITTEES: PROPOSED HORIZONTAL STANDARD:


Other TC/SCs are requested to indicate their interest, if
any, in this CDV to the secretary.
FUNCTIONS CONCERNED:
EMC ENVIRONMENT QUALITY ASSURANCE SAFETY
SUBMITTED FOR CENELEC PARALLEL VOTING NOT SUBMITTED FOR CENELEC PARALLEL VOTING
Attention IEC-CENELEC parallel voting
The attention of IEC National Committees, members of
CENELEC, is drawn to the fact that this Committee Draft
for Vote (CDV) is submitted for parallel voting.
The CENELEC members are invited to vote through the
CENELEC online voting system.
This document is still under study and subject to change. It should not be used for reference purposes.
Recipients of this document are invited to submit, with their comments, notification of any relevant patent rights of
which they are aware and to provide supporting documentation.
Recipients of this document are invited to submit, with their comments, notification of any relevant “In Some
Countries” clauses to be included should this proposal proceed. Recipients are reminded that the CDV stage is the
final stage for submitting ISC clauses. (SEE AC/22/2007 OR NEW GUIDANCE DOC).

TITLE:
Control systems in the process industry - Electrical and instrumentation loop check

PROPOSED STABILITY DATE: 2027

NOTE FROM TC/SC OFFICERS:

Copyright © 2023 International Electrotechnical Commission, IEC. All rights reserved. It is permitted to download this
1
electronic file, to make a copy and to print out the content for the sole purpose of preparing National Committee positions.

You may not copy or "mirror" the file or printed version of the document, or any part of it, for any other purpose without
permission in writing from IEC.

---------------------- Page: 3 ----------------------
oSIST prEN IEC 62382:2023
IEC CDV 62382 © IEC:2023 – 3 –
2 FOREWORD . 4
3 INTRODUCTION . 6
4 1 Scope . 7
5 1.1 General applicability . 7
6 1.2 Exclusions . 7
7 2 Normative references . 8
8 3 Terms, definitions, abbreviated terms and acronyms . 8
9 3.1 Terms and definitions . 8
10 3.2 Abbreviated terms - for terms not otherwise defined. 11
11 4 Loop check schedule . 11
12 5 Loop check content . 12
13 5.1 Included activities . 12
14 5.2 Excluded activities . 13
15 6 Loop check procedure . 13
16 6.1 Loop check planning .
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.