This European Standard provides specifications for two types of variable message signs (VMS); i.e. continuous (see 3.4) and discontinuous (see 3.7).
This European Standard covers mobile, temporary and permanently installed VMS used in circulation areas, on public and private land, including tunnels for the information, guidance, warning and/or direction of traffic. Test modules are used to demonstrate compliance with the requirements.
This European Standard specifies visual and physical characteristics of VMS as well as their durability aspects. It also provides relevant requirements and corresponding test methods, assessment and verification of constancy of performance (AVCP) and marking.
NOTE Provisions for the evaluation of conformity with regards to type testing are further specified in 6.2; provisions with regards to factory production control (FPC) are further specified in 6.3.
This European Standard does not cover
a) sign gantries, cantilevers, posts (supports) and foundations,
b) signal heads,
c) sizes and shapes of VMS messages,
d) control units and monitoring units unless inside the VMS,
e) control of sign luminance.

  • Standard
    121 pages
    English language
    sale 10% off
    e-Library read for
    1 day

This European Standard provides specifications for two types of variable message signs (VMS); i.e. continuous (see 3.4) and discontinuous (see 3.7).
This European Standard covers mobile, temporary and permanently installed VMS used in circulation areas, on public and private land, including tunnels for the information, guidance, warning and/or direction of traffic. Test modules are used to demonstrate compliance with the requirements.
This European Standard specifies visual and physical characteristics of VMS as well as their durability aspects. It also provides relevant requirements and corresponding test methods, assessment and verification of constancy of performance (AVCP) and marking.
NOTE Provisions for the evaluation of conformity with regards to type testing are further specified in 6.2; provisions with regards to factory production control (FPC) are further specified in 6.3.
This European Standard does not cover
a) sign gantries, cantilevers, posts (supports) and foundations,
b) signal heads,
c) sizes and shapes of VMS messages,
d) control units and monitoring units unless inside the VMS,
e) control of sign luminance.

  • Draft
    116 pages
    English language
    sale 10% off
    e-Library read for
    1 day

This European Standard provides specifications for two types of variable message signs (VMS); i.e. continuous (see 3.4) and discontinuous (see 3.7).
This European Standard covers mobile, temporary and permanently installed VMS used in circulation areas, on public and private land, including tunnels for the information, guidance, warning and/or direction of traffic. Test modules are used to demonstrate compliance with the requirements.
This European Standard specifies visual and physical characteristics of VMS as well as their durability aspects. It also provides relevant requirements and corresponding test methods, assessment and verification of constancy of performance (AVCP) and marking.
NOTE   Provisions for the evaluation of conformity with regards to type testing are further specified in 6.2; provisions with regards to factory production control (FPC) are further specified in 6.3.
This European Standard does not cover
a)   sign gantries, cantilevers, posts (supports) and foundations,
b)   signal heads,
c)   sizes and shapes of VMS messages,
d)   control units and monitoring units unless inside the VMS,
e)   control of sign luminance.

  • Standard
    128 pages
    English language
    sale 10% off
    e-Library read for
    1 day

This document specifies the requirements for Factory Production Control (FPC) manufacturers of variable message signs and is designed to be read in conjunction with Part 1.
The requirements described in this document are applicable to the products under the scope of EN 12966-1.
This document specifies which sorts of parameters and tests have to be taken into consideration within the FPC system, but leaves the precise test methods to be applied to be chosen depending on the manufacturer's facilities and production methods. The precise parameters and methods will be found in the manufacturer's written FPC procedures.

  • Standard
    9 pages
    English language
    sale 10% off
    e-Library read for
    1 day

This document specifies the requirements for Initial Type Testing (ITT) and is designed to be read in conjunction with Part 1.

  • Standard
    12 pages
    English language
    sale 10% off
    e-Library read for
    1 day