Digital cellular telecommunications system (Phase 2) (GSM); Mobile Station (MS) conformance specification; Part 1: Conformance specification; (GSM 11.10-1 version 4.28.1)

CRs SMG#31

Digitalni celični telekomunikacijski sistem (faza 2) - Specifikacija skladnosti mobilne postaje (MS) - 1. del: Specifikacija skladnosti (GSM 11.10-1, različica 4.28.1)

General Information

Status
Published
Publication Date
31-Jan-2005
Current Stage
6060 - National Implementation/Publication (Adopted Project)
Start Date
01-Feb-2005
Due Date
01-Feb-2005
Completion Date
01-Feb-2005
Mandate
Standard
SIST ETS 300 607-1 E15:2005
English language
1585 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)


SLOVENSKI STANDARD
01-februar-2005
'LJLWDOQLFHOLþQLWHOHNRPXQLNDFLMVNLVLVWHP ID]D 6SHFLILNDFLMDVNODGQRVWL
PRELOQHSRVWDMH 06 GHO6SHFLILNDFLMDVNODGQRVWL *60UD]OLþLFD

Digital cellular telecommunications system (Phase 2) (GSM); Mobile Station (MS)
conformance specification; Part 1: Conformance specification; (GSM 11.10-1 version
4.28.1)
Ta slovenski standard je istoveten z: ETS 300 607-1 Edition 15
ICS:
33.070.50 Globalni sistem za mobilno Global System for Mobile
telekomunikacijo (GSM) Communication (GSM)
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

EUROPEAN ETS 300 607-1
TELECOMMUNICATION August 2000
STANDARD Fifthteenth Edition
Source: SMG Reference: RE/SMG-071110PRD-1
ICS: 33.020
Key words: Digital cellular telecommunications system, Global System for Mobile communications (GSM)
R
GLOBAL SYSTEM FOR
MOBILE COMMUNICATIONS
Digital cellular telecommunications system (Phase 2);
Mobile Station (MS) conformance specification;
Part 1: Conformance specification;
(GSM 11.10-1 version 4.28.1)
ETSI
European Telecommunications Standards Institute
ETSI Secretariat
Postal address: F-06921 Sophia Antipolis CEDEX - FRANCE
Office address: 650 Route des Lucioles - Sophia Antipolis - Valbonne - FRANCE
Internet: secretariat@etsi.fr - http://www.etsi.org
Tel.:+334 92944200- Fax:+334 93 654716
Copyright Notification: No part may be reproduced except as authorized by written permission. The copyright and the
foregoing restriction extend to reproduction in all media.
© European Telecommunications Standards Institute 2000. All rights reserved.

Page 2
ETS 300 607-1 (GSM 11.10-1 version 4.28.1): August 2000
Whilst every care has been taken in the preparation and publication of this document, errors in content,
typographical or otherwise, may occur. If you have comments concerning its accuracy, please write to
"ETSI Standards Making Support Dept." at the address shown on the title page.

Page 3
ETS 300 607-1 (GSM 11.10-1 version 4.28.1): August 2000
Contents
Foreword .25
1 Scope .27
2 Normative references.27
3 Definitions, conventions, and applicability .33
3.1 Mobile station definition and configurations.33
3.2 Applicability.33
3.2.1 Applicability of this specification.33
3.2.2 Applicability of the individual tests.34
3.2.3 Applicability to terminal equipment.55
3.3 Definitions .56
3.4 Conventions for mathematical notations .56
3.4.1 Mathematical signs.56
3.4.2 Powers to the base 10.56
3.5 Conventions on electrical terms.56
3.5.1 Radio Frequency (RF) input signal level.56
3.5.2 Reference sensitivity level.57
3.5.3 Power level of fading signal .57
3.6 Terms on test conditions.57
3.6.1 Radio test conditions.57
4 Test Equipment .58
4.1 Terms used to describe test equipment in this ETS.58
4.2 Functional requirements of test equipment .58
5 Testing methodology in general (layers 1, 2, and 3).58
5.1 Testing of optional functions and procedures.58
5.2 Test interfaces and facilities .58
5.3 Different protocol layers.59
5.4 Information to be provided by the apparatus supplier .59
5.5 Definitions of transmit and receive times.59
6 Reference test methods. .60
6.1 General .60
6.2 Choice of frequencies in the frequency hopping mode .60
6.3 "Ideal" radio conditions .60
6.4 Standard test signals. .60
6.5 Power (control) levels. .60
7 Implicit testing.61
8 Measurement uncertainty.61
9 Format of tests .61
10 Generic call set up procedures .62
10.1 Generic call set-up procedure for mobile terminating speech calls.62
10.2 Generic call set-up procedure for mobile originating speech calls .67
10.3 Generic call set-up procedure for mobile terminating data calls .70
10.4 Generic call set-up procedure for mobile originating data calls.73
11 General tests.77
11.1 Verification of support and non-support of services (multiple numbering scheme or
ISDN) .77

