kSIST FprEN IEC 63522-14:2024
(Main)Electrical relays - Tests and Measurements - Part 7-14: Mould growth
Electrical relays - Tests and Measurements - Part 7-14: Mould growth
Elektrische Relais - Mess- und Prüfverfahren – Teil 14: Schimmelpilzwachstum
Relais électriques - Essais et mesurages - Partie 14: Moisissures
Električni releji - Preskusi in meritve - 7-14. del: Rast plesni
General Information
Standards Content (Sample)
SLOVENSKI STANDARD
oSIST prEN IEC 61810-7-14:2023
01-oktober-2023
Električni releji - Preskusi in meritve - 7-14. del: Rast plesni
Electrical relays - Tests and Measurements - Part 7-14: Mould growth
Ta slovenski standard je istoveten z: prEN IEC 61810-7-14:2023
ICS:
29.120.70 Releji Relays
oSIST prEN IEC 61810-7-14:2023 en
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.
oSIST prEN IEC 61810-7-14:2023
oSIST prEN IEC 61810-7-14:2023
94/936/CDV
COMMITTEE DRAFT FOR VOTE (CDV)
PROJECT NUMBER:
IEC 61810-7-14 ED1
DATE OF CIRCULATION: CLOSING DATE FOR VOTING:
2023-08-18 2023-11-10
SUPERSEDES DOCUMENTS:
94/791/NP, 94/907/RVN
IEC TC 94 : ELECTRICAL RELAYS
SECRETARIAT: SECRETARY:
Austria Mr Bernhard Spalt
OF INTEREST TO THE FOLLOWING COMMITTEES: PROPOSED HORIZONTAL STANDARD:
Other TC/SCs are requested to indicate their interest, if any,
in this CDV to the secretary.
FUNCTIONS CONCERNED:
EMC ENVIRONMENT QUALITY ASSURANCE SAFETY
SUBMITTED FOR CENELEC PARALLEL VOTING NOT SUBMITTED FOR CENELEC PARALLEL VOTING
Attention IEC-CENELEC parallel voting
The attention of IEC National Committees, members of
CENELEC, is drawn to the fact that this Committee Draft for
Vote (CDV) is submitted for parallel voting.
The CENELEC members are invited to vote through the
CENELEC online voting system.
This document is still under study and subject to change. It should not be used for reference purposes.
Recipients of this document are invited to submit, with their comments, notification of any relevant patent rights of which t hey
are aware and to provide supporting documentation.
Recipients of this document are invited to submit, with their comments, notification of any relevant “In Some Countries” clau ses
to be included should this proposal proceed. Recipients are reminded that the CDV stage is the fina l stage for submitting ISC
clauses. (SEE AC/22/2007 OR NEW GUIDANCE DOC).
TITLE:
Electrical relays – Tests and Measurements – Part 7-14: Mould growth
PROPOSED STABILITY DATE: 2025
NOTE FROM TC/SC OFFICERS:
electronic file, to make a copy and to print out the content for the sole purpose of preparing National Committee positions.
You may not copy or "mirror" the file or printed version of the document, or any part of it, for any other purpose without
permission in writing from IEC.
oSIST prEN IEC 61810-7-14:2023
– 2 – IEC CDV 61810-7-14:2023 © IEC 2023
1 CONTENTS
2 FOREWORD . 3
3 1 Scope . 5
4 2 Normative references . 5
5 3 Terms and definitions . 5
6 4 Test procedure . 5
7 5 Evaluation . 6
8 Annex T (informative) Test report. 7
9 Bibliography . 8
oSIST prEN IEC 61810-7-14:2023
IEC CDV 61810-7-14:2023 © IEC 2023 – 3 –
11 INTERNATIONAL ELECTROTECHNICAL COMMISSION
12 ____________
14 ELECTRICAL RELAYS –
15 Tests and measurements
17 Part 7-14: Mould growth
19 FOREWORD
20 1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising
21 all national electrotechnical committees (IEC National Committees). The object of IEC is to promote international
22 co-operation on all questions concerning standardization in the electrical and electronic fields. To this end and
23 in addition to other activities, IEC publishes International Standards, Technical Specifications, Technical Reports,
24 Publicly Available Specifications (PAS) and Guides (hereafter referred to as "IEC Publication(s)"). Their
25 preparation is entrusted to technical committees; any IEC National Committee interested in the subject dealt with
26 may participate in this preparatory work. International, governmental and non-governmental organizations liaising
27 with the IEC also participate in this preparation. IEC collaborates closely with the International Org anization for
28 Standardization (ISO) in accordance with conditions determined by agreement between the two organizations.
29 2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international
30 consensus of opinion on the relevant subjects since each technical committee has representation from all
31 interested IEC National Committees.
32 3) IEC Publications have the form of recommendations for international use and are accepted by IEC National
33 Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC
34 Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any
35 misinterpretation by any end user.
36 4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications
37 transparently to the maximum extent possible in their national and regional publications. Any divergence between
38 any IEC Publication and the corresponding national or regional publication shall be clearly indicated in the latter.
39 5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity
40 assessment services and, in some areas, access to IEC marks of conformity. IEC is not responsib le for any
41 services carried out by independent certification bodies.
42 6) All users should ensure that they have
...
Questions, Comments and Discussion
Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.