ISO 12576-2:2008
(Main)Thermal insulation products — Conformity control systems — Part 2: In-situ products
Thermal insulation products — Conformity control systems — Part 2: In-situ products
ISO 12576-2:2008 establishes three systems for the conformity control of thermal insulating products that are manufactured on-site from components produced in a factory and provides the minimum requirements for each system. Examples of these types of products are loose fill and spray-applied insulations. The purpose of ISO 12576-2:2008 is to provide uniform methods to determine whether the production of a thermal-insulating product is acceptable as conforming to the relevant specification requirements once it is installed on site.
Produits isolants thermiques — Systèmes de contrôle de la conformité — Partie 2: Produits fabriqués sur place
General Information
Standards Content (Sample)
INTERNATIONAL ISO
STANDARD 12576-2
First edition
2008-07-01
Thermal insulation products —
Conformity control systems —
Part 2:
In-situ products
Produits isolants thermiques — Systèmes de contrôle de la
conformité —
Partie 2: Produits fabriqués sur place
Reference number
ISO 12576-2:2008(E)
ISO 2008
---------------------- Page: 1 ----------------------
ISO 12576-2:2008(E)
PDF disclaimer
This PDF file may contain embedded typefaces. In accordance with Adobe's licensing policy, this file may be printed or viewed but
shall not be edited unless the typefaces which are embedded are licensed to and installed on the computer performing the editing. In
downloading this file, parties accept therein the responsibility of not infringing Adobe's licensing policy. The ISO Central Secretariat
accepts no liability in this area.Adobe is a trademark of Adobe Systems Incorporated.
Details of the software products used to create this PDF file can be found in the General Info relative to the file; the PDF-creation
parameters were optimized for printing. Every care has been taken to ensure that the file is suitable for use by ISO member bodies. In
the unlikely event that a problem relating to it is found, please inform the Central Secretariat at the address given below.
COPYRIGHT PROTECTED DOCUMENT© ISO 2008
All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any form or by any means,
electronic or mechanical, including photocopying and microfilm, without permission in writing from either ISO at the address below or
ISO's member body in the country of the requester.ISO copyright office
Case postale 56 • CH-1211 Geneva 20
Tel. + 41 22 749 01 11
Fax + 41 22 749 09 47
E-mail copyright@iso.org
Web www.iso.org
Published in Switzerland
ii © ISO 2008 – All rights reserved
---------------------- Page: 2 ----------------------
ISO 12576-2:2008(E)
Contents Page
Foreword............................................................................................................................................................ iv
1 Scope ......................................................................................................................................................1
2 Normative references ............................................................................................................................1
3 Terms and definitions ...........................................................................................................................2
4 Conformity systems, their elements and recommended application of the systems....................3
5 Factory production control...................................................................................................................6
6 Site installation control .........................................................................................................................6
7 Certification of factory production control and of site quality control ............................................8
8 Sampling...............................................................................................................................................12
Bibliography ......................................................................................................................................................13
© ISO 2008 – All rights reserved iii---------------------- Page: 3 ----------------------
ISO 12576-2:2008(E)
Foreword
ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies
(ISO member bodies). The work of preparing International Standards is normally carried out through ISO
technical committees. Each member body interested in a subject for which a technical committee has been
established has the right to be represented on that committee. International organizations, governmental and
non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely with the
International Electrotechnical Commission (IEC) on all matters of electrotechnical standardization.
International Standards are drafted in accordance with the rules given in the ISO/IEC Directives, Part 2.
The main task of technical committees is to prepare International Standards. Draft International Standards
adopted by the technical committees are circulated to the member bodies for voting. Publication as an
International Standard requires approval by at least 75 % of the member bodies casting a vote.
Attention is drawn to the possibility that some of the elements of this document may be the subject of patent
rights. ISO shall not be held responsible for identifying any or all such patent rights.
ISO 12576-2 was prepared by Technical Committee ISO/TC 163, Thermal performance and energy use in the
built environment, Subcommittee SC 3, Thermal insulation products.ISO 12576 consists of the following parts, under the general title Thermal insulation products — Conformity
control systems:⎯ Part 1: Factory-made products
⎯ Part 2: In-situ products
iv © ISO 2008 – All rights reserved
---------------------- Page: 4 ----------------------
INTERNATIONAL STANDARD ISO 12576-2:2008(E)
Thermal insulation products — Conformity control systems —
Part 2:
In-situ products
1 Scope
This part of ISO 12576 establishes three systems for the conformity control of thermal insulation products that
are manufactured on site from components produced in a factory, and provides the minimum requirements for
each system. Examples of these types of products are loose fill and spray-applied insulations.