Page 4
ETS 300 607-1 (GSM 11.10-1 version 4.28.1): August 2000
11.1.1 Mobile Terminated (MT) calls . 77
11.1.2 Mobile Originated (MO) calls . 78
11.2 Verification of support of the single numbering scheme . 79
11.3 Verification of non-support of services (Advice of Charge Charging (AoCC)). 80
11.4 Verification of non-support of services (call hold) . 81
11.5 Verification of non-support of services (multiparty). 82
11.6 Verification of non-support of feature (Fixed Dialling Number (FDN)). 83
11.7 IMEI Security. 84
11.8 Coding of the Bearer Capability information element . 85
11.8.1 Network to MS Direction. 86
11.8.1.1 BS 21 to 26 - Asynchronous Service . 86
11.8.1.1.1 BS 21. 86
11.8.1.1.2 BS 22. 90
11.8.1.1.3 BS 24. 90
11.8.1.1.4 BS 25. 90
11.8.1.1.5 BS 26. 90
11.8.1.1.6 BS 23. 90
11.8.1.2 BS 31 to 34 - Synchronous Service. 91
11.8.1.2.1 BS 32. 91
11.8.1.2.2 BS 31. 95
11.8.1.2.3 BS 33. 96
11.8.1.2.4 BS 34. 96
11.8.1.3 BS 61 - Alternate Speech / Data. 96
11.8.1.3.1 Speech/Asynchronous Data,
Transparent. 97
11.8.1.3.2 Speech/Asynchronous Data, Non
Transparent. 99
11.8.1.3.3 Speech/Synchronous Data . 101
11.8.1.4 BS 81 - Speech followed by Data . 102
11.8.1.4.1 Speech followed by Asynchronous
Data. 102
11.8.1.4.2 Speech followed by Synchronous
Data. 102
11.8.1.5 TS 61 - Alternate Speech / Facsimile group 3. 102
11.8.1.5.1 TS 61 - Alternate Speech / Facsimile
group 3, Transparent. 103
11.8.1.5.2 TS 61 - Alternate Speech / Facsimile
group 3, Non-Transparent. 104
11.8.1.6 TS 62 - Automatic Facsimile group 3. 105
11.8.2 MS to SS direction. 105
11.8.2.1 BS 21 to 26 - Asynchronous Service . 105
11.8.2.1.1 BS 21. 106
11.8.2.1.2 BS 22. 110
11.8.2.1.3 BS 24. 110
11.8.2.1.4 BS 25. 110
11.8.2.1.5 BS 26. 110
11.8.2.1.6 BS 23. 110
11.8.2.2 BS 31 to 34 - Synchronous Service. 111
11.8.2.2.1 BS 32. 111
11.8.2.2.2 BS 31. 115
11.8.2.2.3 BS 33. 116
11.8.2.2.4 BS 34. 116
11.8.2.3 BS 41 to 46 - PAD Access Asynchronous . 117
2)
11.8.2.3.1 BS 41 . 117
11.8.2.3.2 BS 42. 118
11.8.2.3.3 BS 44. 119
11.8.2.3.4 BS 45. 119
11.8.2.3.5 BS 46. 119
11.8.2.3.6 BS 43. 119
11.8.2.4 BS 51 to 53 - Packet Service Synchronous. 120
2)
11.8.2.4.1 BS 51 . 120
11.8.2.4.2 BS 52. 120
11.8.2.4.3 BS 53. 120

