Communication networks and systems for power utility automation - Part 10: Conformance testing

Kommunikationsnetze und -systeme in Stationen - Teil 10: Konformitätsprüfung

Réseaux et systèmes de communication pour l'automatisation des systèmes électriques - Partie 10: Essais de conformité

Komunikacijska omrežja in sistemi za avtomatizacijo porabe električne energije - 10. del: Preskušanje skladnosti - Dopolnilo A1

General Information

Status
Not Published
Publication Date
20-Jul-2025
Current Stage
4060 - Enquiry results established and sent to TC, SR, BTTF - Enquiry
Start Date
22-Mar-2024
Completion Date
22-Mar-2024

Relations

Buy Standard

Draft
EN 61850-10:2013/oprA1:2024
English language
76 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

SLOVENSKI STANDARD
SIST EN 61850-10:2013/oprA1:2024
01-marec-2024
Komunikacijska omrežja in sistemi za avtomatizacijo porabe električne energije -
10. del: Preskušanje skladnosti - Dopolnilo A1
Communication networks and systems for power utility automation - Part 10:
Conformance testing
Kommunikationsnetze und -systeme in Stationen - Teil 10: Konformitätsprüfung
Réseaux et systèmes de communication pour l'automatisation des systèmes électriques
- Partie 10: Essais de conformité
Ta slovenski standard je istoveten z: EN 61850-10:2013/prA1:2023
ICS:
29.240.30 Krmilna oprema za Control equipment for electric
elektroenergetske sisteme power systems
33.200 Daljinsko krmiljenje, daljinske Telecontrol. Telemetering
meritve (telemetrija)
SIST EN 61850-10:2013/oprA1:2024 en
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------
SIST EN 61850-10:2013/oprA1:2024

---------------------- Page: 2 ----------------------
SIST EN 61850-10:2013/oprA1:2024
57/2628/CDV

COMMITTEE DRAFT FOR VOTE (CDV)
PROJECT NUMBER:
IEC 61850-10/AMD1 ED2
DATE OF CIRCULATION: CLOSING DATE FOR VOTING:
2023-12-29 2024-03-22
SUPERSEDES DOCUMENTS:
57/2607/RR

IEC TC 57 : POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE
SECRETARIAT: SECRETARY:
Germany Mr Heiko Englert
OF INTEREST TO THE FOLLOWING COMMITTEES: PROPOSED HORIZONTAL STANDARD:


Other TC/SCs are requested to indicate their interest, if any, in
this CDV to the secretary.
FUNCTIONS CONCERNED:
EMC ENVIRONMENT QUALITY ASSURANCE SAFETY
SUBMITTED FOR CENELEC PARALLEL VOTING NOT SUBMITTED FOR CENELEC PARALLEL VOTING
Attention IEC-CENELEC parallel voting
The attention of IEC National Committees, members of
CENELEC, is drawn to the fact that this Committee Draft for Vote
(CDV) is submitted for parallel voting.
The CENELEC members are invited to vote through the
CENELEC online voting system.

This document is still under study and subject to change. It should not be used for reference purposes.
Recipients of this document are invited to submit, with their comments, notification of any relevant patent rights of which they are
aware and to provide supporting documentation.
Recipients of this document are invited to submit, with their comments, notification of any relevant “In Some Countries” clauses to
be included should this proposal proceed. Recipients are reminded that the CDV stage is the final stage for submitting ISC clauses.
(See AC/22/2007 or NEW GUIDANCE DOC).

TITLE:
Amendment 1 – Communication networks and systems for power utility automation – Part 10: Conformance
testing

PROPOSED STABILITY DATE: 2025

NOTE FROM TC/SC OFFICERS:
In addition to this Amendment, the working group has as well prepared a so-called consolidated edition 2.1 based on
the amendment and the existing Ed.2. The document with the consolidated version is circulated in parallel to this CDV
as 57/2629/INF so that national committees can see the implications of the amendment to the existing edition. After
the complete CDV/FDIS approval process the consolidated edition will be published together with the amendment under
reference IEC 61850-10, Ed.2.1.
When preparing their comments, National Committees are kindly asked to refer to the line numbers in the consolidated
version for simplicity.

Copyright © 2023 International Electrotechnical Commission, IEC. All rights reserved. It is permitted to download this
electronic file, to make a copy and to print out the content for the sole purpose of preparing National Committee positions.
You may not copy or "mirror" the file or printed version of the document, or any part of it, for any other purpose without
permission in writing from IEC.

---------------------- Page: 3 ----------------------
SIST EN 61850-10:2013/oprA1:2024
57/2628/CDV – 2 – 61850-10:2012/AMD1 © IEC 2023
Document history

Any person intervening in the present document is invited to complete the table below before
sending the document elsewhere. The purpose is to allow all actors to see all changes
introduced and the intervening persons.

Any important message to IEC editors should also be included in the table below.

Name of Document received Brief description of the Document sent
intervening  changes introduced
person From Date To Date
Ch. Brunner R. 4.8.23 Added this first page; sent document to N. 23.10.23
Schimmel secretary Heidger










This table will be removed by IEC editors before FDIS circulation (in case of IS) or before final
publication (in case of TS or TR).

---------------------- Page: 4 ----------------------
SIST EN 61850-10:2013/oprA1:2024
61850-10:2012/AMD1 © IEC 2023 – 3 – 57/2628/CDV
INTERNATIONAL ELECTROTECHNICAL COMMISSION
____________

COMMUNICATION NETWORKS AND SYSTEMS
FOR POWER UTILITY AUTOMATION –
Pa
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.