ASTM D8173-18
(Guide)Standard Guide for Site Preparation, Layout, Installation, and Hydration of Geosynthetic Cementitious Composite Mats
Standard Guide for Site Preparation, Layout, Installation, and Hydration of Geosynthetic Cementitious Composite Mats
SIGNIFICANCE AND USE
4.1 This guide identifies proper layout, installation, and hydration procedures along with equipment for use by GCCM designers, inspectors, and installers.
4.2 Applications—Typical GCCM applications may include but are not limited to:
4.2.1 Hydraulic structure armoring or protection, including but not limited to: ditches, swales, canals, flumes, and other similar structures.
4.2.2 Slope protection.
4.2.3 Berm and bund lining and protection.
4.2.4 Culvert invert lining.
4.2.5 Scour protection at culvert inlets and outlets.
4.2.6 Remediation of existing concrete channels and structures.
4.2.7 Lining of outfalls and spillways.
4.2.8 Mow strips or weed suppression.
SCOPE
1.1 This guide covers directions for the installation of a geosynthetic cementitious composite mat (GCCM) under field conditions typically present in erosion control, hydraulic structure armoring and protection, and protection applications.
1.2 The values in SI units are to be regarded as the standard. Values in inch-pound units are in parentheses for information.
1.3 This guide contains general guidelines. It is not intended to replace project-specific installation requirements. In the event of a conflict between the two, the requirements of the project specifications will supersede the requirements of this guide.
1.4 This is not an all-inclusive guide, and some projects will be beyond the scope of this guide.
1.5 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.
1.6 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
General Information
Standards Content (Sample)
NOTICE: This standard has either been superseded and replaced by a new version or withdrawn.
Contact ASTM International (www.astm.org) for the latest information
Designation: D8173 − 18
Standard Guide for
Site Preparation, Layout, Installation, and Hydration of
1
Geosynthetic Cementitious Composite Mats
This standard is issued under the fixed designation D8173; the number immediately following the designation indicates the year of
original adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. A
superscript epsilon (´) indicates an editorial change since the last revision or reapproval.
1. Scope 2.3 Further information is available on the various GCCMs
from their manufacturers. Individual GCCM manufacturer’s
1.1 This guide covers directions for the installation of a
recommendations may be more detailed with regards to spe-
geosynthetic cementitious composite mat (GCCM) under field
cific applications or details than the information found in this
conditions typically present in erosion control, hydraulic struc-
standard, and should be consulted prior to undertaking any
ture armoring and protection, and protection applications.
installation.
1.2 The values in SI units are to be regarded as the standard.
Values in inch-pound units are in parentheses for information.
3. Terminology
1.3 This guide contains general guidelines. It is not intended
3.1 Definitions:
to replace project-specific installation requirements. In the
3.1.1 bottom layer flap, n—in a GCCM installation, a
event of a conflict between the two, the requirements of the
section of the bottom layer that extends beyond the top layer.
project specifications will supersede the requirements of this
guide.
3.1.2 butt joint, n—in a GCCM installation, a connection of
two separate segments of GCCM where the edges of each
1.4 This is not an all-inclusive guide, and some projects will
segment of GCCM are touching and generally in the same
be beyond the scope of this guide.
plane and may be sealed with a bottom layer flap.
1.5 This standard does not purport to address all of the
safety concerns, if any, associated with its use. It is the 3.1.3 hydration, n—in a GCCM installation, exposure of the
responsibility of the user of this standard to establish appro-
GCCM, in this case, to water in prescribed conditions for a
priate safety, health, and environmental practices and deter- prescribed time.
mine the applicability of regulatory limitations prior to use.
3.1.4 layer, n—in a GCCM installation, the distinct material
1.6 This international standard was developed in accor-
components of which a segment of GCCM material is com-
dance with internationally recognized principles on standard-
posed.
ization established in the Decision on Principles for the
3.1.5 longitudinal layup, n—in a GCCM installation, a
Development of International Standards, Guides and Recom-
deployed position of the GCCM where the material is deployed
mendations issued by the World Trade Organization Technical
in line with the greater length of the structure being lined (that
Barriers to Trade (TBT) Committee.
is, along the length of a channel).
2. Referenced Documents
3.1.6 segment, n—in a GCCM installation, an individual
2
2.1 ASTM Standards:
strip or section of GCCM material.
D4439 Terminology for Geosynthetics
3
2.2 American Concrete Institute Standard: 3.1.7 shingled joint, n—in a GCCM, a connection method of
ACI 306.1 Standard Specification for Cold Weather Concret- two separate segments of GCCM where a length of one
ing segment overlaps on top of an adjacent segment.
3.1.8 transverse layup, n—in a GCCM installation, a de-
1
This guide is under the jurisdiction of ASTM Committee D35 on Geosynthetics
ployed position of the GCCM where the material is deployed
and is the direct responsibility of Subcommittee D35.05 on Geosynthetic Erosion
transverse to the greater length of the structure being lined (that
Control.
Current edition approved Feb. 1, 2018. Published February 2018. Originally is, across the width of a channel).
approved in 2018. DOI: 10.1520/D8173-18.
2
3.1.9 unjointed edge, n—in a GCCM installation, an edge of
For referenced ASTM standards, visit the ASTM website, www.astm.org, or
contact ASTM Customer Service at service@astm.org. For Annual Book of ASTM
the segment of GCCM that is not secured within an anchor
Standards volume information, refer to the standard’s Document Summary page on
trench or sufficiently fixed to provide immediate contact
the ASTM website.
3 between the segment and substrate and to minimize ingress.
Available from American Concrete Institute (ACI), 38800 Country Club Dr.,
Farmington Hills, MI 48331-3439, http://www.concrete.org. Sometimes referred to as “free ends.”
Copyright © ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States
1
---------------------- Page: 1 ----------------------
D8173 − 18
3.2 For definitions of additional
...