Page 5
ETS 300 607-1 (GSM 11.10-1 version 4.28.1): August 2000
11.8.2.5 BS 61 - Alternate Speech / Data .121
11.8.2.5.1 Speech/Asynchronous Data,
Transparent.121
11.8.2.5.2 Speech/Asynchronous Data, Non
Transparent.124
11.8.2.5.3 Speech/Synchronous Data.126
11.8.2.6 BS 81 - Speech followed by Data.127
11.8.2.6.1 Speech followed by Asynchronous
Data .127
11.8.2.6.2 Speech followed by Synchronous
Data .127
11.8.2.7 TS 61 - Alternate Speech / Facsimile group 3.127
11.8.2.7.1 TS 61 - Alternate Speech / Facsimile
group 3, Transparent .128
11.8.2.7.2 TS 61 - Alternate Speech / Facsimile
group 3, Non Transparent.129
11.8.2.8 TS 62 - Automatic Facsimile group 3 .130
11.8.2.9 TS 11 and TS 12- Speech.130
11.8.2.9.1 Support of only full/half rate speech
version 1 .130
11.8.2.9.2 Support of speech full rate version 2
(Enhanced Full Rate).130
12 Transceiver.132
12.1 Conducted spurious emissions.132
12.1.1 MS allocated a channel.132
12.1.2 MS in idle mode.133
12.2 Radiated spurious emissions.135
12.2.1 MS allocated a channel.135
12.2.2 MS in idle mode.137
13 Transmitter .140
13.1 Frequency error and phase error.140
13.2 Frequency error under multipath and interference conditions.143
13.3 Transmitter output power and burst timing .145
13.4 Output RF spectrum .152
13.5 Intermodulation attenuation .158
14 Receiver .160
14.1 Bad frame indication .166
14.1.1 Bad frame indication - TCH/FS .166
14.1.1.1 Bad frame indication - TCH/FS - Random RF input.166
14.1.1.2 Bad frame indication - TCH/FS - Frequency hopping and
downlink DTX.167
14.1.2 Bad frame indication - TCH/HS.168
14.1.2.1 Bad frame indication - TCH/HS - Random RF input.168
14.1.2.2 Bad frame indication - TCH/HS - Frequency hopping and
downlink DTX.169
14.1.3 Bad frame indication - TCH/FS - Frequency hopping and downlink DTX -
Phase 2 MS in a phase 1 network .170
14.1.4 Bad frame indication - TCH/HS - Frequency hopping and downlink DTX -
Phase 2 MS in a phase 1 network .172
14.2 Reference sensitivity.175
14.2.1 Reference sensitivity - TCH/FS.175
14.2.2 Reference sensitivity - TCH/HS (Speech frames).177
14.2.3 Reference sensitivity - FACCH/F .180
14.2.4 Reference sensitivity - FACCH/H.181
14.2.5 Reference sensitivity - full rate data channels .182
14.2.6 Reference sensitivity - half rate data channels .183
14.2.7 Reference sensitivity - TCH/EFS .184
14.3 Usable receiver input level range .186
14.4 Co-channel rejection.187
14.4.1 Co-channel rejection - TCH/FS. .187

Page 6
ETS 300 607-1 (GSM 11.10-1 version 4.28.1): August 2000
14.4.2 Co-channel rejection - TCH/HS . 189
14.4.3 Co-channel rejection - TCH/HS (SID frames) . 191
14.4.4 Co-channel rejection - FACCH/F. 193
14.4.5 Co-channel rejection - FACCH/H . 194
14.4.6 Co-channel rejection - TCH/EFS. . 195
14.5 Adjacent channel rejection. 196
14.5.1 Adjacent channel rejection - speech channels . 196
14.5.2 Adjacent channel rejection - control channels. 199
14.6 Intermodulation rejection. 201
14.6.1 Intermodulation rejection - speech channels. 201
14.6.2 Intermodulation rejection - control channels. 203
14.7 Blocking and spurious response . 204
14.7.1 Blocking and spurious response - speech channels . 204
14.7.2 Blocking and spurious response - control channels . 207
14.8 AM suppression . 211
14.8.1 AM suppression - speech channels. 211
14.8.2 AM suppression - control channels . 212
14.9 Paging performance at high input levels. 214
15 Timing advance and absolute delay. 216
16 Reception time tracking speed . 218
17 Access times during handover . 220
17.1 Intra cell channel change . 220
17.2 Inter cell handover. 222
18 Temporary reception gaps. 225
19 Channel release after unrecoverable errors. 227
19.1 Channel release after unrecoverable errors -1 . 227
19.2 Channel release after unrecoverable errors - 2 . 228
19.3 Channel release after unrecoverable errors - 3 . 229
20 Cell selection and reselection. 231
20.1 Cell selection. 232
20.2 Cell selection with varying signal strength values. 234
20.3 Basic cell reselection. 236
20.4 Cell reselection using TEMPORARY_OFFSET, CELL_RESELECT_OFFSET,
POWER_OFFSET and PENALTY_TIME parameters. 238
20.5 Cell reselection using parameters transmitted in the System Information type 2bis,
type 2ter, type 7 and type 8 messages. . 240
20.6 Cell reselection timings . 242
20.7 Priority of cells. 244
20.8 Cell reselection when C1 (serving cell) < 0 for 5 seconds. 245
20.9 Running average of the surrounding cell BCCH carrier signal levels . 246
20.10 Running average of the serving cell BCCH carrier signal level . 247
20.11 Updating the list of six strongest neighbour carriers and decoding the BCCH
information of a new carrier on the list . 249
20.12 Decoding the BCCH information of the neighbour carriers on the list of six strongest
neighbour carriers . 250
20.13 Decoding the BSIC of the neighbour carriers on the list of six strongest neighbour
carriers . 251
20.14 Emergency calls. 252
20.15 Cell reselection due to MS rejection "LA not allowed" . 253
20.16 Downlink signalling failure. 255
20.17 Cell selection if no suitable cell found in 10 s . 256
20.18 Cell reselection due to MS rejection "Roaming not allowed in this LA" . 257
20.19 Cell selection on release of SDCCH and TCH. 258
20.20 Multiband cell selection and reselection . 260
20.20.1 Multiband cell selection and reselection / Cell Selection. 260
20.20.2 Multiband cell selection and reselection / Cell reselection . 262

