EN 61850-4:2011
(Main)Communication networks and systems for power utility automation - Part 4: System and project management
Communication networks and systems for power utility automation - Part 4: System and project management
IEC 61850-4:2011 applies to projects associated with process near automation systems of power utilities (UAS, utility automation system), like e.g. substation automation systems (SAS). It defines the system and project management for UAS systems with communication between intelligent electronic devices (IEDs) in the substation respective plant and the related system requirements. This second edition constitutes a technical revision to align the document more closely with the other parts of the IEC 61850 series, in addition to enlarging the scope from substation automation systems to all utility automation systems. This publication is of core relevance for Smart Grid.
Kommunikationsnetze und -systeme in Stationen - Teil 4: System- und Projektverwaltung
Réseaux et systèmes de communication pour l'automatisation des systèmes électriques - Partie 4: Gestion du système et gestion de projet
La CEI 61850-4:2011 s'applique à des projets associés aux procédés proches des systèmes d'automatisation des compagnies d'électricité (UAS), par exemple les systèmes d'automatisation de poste (SAS). Elle définit la gestion du système et la gestion de projet pour les systèmes UAS avec communication entre des dispositifs électroniques intelligents (IED) dans le poste ou le site ainsi que les exigences concernant les systèmes associés. La présente seconde édition constitue une révision technique avec des détails plus proches des autres parties de la série de Normes CEI 61850. Le domaine d'application porte non seulement sur les systèmes d'automatisation de poste, mais aussi sur tous les systèmes d'automatisation pour les compagnies d'électricité. This publication is of core relevance for Smart Grid.
Komunikacijska omrežja in sistemi za avtomatizacijo porabe električne energije - 4. del: Sistemsko in projektno upravljanje
Ta del IEC 61850 velja za projekte, povezane s sistemi za skoraj popolno avtomatizacijo porabe električne energije (UAS, sistem za avtomatizacijo porabe), kot so na primer sistemi avtomatizacije razdelilnih postaj (SAS). Opredeljuje sisteme in projektno upravljanje za sisteme UAS s komunikacijo med inteligentnimi elektronskimi napravami (IED) v inštalaciji ustrezne razdelilne postaje in povezane sistemske zahteve. Specifikacije v tem delu se nanašajo na sistem in projektno upravljanje glede na: - inženirski proces in podporna orodja; - življenjski cikel celotnega sistema in njegovih IED; - zagotavljanje kakovosti, ki se začne v fazi razvoja in konča s prenehanjem delovanja in umikom iz obratovanja UAS in njegovih IED. Opisane so zahteve za sistem in proces projektnega upravljanja in za posebna podporna orodja za inženiring ter preskušanje.
General Information
Relations
Standards Content (Sample)
SLOVENSKI STANDARD
01-september-2011
.RPXQLNDFLMVNDRPUHåMDLQVLVWHPL]DDYWRPDWL]DFLMRSRUDEHHOHNWULþQHHQHUJLMH
GHO6LVWHPVNRLQSURMHNWQRXSUDYOMDQMH
Communication networks and systems for power utility automation - Part 4: System and
project management
Kommunikationsnetze und -systeme in Stationen - Teil 4: System- und Projektverwaltung
Réseaux et systèmes de communication pour l'automatisation des systèmes électriques
- Partie 4: Gestion du système et gestion de projet
Ta slovenski standard je istoveten z: EN 61850-4:2011
ICS:
29.240.30 Krmilna oprema za Control equipment for electric
elektroenergetske sisteme power systems
33.200 Daljinsko krmiljenje, daljinske Telecontrol. Telemetering
meritve (telemetrija)
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
EUROPEAN STANDARD
EN 61850-4
NORME EUROPÉENNE
June 2011
EUROPÄISCHE NORM
ICS 33.200 Supersedes EN 61850-4:2002
English version
Communication networks and systems for power utility automation -
Part 4: System and project management
(IEC 61850-4:2011)
Réseaux et systèmes de communication Kommunikationsnetze und -systeme in
pour l'automatisation des systèmes Stationen -
électriques - Teil 4: System- und Projektverwaltung
Partie 4: Gestion du système et gestion de (IEC 61850-4:2011)
projet
(CEI 61850-4:2011)
This European Standard was approved by CENELEC on 2011-05-16. CENELEC members are bound to comply
with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard
the status of a national standard without any alteration.
Up-to-date lists and bibliographical references concerning such national standards may be obtained on
application to the Central Secretariat or to any CENELEC member.
This European Standard exists in three official versions (English, French, German). A version in any other
language made by translation under the responsibility of a CENELEC member into its own language and notified
to the Central Secretariat has the same status as the official versions.
CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus,
the Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy,
Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia,
Spain, Sweden, Switzerland and the United Kingdom.
CENELEC
European Committee for Electrotechnical Standardization
Comité Européen de Normalisation Electrotechnique
Europäisches Komitee für Elektrotechnische Normung
Management Centre: Avenue Marnix 17, B - 1000 Brussels
© 2011 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members.
Ref. No. EN 61850-4:2011 E
Foreword
The text of document 57/1103/FDIS, future edition 2 of IEC 61850-4, prepared by IEC TC 57, Power
systems management and associated information exchange, was submitted to the IEC-CENELEC
parallel vote and was approved by CENELEC as EN 61850-4 on 2011-05-16.
This European Standard supersedes EN 61850-4:2002.
It constitutes a technical revision to align the document more closely with the other parts of the EN 61850
series, in addition to enlarging the scope from substation automation systems to all utility automation
systems.