The purpose of this part of ISO 12576 is to provide uniform methods to determine whether the production of a
thermal insulation product is acceptable as conforming to the relevant specification requirements once it is
installed on site.2 Normative references
The following referenced documents are indispensable for the application of this document. For dated
references, only the edition cited applies. For undated references, the latest edition of the referenced
document (including any amendments) applies.ISO/IEC Guide 65, General requirements for bodies operating product certification systems
ISO 9229, Thermal insulation — VocabularyISO 12576-1, Thermal insulation — Insulating materials and products for buildings — Conformity control
systems — Part 1: Factory-made productsISO 17020, General criteria for the operation of various types of bodies performing inspection
ISO 17021, Conformity assessment — Requirements for bodies providing audit and certification of
management systemsISO 17024, Conformity assessment — General requirements for bodies operating certification of persons
ISO 17025, General requirements for the competence of testing and calibration laboratories
ISO 17050-1, Conformity assessment — Supplier's declaration of conformity — Part 1: General requirements
© ISO 2008 – All rights reserved 1---------------------- Page: 5 ----------------------
ISO 12576-2:2008(E)
3 Terms and definitions
For the purpose of this document, the terms and definitions given in ISO 9229 and the following apply.
3.1certification organization
organization that conducts certification of conformity and is accredited by an appropriate body, possessing the
necessary competence and reliability to operate a certification system in accordance with International
Standards in which the interests of all parties concerned with the functioning of the system are represented
NOTE A certification organization may operate its own testing and inspection activities or oversee these activities
carried out on its behalf by other bodies.3.2
conformity control
performance of control methods to prove whether a product can be accepted as conforming to specified
requirements3.3
inspection lot
definite quantity of packages (product items) manufactured under conditions that are presumed uniform, and
that are submitted for inspection and accepted or rejected as a whole, depending on the quality found by
inspection of a representative sample drawn from the lot3.4
manufacturer's declaration of conformity
action by which a manufacturer declares under his own responsibility, by means of a “declaration of
conformity” that the product is in conformity with the specification, without being under procedures of a third-
party certification systemSee ISO 17050-1.
3.5
qualified contractor
individual, organization or corporation who/that has the knowledge required for installing the material, who/that
is responsible for the installation of the material and who/that has the contractual obligations for the installation
3.6qualified installer
individual who has proper knowledge of the installation requirements and who installs the material on site to
form the final product3.7
specification
document defining requirements for performance of the product
3.8
third party
person or body that is recognized as being independent of the parties involved with respect to the issues in
question3.9
third-party certification
certification provided by a person or body that is recognized as being independent of the parties involved the
certificationSee ISO 17000.
3.10
verification
validation by a third party, independent of the manufacturer, of the manufacturer's declaration of conformity
2 © ISO 2008 – All rights reserved---------------------- Page: 6 ----------------------
ISO 12576-2:2008(E)
4 Conformity systems, their elements and recommended application of the systems
4.1 General
In this specification, the following three systems for attestation of conformity are described:
⎯ system A: qualified contractor's self-declaration of conformity in accordance with ISO 17050-1, based on
the installer's documented installation procedures and internal quality control and initial type testing of the
product by the manufacturer, without any participation of a third party to the ongoing surveillance of
factory production or site installation;⎯ system B: qualified contractor's declaration of conformity, based on the installer's documented installation
procedures and internal quality control and initial type testing of the components by a laboratory
accredited in accordance with ISO 17025, where both the manufacturer's quality control and the installer's
quality control has been certified initially by a third party; there is ongoing surveillance for the factory
production control but not for the site installation;⎯ system C: installed product certification by a certification organization in accordance with ISO 17021 and
ISO/IEC Guide 65, based on the installer's documented installation procedures and internal quality
control and initial type testing of the components by a laboratory accredited in accordance with
ISO 17025, where both the manufacturer's quality control and the installer's quality control has been
certified initially by a third party; the certification organization certifies the installer in accordance with
ISO 17024 and ongoing surveillance site audits are conducted on a regular basis by the certification
organization accredited in accordance with ISO 17020.NOTE Systems B and C have a progressive increase in third-party involvement in the conformity control system.
4.2 System A — Declaration of conformity by a qualified contractor — Initial type testing of
manufacturer's product, manufacturer's internal quality control and qualified contractor's
internal site quality controlThis system is based on the following elements:
a) manufacturer's responsibilities:
⎯ factory production control;
⎯ having initial type testing of the components completed by the manufacturer;
b) qualified contractor's responsibilities:
⎯ self-declaration of conformity following requirements outlined in ISO 17050-1;
⎯ document site quality-control programme;
c) qualified installer's responsibilities:
⎯ documented installation procedures;
⎯ ongoing site inspection and testing by the installer;
⎯ daily work records by the installer;
d) certification organization:
⎯ none.
© ISO 2008 – All rights reserved 3
---------------------- Page: 7 ----------------------
ISO 12576-2:2008(E)
By the qualified contractor's declaration of conformity, the contractor verifies that the installation is under a site
quality-control program and that the results of the site quality-control program show that the installed products
are in conformity with the product specification and any applicable installation standards.