Page 7
ETS 300 607-1 (GSM 11.10-1 version 4.28.1): August 2000
21 Received signal measurements.264
21.1 Signal strength.264
21.2 Signal strength selectivity .267
21.3 Signal quality under static conditions .268
21.3.1 Signal quality under static conditions - TCH/FS.268
21.3.2 Signal quality under static conditions - TCH/HS .270
21.4 Signal quality under TU50 propagation conditions.272
22 Transmit power control timing and confirmation .275
23 Single frequency reference .276
24 Tests of the layer 1 signalling functions .277
25 Tests of the layer 2 signalling functions .278
25.1 Introduction, objective and scope .278
25.1.1 General.278
25.1.2 Test configurations .278
25.1.3 Pre-conditions .278
25.1.4 Layer 2 test frames.279
25.1.5 Establishment of the dedicated physical resource.279
25.1.6 Release of the dedicated physical resource .280
25.2 Test sequences.280
25.2.1 Initialization.281
25.2.1.1 Initialization when contention resolution required.281
25.2.1.1.1 Normal initialization.281
25.2.1.1.2 Initialization failure .282
25.2.1.1.3 Initialization denial .285
25.2.1.1.4 Total initialization failure .286
25.2.1.2 Initialization, contention resolution not required .287
25.2.1.2.1 Normal initialization without
contention resolution.287
25.2.1.2.2 Initialization failure .288
25.2.1.2.3 Initialization denial .289
25.2.1.2.4 Total initialization failure .290
25.2.2 Normal information transfer.291
25.2.2.1 Sequence counting and I frame acknowledgements .291
25.2.2.2 Receipt of an I frame in the timer recovery state.294
25.2.2.3 Segmentation and concatenation.296
25.2.3 Normal layer 2 disconnection.299
25.2.4 Test of link failure .299
25.2.4.1 I frame loss (MS to SS) .299
25.2.4.2 RR response frame loss (SS to MS) .301
25.2.4.3 RR response frame loss (MS to SS) .301
25.2.5 Test of frame transmission with incorrect C/R values.302
25.2.5.1 I frame with C bit set to zero.302
25.2.5.2 SABM frame with C bit set to zero .303
25.2.6 Test of errors in the control field.304
25.2.6.1 N(S) sequence error .304
25.2.6.2 N(R) sequence error.306
25.2.6.3 Improper F bit .307
25.2.7 Test on receipt of invalid frames .307
26 Testing of layer 3 functions .312
26.1 Default conditions and structured sequence of tests.312
26.1.1 Default test conditions during layer 3 tests .312
26.1.2 Structured sequence of the tests .313
26.1.3 General rules for message parameters.314
26.1.4 General rules for layer 3 testing .314
26.1.5 Format of layer 3 test descriptions .314
26.2 Initial tests.316
26.2.1 Channel request.316
26.2.1.1 Channel request / initial time .316