Attention is drawn to the possibility that some of the elements of this document may be the subject of
patent rights. CEN and CENELEC shall not be held responsible for identifying any or all such patent
rights.
The following dates were fixed:
– latest date by which the EN has to be implemented
at national level by publication of an identical
(dop) 2012-02-16
national standard or by endorsement
– latest date by which the national standards conflicting
(dow) 2014-05-16
with the EN have to be withdrawn
Annex ZA has been added by CENELEC.
__________
Endorsement notice
The text of the International Standard IEC 61850-4:2011 was approved by CENELEC as a European
Standard without any modification.
In the official version, for Bibliography, the following notes have to be added for the standards indicated:
IEC 61850-10 NOTE Harmonized as EN 61850-10.
ISO 9001:2008 NOTE Harmonized as EN ISO 9001:2008 (not modified).
__________
- 3 - EN 61850-4:2011
Annex ZA
(normative)
Normative references to international publications
with their corresponding European publications
The following referenced documents are indispensable for the application of this document. For dated
references, only the edition cited applies. For undated references, the latest edition of the referenced
document (including any amendments) applies.
NOTE When an international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD
applies.
Publication Year Title EN/HD Year
IEC 60848 - GRAFCET specification language for EN 60848 -
sequential function charts
IEC 61082 Series Preparation of documents used in EN 61082 Series
electrotechnology
IEC 61175 - Industrial systems, installations and EN 61175 -
equipment and industrial products -
Designation of signals
IEC 61850-6 - Communication networks and systems for EN 61850-6 -
power utility automation -
Part 6: Configuration description language for
communication in electrical substations
related to IEDs
IEC 61850-7 Series Communication networks and systems for EN 61850-7 Series
power utility automation -
Part 7: Basic information and communication
structure
IEC 81346 Series Industrial systems, installations and EN 81346 Series
equipment and industrial products -
Structuring principles and reference
designations
IEC 81346-1 - Industrial systems, installations and EN 81346-1 -
equipment and industrial products -
Structuring principles and reference
designations -
Part 1: Basic rules
IEC 81346-2 - Industrial systems, installations and EN 81346-2 -
equipment and industrial products -
Structuring principles and reference
designations -
Part 2: Classification of objects and codes for
classes
IEC 61850-4 ®
Edition 2.0 2011-04
INTERNATIONAL
STANDARD
NORME
INTERNATIONALE
Communication networks and systems for power utility automation –
Part 4: System and project management
Réseaux et systèmes de communication pour l'automatisation des systèmes
électriques –
Partie 4: Gestion du système et gestion de projet
INTERNATIONAL
ELECTROTECHNICAL
COMMISSION
COMMISSION
ELECTROTECHNIQUE
PRICE CODE
INTERNATIONALE
CODE PRIX W
ICS 33.200 ISBN 978-2-88912-439-8
– 2 – 61850-4 © IEC:2011
CONTENTS
FOREWORD . 4
1 Scope . 6
2 Normative references. 6
3 Terms and definitions . 7
4 Abbreviations . 10
5 Engineering requirements . 11
5.1 Overview . 11
5.2 Categories and types of parameters . 12
5.2.1 Classification . 12
5.2.2 Parameter categories . 13
5.2.3 Parameter types . 14
5.3 Engineering tools . 15
5.3.1 Engineering process . 15
5.3.2 System specification tool . 17
5.3.3 System configuration tool . 17
5.3.4 IED configuration tool. 18
5.3.5 Documentation tool . 19
5.4 Flexibility and expandability . 19
5.5 Scalability . 20
5.6 Automatic project documentation . 20
5.6.1 General . 20
5.6.2 Hardware documentation . 22
5.6.3 Parameter documentation . 22
5.6.4 Requirements of the documentation tool . 23
5.7 Standard documentation . 23
5.8 System integrator's support . 24
6 System life cycle . 24
6.1 Requirements of product versions . 24
6.2 Announcement of product discontinuation . 26
6.3 Support after discontinuation . 26
7 Quality assurance . 27
7.1 Division of responsibility . 27
7.1.1 General . 27
7.1.2 Responsibility of the manufacturer and system integrator . 27
7.1.3 Responsibility of the customer. 29
7.2 Test equipment . 29
7.2.1 General . 29
7.2.2 Normal process test equipment . 29
7.2.3 Transient and fault test equipment . 29
7.2.4 Communication test equipment . 30
7.3 Classification of quality tests . 30
7.3.1 Basic test requirements . 30
7.3.2 System test . 30
7.3.3 Type test . 31
7.3.4 Routine test . 32
7.3.5 Conformance test . 32
61850-4 © IEC:2011 – 3 –
7.3.6 Factory Acceptance Test (FAT) . 32
7.3.7 Site Acceptance Test (SAT) . 32
Annex A (informative) Announcement of discontinuation (example) . 34
Annex B (informative) Delivery obligations after discontinuation (example) . 35
Bibliography . 36
Figure 1 – Structure of the UAS and its environment . 11
Figure 2 – Structure of UAS and IED parameters . 13
Figure 3 – Engineering tasks and their relationship . 16
Figure 4 – IED configuration process . 18
Figure 5 – Project related documentation of UAS . 21
Figure 6 – Two meanings of the system life cycle . 25
Figure 7 – Stages of quality assurance – Responsibility of manufacturer and system
integrator . 27
Figure 8 – Contents of system test . 30
Figure 9 – Contents of type test . 31
Figure 10 – Contents of routine test .
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.