4.3 System B — Declaration of conformity by an installer — Initial type testing of
manufacturer's product by a third party, third-party verification of factory production control,
verification of a qualified contractor's site quality-control program and site quality control by
a qualified contractorThis system is based on the following elements:
a) manufacturer's responsibilities:
⎯ factory production control;
⎯ having initial type testing of the components completed by a laboratory accredited in accordance with
ISO 17025;b) qualified contractor's responsibilities:
⎯ document site quality-control program;
c) qualified installer's responsibilities:
⎯ documented installation procedures;
⎯ ongoing site inspection and testing by the installer;
⎯ daily work records by the installer;
d) certification organization, in accordance with ISO 17021 and ISO/IEC Guide 65:
⎯ testing laboratory accredited in accordance with ISO 17025;⎯ initial inspection of factory production control;
⎯ ongoing surveillance audits of factory production control;
⎯ initial inspection of the qualified contractor's installation procedures, site quality-control program,
installer's site inspection, installer's site testing procedures and daily work record.
By the qualified contractor's declaration of conformity, the qualified contractor verifies that the installation is
under a site quality-control program that has been verified by a third party and that the results of the site
quality-control program show that the installed product is in conformity with the product specification and any
installation standards. The qualified contractor also declares that the factory production control has been
verified and is being monitored by a certification organization. Certification bodies shall be in accordance with
ISO 17021 and be accredited by an accreditation body that is member of the IAF/ILAC Multilateral Agreement.
4 © ISO 2008 – All rights reserved---------------------- Page: 8 ----------------------
ISO 12576-2:2008(E)
4.4 System C — Declaration of conformity by a third party — Initial type testing of
manufacturer's product by a third party, third-party verification of factory production control,
verification of a qualified contractor's site quality-control program and site quality control by
a third partyThis system is based on the following elements:
a) manufacturer's responsibilities:
⎯ factory production control;
⎯ initial type testing of the components completed by a laboratory accredited in accordance with
ISO 17025;b) qualified contractor's responsibilities:
⎯ document site quality-control program;
c) qualified installer's responsibilities:
⎯ documented installation procedures;
⎯ ongoing site inspection and testing by the installer;
⎯ daily work records by the installer;
d) certification organization, in accordance ISO 17021 and ISO/IEC Guide 65:
⎯ testing laboratory accredited in accordance with ISO 17025;
⎯ initial inspection of factory production control;
⎯ ongoing surveillance audits of factory production control;
⎯ initial inspection of the qualified contractor's installation procedures, site quality-control program,
installer's site inspection, installer's site testing procedures and daily work record;
⎯ development of a certification scheme in accordance with ISO 17024;⎯ routine certified installer audits to provide surveillance, assessment and approval of the ongoing
in-situ product installation (routine inspections) in accordance with ISO 17020.By the certification organization's declaration of conformity, the certification organization verifies that the
installation is under a site quality-control program that has been verified and is monitored on an ongoing basis
by a third party and that the results of the site quality-control program show that the installed products are in
conformity with the product specification and any installation standards. Certification bodies shall be in
conformance with ISO 17021 and be accredited by an accreditation body that is member of the IAF/ILAC
Multilateral Agreement. The certification organization also declares that the factory production control has
been verified and is being monitored. The certification organization for the factory production control may be a
different organization from the certification organization for the site quality-assurance program; however, the
certification organization for the site quality-assurance program shall be consistent with that for the factory
production control program.© ISO 2008 – All rights reserved 5
---------------------- Page: 9 ----------------------
ISO 12576-2:2008(E)
5 Factory production control
The purpose of the control is to ensure the products produced conform to the material specification. Factory
production control requirements shall be in accordance with ISO 12576-1. The manufacturer shall choose and
document which system in accordance with ISO 12576-1 is being followed. The manufacturer shall meet the
factory-production-control and certification-organization-monitoring outline in any one of the three systems.
For material that takes its final form on a construction site, this part of ISO 12576 specifies the requirements to
ensure that the products produced conform to the material specification.6 Site installation control
6.1 General
The purpose of the site installation quality control is to ensure that the in-situ products conform to the product
specification and that they have been installed in accordance with the appropriate installation standard(s) and
in accordance with the product manufacturer's instructions. Site installation quality control, as defined in
Clause 6, is the most important element of each of the three systems defined in ISO 12576-1 for the
attestation of conformity.Site installation quality control includes the operational techniques and measures necessary to maintain and
regulate the quality of the installed product. It consists of continuous process monitoring, inspections and tests
by the installer and the utilization of their results with regard to equipment settings, products used, processes
of installation, and the installed product itself, and by taking account of the corresponding requirements given
by the product specification.All equipment and personnel required to carry out the necessary inspections and tests ind
...