Page 8
ETS 300 607-1 (GSM 11.10-1 version 4.28.1): August 2000
26.2.1.2 Channel request / repetition time. 317
26.2.1.3 Channel request / random reference . 319
26.2.2 IMSI detach and IMSI attach . 320
26.2.3 Sequenced MM / CM message transfer. 324
26.2.4 Establishment cause. 325
26.3 Test of MS functions in idle mode. 333
26.3.1 Initial conditions . 333
26.3.2 MS indication of available PLMNs . 335
26.3.3 MS will send only if BSS is "on air". 336
26.3.4 Manual mode of PLMN selection. 336
26.4 Lower layer failures in layer 3 testing. 338
26.4.1 Introduction . 338
26.4.2 Layer 1 reception failures . 338
26.4.3 Data link layer failures . 338
26.4.4 Lower layer failures, used for the tests in clause 25 . 338
26.5 Handling of unknown, unforeseen, and erroneous protocol data, and of parallel
transactions. 339
26.5.1 Handling of unknown, unforeseen, and erroneous protocol data, and of
parallel transactions / unknown protocol discriminator. 339
26.5.2 Handling of unknown, unforeseen, and erroneous protocol data, and of
parallel transactions / TI and skip indicator . 340
26.5.2.1 TI and skip indicator / RR. 340
26.5.2.1.1 TI and skip indicator / RR / Idle Mode 340
26.5.2.1.2 TI and skip indicator / RR / RR-
Connection established. 341
26.5.2.2 TI and skip indicator / MM. 342
26.5.2.3 TI and skip indicator / CC. 344
26.5.3 Handling of unknown, unforeseen, and erroneous protocol data, and of
parallel transactions / undefined or unexpected message type . 346
26.5.3.1 Undefined or unexpected message type / undefined
message type / CC . 346
26.5.3.2 Undefined or unexpected message type / undefined
message type / MM. 347
26.5.3.3 Undefined or unexpected message type / undefined
message type / RR . 349
26.5.3.4 Undefined or unexpected message type / unexpected
message type / CC . 350
26.5.4 Handling of unknown, unforeseen, and erroneous protocol data, and of
parallel transactions / unforeseen information elements in the non-
imperative message part . 351
26.5.4.1 Unforeseen information elements in the non-imperative
message part / duplicated information elements . 351
26.5.5 Handling of unknown, unforeseen, and erroneous protocol data, and of
parallel transactions / non-semantical mandatory IE errors . 353
26.5.5.1 Non-semantical mandatory IE errors / RR. 353
26.5.5.1.1 Non-semantical mandatory IE errors /
RR / missing mandatory IE error. 353
26.5.5.1.2 Non-semantical mandatory IE errors /
RR / comprehension required . 355
26.5.5.2 Non-semantical mandatory IE errors / MM . 356
26.5.5.2.1 Non-semantical mandatory IE errors /
MM / syntactically incorrect
mandatory IE. 356
26.5.5.2.2 Non-semantical mandatory IE errors /
MM / syntactically incorrect
mandatory IE. 357
26.5.5.2.3 Non-semantical mandatory IE errors /
MM / comprehension required . 359
26.5.5.3 Non-semantical mandatory IE errors / CC. 361
26.5.5.3.1 Non-semantical mandatory IE errors /
CC / missing mandatory IE . 361
26.5.5.3.2 Non-semantical mandatory IE errors /
CC / comprehension required . 363

Page 9
ETS 300 607-1 (GSM 11.10-1 version 4.28.1): August 2000
26.5.6 Handling of unknown, unforeseen, and erroneous protocol data, and of
parallel transactions / unknown IE, comprehension not required .364
26.5.6.1 Unknown information elements in the non-imperative
message part / MM.364
26.5.6.1.1 Unknown IE, comprehension not
required / MM / IE unknown in the
protocol .364
26.5.6.1.2 Unknown IE, comprehension not
required / MM / IE unknown in the
message .366
26.5.6.2 Unknown information elements in the non-imperative
message part / CC.367
26.5.6.2.1 Unknown information elements in the
non-imperative message part / CC /
Call establishment .367
26.5.6.2.2 Unknown information elements in the
non-imperative message part / CC /
disconnect.368
26.5.6.2.3 Unknown information elements in the
non-imperative message part / CC /
release .369
26.5.6.2.4 Unknown information elements in the
non-imperative message part / CC /
release complete .370
26.5.6.3 Unknown IE in the non-imperative message part,
comprehension not required / RR.371
26.5.7 Handling of unknown, unforeseen, and erroneous protocol data, and of
parallel transactions / spare bits.373
26.5.7.1 Spare bits / RR .373
26.5.7.1.1 Spare bits / RR / paging channel.373
26.5.7.1.2 Spare bits / RR / BCCH .374
26.5.7.1.3 Spare bits / RR / AGCH .376
26.5.7.1.4 Spare bits / RR / Connected Mode.378
26.5.7.2 Spare bits / MM .380
26.5.7.3 Spare bits / CC .381
26.5.8 Default contents of messages.384
26.6 Test of the elementary procedures for radio resource management .387
26.6.1 Immediate assignment .387
26.6.1.1 Immediate assignment / SDCCH or TCH assignment .387
26.6.1.2 Immediate assignment / extended assignment.388
26.6.1.3 Immediate assignment / assignment rejection .391
26.6.1.4 Immediate assignment / ignore assignment.392
26.6.1.5 Immediate assignment after immediate assignment reject394
26.6.2 Test of paging.395
26.6.2.1 Normal paging .395
26.6.2.1.1 Paging / normal / type 1.395
26.6.2.1.2 Paging / normal / type 2.398
26.6.2.1.3 Paging / normal / type 3.400
26.6.2.2 Paging / extended.401
26.6.2.3 Paging / reorganization.405
26.6.2.3.1 Paging / reorganization / procedure 1 405
26.6.2.3.2 Paging / reorganization / procedure 2 408
26.6.2.4 Paging / same as before.409
26.6.2.5 Paging / multislot CCCH.410
26.6.3 Test of measurement report.411
26.6.3.1 Measurement / no neighbours.412
26.6.3.2 Measurement / all neighbours present .415
26.6.3.3 Measurement / barred cells and non-permitted NCCs.419
26.6.3.4 Measurement / DTX .424
26.6.3.5 Measurement / Frequency Formats .428
26.6.3.6 Measurement / multiband environment .432
26.6.4 Test of the channel assignment procedure.437
26.6.4.1 Dedicated assignment / successful case .437

Page 10
ETS 300 607-1 (GSM 11.10-1 version 4.28.1): August 2000
26.6.4.2 Dedicated assignment / failure. 449
26.6.4.2.1 Dedicated assignment / failure /
failure during active state . 449
26.6.4.2.2 Dedicated assignment / failure /
general case. 451
26.6.5 Test of handover. 452
26.6.5.1 Handover / successful / active call / non-synchronized . 453
26.6.5.2 Handover / successful / call under establishment / non-
synchronized. 468
26.6.5.3 Handover / successful / active call / finely synchronized. 486
26.6.5.4 Handover / successful / call under establishment / finely
synchronized. 491
26.6.5.5 Pre-synchronized handovers . 501
26.6.5.5.1 Handover / successful / active call /
pre-synchronized / Timing Advance IE
not included. 501
26.6.5.5.2 Handover / successful / call being
established / pre-synchronized /
timing advance IE is included /
reporting of observed time difference
requested. . 503
26.6.5.6 Handover / successful / active call / pseudo synchronized505
26.6.5.7 Handover / successful / active call / non-synchronized /
reporting of observed time difference requested. . 507
26.6.5.8 Handover / layer 3 failure. 508
26.6.5.9 Handover / layer 1 failure. 510
26.6.6 Test of frequency redefinition . 511
26.6.6.1 Frequency redefinition . 511
26.6.7 Test of the channel mode modify procedure . 517
26.6.7.1 Test of the channel mode modify procedure / full rate . 517
26.6.7.2 Test of the channel mode modify procedure / half rate . 519
26.6.8 Test of ciphering mode setting . 521
26.6.8.1 Ciphering mode / start ciphering. 522
26.6.8.2 Ciphering mode / no ciphering. 523
26.6.8.3 Ciphering mode / old cipher key . 524
26.6.8.4 Ciphering mode / change of mode, algorithm and key . 526
26.6.8.5 Ciphering mode / IMEISV request . 534
26.6.9 Test of additional assignment. 535
26.6.10 Test of partial release . 535
26.6.11 Test of classmark. 535
26.6.11.1 Classmark change . 535
26.6.11.2 Classmark interrogation . 537
26.6.12 Test of channel release . 539
26.6.12.1 Channel release / SDCCH. 539
26.6.12.2 Channel release / SDCCH - no L2 ACK . 540
26.6.12.3 Channel release / TCH-F. 542
26.6.12.4 Channel release / TCH-F - no L2 ACK . 543
26.6.13 Test of starting time . 544
26.6.13.1 Dedicated assignment with starting time / successful
case / time not elapsed . 546
26.6.13.2 Dedicated assignment with star
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.

Loading comments...